You are on page 1of 3
‘Abita eater { Saud Arbian O8 Company j Tot e06s 13 ac7 ose Gonna Foprsmtve ‘Naum Tome Foor, raha Gos Comprendon Panta {P.O Box 00 ln 1852 Briooigesa locas ose ot Sui Ala Gagouill gSohji li aramco. Docomber 19, 2018 ‘SAO-HHGCP-TR-01042-18 (KAMCO-TRSA-HSE-MOS-0001-KAMCO METHOD OF STATEMENT FOR TERMITE CONTROL) TK Contracts No. 6600040668/70772 Francisco Marin Cano, Contractor Representative Tecnicas Reunidas Saudia for Services and Contracting Co. Ltd. P.O, Box 1/076. Al Khobar 31962, Saudi Arabia References: 10130-TRSA-AOC-T-00030 COMPANY informs CONTRACTOR that the submitted (KAMCO-TRSA-HSE-MOS-0001- KAMCO METHOD OF STATEMENT FOR TERMITE CONTROL) was reviewed and it was ‘found no comments as per the attached. ‘Should you need any more clarifications. Please contact Abdullah S.Aldossary at 0198537802 (or by email at Abdullah. dossary.74@arameo.com. \y29/6 SS ps Aah Jat, Cony Reese AoHONNESS ‘Atacecas 7248 e GCP IK si Pe Prat RECEIVED _. 30 JAN 2019 tah amnn rn INSPECTION DEPARTMENT DOWNSTREAM PROJECTS INSPECTION DIVISION Section: SA Gas Compression Projects Insp. Sec Unit : H & H Compression Pipeline Project Inspection Unit GCPIS/T-243/18 Telephone: 013-536-6435 Fax: ‘Aiention Project Management Project Information Wane Mohammed Al Onaiz, Project | Hafadh-Hawivah Feld Gas Compression- Pauition | bead Projects Engineer a TR Packages ‘GAS COMPRESSION BI/ Department | Peo secs Bi yo., | 10-01996/10-02029 Address | Flr-08, C Wing, Contractor | 6600040668/6600040674/TR Contact _| (+966) 13-8537943 POM /PQL | Mohammad 8. Ghamdi/G. Jafar K. Document, ‘SAO-HHGCP-TR-L-00438-18 Reference No.: Date of Doc. Reference No. 12/02/2018 ‘Document Description: KAMCO- METHOD OF STATEMENT FOR TERMITE CONTROL, REVIEW STATUS Non- Personnel 5 - Reviewed, No Comments REVIEW COMMENTS H&HCPPIU reviewed the submitted KAMCO- METHOD OF STATEMENT FOR TERMITE, CONTROL, KAMCO-TRSA-HSE-MOS-0001-Rev-00 with no comments. 16/2018 ‘Submited with Attachments | SAPMT Acknowledgement ‘Skv/NAH See 013-536-6439 Zé Mohammad 8. conan ee — GAS COMPRESSION PROJECT DEPARTMENT NORTH GAS COMPRESSION PLANTS PROJECTS DIVISION Floor 8, C Wing, Dammam A-Yaum Tower (Bidg. AYT) Tek: O13 853 7943 ‘November 29, 2018 ‘SAO-HHGCP-TR-L-00438-18 (KAMCO-TRSA-HSE-MOS-0001-KAMCO ‘METHOD OF STATEMENT FOR TERMITE Ci BI 10-1996 & Bi 10-02029, Haradh & Hawiyah Field Gas Compression Projects Ghamdi, Mohammad S, SR. Supervisor Project Inspection, Inspection Department ‘Gas Comp. Projects inspection Seo. R-A.25, Floor 8, A Wing, Dammam ‘AkYaum Tower (Bidg. AYT) NGCPPO kindly requests GCPID to assess proposed quality document listed below for subject projects: * (KAMCO-TRSA-HSE-MOS-0001-KAMCO METHOD OF STATEMENT FOR ‘TERMITE CONTROL) ‘Should you need any more clarifications, please contact Abdullah S. Adossary at 013 853 77802 or by email at abdullah dossary.74@aramco.com. WOHAMMED ALONAIZI Lead Projects Engineer _Atetment 10190TRSAACC--00080 oc: oce mse Pe Prost lel tatnak Seuel Acameo: Campany General Uso

You might also like