Deciding the location of a new plant, warehouse or other facility is an important and commonly discussed problem as long te
Uncertainties in transporation costs from the chosen location to the supply points are also required to be taken into conside
associated with 5 potential distribution centres (warehouses to store goods) and enables us to select the optimal location w
Discussion
We have selected 5 potential locations in some Indian states (Maharashtra, Jharkhand, West Bengal, etc.) for a new distributi
investment will also vary for every site, as shown in the Model Parameters worksheet. Other expenses such as Gas Prices, Nu
irrespective of the location chosen.
In the Model worksheet, we have listed 147 delivery points that must receive deliveries from the chosen distribution center.
week. We have considered factors such as detours, poor road conditions and indirect routes from distribution center to the s
Initially, in Row 5, we can see that no center has been selected. By entering 1 in any of the Decision cells in L8:L12, we can en
cell values as zero)
When we test each location, the model recalculates the Distances for the supply points as well as the cost cells in Row 5 with
offers the lowest Total Cost.
Using OptQuest, cont.
To view the details of a decision variable, highlight the cell and either select Define Decision from the Define menu or click
Decision button on the Crystal Ball toolbar.
Start OptQuest from the Run menu and use the OptQuest Wizard to view the settings for the optimization. The problem ha
can only select one of the five centers at a time) and one objective: to minimize Total Cost.
Run the optimization. For each optimization, OptQuest selects a new value within the defined range of each decision varia
runs a Crystal Ball simulation (e.g., 2000 trials). OptQuest then saves the mean Total Cost value. OptQuest then runs anot
new set of decision variables. OptQuest repeats this process, constantly searching for the lowest Total Cost until it either w
possible solution or reaches the end of the set running time. In this model, there are only five possibilities, so the model run
As OptQuest runs, it uses multiple metaheuristic methods and techniques to analyze past results and improve the quality a
process. You can watch OptQuest's progress through the performance graph, which shows a flattened line as it converges
Which center results in the lowest Total Cost? Is this what you expected? Once OptQuest is finished, you can copy the opt
your spreadsheet through the Copy Best Solution to Spreadsheet option in the Edit menu. Your spreadsheet now displays
and Crystal Ball displays the forecast chart for the simulation from the best optimization. You can use OptQuest's Solution A
review the other optimization results.
Copyright Information
Copyright © 2004, 2008, Oracle and/or its affiliates. All rights reserved.
Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Other names
may be trademarks of their respective owners.
only discussed problem as long term capital expenditure is involved, apart from strategic implications of the potential locations chosen.
equired to be taken into consideration, apart from operating costs and capital investment. The model we have built analyzes the costs
to select the optimal location with the least investment.
Bengal, etc.) for a new distribution center. The costs of transportation and operations will be different for each state, and the capital
expenses such as Gas Prices, Number of Employees, Years of Operation, KwH per Year and Electricity Costs will all remain constant,
m the chosen distribution center. Due to differences in geographical locations, these cities will receive deliveries at a different rate per
from distribution center to the supply centres in calculation of Distance per week.
ecision cells in L8:L12, we can enter a center into Row 5. ( Note: only select one center at a time, leaving the other four decision variable
ell as the cost cells in Row 5 with the data from the Model Parameters sheet. By testing each center, we can determine the location that
n from the Define menu or click on the Define
Trips per week Distance (km) Column2 Distance per week (km) Wage ($/hr)
592.34 0.000 65748 ₹ -
467.1 59.030 66017 ₹ -
351.2 123.053 70064 ₹ -
274.14 178.084 68014 ₹ -
226.48 79.419 67779 ₹ -
Trips per week Distance (km) Distance Factor Distance per week (km)
592.34 1668.229 1.500 2964476
467.1 2246.773 1.500 3148403
351.2 1304.258 1.500 1374166
274.14 2272.329 1.500 1868809
226.48 2148.504 1.500 1459780
194.92 2017.136 1.500 1179540
155.28 2207.848 1.500 1028504
148.2 2117.175 1.500 941296
116.14 2165.302 1.500 754435
67.64 1493.839 1.500 303130
