Professional Documents
Culture Documents
7.M
SLUDGE
SETTLING TANK
1.5 X 1.5 X 2.5(H)
landscaping TYPE-A(TYPICAL)
4.M
HOLDING 1.5 X 1.5 X 2.5(H) + 4000 X 5000 3200 X 3200
BAR SCREEN
0.5m X 1m
50Ø FHR PIPE WITH NECESSARY 50Ø FHR PIPE WITH NECESSARY 3. ALL DIMENSIONS AND LEVELS INDICATED IN THE
PRV PRV FOR FIRST FLOOR FHR COVERED PARKING ASPHALT ROAD DRAWINGS ARE FROM UNFINISHED SURFACES.
63
UP
landscaping
OFFICE
PRAYER ROOM
ROOM
2900x4825 2900x4825
SHAFT
COMMON TOILET
62
ABLUTION
3975X2125 TOILET
SHW.
82.M
REST ROOM
2800 x 4000
DRIVER'S
SHOE
FIRE WATER STORAGE
FIRE HYDRANT
1.2M WIDE PASSAGE
WATER TANK
49750x12250
LOCKER ROOM
1800x3400
TOILET MALE TOILET
5100x3325 WC ±0.00 FFL UP
(90 MINUTES COVERAGE)
WC
FEMALE
TOILET
1900
PUMP ROOM
9775x14825
25.M
GV
47 COMPACTED
58
PRV
GV
GV
UNION
GV
GV
75.M
EARTH
GV
GV
CONTROL PANEL (IND. MNTG)
MECHANICAL AND ELECTRICAL DRAWINGS AND ALL
GV
GV
UNION
GV
61 60
UP
GV
GV
GV
UNION
GV
GV
WATER TANK
49750x12250
COMPACTED COMPACTED
47 RELEVANT SECTIONS OF THE SPECIFICATIONS.
DOUBLE HEIGHT AREA
DIESEL TANK
DIESEL TANK
60.M
50Ø FHR PIPE WITH NECESSARY
46.M
PRV landscaping 1.2M WIDE 5. DISCREPANCY IN THE DRAWINGS IF ANY,SHALL BE
INTERLOCK BAY (TYP)
FIRE PUMP SET
CAPACITY - 1250 GPM BROUGHT TO THE NOTICE OF THE CONCERNED
7.M
(ELECTRIC+DIESEL+JOCKEY)
7M WIDE ASPHALT ROAD 1.2M WIDE 7M WIDE ASPHALT ROAD
62 ENGINEER PRIOR TO THE CONSTRUCTION.
UP
UP
LC 2 LC 6 LC 7 LC 3
UP
ASPHALT ROAD
50Ø FHR PIPE WITH NECESSARY
6. VSK BUILDING 5 TO 8 ARE TYPICAL OF 1 TO 4. (TOTAL
25 24
LC 1 LC 5 LC 8 LC 4
ROLLING SHUTTER
2000KVA TR YARD 2000KVA
STAIRCASE-03
SLOPE 1:10
UP
RAMP UP
TR-5 TR-6 160Ø MAIN FIRE PIPE NUMBER OF VSK BUILDING WILL BE 8 NOS.
25
CONCRETE FOUNDATION
REINFORCED
X=(+)291.735
STAIRCASE-02
UP
Y=(+) 240.000
50
75m (TYP)
CONTAINER LID ASSEMBLY 20'x8'x9'6" OT CONTAINER LID ASSEMBLY 20'x8'x9'6" OT
UP
WALL OPENING
FOR CABLE TRAY
CABLE TRENCH
WALL OPENING
FOR CABLE TRAY
27
ASPHALT ROAD
ASPHALT ROAD
1F 2F 3F 4F 5F 6F 7F 8F 9F 10F 11F 12F 13F 14F 15F 16F 17F 18F
FIRE HYDRANT
TOP VIEW
PMCC PANEL
39
ASPHALT ROAD
1:10 SLOPE
1:10 SLOPE
1:10 SLOPE
38 54
RAMP
RAMP
RAMP
WALL OPENING Ø25 Ø25
TYPE-A(TYPICAL)
X=(+)158.704
Y=(+)229.058
24
M
WALL OPENING
HT PANEL
65 40
FOR CABLE TRAY
Ø25 Ø25
UP
41
LC 1
LC 2
3065 3065
UP
BUCKET
BUCKET
WALK WAY
UP
DC302
66
UP
LIFT
LIFT
4036
21
FN304
27 26
STAIRCASE-01
EL+0.00M
LP DOSING
LC 5
LC 6
53 26 24A
X=(+)158.704
DN
DN
UP
UP
Y=(+)219.058
4206
SCREENING
SCREENING
UP
HEADER HEADER
MS-01
HEADER HEADER
C ECO.O/L C ECO.O/L
