1. PM Tester
Close all the programs and turn-off the PC
Turn-off the breaker in the tester
Remove the PM sticker
Replace the PM sticker
Quick Check POOL2 to check for PM Due
2. Full Check
Save (C:maintenance/datalog/PMlogs\Datalogs\2021\datenotep)
3. Continuity Test
Check (System Checks)
Data Collect Set-Up (All)
Save (C:maintenance/datalog/PMlogs\Datalogs\2021\datenotep)
4. Calibration
SAVE IN NOTEPAD (C:maintenance/datalog/PMlogs\Datalogs\2021\date)
Pool 2 External>Install Keithley> Place GPIB cable from tester to keithley>
Connect 2 wires to PMO>Input PMO ID and CAL DATE
Support Board (Need to set-up cal board with PMO Cable)
HSD (Dock Cal Board)
DCVI & HDPMU, BBAC
Pool 2 (Internal Only)
5. DC Enabler
Open Existing>Program Files>Teradyne>IGXL>DC EN V.4
(C:maintenance/datalog/PMlogs\Datalogs\2021\date)
6. Gage and Upload
Update CalMaster
Items>Identification ( Tester No. )> Update Cal> Find the serial number of
meter> Back to Microflex> Fill the boxes and upload zip file.
--------------------------------------
02BBC53-Continuity Dib SN
C1560AF-CAL Dib SN
4001D5E-DC EN Dib SN
3064918-Pool 2 Dib SN
----------------------------------------
Closing Downtime
http://cavmitcamprod.maxim-ic.com/InSiteMaximApplication/Default.aspx
username:pcftsg
Password:3edc$RFV
----------------------------------------
</TEST_HEAD TH 1>
<BACKPLANE-DIB_CABLES TH 1>
1 2
2 4
3 7
4 10
5 11
6 12, 13
7 8, 20
8 14
9 15
10 17
11 23
12 24
13 25
14 50
15 49
16 48
17 42
18 40
19 38
20 45, 33
21 32
22 31
23 30
24 29
25 28
26 27
DCEN
J5 J6 J18 J22 J30 J43
-------------------------------
Links
Shift Report-\\maxcavfs01\Test_Engg\uFlex_J750_ETS_TSG\UFLEX_SHIFT_REPORT
Statusphere-http://statusphere.maxim-ic.com/dp/?q=user/login
Cal Master-http://mpoctsg.maxim-ic.com/calmaster/index.php/frameset/index
TSG Links-http://cav-dt-the03/tsg/
Gage-C:\Program Files\Teradyne\IG-XL\Maintenance\Data\Gage_Project_Data
Sedana Summary- C:\production\lot_summaries
Restart PC Password: Testflr1$
Encounter RTE: C:\Program Files\Teradyne\IG-XL\5.10.55_flx\tester
Encounter slow opening of IGXL-C:\Documents and Settings\uflex025\Application
Data\Microsoft\Excel
------------------------------
Isolation Process
RTE
> Check for summary ( Check e-ts )
> If none, check for SEDANA and print summary submit to operator.
> File in IRAC > Raise Issue > Upload file choose OTHERS
Sudden Shutdown
FT swing to WS
ID Prom Error