Pile Design (Reinforcement)

Maximum P Case (Governing Case EE)

P V2 V3 M2 M3 Pile Dia Reinf. %


(kips) (kips) (kips) (kips-ft) (kips-ft) (mm)
1754 133 246 735 450 1000 10 # 10 (1%)

Maximum M2 Case (Governing Case EE)

P V2 V3 M2 M3 Pile Dia Reinf. %


(kips) (kips) (kips) (kips-ft) (kips-ft) (mm)
254 126 98 761 124 1000 10 # 10 (1%)

Maximum M3 Case (Governing Case EE)

P V2 V3 M2 M3 Pile Dia Reinf. %


(kips) (kips) (kips) (kips-ft) (kips-ft) (mm)
1441 68 132 339 694 1000 10 # 10 (1%)

All Maximum Cases

P V2 V3 M2 M3 Pile Dia Reinf. %


(kips) (kips) (kips) (kips-ft) (kips-ft) (mm)
216 133 246 761 694 1000 10 # 10 (1 %)

Length of Pile

At Pier Locations

PService Pile Dia Length (m)


(Tons) (mm)
467 1000 41
For Pile Arrangement that requires group efficiency factor load is as follow:

PService Pile Dia Length (m)


(Tons) (mm)
467/0.78 = 598 1000 Need to be Revised

At Portal locations 2 Piles Results (Will be Revised to 4 Piles arrangement)

PService Pile Dia Length (m)


(Tons) (mm)
525 1000 44
For Pile Arrangement that requires group efficiency factor load is as follow:

PService Pile Dia Length (m)


(Tons) (mm)
525/0.78=673 1000 Need to be Revised