1 2 3 4 COL. FOUNDATION TO GROUND FLOOR SLAB GROUND FLOOR SLAB TO U/s THIRD FLOOR LVL.
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN MM UNLESS
OTHERWISE SPECIFIED.
24'-721" No. 2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE
COL. SIZE MAIN BAR GRADE STIRRUPS COL. SIZE MAIN BAR GRADE STIRRUPS TO BE FOLLOWED.
10'-421" 6'-721" 7'-721" 3. CONCRETE GRADE M25 FOR ALL R.C.C. WORK AS PER IS456-200 MIX
C1 DESIGN.
9"x15" 10no-12# M200 8# @ 6"c/c 9"x15" 10no-12# M200 8# @ 6"c/c 4. CONCRETE MIX M15 FOR P.C.C. WORKS, AS IS456-2000.
F3
5. REINF. STEEL SHALL BE TMT BARS OF GRADE Fe 500 CONFORMING TO
421" 421" 421" 421" C2 9" x 15" 8no-12# + M200 8# @ 6"c/c 9" x 15" 8no-12# + M200 8# @ 6"c/c IS:1786-2008.
2-10# 2-10# 6. IF FULL LENGTH BARS ARE NOT AVAILABLE, LAPS IN BARS MAY

721"
BE LOCATED AT POINT OF LOW STRESSES AND SUITABLE STAGGERED.

C2
A

721" 721"
LAP LENGTH SHALL BE PROVIDED AS 50 x DIA OF BARS.
C3 9"x9" 8no-12# M200 8# @ 6"c/c 9"x15" 10no-12# M200 8# @ 6"c/c 7. THE MINIMUM CONCRETE CLEAR COVER TO REINFORCEMENT SHALL BE

C2

721"
a)COLUMN = 40mm b) FOOTING = 50mm c) PEDESTAL = 50mm
d) SLAB =25mm e) TIE BEAM = 40mm f) WALL = 40mm
8. DISTRIBUTION REINFORCEMENT SHALL BE SECURELY TIED WITH THE MAIN
REINFORCEMENT AT ALL JOINTS.
9. NET SBC REQUIRED IS 19 T/M² AS PER SOIL REPORT,SAME SHALL BE
8'-9"

STIRRUPS
CONFIRMED
G.L STIRRUPS
F4 MAIN BAR AT SITE BEFORE EXECUTION.
G.L 10. DEPTH OF FOUNDING LEVEL WILL BE 1.5 MT FROM EXISTING GROUND
MAIN BAR
LEVEL
9" 11. BACKFILL SOIL MUST BE WELL COMPACTED & PROPER COMPACTION
F2 TECHNIQUE
B F1

C3
SHOULD BE CARRIED OUT ON SITE.

9"

6'-0" or upto yellow soil


421" 421" 421" 421" 421" 421"

which ever is more

1800 or upto yellow soil


3'-721"

REIN. SHORT

which ever is more


DIRECTION REIN. SHORT

721"
721" 721"

DIRECTION
1021"

C1
REIN. LONGER
REIN. LONGER
C1

DIRECTION
C1

421"

721"
1'-0" (TYP.) DIRECTION
EXTRA TOP IN BEAM

D
1'-0" (TYP.)

lo
BEAM AT SLAB LEVEL

D
4" (TYP.)
31'-9"

d
4" (TYP.)
8'-221"

d
P C C (1:3:6)

4"
P C C (1:3:6)

4"
421" 421"
F1 F2 SECTION
SECTION

721"
SCALE : N.T.S.
421" 421"

lo
C 1
1021" 42"
SCALE : N.T.S.

C1

hc/4
L
1'-921"

421" 421"
721" 721"

721"
R.C.C. COLUMN
D
C1

L
C1

hc

l1
(REST PORTION)
6'-8"

421" 421"

1/6xCLEAR SPAN
F3 1
1021" 42"
1021"

MAXIMUM SPACING 100MM

hc/4
F1

REINF. SHORT
421" 421"

lo
E
C1

C1

DIRECTION
421" 421"
B

REINF. SHORT
421"

DIRECTION
2'-821"

B
721" 721"

F
C1

REINF. LONGER
DIRECTION
REINF. LONGER PLINTH BEAM
DIRECTION EXTRA TOP IN BEAM

FOUNDDATION PLAN
SCALE : N.T.S. TYPICAL FOOTING DETAILS
SCALE : N.T.S.
ECCENTRIC FOOTING DETAILS
DETAILS FOR FOOTING SCHEDULE SCALE : N.T.S.

F1 5' - 8" 6' - 8'' 5' - 0" 6' - 0'' 2'-0'' 1'-0'' 10 # @ 5" c/c 10 # @ 5" c/c M200

0
10
F2 7' - 2" 7' - 2" 6' - 6" 6' - 6'' 2'-0'' 0'-9'' 10 # @ 6" c/c 10 # @ 6" c/c M200

F3 6' - 2" 6' - 2'' 5' - 6" 5' - 6'' 2'-0'' 0'-9'' 10 # @ 6" c/c 10 # @ 6" c/c M200 DETAILS OF
TRANSVERSE TIES
F4 5' - 8" 5' - 8'' 5' - 0" 5' - 0'' 1'-6'' 0'-9'' 10 # @ 6" c/c 10 # @ 6" c/c M200 (SCALE-N.T.S)