Professional Documents
Culture Documents
SPECIFICATION
of
DI WATER SYSTEM
Capacity : 10 m3/hr.
for
Table
1.DESIGN
OUTLINE ..........................................................2
1-1. OUT
..........................................2
1-4. SCOPE OF
WORK .......................................................3
1-5.
GUARANTEE ...........................................................3
1-6.
ACCEPTANCE ..........................................................3
REGULATIONS .........................3
2.DRAWING AND
DOCUMENTS ....................................................4
3.DESIGN AND
CONDITION .....................................................5
QUALITY .............................................5
WATER ................................5
WATER .....................................6
UTILITY ................................................6
4.MECHANICAL
EQUIPMENT ....................................................6
4-1. EQUIPMENT
LISH ......................................................7
4-2. PIPING
MATERIALS/VALVES/SUPPORTS ....................................8
4-2-1. PIPING
MATERIALS ..................................................8
NUT .........................................................8
1
4-2-3.
VALVE .............................................................8
4-2-4.
SUPPORTS ..........................................................8
5.ELECTRICAL
EQUIPMENT .....................................................9
5-1. CONTROL
SYSTEM ......................................................9
EQUIPMENT .....................9
5-3. CABLE
WORK .........................................................10
6. SCOPE OF
WORK ..........................................................10
7.
CONSUMABLES ............................................................13
1. DESIGN OUTLINE
1-1. Outline
2
Flow rate : 15m3/H
- Commissioning
- Operator Training
1-5. Guarantee
3
to responsibility of System Control Service Co.,Ltd., shall be repaired
1-6. Acceptance
of your inspector.
communication.
# Description Remarks
1 Mechanical Equipment
4
1-3 Foundation drawings(with loading data)
pumps, vessels
1-4 Structure drawings of Main equipment
automatic valves
2 Electrical Equipment
3 Manual
5
3-1. Condensate Water Quality
Name of Sample
Unit Average
Description
pH 8.21
Temperature C 90-95
Iron <0.5
Manganese <0.3
Color <5
6
3-3. Treated Water Quality of RO Water
380V 50Hz 3-
Control Panel in
Electricity phase 89kw
RO&DI Water System Yard
4wire+earth
Raw Water
Cooling Water System 15m3/Hr
Supply
Condensate
DI Water System 15m3/Hr
Water Supply
7
4. MECHANICAL EQUIPMENT
4-1. Equipment List
12element SUS304
Element : 1micronx40inch
8
9 EDI Unit 1 Feed Water : 11m3/Hr SUS316
Q’ty : 1 Lot
supply
to RO Unit to RO Tank
Installation ACF
to
DI Supply pump
Water
9
Tank [DI Water Plant]
installation
Nylon tube
- Sanitize DI Loop
- Analysis Report
4-2-3. Valves
4-2-4. Supports
5. ELECTRICAL EQUIPMENT
10
5-2. Common specification of the operation equipment
Main circuit
MCB+ELR triples
Motor circuit
Breaker MCCB
Execution method
In general, all piping and cablings are of exposed overhead type, and
Item Indicate
Equipment Measuring Point Q'ty
No. Indicator Totalized Alarm
Condensate
1 Level Switch 1 Full lamp -
Water Tank
low
11
Conductivity
2 RO water 2 ○ - -
Indicator
3 Level Switch RO Water Tank 1 Full lamp -
low
4 Level Switch DI WaterTank 1 Full lamp -
low
Resistivity
5 EDI Unit 1 ○ -
Indicator
high
6 Level Switch DI Water Tank 1 Full lamp -
low
RO pump
7 Pressure switch 2 ○ -
Inlet
low
8 Pressure switch Air line 1 - -
low
6. SCOPE OF WORKS
Allocation
# Apparatus Out of Remarks
Other
SCS*
Scope Vendor
*System
1 Design & engineering
Control
1-1 Condensate water system
- - Service
Co.,Ltd.
1-2 RO water system - -
12
1-3 DI water system
- -
Allocation
# Apparatus Out of Remarks
Other
SCS*
Scope Vendor
Electrical and *System
4
Instrumentation Control
Control Panel
4-2 - -
(for Filter & DI water
system)
13
Primary power wiring
4-3 -
materials -
Lighting system
4-10
- -
-Insulation(Insulator +
- -
Aluminum Tape)
Painting
6
Rust proof painting works at
6-1
shop on carbon steel.
- -
14
Finish painting materials
6-2
and - -
Works on carbon steel.
Mechanical Erection of DI
7
water
- -
System
Allocation
# Apparatus Out of Remarks
Other
SCS*
Scope Vendor
Civil and foundation *System
8
Control
All civil work and foundation
8-1
Service
work (include design) for our
- -
Co.,Ltd.
proposed facilities.
15
Loading data and dimension
8-6
- -
Noise isolation
9 - -
Utilities
10
Following utilities supplied
for siteconstruction,
Raw Water
10-1 - -
Others
11
16
Charge for water analysis at
11-2
Commissioning
- -
Allocation
# Apparatus Out of Remarks
Other
SCS*
Scope Vendor
Other works which are not *System
7.CONSUMABLES
List shows Standard of Replacement
Micro filter
Micro Filter 3 micron 1 set 100% 2 months
elements
quality of raw water. If the quality and/or the treatment volume were
17
shorter than described above.
18