GENERAL NOTES

01. All dimensions are in MM.


02. All dimensions are to be read and not to be measured.
03. Refer detail drawings wherever mentioned.

TYPE OF STAIR : SIDE BEAM STAIR CASE WITH WOODEN FINISH FINISHING : TRADES ARE FINISHED WITH WOODEN PLANKS. 04. All levels are unfinished levels.
05. All dimensions are of unfinished surfaces.
06. All flooring slopes indicated with the floors should be tested and
SIDE BEAM STAIRCASE WITH WOODEN FINISH

certified by the site supervision team.

STRUCTURE : RCC WALL AND BEAM ,STEPS ARE RESTED ON STEEL RAILINGS : RAILINGS ARE MADE FROM WOODEN PLANKS AND 07. In case there is any ambiguity/discrepancy between the Architectural
drawings and other consultant drawings, this ambiguity/discrepancy to be
brought to the notice of the Architect before commencement of the work.
BEAM AND TRADES ARE FIXED ON METAL CLIEAT SUPPORTED BY STEEL PIPES WHICH FIXED AT UPPER SLAB 08. The civil contractor shall cross check all service drawings. And any
ambiguity there-in shall be brought to the notice of the Architect before
commencement of work on site.
09. This drawing is the property of XXXXX Architects. It should not be
used without the prior permission of the Architect.

KEY PLAN

WOODEN PLANKS FITTED ON


STEEL CLEAT BY SCREW
31 32 33 34 35 36 37 38 39 40
C
DN

0
20
50
20 20 MM DIA
STEEL ROD
DETAIL C SUSPENDED

8 40
FROM SLAB @
WOODEN
TERRACE LVL
RAILING
30 29 28 27 26 25 24 23 22 21 C SUSPENDED LEGEND
WOOD LEVEL DIFFERENCE
ON STEEL ROD
RCC M.S. GRILL
FLOOR-LINE
TERRACE FLOOR PLAN S.S RAILING
DETAIL E 20 MM DIA RWP

STEEL ROD
FOR SUPPORT
OF RAILING
280
20 MM DIA REFERENCES
DRAWING NO./
STEEL ROD SR.NO. ITEM REFERENCE NO. REMARKS

FOR SUPPORT 01

OF RAILING 300

40
02

11 12 13 14 15 16 17 18 19 20 03

WOODEN
TERRACE FLOOR
DN RAILING 39 LVL +6600
SUSPENDED 38 E
ON STEEL ROD 37
36 STEEL FLIGHT
35 CONNECTED REVISION
WITH RCC

150
34 REVISION DATE DESCRIPTION

33 LANDING BY VALSADI TEAK R1 25-6-'19 Change in Toilet Layout


up BOLT WOOD PLANK
32 C -CHANNEL
LANDING 31
30 25 SECTION BEAM
29 28 27 26 24 23 22 21 LVL + 5100 30 @ BOTH SIDE

2850
29
28 DETAIL B STEEL ANGLE 1. Last revised drawing shall supersede all previous drawings.
2. On receipt of the revised drawing, relevant previous drawing shall
FIRST FLOOR PLAN 27 CLEAT be returned to the Architect's office.
26
25 PRINTS ISSUED FOR:
B 24 DATE REVISION CLIENT SITE CONSULTANT OFFICE COPIES SIGN

23 15-5-'19 R0 -- E -- -- 05 YP

22 25-6-'19 R1 -- E -- -- 05 YP
3000

21
FIRST FLOOR
LVL +3600
18
17
D T-TENDER, R- REFERENCE, I- INFORMATION, E- EXECUTION
16
11 12 13 14 15 16 17 18 19 20 15
PROJECT -
600

14
EQ EQ EQ EQ EQ EQ EQ EQ EQ
200

13
12 DETAIL D DRG.TITLE STAIRCASE DETAIL
LANDING DRG. NO. -
2200

11
2850

LVL + 2100 10
DATE 03-07-2020
9
DRN. BY YASH MISTRY
A 300 A
8
7 CHK. BY PROF.HARDIK GANDHI
up
1500

6
1000 EQ EQ EQ EQ EQ EQ EQ EQ 5
STEEL FLIGHT
D
APPROVED BY PROF.HARDIK GANDHI
1:10; 1:5, 1:50,
10 9 8 7 6 5 4 3 2 1 4 SCALE
3 CONNECTED N
GRAPHICAL SCALE
2 WITH RCC SLAB 0.5 1
0 3
1 BY BOLT@
GROUND FLOOR PLAN FIRST FLOOR
NAME: YASH MISTRY CODE : 59
SECTION AA LVL
B.ARCH-lll SEM-V
ELEVATION
A.A.E.R.T. & THE S.S.B.,

STAIRCASE DETAIL
FACULTY OF ARCHITECTURE,
SCET, SURAT.