Professional Documents
Culture Documents
orange
CERTIFICATE OF ACcOMPLISHMENT
OML NOKIA
SITE ID:
1CRNABOUáDD
SITE NAME
TRINARDuGu_ SAN
STAGE COMPLETE (Initials/Signature)
NOKIA states that the whole of supplies detailed above have been inspected, implemented. tested and unless
atherwise stated contorm to the specified requirements in the contract or order identified above.
tem Data
Site ID
Site Name
2015
Installed by / Date
TERINAoUGDLL
Commissioned by / Date
IL SEM
WILSEH
Integrated by / Date
WILSEN_
PUNCH LIST
Select the correct check number and point to check in Flexi BTS Implementation Check List. Type the
description of point to check and your comments for failure description.
When completed, type what was done.
OML REPRESENTATIVE
s y hajpjoATE 241b4
J u I 3 gu u6
NOKIA REPRESENTATIVE DATE: 24 D e
KHnBBA oRRK
o 5 872