WORK INSPECTION REQUEST

PROJEC NAME: SIDF HQ


WIR # 0 Date : 18-Apr-21
CONTRACTOR: MARCO Received

Project #: SIDF - HQ

Discipline: Architectural Date Ready: 18-Apr-21 Time Ready : 3:00 PM AM / PM

Location: Level 8 Quantity: 0

Closeout ARC-SD-08-DWG-10023
Spec.: Dwg.:

Work to be inspected: :
closure of Architectural punch ID A-50@Level 08( Black groove on Wall and Ceiling not aligned as mention in
the 11th Floor Snag List ) as per attached approved constrution layout drawing

Enclosure:

Contractor QC Engineer Kalidas.M Date 18-Apr-21

Remarks: APPROVED NOT APPROVED APPROVED AS NOTED


Cont.QC Eng. DAH's
S.No. Description Remarks
Sign & Date Sign & Date

Discipline Eng. Date Time

RECEIVED BY CONTRACTOR__________________________ DATE : - ____________________ TIME : - _________

Distribution: TCI-BLUE DAH-WHITE(Originol after InspectioN)YELLOW(Before Inspection) CONTRACTOR-GREEN