Professional Documents
Culture Documents
Matrafor Rebar List After Check
Matrafor Rebar List After Check
rebar direction
0,4+1,9+0,4
footing
0,4+1,9+0,4
pedestal 155/80
cad 0,2*0,5 0,2*0,5
cad 0,5*0,5 0,5*0,5
TRANS
footing 36
LONG
pedestal 36 1,20+0,7
finish / shaping(
finish/shaping
cut finish/ not shaping
DZ,HBR
rebar direction
TRANS
footing
LONG
pedestal 1,25/0,7
2 32 32 T20 64 64 64
finish/shaping
DZ,HBR-01
rebar
rebar direction rebar length
number
TRANS 2
footing
LONG
pedestal 1,5+0,5 2
12 T16 24 24
TRANS
footing
LONG
pedestal 1,85/0,7
0,15+2,9+0,15
MB3
0,15+2,9+0,15
DZ,HBR-01,GH ,STR, DWG 0007/LER FONDATION
2.5 24 16 T20 60 40 60
1 66 69 R10 66 69 66
1 32 / R10 32 / 32
7.1 4 / R16 28.4 / 28.4
6.7 4 / R16 26.8 / 26.8
4.1 4 / R16 16.4 / 16.4
3.9 4 / R16 15.6 / 15.6
6.2 2 / R12 12.4 / 12.4
6.2 2 / R20 12.4 / 12.4
3.2 2 / R16 6.4 / 6.4
3.2 2 / R20 6.4 / 6.4
192
cut/ shaping
cut/04 shaping
not-yet
not-yet
not-yet
Diametre length tot
nominal ᶲ length tot after
(mm)/diame checking
ter
T12 #REF! #REF!
T12 #REF! /
T16 #REF! #REF!
T20
T20 #REF! #REF!
T12 #REF! #REF!
R12 #REF! /