You are on page 1of 41

An Introduction to Design for Six

Sigma concepts
Dr Jane Marshall
Product Excellence using 6 Sigma
Module

PEUSS 2012/2013 Design for Six Sigma Page 1

Objectives of the session


• History of Six Sigma
• Describe the Six Sigma Philosophy
• Introduce DFSS
• Key points in DFSS
• DFSS background
• DFSS process
• Differences between DFSS and Six Sigma

PEUSS 2012/2013 Design for Six Sigma Page 2

1
Introduction to Six Sigma
• Six Sigma is:
– A business process
– Proactive approach to designing and monitoring key
activities
– Philosophy
– Methodology
– A process that is customer focussed and profit
driven

PEUSS 2012/2013 Design for Six Sigma Page 3

Introduction to Six Sigma


• It works by:
– Being adopted by the whole company;
– Creating an internal infrastructure within the
company;
– Using metrics to measure processes and changes to
processes
– Using scientific methods, changing the working
culture and introducing business process
management
PEUSS 2012/2013 Design for Six Sigma Page 4

2
Six Sigma Background
• Motorola employee investigating variation in
various processes
• Acted on results using tools to reduce variation
• Improved the effectiveness and efficiency of the
processes
• Engaged CEO
• GE is the company that made SIX Sigma a
management philosophy
PEUSS 2012/2013 Design for Six Sigma Page 5

What is six sigma performance ?


Sigma ( s ) is a statistical metric that corresponds to dpm
(defectives per million)

2s 3s 4s 5s 6s
308,537 dpm 66,807 dpm 6,210 dpm 233 dpm 3.4 dpm
PEUSS 2012/2013 Design for Six Sigma Page 6

3
DMAIC Define business objectives
Set Up project team, establish the charter and develop
project plan
Review customer requirements
Define Map process

Data collection plan


Confirm starting and targets
Measure Validate measurement system

Data analysis
Analyse Root cause analysis
Process analysis

Improve Solution generation, selection and implementation

Launch new improvements


Control Monitor controls and track defect reduction
Design and implement audit plan

PEUSS 2012/2013 Design for Six Sigma Page 7

Product life cycle


Disposal
Concept and
definition

Operation and
maintenance Continuous
assessment
Design and
development
Installation

Manufacturing

PEUSS 2012/2013 Design for Six Sigma Page 8

4
Introduction to DFSS
• Systematic methodology for designing or
redesigning products or services according to
customer requirements and expectations.
• Optimises design process to achieve six sigma
performance
• Get it ‘right first time’

PEUSS 2012/2013 Design for Six Sigma Page 9

What is Design For Six Sigma?

• Companies who had seen the success of Six Sigma


for problem solving using DMAIC wanted to apply data
driven tools and techniques to the design of new
products, processes & services
• Typically, after 2 years of DMAIC, Design For Six
Sigma programmes were launched
• Applied in both Manufacturing and Service industries
in technical and non-technical environments
• Used to define and/or supplement the ‘design’
process
PEUSS 2012/2013 Design for Six Sigma Page 10

5
When to Use DFSS
• Creating a new product, process, or service
• Incremental improvement cannot close the gap
between the current process capability and customer
requirements
• Should spend time understanding the faults of
existing systems before you embark on a a redesign
methodology

PEUSS 2012/2013 Design for Six Sigma Page 11

Generic ‘Design’ Process

Requirements Flow down

Define Identify Select Develop Implement


Project Require- Concept Design Design
ments

CTQ Flow up

PEUSS 2012/2013 Design for Six Sigma Page 12

6
The DFSS Opportunity
1000 “Classic” Six Sigma
focuses here
to Impact Change
Relative Cost

100

DFSS focuses here

10

Research Design Development Production

Product Stage

“Design in” quality when costs are lowest


PEUSS 2012/2013 Design for Six Sigma Page 13

Effect of design phases on life cycle


Cost vs impact
cost

Potential is positive Potential is negative


Impact>cost Impact<cost

impact

Design Produce/build deliver Service support


time
PEUSS 2012/2013 Design for Six Sigma Page 14

7
The Vision of DFSS

Reactive Predictive
DFSS
Design Quality Design Quality

From To
• Evolving design requirements • Disciplined CTQ flow-down through
• Extensive design rework requirements management
• Product performance assessed by • Controlled design parameters
“build and test” • Confidence in product performance
• Performance and producibility • Designed for robust performance and
problems fixed after product in manufacture
use
• Quality “designed in”
• Quality “tested in”

PEUSS 2012/2013 Design for Six Sigma Page 15

DFSS Methodology
• DMADV
– Define, Measure, Analyse, Design and Verify

• PIDOV
– Plan, Identify, Design, Optimise and Validate.

