CONDITION Frequency of Maintenance and service 2 time per month is the first week of month and third week of month with the detail data report and check sheet. Incase of problems such as defective equipment due to use or any appropriate equipment replacing or repairing it promptly so that it can continue to work. The cost incurred. Lt is considered to be a work of System Control Service can be expenses to TPL.
MAINTENANCE SERVICE AGREEMENT
PLANT : UDI WATER SYSTEM & RO WATER SYSTEM PLANT & RO PEROXIDE SYSTEM ORDERED : THAI PEROXIDE CO.,LTD.
SUPPLIER : SYSTEM CONTROL SERVICE CO.,LTD.
TERM OF PAYMENT : 30 DAY
TOTAL AMOUNT : 21,000 Baht
ATTACHED CONDITION : GENERAL CONDITION AND SPECIFICATION
KINDLY SIGN THE DUPLICATE AND IT IN CONFIRMATION OF THE ABOVE EACH.
THAI PEROXIDE CO.,LTD. SYSTEM CONTROL SERVICE CO.,LTD.
………………………………………… ……………………………………………
(…………………………………) (…………………………………)
………………………………………… MANAGING DIRECTOR
EXCLUSTIONS : For proper completion of the equipment, the
following items which are excluded from this quotation, have be to provided by owner or purchaser. 1) All Thailand Import Tax ( B.O.I.) 2) All civil engineering and works such as foundation, concrete structure , concrete tank , buildings , cover of pits , handrails and water proof martar. 3) Reception , unloading and storage of equipment and components 4) All necessary utilities , materials lubrication oil , etc., for the erection and test run. 5) Lighting facilities. 6) In case equipment is problem, will to service charge only equipment. 7) All earth wiring materials and labour. 8) Acid and Alkali resistance paint , for concrete tanks. 9) Manholes for concrete tank 10) Pipe pit 11) Customs Handling Charge at Thailand. 12) Value Added Tax (Vat) 7%