GENERAL DATA STIFFNESS TRAVEL LOADING DIMENSIONS ASSEMBLY DETAILS OTHER DETAILS

PTFE/
PRESET COLD HOT INSTALLED UPPER GRAPHITE INSULATION
INSTALLED TO OPR. VAR. LOWER ASSEMBLY LINE SIZE TEMP
(SPRING LOAD LOAD LOAD HT ASSEMBLY PAD ON THICKNESS IN REMARK
A B C (NB) (DEG C)
SR NODE SUPPORT TAG RATE) H LOAD MM
No. NO. No. QTY SPRING TYPE UP DOWN HOR. TYPE EL-II TYPE EL-I EQUIPMENT NAME
FLANGE
(Kg/mm) (mm) (mm) (mm) (Kg) (Kg) (Kg) (%) (mm) (mm) (mm) (mm) (m) (m)

BOTTOM BOILER NO 1 OUTLET


1 815 VSH-01 2 8.4 ±5 ± 15 305 457 452 0.25 NOTE-1 NOTE-1 GRAPHITE 150 NB BOILER NO 1 255 65
MOUNTED LINE

NOTES:-
Project:- XXX
1) ASK TO SPRING VENDOR.

2) VSH= VARIABLE SPRING HANGER. Client:- XXX


3) CSH= CONSTANT SPRING HANGER. EPC Title:-SPRING SUPPORT SCHEDULE
CONTRACT XXX
OR:-
4) PTFE/GRAPHITE PAD IS TO BE PROVIDED BETWEEN SPRING HANGER JOB NO: XXX
SUPPORT & SECONDARY SUPPORT. SPEC NO: XX-SS-001 SHEET: 1 OF 1
0 ISSUED FOR ENQUIRY PURPOSE ASJ / 31-05-2021 SSK / 31-05-2021 AVJ / 31-05-2021

REV ALTERATION PREPD.BY / DATE CHKD.BY / DATE APPD.BY / DATE