Skeletal Workforce 04/05/21
Time-in: 7:23-12:15 Distribution and Retrieval of Modules
Time-out: 12:50-4:31
Skeletal Workforce 04/06/21
Time-in: 7:20-12:00 Distribution and Retrieval of Modules
Time-out:12:03-4:30
Work from home 04/07/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 1:00-4:30
Skeletal Workforce 04/08/21
Time-in: 7:25-12:01 Distribution and Retrieval of Modules
Time-out:12:45-4:30
HOLIDAY 04/09/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 1:00-4:30
Skeletal Workforce 04/12/21
Time-in: 7:18-12:00 Distribution and Retrieval of Modules
Time-out: 12:03-4:32
Skeletal Workforce 04/13/21
Time-in: 7:24-12:00 Distribution and Retrieval of Modules
Time-out:12:03-4:32
Skeletal Workforce 04/14/21
Time-in: 7:23-12:23 Distribution and Retrieval of Modules
Time-out: 12:37-4:30
Work from home 04/15/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out:12:30-4:30
Skeletal Workforce 04/16/21
Time-in: 7:15-11:59 Distribution and Retrieval of Modules
Time-out: 12:44-4:30
SCHOOL DISINFECTION 04/19/21
Time-in: 7:00-12:00
Time-out:12:30-4:30
Skeletal Workforce 04/20/21
Time-in: 7:18-12:02 Distribution and Retrieval of Modules
Time-out: 1:16- 4:30
Skeletal Workforce 04/21/21
Time-in: 7:19-12:00 Distribution and Retrieval of Modules
Time-out:12:58-4:40
Skeletal Workforce 04/22/21
Time-in: 6:52-12:05 Distribution and Retrieval of Modules
Time-out:12:49-4:41
Work from home 04/23/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out:12:30- 4:30
Skeletal Workforce 04/26/21
Time-in: 7:19-12:05 Distribution and Retrieval of Modules
Time-out:12:50-4:43
Skeletal Workforce 04/27/21
Time-in: 7:22-12:13 Distribution and Retrieval of Modules
Time-out:12:58-4:41
Skeletal Workforce 04/28/21
Time-in: 7:12-12:00 Distribution and Retrieval of Modules
Time-out: 12:42-4:50
Skeletal Workforce 04/29/21
Time-in: 7:22-12:02 Distribution and Retrieval of Modules
Time-out: 12:38-4:57
Work from home 04/30/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 12:30-4:30

Submitted by: Approved by:


JUDY MAE C. DALAPO REYNANTE H. GANTALAO
May 3, 2021 May 3, 2021
Enclosure No. 2 to Division Memorandum No._________________________________, s.2020
INDIVIDUAL DAILY LOG AND ACCOMPLISHMENT REPORT

Name of Personnel: CRYSTAL GAY T. BUSTAMANTE


School: Sugod Integrated School
District: VI

Date/s Covered: April 5-31, 2021

Alternative Work Arrangement Date and Actual Time logs Actual Accomplishment
Skeletal Workforce 04/05/21
Time-in: 7:23-12:00 Distribution and Retrieval of Modules
Time-out: 12:03-4:31
Skeletal Workforce 04/06/21
Time-in: 7:18-12:02 Distribution and Retrieval of Modules
Time-out:12:05-4:30
Work from home 04/07/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 1:00-4:30
Skeletal Workforce 04/08/21
Time-in: 7:15-12:21 Distribution and Retrieval of Modules
Time-out:12:39-4:31
HOLIDAY 04/09/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 1:00-4:30
Skeletal Workforce 04/12/21
Time-in: 7:25-12:00 Distribution and Retrieval of Modules
Time-out: 12:17-4:32
Skeletal Workforce 04/13/21
Time-in: 7:24-12:55 Distribution and Retrieval of Modules
Time-out:12:57-4:51
Skeletal Workforce 04/14/21
Time-in: 7:29-12:24 Distribution and Retrieval of Modules
Time-out: 12:37-4:30
Work from home 04/15/21
Time-in: 7:47-12:16 Checking of Outputs
Time-out:12:59-4:33
Skeletal Workforce 04/16/21
Time-in: 7:15-11:59 Distribution and Retrieval of Modules
Time-out: 12:44-4:30
SCHOOL DISINFECTION 04/19/21
Time-in: 7:00-12:00
Time-out:12:30-4:30
Skeletal Workforce 04/20/21
Time-in: 7:29-12:08 Distribution and Retrieval of Modules
Time-out: 12:45- 4:30
Skeletal Workforce 04/21/21
Time-in: 7:34-12:05 Distribution and Retrieval of Modules
Time-out:12:59-4:40
Skeletal Workforce 04/22/21
Time-in: 7:18-12:16 Distribution and Retrieval of Modules
Time-out:12:50-4:40
Work from home 04/23/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out:12:30- 4:30
Work from home 04/26/21
Time-in: 7:00-12:00 Distribution and Retrieval of Modules
Time-out:12:30-4:30
Skeletal Workforce 04/27/21
Time-in: 7:20-12:02 Distribution and Retrieval of Modules
Time-out:12:57-4:40
Skeletal Workforce 04/28/21
Time-in: 7:08-12:02 Distribution and Retrieval of Modules
Time-out: 12:35-4:50
Skeletal Workforce 04/29/21
Time-in: 7:22-12:01 Distribution and Retrieval of Modules
Time-out: 12:39-4:57
Work from home 04/30/21
Time-in: 7:04-12:03 Checking of Outputs
Time-out: 12:45-4:40