PEUSS 2012/2013 Design for Six Sigma Page 16

8
DFSS Process
Plan Identify Design Optimise Verify

Generate,
Detailed
Develop VOC – CTQ evaluate, Demonstrate
design and
project select and satisfies
Prioritise CTQ optimise
plans review requirements
performance
concepts

Define Measure Analyze Design Verify

PEUSS 2012/2013 Design for Six Sigma Page 17

Process for DFSS - DMADV


Define
Initiate, scope and plan the project
Measure
Understand customer requirements and generate specification
Analyse
Develop design concepts and high level design
Design
Develop detailed design and verification plan
Verify
Demonstrate compliance and launch product

PEUSS 2012/2013 Design for Six Sigma Page 18

9
Tollgates and phases
• Stopping point within the flow of phases
– A thorough assessment of deliverables
– A thorough review of the project management plans for the
next phase
• Checklists
– Summary statements of tools and best practices required to
fulfil gate deliverable
• Scorecards
– Summary statements from specific application of tools and
best practice
PEUSS 2012/2013 Design for Six Sigma Page 19

DMADV

Define

PEUSS 2012/2013 Design for Six Sigma Page 20

10
DMADV - Define

Develop
Review
Develop Develop Organiza-
Identify Tollgate
the Project tional
Risks Require-
Charter Plans Change
ments
Plan

PEUSS 2012/2013 Design for Six Sigma Page 21

Elements of a Charter
• Problem Statement
• Opportunity Statement
• Importance
• Expectations/Deliverables
• Scope
• Schedule
• Team Resources
PEUSS 2012/2013 Design for Six Sigma Page 22

11
Develop Project Plans
• Project schedule and milestones
• Organizational change plan
• Risk management plan
• Review schedule

PEUSS 2012/2013 Design for Six Sigma Page 23

Risk Management Plan


• Design projects face a number of risks
• The team’s job is to anticipate where the key
risks of failure are and to develop a plan to
address those risks
• In Define, the team should:
– Identify known and potential risks for the project
– Indicate when and how the risks will be
addressed

PEUSS 2012/2013 Design for Six Sigma Page 24

12
Sources of risk
• External – legislation – outwith the control of the
project team
• Internal – within control of project design, human
factors and technology etc.
• Handle risk by taking action to avoid (mitigation)
• Build up reserves (contingency)

PEUSS 2012/2013 Design for Six Sigma Page 25

Spheres of Risk

 Risks cannot be transferred between disciplines


 Risks must be translated between disciplines
PEUSS 2012/2013 Design for Six Sigma Page 26

13
Project plan vs Risk plan
• Project Plan
– Outlines what the project team intend to do
– Supports the Project Management process

• Risk Plan
– Covers how the project team might have to
change the plan
– Supports the Risk Management Process

PEUSS 2012/2013 Design for Six Sigma Page 27

Risk Management Process

Identify Quantify/Classify Analyse

Get OWNERSHIP

Provision Monitor

Manage / Control

PEUSS 2012/2013 Design for Six Sigma Page 28

14
Systematic Risk Identification
• A structured approach that allows an organised critical
analysis of risks of the system under consideration.
• All risks are reviewed systematically.
• Risks are addressed from the system level to the
component level.
• Risks arising due to system functional, environmental
profiles, implicit & explicit requirements, interaction of
components/subassemblies, manufacturing/assembly
processes & supply chain are considered.

PEUSS 2012/2013 Design for Six Sigma Page 29

Risk Categorisation
Probability of occurrence Impact
high 5 Uncertainties high 5 Major redesign
Remain and program
delay
medium 3 Some
uncertainties medium 3 Minor redesign
remain and schedule
readjustment
low 1 Few
uncertainties low 1 Requirements
remain met within
schedule

Risk element scores = probability X impact


PEUSS 2012/2013 Design for Six Sigma Page 30

15
Categorizing Risks
• Risks are categorized by their probability of
occurrence and their impact on the project
Yellow Light: Red Light: Red Light:
Probability of Occurrence
High

Proceed with Address before Do not


caution proceeding proceed

Yellow Light: Yellow Light: Red Light:


Medium

Proceed with Proceed with Reassess


caution caution project

Green Light: Yellow Light: Red Light:


