PRELIMINARY STATUS GA'S RECEIVED FOR

QUOTATION FROM RAMBOLL UK

FLOWCHART FOR RC DETAILING BY MUMBAI OFFICE


QUOTATION SENT TO RAMBOLL UK OFFICE BASED
ON PROPOSED NO. OF RC DRAWINGS ALONG
WITH FEES

INITIAL BRIEFING SHEET SENT TO RAMBOLL UK


OFFICE ALONG WITH ABOVE QUOTE

INITIAL BRIEFING SHEET + GA'S RECEIVED IN DWG


& PDF FORMAT

RC DETAILING PROGRAM FROM THE RAMBOLL UK /


CONTRACTOR RECEIVED SOMETIMES

ENGINEER STUDIES DWGS & SENDS BACK


QUERIES TO RAMBOLL UK

ENGINEER DISCUSSES THE PROJECT DETAIL &


APPROACH WITH THE CAD TEAM & THEREAFTER
THE RC DETAILING WORK BEGINS

CAD TECH. PROVIDES FIRST DRAFT COPY TO


ENGINEER FOR CHECKING

RC DRAWING CHECKED BY ENGINEER WITH


COMMENTS MARKED IN RED (WITH POINTS
HIGHLIGHTED IN DRAWING COMPLIANCE REPORT)

ENGINEER HANDS OVER COMMENTED COPY TO


CAD TECH., EXPLAINS HIM REGARDING CHANGES
TO BE CARRIED OUT ON RC DRAWING

SECOND DRAFT COPY (FRESH PRINT) GIVEN TO


ENGINEER FOR RE-CHECKING TO CONFIRM
WHETHER ALL HIS COMMENTS HAVE BEEN
INCORPORATED

ENGINEER DOES A FINAL CHECK ON RC DRAWING


AND SENDS TO RAMBOLL UK

FOR APPROVAL (P01 COPY) FILES PREPARED &


SENT TO RAMBOLL UK FOR THEIR REVIEW

COMMENTS, IF ANY RECEIVED FROM RAMBOLL UK


OFFICE AND INCORPORATED (WHICH ARE
APPLICABLE) ON TO RC DRAWING

ENGINEER RE-CHECKS AS AGAINST COMMENTS


RECEIVED FROM RAMBOLL UK & RE-ISSUES RC
DRAWING IN P02 / C01 REVISION