SPECIFICATION
of
RO WATER SYSTEM
for
(PHOSPHATES DIVISION)
1-1. Outline
RO WATER SYSTEM
Co.,Ltd.
-Commissioning
-Operator Training
1-5. Guarantee
Within 1 (one) year after hand-over of the equipment, for any troubles
or
1
1-6. Acceptance
your
inspector.
water.
for communication.
# Description Remarks
1 Mechanical Equipment
automatic valves
2 Electrical Equipment
3 Manual
2
3. DESIGN and CONDITION
Name of Sample
Unit Minimum Average Maximum
Description
Chloride mg/l as Cl 22 22 22
3
RO Water Tank RO Water Tank 10 m3
Brine Water
Brine Water Tank 15 m3
Tank
Consumption
DESCRIPTION Usage REMARKS
(kg/day)
4. MECHANICAL EQUIPMENT
Capacity :
1 Raw water tank 1 Exiting
Dimension :
Type :Centrifugal
Gravel :600L
: 1 C/Days
4
5 Micro filter 1 Feed Water :8m3/H SUS304
5pes
5.5kw
Type :Centrifugal
3element
2’nd : 1vessel x
2element
Capacity :
8 RO water tank 1 Exiting
Dimension :
Capacity : 50 Lits
9 Anti Scale Tank 1 PP
Dimension : 380φx480H
5
RO module ~ DI water supply : UPVC
4-2-3. Valves
corrosion, abrasion.
4-2-4. Supports
5. ELECTRICAL EQUIPMENT
Main circuit
-MCB++N+ELR triples
6
-Voltage meter □Yes ■No
Motor circuit
Breaker MCB
Execution method
Item Indicate
Equipment Measuring Point Q'ty
No. Indicator Totalizer Alarm
Softened Water ○
T1 Level Switch 1 - -
Tank low
Full
T2 Level Switch RO Water Tank 1 - -
lamp
Conductivity
CIA RO water 1 ○ - -
Indicator
RO pump Full ○
RO1 Pressure switch 1 -
inlet
lamp low
7
6. SCOPE OF WORKS
Allocation
# Apparatus Out of Other
Remarks
SCS
Scope Vendor
System
1-1 RO water system - ○ -
Control
1-2 Waste water treatment system - - -
Service
1-3 Use Point piping (ROW) ○ - -
Co.,Ltd.
8
4-5 Secondary power wiring materials - ○ -
Materials and works for primary
4-6 ○ - -
earthling
Allocation
# Apparatus Out of Other
Remarks
OT
Scope Vendor
6 Painting
proposed facilities.
9
8-2 Trench and cover if necessary. ○ - -
Opening and after closement for
8-3 ○ - -
straight though piping
Noise isolation
9 ○ - -
Allocation
# Apparatus Out of Other
Remarks
OT
Scope Vendor
Utilities
facilities
10
Electricity (for commissioning
10-3 ○ - -
and operation)
Others
11
test
11-4 ○ - -
run
7.CONSUMABLES
List shows Standard of Replacement
・ Activated
Filter
This replacement interval term is estimated under based on the quality of raw
water.
If the quality and/or the treatment volume were changed worse and bigger
11
These consumable are consumed from the test run.
12