TW-01
TW-01
Ø25 Ø25
TR-3 TR-4
HEADER HEADER
C ECO.I/L C ECO.I/L
ASPHALT ROAD
62
1100
LC 7
MAINTENANCE BAY
OPEN STRUCTURE
TR 2000KVA
TR 2000KVA
2000-KVA 2000-KVA
6800 x 9800
EL+0.00M
TR YARD
TW-01
TW-01
CHEMICAL
LAB ROOM STORAGE
42 46
ROOM
2000 KVA 2000 KVA
BUCKET
BUCKET
BUILDING ONLY
EL+4.00M
℄ OF BE
℄ OF BE
ST-02
LIFT
LIFT
ONLY
ST-01
LC 4
LC 3
X=(+)152.500
Y=(+)214.200
75m (TYP)
N 11/A N 11/A SCHNITTA-A SCHNITTA-A
N 11/B N10 N 11/B M1:2 SCHNITTA-A M1:2
SCHNITTA-A
M1:2 M1:2 SCHNITTA-A
M1:2
MDP-3
6M WIDE ASPHALT ROAD
-
N 7/B N 7/A
SCHNITTA-A
M1:2 SCHNITTA-A
M1:2
N14 SCHNITTA-A
CL OF BC
CL OF BC
N18 SCHNITTA-A
M1:2
IO PANELS
AW-01
APFC
43
LV ROOM-02
3800 X 8800
2000-KVA
STEAM DRUM STEAM DRUM
32
C ECO.OUTLET C ECO.OUTLET
MCC-7
PRV
MDP-2
MDP-01
TR YARD
7400 X 5400 OUT
24000 x 12000
OUT
23
STEAM STEAM
68
AW-01
LV ROOM
CL OF FAN CASING
TR-1
DN TO GRID
DN TO GRID
CL OF ROTOR & MOTOR
RMU-01
APFC
33
AW-01
31
82.M
UP
TYP
750
TYP
750
COMPACTED
ST-01
23
PLC PANEL
75.M
23A
EDG PANEL
43A 49
UP
ID FAN-2
B
10PANELS
AW-01
RMU-4
ID FAN-1
700
700
MCC-6
MCC-08
AW-01
RMU-3
MCC-5
UP
45
UP
MCC-08
20A
ST-02
OPEN STRUCTURE ONLY
AW-01 AW-01
CL OF HEAT EXCHANGER
GAS INLET
GAS INLET
C BOILER &
C BOILER &
CL OF HOT STACK
CL OF HYDRAULIC DAMPER
CL OF HYDRAULIC DAMPER
CL OF BOILER
CONTROL
PANNEL
END
CL OF BOILER
22
75m (TYP)
ASPHALT ROAD
ASPHALT ROAD
COMPACTED
EARTH FIRE HYDRANT
52 52 CL OF DAMPER
Ø3000
Ø3000
CL OF DAMPER CL OF DAMPER
Ø3000
75m (TYP)
TYPE-A(TYPICAL) 525.0000 525.0000 525.0000 525.0000 525.0000 525.0000 525.0000 525.0000
CL OF HOT DUCT
160Ø MAIN FIRE PIPE
CL OF HOT DUCT
CL OF HOT DUCT
UP
UP
UP
UP
UP
UP
CL OF HOT DUCT
7M WIDE ASPHALT ROAD
UP
UP
327.M
FIRE HYDRANT
FIRE HYDRANT TYPE-B
09
2000KVA
12" GV 12" Y/T STRAINER 12" Bellow
PUMP
TYPE-B
160Ø MAIN FIRE PIPE COMPACTED 2000-KVA
12" GV 12" Y/T STRAINER 12" Bellow
PUMP
315.M
EARTH
PUMP
TR-7
CL OF BELT CONVEYOR
12" GV 12" Y/T STRAINER 12" Bellow
PUMP
AW-01 AW-01
MCC-9A
APFC
RAMP UP
RAMP UP
RAMP UP
RAMP UP
OUTLET
CL
INLET
OUTLET
48 12" GV 12" Y/T STRAINER 12" Bellow
20
MDP-07
PUMP
34A
MCC-9D
EXISTING CHAIN LINK FENCING
CL
48A
EDG PANEL
12" GV 12" Y/T STRAINER 12" Bellow
PUMP
3500
MCC-9B
RMU-07
24" GV
FIRE HYDRANT
16 16
INLET
OUTLET
INLET
6000
6000
6000
6000
14" GV 14" Y/T STRAINER 14" Bellow
PUMP
75m (TYP)
1 TYPE-A(TYPICAL) 14" GV 14" Y/T STRAINER 14" Bellow
PUMP
RAMP UP
RAMP UP
RAMP UP
CL
RAMP UP
RCC RAMP
APFC
35
LV ROOM-02
3800 X 8800
2000-KVA
TR-2
MDP-01
14" GV 14" Y/T STRAINER 14" Bellow
15
TR YARD