Submitted by: Approved by:


CRYSTAL GAY T. BUSTAMANTE REYNANTE H. GANTALAO
May 3, 2021 May 3, 2021
Enclosure No. 2 to Division Memorandum No._________________________________, s.2020
INDIVIDUAL DAILY LOG AND ACCOMPLISHMENT REPORT

Name of Personnel: ROSALIE W. AMBASA


School: Sugod Integrated School
District: VI

Date/s Covered: June 1-30, 2021

Alternative Work Arrangement Date and Actual Time logs Actual Accomplishment
Skeletal Workforce 06/01/21
Time-in: 7:18-12:28 Distribution and Retrieval of Modules
Time-out: 12:31-4:33
Skeletal Workforce 06/02/21
Time-in: 7:15-12:24 Distribution and Retrieval of Modules
Time-out:12:32-4:35
Skeletal Workforce 06/03/21
Time-in: 6:59-12:07 Distribution and Retrieval of Modules
Time-out: 12:34-4:32
Work from home 06/04/21
Time-in: 7:24-12:21 Checking of Outputs
Time-out:12:31-4:30
Work from home 06/07/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 1:00-4:30
Skeletal Workforce 06/08/21
Time-in: 7:23-12:38 Distribution and Retrieval of Modules
Time-out: 12:41-4:30
Skeletal Workforce 06/09/21
Time-in: 7:18-12:38 Distribution and Retrieval of Modules
Time-out:12:41-4:30
Work from home 06/10/21
Time-in: 7:08-12:23 Checking of Outputs
Time-out: 12:37-4:30
Work from home 06/14/21
Time-in: 7:14-12:20 Checking of Outputs
Time-out:12:38-4:30
Skeletal Workforce 06/15/21
Time-in: 6:41-12:29 Distribution and Retrieval of Modules
Time-out: 12:34-4:35
Skeletal Workforce 06/16/21
Time-in: 7:19-12:06 Distribution and Retrieval of Modules
Time-out:12:15-4:30
Work from home 06/17/21
Time-in: 7:10-12:23 Checking of Outputs
Time-out: 12:55- 5:00
Work from home 06/18/21
Time-in: 7:57-12:08 Checking of Outputs
Time-out:12:58-4:40
Work from home 06/21/21
Time-in: 6:52-12:06 Checking of Outputs
Time-out:12:49-4:40
Skeletal Workforce 06/22/21
Time-in: 7:18-12:26 Distribution and Retrieval of Modules
Time-out:12:38- 4:30
Skeletal Workforce 06/23/21
Time-in: 7:24-12:36 Distribution and Retrieval of Modules
Time-out:12:38-4:31
Work from home 06/28/21
Time-in: 6:48-12:13 Checking of Outputs
Time-out:12:50-4:37
Skeletal Workforce 06/29/21
Time-in: 7:12-12:36 Distribution and Retrieval of Modules
Time-out: 12:56-4:34
Skeletal Workforce 06/30/21
Time-in: 7:24-12:47 Distribution and Retrieval of Modules
Time-out: 1:13-4:34

Submitted by: Approved by:


ROSALIE W. AMBASA REYNANTE H. GANTALAO
June 30, 2021 June 30, 2021
Enclosure No. 2 to Division Memorandum No._________________________________, s.2020
INDIVIDUAL DAILY LOG AND ACCOMPLISHMENT REPORT

Name of Personnel: JOSEPH JOSHUA A. PALAPAR


School: Sugod Integrated School
District: VI

Date/s Covered: April 5-31, 2021

Alternative Work Arrangement Date and Actual Time logs Actual Accomplishment
Skeletal Workforce 04/05/21
Time-in: 7:11-12:15 Distribution and Retrieval of Modules
Time-out: 12:20-4:33
Skeletal Workforce 04/06/21
Time-in: 7:20-12:15 Distribution and Retrieval of Modules
Time-out:12:31-4:39
Skeletal Workforce 04/07/21
Time-in: 7:35-12:26 Distribution and Retrieval of Modules
Time-out: 12:43-4:32
Work from home 04/08/21
Time-in: 7:25-12:01 Checking of Outputs
Time-out:12:45-4:30
HOLIDAY 04/09/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 1:00-4:30
Skeletal Workforce 04/12/21
Time-in: 7:27-12:53 Distribution and Retrieval of Modules
Time-out: 12:55-4:33
Skeletal Workforce 04/13/21
Time-in: 7:24-12:01 Distribution and Retrieval of Modules
Time-out:12:27-5:13
Skeletal Workforce 04/14/21
Time-in: 7:17-12:23 Distribution and Retrieval of Modules
Time-out: 12:30-6:00
Work from home 04/15/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out:12:30-4:30
Skeletal Workforce 04/16/21
Time-in: 7:15-11:59 Distribution and Retrieval of Modules
Time-out: 12:44-4:30
SCHOOL DISINFECTION 04/19/21
Time-in: 7:00-12:04
Time-out:12:42-4:35
Skeletal Workforce 04/20/21
Time-in: 7:26-12:03 Distribution and Retrieval of Modules
Time-out: 12:46- 5:16
Skeletal Workforce 04/21/21
Time-in: 7:26-12:18 Distribution and Retrieval of Modules
Time-out:12:20-4:30
Work from home 04/22/21
Time-in: 6:52-12:05 Checking of Outputs
Time-out:12:49-4:41
Skeletal Workforce 04/23/21
Time-in: 7:10-12:10 Distribution and Retrieval of Modules
Time-out:12:40- 4:37
Skeletal Workforce 04/26/21
Time-in: 7:18-12:01 Distribution and Retrieval of Modules
Time-out:12:53-6:00
Skeletal Workforce 04/27/21
Time-in: 7:30-12:19 Distribution and Retrieval of Modules
Time-out:1:00-6:30
Skeletal Workforce 04/28/21
Time-in: 6:53-12:03 Distribution and Retrieval of Modules
Time-out: 12:12-4:50
Skeletal Workforce 04/29/21
Time-in: 7:28-12:02 Distribution and Retrieval of Modules
Time-out: 12:40-4:59
Work from home 04/30/21
Time-in: 7:00-12:00 Checking of Outputs
Time-out: 12:30-4:30

Submitted by: Approved by:


JOSEPH JOSHUA A. PALAPAR REYNANTE H. GANTALAO
May 3, 2021 May 3, 2021
Enclosure No. 2 to Division Memorandum No._________________________________, s.2020
INDIVIDUAL DAILY LOG AND ACCOMPLISHMENT REPORT

Name of Personnel: CRYSTAL GAY T. BUSTAMANTE


School: Sugod Integrated School
District: VI

Date/s Covered: March 1-31, 2021

Alternative Work Arrangement Date and Actual Time logs Actual Accomplishment
Skeletal Workforce 03/01/21
Time-in: 7:46-12:23 Distribution and Retrieval of Modules
Time-out: 1:02-4:30
Skeletal Workforce 03/02/21
Time-in: 7:26-12:01 Distribution and Retrieval of Modules
Time-out:12:53-4:38
Skeletal Workforce 03/03/21
Time-in: 7:22-12:00 Distribution and Retrieval of Modules
Time-out: 1:45-4:30
Skeletal Workforce 03/04/21
Time-in: 7:27-12:01 Distribution and Retrieval of Modules
Time-out:12:57-4:32
Work from home 03/05/21
Time-in: 7:00 Checking of Outputs
Time-out: 4:30
Work from home 03/08/21
Time-in: 7:11 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/09/21
Time-in: 7:24-12:02 Distribution and Retrieval of Modules
Time-out:12:04-4:39
Skeletal Workforce 03/10/21
Time-in: 7:20-12:01 Distribution and Retrieval of Modules
Time-out: 12:03-4:38
Skeletal Workforce 03/11/21
Time-in: 7:50-12:02 Distribution and Retrieval of Modules
Time-out:12:05-4:42
Skeletal Workforce 03/12/21
Time-in: 7:32-12:00 Distribution and Retrieval of Modules
Time-out: 12:04-4:31
Skeletal Workforce 03/15/21
Time-in: 7:24-12:02 Distribution and Retrieval of Modules
Time-out:12:53-4:31
Skeletal Workforce 03/16/21
Time-in: 7:33-12:42 Distribution and Retrieval of Modules
Time-out: 12:43- 4:39
Skeletal Workforce 03/17/21
Time-in: 7:22-12:00 Distribution and Retrieval of Modules
Time-out:12:02-4:30
Skeletal Workforce 03/18/21
Time-in: 7:24-12:39 Distribution and Retrieval of Modules
Time-out:12:40-4:32
Work from home 03/19/21
Time-in: 7:00 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/22/21
Time-in: 7:27-12:42 Distribution and Retrieval of Modules
Time-out:12:45-4:30
Skeletal Workforce 03/23/21
Time-in: 7:29-12:31 Distribution and Retrieval of Modules
Time-out:12:34-4:38
Skeletal Workforce 03/24/21
Time-in: 7:20-12:23 Distribution and Retrieval of Modules
Time-out: 12:24-4:37
Skeletal Workforce 03/25/21
Time-in: 7:24-12:23 Distribution and Retrieval of Modules
Time-out: 12:32-4:32
Work from home 03/26/21
Time-in: 7:00 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/29/21
Time-in: 7:23-12:41 Distribution and Retrieval of Modules
Time-out: 12:45-4:30
Skeletal Workforce 03/30/21
Time-in: 7:30-12:02 Distribution and Retrieval of Modules
Time-out: 12:05-4:43
Skeletal Workforce 03/31/21
Time-in: 7:29-12:07 Distribution and Retrieval of Modules
Time-out: 12:25-4:50
Submitted by: Approved by:
CRYSTAL GAY T. BUSTAMANTE REYNANTE H. GANTALAO
April 5, 2021 April 5, 2021

Enclosure No. 2 to Division Memorandum No._________________________________, s.2020


INDIVIDUAL DAILY LOG AND ACCOMPLISHMENT REPORT

Name of Personnel: ROSALIE W. AMBASA


School: Sugod Integrated School
District: VI

Date/s Covered: March 1-31, 2021

Alternative Work Arrangement Date and Actual Time logs Actual Accomplishment
Skeletal Workforce 03/01/21
Time-in: 7:08-12:20 Distribution and Retrieval of Modules
Time-out: 1:00-4:32
Skeletal Workforce 03/02/21
Time-in: 7:12-12:09 Distribution and Retrieval of Modules
Time-out:12:50-4:36
Skeletal Workforce 03/03/21
Time-in: 7:06-12:00 Distribution and Retrieval of Modules
Time-out: 1:43-4:35
Skeletal Workforce 03/04/21
Time-in: 6:59-12:01 Distribution and Retrieval of Modules
Time-out:12:09-4:32
Work from home 03/05/21
Time-in: 7:00 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/08/21
Time-in: 7:25-12:00 Distribution and Retrieval of Modules
Time-out: 12:03-4:30
Skeletal Workforce 03/09/21
Time-in: 7:21-12:02 Distribution and Retrieval of Modules
Time-out:12:04-4:39
Skeletal Workforce 03/10/21
Time-in: 7:23-12:06 Distribution and Retrieval of Modules
Time-out: 12:08-4:43
Skeletal Workforce 03/11/21
Time-in: 7:21-12:02 Distribution and Retrieval of Modules
Time-out:12:06-4:42
Skeletal Workforce 03/12/21
Time-in: 7:25-12:00 Distribution and Retrieval of Modules
Time-out: 12:18-4:31
Skeletal Workforce 03/15/21
Time-in: 7:06-12:47 Distribution and Retrieval of Modules
Time-out:12:48-4:32
Skeletal Workforce 03/16/21
Time-in: 7:09-12:43 Distribution and Retrieval of Modules
Time-out: 12:44- 4:39
Skeletal Workforce 03/17/21
Time-in: 7:13-12:00 Distribution and Retrieval of Modules
Time-out:12:02-4:31
Skeletal Workforce 03/18/21
Time-in: 7:16-12:39 Distribution and Retrieval of Modules
Time-out:12:40-4:35
Work from home 03/19/21
Time-in: 7:00 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/22/21
Time-in: 7:36-12:42 Distribution and Retrieval of Modules
Time-out:12:45-4:30
Skeletal Workforce 03/23/21
Time-in: 7:13-12:31 Distribution and Retrieval of Modules
Time-out:12:34-4:38
Skeletal Workforce 03/24/21
Time-in: 6:45-12:23 Distribution and Retrieval of Modules
Time-out: 12:24-4:36
Skeletal Workforce 03/25/21
Time-in: 7:17-12:23 Distribution and Retrieval of Modules
Time-out: 12:25-4:32
Work from home 03/26/21
Time-in: 7:00 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/29/21
Time-in: 7:20-12:51 Distribution and Retrieval of Modules
Time-out: 12:52-4:30
Skeletal Workforce 03/30/21
Time-in: 7:25-12:02 Distribution and Retrieval of Modules
Time-out: 12:05-4:41
Skeletal Workforce 03/31/21
Time-in: 7:21-12:32 Distribution and Retrieval of Modules
Time-out: 12:45-4:33
Submitted by: Approved by:
ROSALIE W. AMBASA REYNANTE H. GANTALAO
April 5, 2021 April 5, 2021

Enclosure No. 2 to Division Memorandum No._________________________________, s.2020


INDIVIDUAL DAILY LOG AND ACCOMPLISHMENT REPORT

Name of Personnel: JOSEPH JOSHUA A. PALAPAR


School: Sugod Integrated School
District: VI

Date/s Covered: March 1-31, 2021

Alternative Work Arrangement Date and Actual Time logs Actual Accomplishment
Skeletal Workforce 03/01/21
Time-in: 7:14-12:19 Distribution and Retrieval of Modules
Time-out: 12:20-4:33
Work from home 03/02/21
Time-in: 7:30 Checking of Outputs
Time-out: 4:30
WEBINAR 03/03/21
Time-in: 7:30 SCHOOL PAPER
Time-out: 4:30
WEBINAR 03/04/21
Time-in: 7:30 SCHOOL PAPER
Time-out: 4:30
WEBINAR 03/05/21
Time-in: 7:30 SCHOOL PAPER
Time-out: 4:30
Skeletal Workforce 03/08/21
Time-in: 7:11-12:00 Distribution and Retrieval of Modules
Time-out: 12:03-4:37
Skeletal Workforce 03/09/21
Time-in: 7:15-12:00 Distribution and Retrieval of Modules
Time-out:12:04-4:39
Skeletal Workforce 03/10/21
Time-in: 7:20-12:03 Distribution and Retrieval of Modules
Time-out: 12:04-4:42
Work from home 03/11/21
Time-in: 7:25-12:00 Checking of Outputs
Time-out:12:01-4:31
Skeletal Workforce 03/12/21
Time-in: 7:20-12:09 Distribution and Retrieval of Modules
Time-out: 12:31-4:31
Skeletal Workforce 03/15/21
Time-in: 7:14-12:28 Distribution and Retrieval of Modules
Time-out:12:32-4:30
Skeletal Workforce 03/16/21
Time-in: 7:14-12:43 Distribution and Retrieval of Modules
Time-out: 12:47- 4:39
Skeletal Workforce 03/17/21
Time-in: 7:21-12:08 Distribution and Retrieval of Modules
Time-out:12:50-4:31
Skeletal Workforce 03/18/21
Time-in: 7:18-12:36 Distribution and Retrieval of Modules
Time-out:12:38-4:49
Work from home 03/19/21
Time-in: 7:00 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/22/21
Time-in: 7:28-12:36 Distribution and Retrieval of Modules
Time-out:12:45-4:33
Skeletal Workforce 03/23/21
Time-in: 7:31-12:30 Distribution and Retrieval of Modules
Time-out:12:36-4:31
Skeletal Workforce 03/24/21
Time-in: 7:26-12:23 Distribution and Retrieval of Modules
Time-out: 12:24-4:37
Work from home 03/25/21
Time-in: 7:30 Checking of Outputs
Time-out: 4:30
Skeletal Workforce 03/26/21
Time-in: 7:27-12:11 Distribution and Retrieval of Modules
Time-out: 12:34-4:33
Skeletal Workforce 03/29/21
Time-in: 7:26-12:20 Distribution and Retrieval of Modules
Time-out: 12:42-4:35
Skeletal Workforce 03/30/21
Time-in: 7:30-12:11 Distribution and Retrieval of Modules
Time-out: 12:15-4:44
WEBINAR 03/31/21
Time-in: 7:30 SCHOOL PAPER
Time-out: 4:30