Low

Proceed! Proceed with Address before


caution proceeding

Low Medium High

Impact on Project
PEUSS 2012/2013 Design for Six Sigma Page 31

Mitigation versus Contingency

Mitigation involves buying off a


problem in advance

Contingency means being ready to


manage crises pro-actively

PEUSS 2012/2013 Design for Six Sigma Page 32

16
Effect of mitigation and contingency on
project plans
Project Plan
Contingency plans
Implemented and contingent
contingency mitigation plans
becomes part are held in the
of the project Risk Plan
plan
Mitigation activity is
entered directly into the
project plan

when an impact occurs


Contingency contingency plans are
Plan moved

PEUSS 2012/2013 Design for Six Sigma Page 33

Responsibility
• The Technical Manager or the Lead Engineer of the
project
• He/She acts as, or alternatively, nominates a team
leader.
• Responsible for organising Technical Risk Assessment
sessions & maintaining the information and selecting a
team.
• The team consists of at least one representative from:
– Project Management; Stress/Integrity; Design Engineering;
Development Testing; ILS; Quality; Manufacturing; Sourcing;
Systems/Requirements
PEUSS 2012/2013 Design for Six Sigma Page 34

17
Example: Risk
assessment/management
process
2 RISK IDENTIFICATION
Identify risk

3 RISK PRIORITISATION
Assess magnitude of the risk

4 RISK MANAGEMENT
Develop plans to manage the risk

PEUSS 2012/2013 Design for Six Sigma Page 35

Example

In order to ensure that all possible risks are identified,


the risk identification for a component/sub-assembly is
carried out in three stages:

Brainstorm all risks Brainstorm all risks Brainstorm all risks


associated with the associated with the associated with the
‘FUNCTION’ of the ‘REQUIREMENT’ of the ‘MANUFACTURE/
component (or component (or ASSEMBLY/ SUPPLY’ of
subassembly) subassembly) the component (or
subassembly)

PEUSS 2012/2013 Design for Six Sigma Page 36

18
Risk Identification
Example : Brainstorming risks
Remember all risks
Clamp Plate : The function of the clamp brainstormed must be
plate is to axially clamp the rotor considered & recorded !
windings
Who identified the
Sub- Part Type of risk Description of risk Who risk
assembly

Rotor Clam Function - What does it Clamp plate is too weak to clamp the rotor Paul
Wound p do ? (eg. Insulating, windings axially – could cause windings to Harris
Main Plate protecting) short against rotor framework.
Assembly
Requirement - What Cannot withstand the high CF loads – could Paul
does it have to cope with cause clamp plate to break & thus, windings Harris
? ( eg. CF loading, to short against rotor framework
vibration, temp., oil)
PROMPTS FOR Manufacture - How do New manufacturing process to be used. This Steve
BRAINSTORMING you make this or where may cause porosity of the material. Robb
RISKS!! did you buy it (supply
chain) ?

PEUSS 2012/2013 Design for Six Sigma Page 37

Magnitude of risk
• After a risk has been identified, the next step is to
assess the magnitude of the risk. This enables the
prioritisation of all the risks identified & ensures that a
concerted effort is made to mitigate the high scoring
risks.

• The following factors are used to assess the magnitude


of & prioritise technical risks :
» Pedigree
» Testing
» Analysis
» Severity
» Probability

PEUSS 2012/2013 Design for Six Sigma Page 38

19
Risk Prioritisation

FACTORS USED FOR PRIORITISING RISKS

PEDIGREE TESTING ANALYSIS SEVERITY PROBABILITY


Do we have any past Do we have any Do we have any What impact can What is the
experience (product evidence from evidence from this risk have on likelihood of the
/process) that can testing that can theoretical the project or risk being realised
help us assess the help us assess the analysis that can product ? ?
magnitude of the magnitude of the help us assess the
risk ? risk ? magnitude of the
risk ?