7400 X 5400
15
24" GV
CL
RMU-01
UP
15
82.M
19
INLET
OUTLET
INLET
OUTLET
CL OF BELT CONVEYOR
14" GV 14" Y/T STRAINER 14" Bellow
PUMP
B
UP
24" GV
1
8700
14" GV 14" Y/T STRAINER 14" Bellow
29513
PUMP
24" GV
35A
160Ø MAIN FIRE PIPE
5
75m (TYP)
IO PANEL WF PANEL
69
MCC-02 MCC-01
13 29
8700
AW-01
11 12 28 37 44
6000
2000
GRID
1271
18686
DN
GRID
SECTION
F4 F4
11.M
UP DN UP DN
REF
6000
DN
9265
14b
B
F4 F4
CL OF BELT CONVEYOR
J1
CL OF BELT CONVEYOR CL OF BELT CONVEYOR
75m (TYP)
F5
F5
F5 F5
F5 F5
18A
DN
DN
2000
17 18
J2
J2 J2
HAND RAIL
14 14a
J2
J2
STEEL STAIR WITH
DN
J2
J3
J3
UP
UP
UP UP UP
199295
6357
36901 32243 36901 35155
10 FIRE HYDRANT 160Ø MAIN FIRE PIPE 160Ø MAIN FIRE PIPE
8M WIDE ASPHALT ROAD
10
6145 1385
BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1 BP1
CL OF BELT CONVEYOR
141 BC 1
8
SUMP
HOLE
MAN
N1
N1
700
BP2 BP2A
20 2 9
2200
BP2 BP2A
PORTAL BRACING PB-2
20
69.1.M
6
44840
CL OF BELT CONVEYOR
4a
160Ø MAIN FIRE PIPE
BP2 BP2A
6000
2300 3700
3
2
1500
OPEN
1000
±0.00 FRL
10000
-300 FRL
34410
6400
111 BC 3
740
TB-4
2000 2000
BP2 BP2A
UP
750
eq eq
S5
600
1800
1490
TB-14
1000
S5
S5
UP
13500
3600
S5
±0.00 FRL
27111
1000
- 0.300 FGL
S5
OPEN
BP2 BP2A
1
5
-300 FRL
UP
3500
3500
3a
1'
6000
731
BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A BP1A
A
75m (TYP)
EXISTING CHAIN 75m
LINK(TYP)
FENCING 18EXISTING CHAIN LINK FENCING 17 16 15 75m (TYP) 14 13 12 11
19 11
11
S.No DESCRIPTION GROUND FIRST SECOND THIRD FOURTH S.No DESCRIPTION GROUND FIRST SECOND THIRD FOURTH S.No DESCRIPTION GROUND FIRST
FLOOR FLOOR FLOOR FLOOR FLOOR TOTAL FLOOR FLOOR FLOOR FLOOR FLOOR TOTAL FLOOR FLOOR
1 TRUCK UNLOADERS 1050.0 -- -- -- -- 1050.00 27 STACK 72.0 -- -- -- -- 72.00 57-59 STORES, WORKSHOP & LAB 827.0
-- 771.0
2 BELT CONVEYOR-(02) 217.0 -- -- -- -- 217.00 28 BELT CONVEYOR -- -- -- -- -- -- 60-61 ADMINISTRATION OFFICE 340.0 340.0
3 RPC CRUSHER HOUSE 70.0 70.0 70.0 70.0 -- 210.00 29 TRANSFER TOWER 62.0 62.0 -- -- -- 124.00 62 WEIGH BRIDGE
3A BELT CONVEYOR-(3A) -- -- -- -- -- -- 30 BELT CONVEYOR 63 SECURITY & TIME OFFICE 5.0
4 TRANSFER TOWER 44.0 44.0 -- -- -- 88.00 31 TRANSFER TOWER 64 CAR PARKING --
4A BELT CONVEYOR-(4A) -- -- -- -- -- -- 32 BELT CONVEYOR 65 WEIGH BRIDGE CONTROL ROOM 8.0
5 STACKER (EQUIPMENT) -- -- -- -- -- -- 33 KILN FEED BUILDING 66 STORM WATER PIT --
6 RPC STOCK PILE SHED 27000 -- -- -- -- 27000 34 ROTARY KILN 67 GUARD HOUSE (2 NOS) 16.0
7 RECLAIMER (EQUIPMENT) -- -- -- -- -- -- 34A ROTARY KILN DISCHARGE BUILDING 68 SUBSTATION 88.0 CLIENT: