The main body includes 4 parts: first combustion chamber, second combu
control circuit.
The fuel oil system consists of one oil tank, two burners, and oil pipeline.
The air system includes: air blower, air pipeline, and four butterfly valves.
Other spare parts consists of bolts, asbestos ropes, steel wire ropes, rubber
rings etc.
and pay attention to the safety.the workers need prepare for the safety
electrician to operate.
Below operation steps depend on 150kg model and the model larger
than 150kg model. As the model smaller than 150kg model, you can
Operation steps:
help of crane. Align the screw holes and tighten the screws. Put the
asbestos ropes seal ring on the second combustion chamber with the
chamber’s door. Align the screw holes and tighten the screws. Then
asbestos ropes in the joint of the chimney, Align the screw holes and
tighten the screws. Cut the steel wire rope into three same length
parts.Fix one end of steel wire rope on the torus of the chimney,then
balance. Align the screw holes and tighten the screws. Fix three steel
3, Put the butterfly valves on the joint of air pipeline. Align the air
butterfly valves to operate easily. Align the screw holes and tighten
the screws. Put the bubber rings on the interface of the air blower and
4, Fix the oil tank on the second combustion chamber with the
screw,connect the oil pipeline and oil filter.The oil pipeline is divided
into up oil outlet pipe and down oil return pipe, connect the exit end
of oil filter with the oil pipeline, connect the entry end with the up of
chamber. Depend on the intructions of the burner and connect the oil
pipeline.
Open the control box on the burner, there are two power wapes from
the control box to the burner, one is connected to the burner power
supply, and the other is connected to the built-in fan power supply
(the built-in fan motor cable has been removed from the burner
junction box)
the mark on the internal interface of control box connect the control
2, All the screws and interfaces has been connected and fixed.
3,The anode and cathode of control circuit and control system are
correct.
1. second burner switch, the main fan switch, first burner inbuilt air
blower button, second burner inbuilt air blower button stop button, First
medical waste into the first combustion chamber,close the door and make
3.Depend on the quantity of the medical waste,Put enough diesel into the
switch of the oil pipeline,check the oil pipeline there is no leakage and
6.Connect the cable with the switch in the control box,connect the anode
1. Flip the switch inside the Control box, red power indicator light
burning circumstances.
2. Turn on the No. 2 burner switch and the upper green indicator
lights up. The built-in fan of the second burner is automatically turned on,
The ignition starts. It’s about 20 seconds for the procedure of successfully
ignition.
Celsius degree. Press the operation button of first burner, the yellow light
on, the built-in fan of the first burner is automatically turned on. watch
the length of the burner flame, then adjust it according to the manual
book.
burning situation, meantime turn on the air blower, control the air force.
2. Press the turn off button of first burner and second burner.
4. Turn off the air blower swift, meantime turn off the air pipeline
5. Turn off the fan of first burner swift,fan of second burner swift
and main air blower, meantime turn off the air pipeline and butterfly
valves.
A. After opening the furnace door, put the garbage into the furnace. The
amount of each input should not exceed 80% of the total volume of the
more than 30 cm from the burner on the right side to prevent blockage.
The resulting poor combustion will reduce the combustion efficiency and
D. The garbage of plastic products should be kept away from the vent as
far as possible to avoid direct combustion that cannot be fully burned out
Before the ignition is started, the bolts of the furnace door should be
tightened to prevent the furnace door from being tightly closed and
B. Before each use, check the amount of oil in the oil tank and open the
oil inlet and return valves. (0# or -10#, -20# light diesel must be used
according to the temperature, otherwise it will block the oil circuit and
the fuel injector due to the dirty fuel, which will cause insufficient
adjusted in time according to the different types of garbage, and the air
starting.
D. Manual mode is adopted for ignition and combustion. Make sure that
E. Do not cut off the power immediately after stopping the furnace. Due
to the high temperature of the furnace at that time, the fan will stop after
the power is cut off, so that the burner cannot be cooled, and the high
temperature will cause the nozzle and the photoresistor of the burner to be
100 degrees Celsius, turn off the built-in small fan and blower of the
burner.
an emergency shutdown.
the rotation of the burner fan to prevent burning of the burner due to high
temperature.
incineration.
I. It is forbidden to open the door when burning garbage and open the
fire to burn personnel and high temperature to burn the burner on the
upper part of the furnace door and cause air pollution due to the outgoing
smoke.
G. When cleaning the ash each time, the temperature of the ash should be
1. When the incinerator is out of service for a long time, the oil circuit
2. Regularly clean the filter screen of the oil cup to avoid clogging.
3. Every 2-3 months, open the dust removal door of the burn-out dust
inside.