Based on evidence Based on expert judgement

PEUSS 2012/2013 Design for Six Sigma Page 39

Risk Prioritisation –
Function/Requirement Risks
Pedigree
1 Identical design in Long Field Service
3 Identical design in Development Units/ Similar
design in long term service Testing Analysis
9 New Design 1 Full representative test 1 Full Capable Analysis
3 Read across tests with good sample size/ 3 Preliminary Analysis
If pedigree = 1, stop scoring, move onto next risk. limited tests/ Verification 9 No Analysis/not capable of
9 Zero testing/ small sample size analysis

Example : Scoring Function/Requirements Risks


E ngineering Report

No Issu

Preliminary analysis : e:

D ate:

suggests design meets


This is a new design. Therefore, requirements. Therefore,
Pedigree = 9 Analysis = 3 Preliminary Analysis
Report
Clamp Plate

Sub- Part Type of risk Description of risk P T A Evidence


assembly
Rotor Wound Clamp Function - What does it do ? Clamp plate is too weak 9 9 3 Stress
Main Plate (eg. Insulating, protecting) to clamp the rotor
Assembly windings axially. Report 1234
Remember to record evidence used for
No development testing has been done using the new design of scoring. This can be updated as
Managements actions are completed.
PEUSS 2012/2013 the clamp plate. Therefore,Design
Testing =for
9 Six Sigma Page 40

20
Risk prioritisation – severity
and probability
Severity Probability
1 Low impact on product/project 1 Low
3 Medium impact of product/project 3 Medium
9 High impact on product/project 9 High

Example : Scoring Severity & Probability


The likelihood of the risk being
Sub- Part Type of risk Descriptio P T A RP S P realised is medium. Therefore,
assembly n of risk N1 R Probability = 3

Rotor Clam Function - Clamp 9 9 3 24 9 3


Wound p What does plate is 3
Main Plate it do ? (eg. too
Assembly Insulating, weak to
protecting) clamp

If the clamp plate fails to clamp windings axially, windings


centrifuge outwards & short on rotor framework, leading to
catastrophic failure. Therefore, Severity = 9
Windings short on rotor
frame work
PEUSS 2012/2013 Design for Six Sigma Page 41

Risk prioritisation – project


risk score
• The ‘Project Risk Score’ is calculated using the formula :
Project Risk Score = S X PR
• The Project Risk Score is used by the project managers for
the prioritisation of technical risks in the overall project risk
management process.

Example : Calculating the ‘Project Risk Score’

Sub- Part Type of risk Description of risk P T A RP S P RP Project


assembl N1 R N2 Risk
y Score

Rotor Clam Function - What Clamp plate is too 9 9 3 243 9 3 6561 27


Wound p does it do ? (eg. weak to clamp the
Main Plate Insulating, rotor windings axially.
Assembl protecting)
y
PEUSS 2012/2013 Design for Six Sigma Page 42

21
Risk prioritisation – managing actions
Example : Managing Risk Management Actions
At early stages, more risks
identified, total RPN2 rises

The project manager is responsible for managing the risk management


actions and maintaining the risk curve. A380 VFG Risk Curve

Effective
Management Who Planne Actual Status management of
Action d Closure risks –RPN 2
Closure Date falls.
Date RPN2
Carry out full David 15/01/02 Open
stress Bonniema
analysis of n
clamp plate
Monitor Peter 15/01/02 Open
performance Dunkz
Fields filled
of clamp plate in by project Expected Trend Time
manager
when next five
development
units are
tested
PEUSS 2012/2013
Design for Six Sigma Page 43

Risk Management
• Identify some risks for projects
• Estimate the probability of occurrence
• Estimate the effect/impact
• Identify mitigating actions for highest scoring
risks.

PEUSS 2012/2013 Design for Six Sigma Page 44

22
Project Reviews
• Regular reviews are key for successful
projects and should be included in the
project schedule
• There are several levels of review:
– Milestone or tollgate reviews; weekly reviews;
daily reviews
• In addition, design projects have three
unique reviews:
– Concept review; High-level design review;
Detailed design review
PEUSS 2012/2013 Design for Six Sigma Page 45

Key Outputs of DEFINE Phase


• Project team
• Project business case
• Project objective
• Project plan (GANNT chart)
• Document control systems
• Risk reduction plan

PEUSS 2012/2013 Design for Six Sigma Page 46

23
DMADV

Measure

PEUSS 2012/2013 Design for Six Sigma Page 47

DMADV - Measure
• Goals:
– Collect Voice of the Customer data
– Translate VOC into design requirements (CTQs)
– Identify the most important CTQs
– Develop the measurement system for each CTQ
– Develop a design scorecard
– Revise project objective if necessary

• Output:
– Prioritized CTQs

PEUSS 2012/2013 Design for Six Sigma Page 48

24
Measure: Tools
• Data collection plan
• Customer segmentation
• Customer research
• Voice of Customer table
• Kano model
• Affinity diagram
• Benchmarking
• QFD (Quality Function Deployment)

PEUSS 2012/2013 Design for Six Sigma Page 49

Measure: Key Activities

Understand Translate Prioritize Reassess


Voice of the VOC Needs CTQs Risk
Customer Into Require-
ments (CTQs)

PEUSS 2012/2013 Design for Six Sigma Page 50

25
What is the Voice of the Customer?

• The term Voice of the


Customer (VOC) is used to
describe customers’ needs
and their perceptions of your
product or service

• It includes all forms of


interaction between
customers and your
organization

Use of Kano analysis


PEUSS 2012/2013 Design for Six Sigma Page 51

Critical to Quality Characteristics


• A quality characteristic that specifies how the customer
need will be met by the product/service to be designed
• A quantitative measure for the performance of the
quality characteristic
• A target value that represents the desired level of
performance that the characteristic should meet
• Specification limits that define the performance limits
that will be tolerated by customers
• Several CTQs will exist for each need.
• Use QFD to transfer VOC data into CTQs
PEUSS 2012/2013 Design for Six Sigma Page 52

26
Develop and Validate a
measurement system
• Review data requirements
• Review how to capture data
• Review applicable analysis methods
– e.g. compare voice of the process with voice of the
customer – SPC and capability analysis
• Decision criteria to determine acceptance
• Establish validity of the measurement system

PEUSS 2012/2013 Design for Six Sigma Page 53

Develop a design scorecard


Used to help the team to:
• Establish nominal values and specification limits
for each CTQ
• Predict output of the voice of the process with
respect to stability (SPC)
• Highlight problems and risks of CTQs
• Track CTQs throughout the entire life of the
product
PEUSS 2012/2013 Design for Six Sigma Page 54

27
Generic design scorecard

Scorecard Part A (Voice of the Scorecard Part B (Predicted Voice of the process)
customer)
CTQ Target LSL USL Sigma Stable Shape Mean Standard DPU Predicted
target (Y/N) Deviation Process
Sigma

PEUSS 2012/2013 Design for Six Sigma Page 55

Reassess Scope and Risk


• How difficult do we predict it will be to meet all the
target values of the most important CTQs?
• Is it necessary to adopt a phased approach to meet the
target?
• What are the risks associated with not meeting the
CTQs now?
• What are the risks associated with dropping some of
the less important CTQs from consideration?

PEUSS 2012/2013 Design for Six Sigma Page 56

28
Measure: Tollgate Review
• This tollgate review focuses on
– Customer segmentation strategy
– Top 10-15 customer needs
– Top 8-10 CTQs and targets
– Summarized benchmark information
– Platform management matrix
– CTQ achievement matrix
• The review can lead to the following steps:
– Proceed to Analyse
– Redo parts Measure
– Stop the project
PEUSS 2012/2013 Design for Six Sigma Page 57

DMADV

Analyse

PEUSS 2012/2013 Design for Six Sigma Page 58

29
DMADV - Analyse: Key questions
• Important processes/functions that must be designed to
meet the design requirements?
• Key inputs and outputs of each process?
• Processes for which innovative new designs are
required to maintain a competitive advantage?
• Different solutions available for designing each process?
• What criteria do we use to evaluate these design
alternatives?
• Collect information on these criteria for evaluation?
PEUSS 2012/2013 Design for Six Sigma Page 59

DMADV - Analyse

Identify Key Prioritize Generate Evaluate Concept


Functions Functions Concepts and Analyze Review

PEUSS 2012/2013 Design for Six Sigma Page 60

30
Identify Key Functions

PEUSS 2012/2013 Design for Six Sigma Page 61

Identify Key Functions

PEUSS 2012/2013 Design for Six Sigma Page 62

31
Generate Concepts
• Concepts are generated using two approaches:
• Creative idea-generation techniques that focus
on analogy, connections, extrapolations and
creative visualization to develop new ideas
• Benchmarking techniques that study similar
designs in competing and non-competing
businesses

PEUSS 2012/2013 Design for Six Sigma Page 63

Design Review
• Process for objectively evaluating the quality of a
design at various stages of the design process
• Opportunity for voices external to the design team
to provide feedback on the design, as the product
and service is being developed
• Helps to ensure that the design will satisfy
customers, and that the design process will
function effectively to produce a high quality
product or service
PEUSS 2012/2013 Design for Six Sigma Page 64

32
When to conduct a design review
• Concept Review: Conducted after two to three key
concepts have been identified and their feasibility has
been determined.
• High Level Design Review: Conducted after a selected
concept has been designed to some level of detail and
tested, and before detailed design begins.
• Pre-pilot Design Review: Conducted when the detailed
design is complete and the product/service is ready to
be piloted.

