No. WAP/POW/BURUNDI/KABU-16/MINHEM/1704 Date: 05.07.

2021
Monsieur Dr. Ir. Martin NDAYIZEYE,
Director General,
General Directorate of Energy,
Ministry of Hydraulics, Energy and Mines,
P.O. Box: 745,
Bujumbura / Burundi
Sub: KABU-16 HEP (2x10 MW), Burundi–Re-Concurrence of 11KV SPBD Terminal Drawing, Rev.C.
Ref:
1) AIL letter no. 1696 dated 27.07.2020-Submission of11KV SPBD Terminal Drawing (Rev-0)
2) WAPCOS Letter no. 1376 dated 07.10.2020-Comments on11KV SPBD Terminal Drawing
3) AIL letter no. 1969 dated 04.11.2020-Submission of revised 11kV SPBD Terminal Drawing-
Rev.A
4) Telephonic discussion with AIL dated 25.11.2020
5) AIL letter no. 2028 dated 26.11.2020-Submission of revised 11kV SPBD Terminal Drawing-
Rev.B
6) WAPCOS Letter no. 1497 dated 15.12.2020- Comments on11KV SPBD Terminal Drawing,
Rev.B
7) Telephonic discussion dated 29.12.2020
8) AIL submitted clarification by email dated 30.12.2020.
9) WAPCOS Letter no. 1537 dated 06.01.2021- Concurrence of 11KV SPBD Terminal
Drawing,Rev.B
10) AIL letter no. 2200 dated 10.02.2021-Submission of revised 11KV SPBD Terminal Drawing
(Rev-C)
11) WAPCOS Email dated 06.04.2021- Comments on11KV SPBD Terminal Drawing, Rev.C
12) AIL submitted clarification by email dated 13.05.2021.

Dear Sir,

With above reference (9),the document was concurred. Further, AIL vide above reference (10)
submitted the revised documents on 11kV SPBD Terminal Drawing, Rev.C to MOHEM/WAPCOS for
review/approval. The submitted document has been reviewed by WAPCOS and WAPCOS observations
v had been issued by reference (11). However, AIL submitted their clarification by email dated
13.05.2021 and found to be complied our all quaries. Accordingly, WAPCOS hereby recommend/re-
concurs the following document for MOHEM approval:
S. No. Name of Document Document No. Revision Submitted on
1. 11KV SPBD Terminal Drawing 2-10101546 C 13.05.2021

Page 1 of 2
AIL is requested take care the aspect in Excitation Transformer design, which already intimated vide
above reference(9). Any change in approved bus duct drawing due to above shall be done by AIL.

However, concurrence of this document does not relieve the contractor of any responsibility for
Accuracy, Correctness of Design, Drawing, Fabrication, Erection, Testing, Commissioning and
Satisfactory Performance of the Equipment at the site and Guarantee etc. under the contract.
Yours Sincerely,

Dy. Chief Engineer


WAPCOS LIMITED

Copy to:
1. Mr. Cyprien SIMBANANIYE, Head of NCU, Burundi
2. Mr. D.V.S.N Raju, Chief Project Director (Power), WAPCOS For your kind information please
3. Mr. D.P. Singh, Project Manager, WAPCOS
4. Dr. R. Venugopal Rao,Sr.VP and Head, AIL, Noida For necessary action please

Page 2 of 2