Completeness
Process Sub-process Risk Description Control Control Description
Existence or Occurrence
Fixed Assets & Project for Survey report may not be On the basis of new customer application, a a No Financial Inquiry and 1) Perform an inquiry with Name, DGM, Commercial on 16/03/2016 to gain an understanding of the process. date date Key As needed Field Engineer Sr. Divisional Preventive Manual Manual Yes The Management currently relies on the ITGC
Project Lines approved Business Development Team requests the Inspection Engineer procedures for the accuracy and completeness of
Engineering Team to conduct a survey. Post 2) Obtain the list of survey conducted during FY 2016-17 the controls
conducting a survey a report is submitted to
Sr. Divisional engineer approves the survey 3) Randomly select a sample
report
4) Obtain the copy of mail sent by engineering Department to commercial Department
5) Verify whether the mail sent contains the details of the materials required for the project
Test of Design Test of Operating Effectiveness
Walkthrough Details: Test of Design Issue Recommendation Test of O/E Issue Recommendation
Conclusion Summary Conclusion Summary
1) Inquired with Name, DGM, Commercial and gained an understanding of the process. Pass NA NA Pass NA NA
5) Verified that mail sent contains the details of the materials required for the project
Design Effectiveness Testing Procedures
Location: Plant
Process: Fixed Assets & Project
Control Reference: 0
Control Owner: Name
Tester:
Reviewer:
On the basis of new customer application, Business Development Team requests the Engineering Team to
Control Description: conduct a survey. Post conducting a survey a report is submitted to Sr. Divisional engineer approves the
survey report
Key/Non-Key Key
Control Frequency: As needed
Automated / Manual Manual
Preventive / Detective Preventive
Preparer Field Engineer
Reviewer Sr. Divisional Engineer
As per the sampling methodology, we have considered one sample for testing the design of the above
Sampling Approach: mentioned control
1) Inquired with Name, DGM, Commercial and gained an understanding of the process.
2) Obtained the list of survey conducted during FY 2016-17
Conclusion: Pass
Attribute
Legend:
Y Control attribute achieved (pass)
X Control attribute not achieved (exception)
N1, N2, N3…. Testing Note
N/A Not Applicable
Operating Effectiveness Testing Procedures
Location: Plant
Process: Fixed Assets & Project
Control Reference: 0
Control Owner: Name
Tester:
Reviewer:
On the basis of new customer application, Business Development Team requests the Engineering Team to
Control Description: conduct a survey. Post conducting a survey a report is submitted to Sr. Divisional engineer approves the
survey report
Key/Non-Key Key
Control Frequency: As needed
Automated / Manual Manual
Preventive / Detective Preventive
Preparer Field Engineer
Reviewer Sr. Divisional Engineer
As per the sampling methodology, as this control operates on an as needed frequency, hence have made 25
Sampling Approach: sample selections for the test of operating effectiveness of the above mentioned control.
If IPE is relied upon, reference the corresponding report or 1) Noted that list of survey conducted during FY 2015-16 was generated using T-code ''ZCUST_DETAILS' from
spreadsheet testing. the SAP. The parameters used to pull the report are as follow.
If IPE is validated, discuss the procedures performed in this control to Generated the 'consumer master' by executing.
validate the completeness and accuracy of data inputs, data Since it is generic SAP report, the logic of the report need not be tested.
processing, and data outputs.
1) Inquired with Name, DGM, Commercial and gained an understanding of the process.
Conclusion: Pass
Attribute
Legend:
Y Control attribute achieved (pass)
X Control attribute not achieved (exception)
N1, N2, N3…. Testing Note
N/A Not Applicable
Design Effectiveness Testing Procedures
Location: Plant
Process: Fixed Assets & Project
Control Reference: 0
Control Owner: Name
Tester:
Reviewer:
Key/Non-Key Key
Control Frequency: As needed
Automated / Manual Manual
Preventive / Detective Preventive
Preparer Business Development Team (BD Team)
Reviewer As per Approval Matrix
Conclusion: Pass
Attribute
Sample Approver A
As per
Screen shot of approval Y
approval made
matrix
Legend:
Y Control attribute achieved (pass)
X Control attribute not achieved (exception)
N1, N2, N3…. Testing Note
N/A Not Applicable
roject
ling methodology, we have considered one sample for testing the design of the above
rol
ed report
t of list of new project created in SAP was generated using T-code ''ZBUDGET_DISPLAY' from
ameters used to pull the report are as follows
ew project created
pproval made for a project
Operating Effectiveness Testing Procedures
Location: Plant
Process: Fixed Assets & Project
Control Reference: 0
Control Owner: Name
Tester:
Reviewer:
Key/Non-Key Key
Control Frequency: As needed
Automated / Manual
Preventive / Detective
Preparer Business Development Team (BD Team)
Reviewer As per Approval Matrix
As per the sampling methodology, as this control o
sample selections for the test of operating effectiv
Sampling Approach:
Conclusion: Pass
Attribute
Document No. Approver A Exceptions Noted?
