You are on page 1of 2

Various Configurations

A comparison is done on a location Comparison of Grounding Resistance Before and


which is located on a hill. As we After Installations of AGE (Individual)
know, to achieve a good ground
reading on a hill is difficult. With the
AGE, getting an improvement in the
ground reading is made possible.

Before Installation of AGE


After Installation of AGE

Leach holes Access well cover

Easy Maintenance
Removable cap for easy refill of
electrolytic salt.

Copper for normal


Excellent Bonding soil conditions and
2’ long, 4/0 AWG pigtail. requirements.
Exothermically welded to body
of Chem-Rod for bonding to
ground grid/ down conductor.

Increases Soil’s Conductivity


Electrolytic salt dissolves and
seeps out of leach holes.

Enhanced Earth/ Electrode Interface


GAF Backfill Optimizes The
Tinned Copper
Conductivity Of Soil Around The
for cathodic
Chem-Rod.
protection systems
and suitable for
corrosive soil
Larger Surface Contact Area conditions/
2 ⅝ inch shaft diameter for requirements.
better connection to earth.

Applications
The AGE improves the effectiveness and reliability of many applications, including:

Lightning protection systems Protection of Electronics against electrical energy


Power Surge and Transient Elimination Systems threats
Preventing static charge and stray currents Grounding of AC power systems
accidents Attaining fast efficient ground fault neutralizing
Achievement of Electrical Substation grounding systems
safety requirement Grounding of Central Communications/Electronics
Systems

Critical Facility Group


31 Loyang Crescent Singapore 509013
T: (+65) 62141830 | F: (+65) 62141831 | W: www.critical-facility.com
| E: enquiry@critical-facility.com

You might also like