Concrete Cube Strength Summary (MAHSR, S

Location/ Description Of Structure Quantity


SL No. Date of Casting Grade
Chainage Structure Member (CUM)

1 3/7/2021 414+585 Test Pile-01 Test Pile-01 M40 Pile 59.5

Reaction Pile-
Reaction Pile-01 01 (Test Pile- M40 Pile
2 3/23/2021 414+585 34
(Test Pile-01)
01)

Reaction Pile-02 Reaction Pile-


3 3/23/2021 414+585 02 (Test Pile- M40 Pile 30
(Test Pile-01)
01)

Reaction Pile-03 Reaction Pile-


4 3/24/2021 414+585 03 (Test Pile- M40 Pile 30
(Test Pile-01)
01)

Reaction Pile-
Reaction Pile-04
5 3/25/2021 414+585 (Test Pile-01) 04 (Test Pile- M40 Pile 30
01)

Reaction Pile-
6 4/6/2021 413+195 Test Pile-02 M40 Pile 35.5
04

Reaction Pile-04 Reaction Pile-


7 4/23/2021 413+195
(Test Pile-02) 04 (Test Pile- M40 Pile
30
02)

Reaction Pile-03 Reaction Pile-


8 4/24/2021 413+195
(Test Pile-02) 03 (Test Pile- M40 Pile
30
02)
Reaction Pile-
Reaction Pile-03
8 4/24/2021 413+195 03 (Test Pile- M40 Pile 30
(Test Pile-02)
02)

Reaction Pile-
Reaction Pile-02
9 4/25/2021 413+195 02 (Test Pile- M40 Pile 30
(Test Pile-02)
02)

Reaction Pile-
Reaction Pile-01 01 (Test Pile- M40 Pile
10 4/26/2021 413+195 30
(Test Pile-02)
02)

11 6/1/2021 414+693 Pier-18 (Working Pile-04 M40 Pile 55.5


Pile)

Average Strength (N/mm2)

Standard Deviation

Standard Deviation Graph of M 40 Pile (28 days


70.00

68.00
Standard Deviation 2.15
66.00
CUBE STRENGTH (N/MM2)

64.00

62.00

60.00

58.00

56.00

54.00

52.00

50.00
1 3 5 7 9 1 1 13 1 5 17 19 2 1 2 3 25 2 7 29 31 3 3 3 5 37 39 41 43 4 5 4 7 49 51 53 55

SL No.
50.00
1 3 5 7 9 1 1 13 1 5 17 19 2 1 2 3 25 2 7 29 31 3 3 3 5 37 39 41 43 4 5 4 7 49 51 53 55

SL No.
th Summary (MAHSR, Sec-1)
28 days

Average LCL UCL Remarks


Individual Set
strength
(N/mm2)
(N/mm2)
61.46 57.43 64.51
64.12 57.43 64.51
62.58 63.10 57.43 64.51
63.6 57.43 64.51
63.76 57.43 64.51
61.28 57.43 64.51
60.06 57.43 64.51
61.22 57.43 64.51
59.55 57.43 64.51
60.72
62.76 57.43 64.51
59.8 57.43 64.51
60.53 57.43 64.51
60.58 57.43 64.51
58.15 57.43 64.51
60.16 57.43 64.51
61.27 57.43 64.51
59.14 59.9 57.43 64.51
59.51 57.43 64.51
60.39 57.43 64.51
60.68 57.43 64.51
61.05 57.43 64.51
61.36 57.43 64.51
59.44 57.43 64.51
60.75
60.68 57.43 64.51
61.17 57.43 64.51
60.79 57.43 64.51
59.77 57.43 64.51
61.24 57.43 64.51
60.24 57.43 64.51
61.00
61.25 57.43 64.51
62.17 57.43 64.51
61.33 57.43 64.51
66.78 57.43 64.51
65.97 57.43 64.51
66.54
67.29 57.43 64.51
66.11 57.43 64.51
59.46 57.43 64.51
59.78 57.43 64.51
60.24 57.43 64.51
59.89
60.17 57.43 64.51
59.79 57.43 64.51
59.89 57.43 64.51
63.19 57.43 64.51

61.86
62.47 57.43 64.51
62.04 57.43 64.51
61.86
61.19 57.43 64.51
60.53 57.43 64.51
61.71 57.43 64.51
59.56 57.43 64.51
60.04 57.43 64.51
60.23 57.43 64.51
59.93
59.69 57.43 64.51
60.09 57.43 64.51
59.98 57.43 64.51
61.63 57.43 64.51
61.73 57.43 64.51
62.12 57.43 64.51
62.16
62.68 57.43 64.51
62.48 57.43 64.51
62.34 57.43 64.51
57.07 57.43 64.51
57.45 57.43 64.51
57.53 57.43 64.51
57.28
56.7 57.43 64.51
56.23 57.43 64.51
58.67 57.43 64.51
60.97

2.15

h of M 40 Pile (28 days)


rd Deviation 2.15

Column
K
Column
L
Column
I