PEUSS 2012/2013 Design for Six Sigma Page 65

Design for X
• Design for manufacture
• Design for assembly
• Design for reliability
• Design for testability
• Design for service
• Design for quality
• Design for reusability
• Design for environment
PEUSS 2012/2013 Design for Six Sigma Page 66

33
Analyse: Tollgate Review
• This tollgate review focuses on:
– List of key functions
– List of top concepts
– Pugh Matrix
– Concept review outputs
– Risk analysis update
• This review can lead to the following steps:
– Proceed to High Level Design
– Redo work on concepts, concept review and tollgate review
– Stop the project
PEUSS 2012/2013 Design for Six Sigma Page 67

DMADV

Design

PEUSS 2012/2013 Design for Six Sigma Page 68

34
DMADV - Design

High Level Detailed


Design Design

PEUSS 2012/2013 Design for Six Sigma Page 69

From Concept to Design


CONCEPT
Less Detail /Many Alternatives DESIGN

HIGH LEVEL Redesign


More Detail/Few Alternatives DESIGN

DETAILED
Most Detail/Single Alternative DESIGN

PEUSS 2012/2013 Design for Six Sigma Page 70

35
Design: Goals and Outputs
• Goals:
– Develop high level and detailed design
– Test design components
– Prepare for pilot and full scale deployment
• Outputs:
– Tested high level design
– Tested detailed design
– Plans for process control
– Completed design reviews
PEUSS 2012/2013 Design for Six Sigma Page 71

Design: Tools
• QFD
• Simulation
• Rapid prototyping
• Weibull analysis
• SPC and process capability
• Detailed design scorecards
• FMEA
• Reliability testing and qualification testing
• Design reviews

PEUSS 2012/2013 Design for Six Sigma Page 72

36
Tollgate review
The pre-pilot detailed design tollgate review
focuses on:
• Developed design
• Completed FMEA/simulation analysis
• Design solutions for vulnerable elements
• Organizational Change Plan updates
• Process management system variables
• Process management system details

PEUSS 2012/2013 Design for Six Sigma Page 73

DMADV

Verify

PEUSS 2012/2013 Design for Six Sigma Page 74

37
DMADV - Verify

Conduct
Plan the and Close
Evaluate Implement
Pilot Project
the Pilot

PEUSS 2012/2013 Design for Six Sigma Page 75

Steps in the Verify phase


• Build a prototype
• Pilot test the prototype
• conduct design reviews using design scorecards
• Decide if the process is meeting business
objectives
• Close DMADV project
• Transfer lessons learned from the project

PEUSS 2012/2013 Design for Six Sigma Page 76

38
Verify: Goals and Outputs
• Goals:
– ‘Stress-testing’ and de-bugging of prototype
– Implementation and team closure

• Outputs:
– Working prototype with documentation
– Plans for full implementation
– Process owners using control plans to measure, monitor and
maintain process capability
– Project closure and documentation completed
– Ownership transition from sponsor to operations
management, and from design team to process management
team(s)
– Lessons learned
PEUSS 2012/2013 Design for Six Sigma Page 77

Completion Checklist
• Completed project documentation that
summarizes results and learnings
• Recommendations (supported by updated
information, if possible) for the next generation of
this design
• Plans for (or results from) communicating your
achievements to the rest of the organization
• Plans for celebrating your success
PEUSS 2012/2013 Design for Six Sigma Page 78

39
Advantages of DFSS
• Provide structure to development process
• Anticipate problems and avoid them
• Reduce life cycle cost
• Improve product quality, reliability and durability
• Cultural change
• Minimise design changes
• Improve communication between functions

PEUSS 2012/2013 Design for Six Sigma Page 79

Difference between SS and DFSS


DMAIC DFSS
reactionary proactive

detecting and resolving problems preventing problems

Existing products or services Design of new products,


services or processes;
Financial benefits quantified Financial benefits long-term
quickly
Mainly manufacturing processes Marketing R&D and design

DFSS team cross-functional


PEUSS 2012/2013 Design for Six Sigma Page 80

40
DFSS Summary
• Rigorous approach to design
• Primarily used for new product design
• Structured approach
• DMADV and PIDOV
• Tailored for each company
• In conjunction with product introduction
• Pushes key issues up front – design for
reliability and design for manufacture

PEUSS 2012/2013 Design for Six Sigma Page 81

41

You might also like