As per
Screen shot of
approval made approval Y NA
matrix
Legend:
Y Control attribute achieved (pass)
X Control attribute not achieved (exception)
N1, N2, N3…. Testing Note
N/A Not Applicable
& Project
ated report
list of list of new project created in SAP was generated using T-code ''ZBUDGET_DISPLAY' from
parameters used to pull the report are as follows
o.
e 'all the documents from document no.
eric SAP report, the logic of the report need not be tested
selected 15 samples
screen shot of the approvals made by approving authority
Tester:
Reviewer:
Risk Description
Control Description:
Key/Non-Key
Control Frequency:
Automated / Manual
Preventive / Detective
Preparer
Reviewer
Sampling Approach:
Conclusion:
Testing Attribute A:
Attribute
Sample Approver A
Legend:
Y Control attribute achieved (pass)
X Control attribute not achieved (exception)
N1, N2, N3…. Testing Note
N/A Not Applicable
Plant
Fixed Assets & Project
0
Name
The final quotation amount in offer letter may not tie out with the cost approved in SAP
VP, Technical/DGM, Commercial & Billing/AGM, Technical reviews and signs off the offer letter before
sending it to the consumer
Key
As needed
Manual
Preventive
BD Team
VP, Technical/DGM, Commercial & Billing/AGM, Technical
As per the sampling methodology, we have considered one sample for testing the design of the above
mentioned control
1) Noted that list of offer letter given to consumer during FY 2015-16 was generated using T-code
''ZCUST_DETAILS' from the SAP. The parameters used to pull the report are as follow.
Generated the 'consumer master' by executing.
Since it is generic SAP report, the logic of the report need not be tested.
1) Inquired with Name, DGM, Commercial and gained an understanding of the process.
2) Obtained the list of offer letter given to consumer during FY 2016-17
Pass
Evidence of offer letter given to consumer is signed by VP, Technical/AGM, Technical/DGM, Commercial &
Billing
e achieved (pass)
e not achieved (exception)
e cost approved in SAP
ws and signs off the offer letter before
tested.
anding of the process.
016-17
er
Billing
Tester:
Reviewer:
Key/Non-Key Key
Control Frequency: As needed
Automated / Manual Manual
Preventive / Detective Preventive
Preparer BD Team
Reviewer VP, Technical/DGM, Commercial & Billing/AGM,
As per the sampling methodology, as this contro
Sampling Approach: sample selections for the test of operating effec
Conclusion: Pass
Attribute
Legend:
Y Control attribute achieved (pass)
X Control attribute not achieved (exception)
N1, N2, N3…. Testing Note
N/A Not Applicable
roject
on amount in offer letter may not tie out with the cost approved in SAP
GM, Commercial & Billing/AGM, Technical reviews and signs off the offer letter before
consumer
ed report
t of offer letter given to consumer during FY 2015-16 was generated using T-code
S' from the SAP. The parameters used to pull the report are as follow.
consumer master' by executing.
c SAP report, the logic of the report need not be tested.
Name, DGM, Commercial and gained an understanding of the process.
ected 15 sample
copy of offer letter given to prospective consumer
he offer letters is signed by VP, Technical and DGM, Commercial & Billing
Tester:
Reviewer:
Key/Non-Key Key
Control Frequency: As needed
Automated / Manual Manual
Preventive / Detective Preventive
Preparer Accounts Department
Reviewer DGM, F&A
As per the sampling methodology, we have cons
Sampling Approach: mentioned control
Conclusion: Pass
Attribute
Sample Approver A B
Capitalisation entry
made and approval Anil Prasad Y Y
thereof
ment
ling methodology, we have considered one sample for testing the design of the above
rol
ed report
t of list of new project created in SAP was generated using T-code 'AR02' from the SAP. The
d to pull the report are as follows
ected a sample
Tester:
Reviewer:
Key/Non-Key Key
Control Frequency: As needed
Automated / Manual Manual
Preventive / Detective Preventive
Preparer Accounts Department
Reviewer DGM, F&A
As per the sampling methodology, as this contro
Sampling Approach: sample selections for the test of operating effec
Conclusion: Pass
Attribute
Sample
Approver A B
(Voucher)
Y Y
Y Y
Y Y
Legend:
Y Control attribute achieved (pass)
X Control attribute not achieved (exception)
N1, N2, N3…. Testing Note
N/A Not Applicable
roject
ment
ling methodology, as this control operates on an as needed frequency, hence have made 3
ns for the test of operating effectiveness of the above mentioned control.
ed report
t of list of new project created in SAP was generated using T-code 'AR02' from the SAP. The
d to pull the report are as follows