61.467 1799.839 1.500 331892
54.02648 1542.824 1.500 250060
49.9394 1463.038 1.500 219190
48.1133 1816.652 1.500 262215
47.62904 1656.278 1.500 236661
44.03854 1935.379 1.500 255694
41.31542 2104.474 1.500 260842
40.71844 1772.817 1.500 216559
37.66762 1825.956 1.500 206338
34.5864 2205.815 1.500 228874
33.68444 1305.863 1.500 131962
32.98 1707.936 1.500 168983
31.7141 1659.538 1.500 157892
31.53228 2217.536 1.500 209772
31.22258 2408.022 1.500 225554
31.16 1385.304 1.500 129498
29.72106 2153.808 1.500 192040
27.88 1668.551 1.500 139558
27.4266 2072.900 1.500 170558
26.70794 2247.498 1.500 180078
26.10858 1630.261 1.500 127691
25.35128 1687.846 1.500 128367
25.23034 2231.269 1.500 168887
24.92 1324.556 1.500 99024
24.02 1492.373 1.500 107540
23.96982 1432.489 1.500 103010
23.6114 1732.117 1.500 122693
22.64766 1761.309 1.500 119669
22.6232 1635.755 1.500 111018
22.51796 2220.858 1.500 150028
22.03962 1678.594 1.500 110987
21.94 1691.546 1.500 111338
21.5415 1302.777 1.500 84191
21.4688 1398.401 1.500 90066
20.9648 1955.875 1.500 123014
20.52918 1649.751 1.500 101604
20.28454 2348.824 1.500 142934
20.20174 1680.431 1.500 101843
20.03388 1853.541 1.500 111401
20 1539.511 1.500 92371
19.9 1994.396 1.500 119065
19.19646 2401.136 1.500 138280
19.14704 968.233 1.500 55616
19.14704 967.438 1.500 55571
19.03116 2132.526 1.500 121753
18.33714 2335.462 1.500 128477
17.8 2276.623 1.500 121572
17.4745 1718.123 1.500 90070
16.75474 1531.468 1.500 76978
16.2931 2233.028 1.500 109149
15.74 1567.485 1.500 74017
15 2263.345 1.500 101851
14.87382 2535.149 1.500 113122
14.10956 1617.116 1.500 68450
14.0914 1932.805 1.500 81708
13.86472 2314.648 1.500 96276
13.81688 2089.688 1.500 86619
13.54762 2484.701 1.500 100985
13.46892 1356.741 1.500 54822
13.0811 2321.469 1.500 91102
13 2379.088 1.500 92784
12.95016 1974.395 1.500 76706
12.51662 1473.353 1.500 55324
12.47682 2404.919 1.500 90017
12.47416 1994.773 1.500 74649
12.12014 1520.028 1.500 55269
11.90236 1857.404 1.500 66322
11.5684 1578.253 1.500 54774
11.33034 1295.593 1.500 44039
11.27834 1305.061 1.500 44157
11.09956 2185.255 1.500 72766
10.9874 1897.498 1.500 62546
10.95242 2091.196 1.500 68711
10.84642 1888.482 1.500 61450
10.844 2489.093 1.500 80975
10.58014 1932.334 1.500 61333
10.45226 1118.226 1.500 35064
10.3043 1923.042 1.500 59447
10.14 1681.331 1.500 51146
10.12196 2219.400 1.500 67394
10.07128 2278.678 1.500 68848
10.04394 1744.870 1.500 52576
9.76314 2285.806 1.500 66950
9.6723 2100.681 1.500 60955
9.5984 2286.008 1.500 65826
9.58146 2063.254 1.500 59307
9.48186 1349.998 1.500 38401
9.20936 2014.695 1.500 55662
9.15266 2111.361 1.500 57974
9.022 2001.976 1.500 54185
8.90776 2197.640 1.500 58728
8.73278 2238.629 1.500 58648
8.72188 2468.633 1.500 64593
8.6312 2442.592 1.500 63247
8.51634 1946.476 1.500 49731
8.2042 1226.648 1.500 30191
8 1826.669 1.500 43840
7.99212 2277.262 1.500 54600
7.94838 2528.016 1.500 60281
7.84902 1618.384 1.500 38108
7.79822 1920.980 1.500 44941
7.7701 1976.013 1.500 46061
7.72038 1283.467 1.500 29727
7.68364 1862.615 1.500 42935
7.56652 2019.953 1.500 45852
7.54694 1294.903 1.500 29318
7.48788 2067.221 1.500 46437
7.48584 1704.353 1.500 38276
7.39982 2457.384 1.500 54553
7.01718 2137.065 1.500 44989
6.89786 2141.301 1.500 44311
6.83662 1879.337 1.500 38545
6.82844 1735.337 1.500 35549
6.664 1271.303 1.500 25416
6.6206 1619.875 1.500 32174
6.61022 1671.473 1.500 33146
6.60422 1295.979 1.500 25677
6.58448 1684.448 1.500 33274
6.5648 1727.693 1.500 34026
6.54854 2180.709 1.500 42841
6.49452 1625.416 1.500 31669
6.40868 1523.471 1.500 29290
6.31192 2459.496 1.500 46572
6.2853 1287.426 1.500 24276
6.27618 1308.152 1.500 24631
6.21704 1554.596 1.500 28995
6.21634 1179.471 1.500 21996
6.14048 1751.522 1.500 32266
6.12818 1637.505 1.500 30105
6.00272 2039.285 1.500 36724
5.92836 1551.390 1.500 27592
5.89092 1088.633 1.500 19239
5.86746 1298.302 1.500 22853
5.85616 1666.831 1.500 29284
5.79642 1933.671 1.500 33625
5.78858 2278.298 1.500 39564
5.7514 2250.905 1.500 38838
Decisions Column3
1 1
0 0
0 0
0 0
0 0
Model Parameters
Transportation Cost
Truck Drivers Mean Wage Std Dev Error Hours Wage
Delhi ₹ 200.00 ₹ 27.20 13.6 39.6 ₹ 14.98
Mumbai ₹ 250.00 ₹ 19.25 7.7 39.7 ₹ 17.98
Kolkāta ₹ 180.00 ₹ 23.58 13.1 40.5 ₹ 17.41
Gas Prices $/MCF ₹ 80.00
Operating Cost
Laborers Mean Wage Std Dev Error Hours Wage
Delhi ₹ 200.00 ₹ 10.60 5.3 34.4 ₹ 11.34
Mumbai ₹ 250.00 ₹ 19.25 7.7 37 ₹ 12.74
Kolkāta ₹ 180.00 ₹ 7.56 4.2 32.8 ₹ 8.87
Number of Employees 950
Years of Operation 13.0
KwH per Year 11,000,000
Electricity Cost $/KwH ₹ 7.00
Capital Investment
Delhi ₹ 55,000,000.00
Mumbai ₹ 80,000,000.00
Kolkāta ₹ 75,000,000.00
Bangalore ₹ 90,000,000.00
Chennai ₹ 35,000,000.00