BATTERY LIMIT IN/OUT DIAGRAM LIST (HDN)

IP No. Type North East Elev Line Line Term'n Insul Insul Line No. P&ID
No. Complex IP No. Plant Elev(mm) Medium
(Tag No.) (Disc) Coord(m) Coord(m) Loc(mm) Size Spec Type & Trace Thk (Description) (w/Rev No.)
IP-P-203-1PKG2/
1 203-U-O-101 203 Piping 1324500.00 2032800.00 122402.91 121400 Low Pressure Flare 28" T-A13T1 FLGD N To be updated 28"-DBP-614039-T-A13T1-N R2B-P2-203-2-A-DTI-10302
303PKG6-000052
IP-P-203-1PKG2/
2 203-U-O-102 203 Piping 1326450.00 2032800.00 122414.98 121400 High Pressure Flare 28" T-A13T1 FLGD N To be updated 28"-DAP-614059-T-A13T1-N R2B-P2-203-2-A-DTI-10302
303PKG6-000053
IP-P-203-1PKG2/
3 203-U-I-103 203 Piping 1329800.00 2032600.00 116600.00 114900 Nitrogen 8" T-A03T1 FLGD N To be updated 8"-GI-614031-T-A03T1-N R2B-P2-203-2-A-DTI-10301
303PKG6-000018
IP-P-203-1PKG2/
4 203-U-I-104 203 Piping 1329200.00 2032600.00 116600.00 114900 Plant air 4" T-A06T1 FLGD N To be updated 4"-AP-614036-T-A06T1-N R2B-P2-203-2-A-DTI-10301
303PKG6-000019
IP-P-203-1PKG2/
5 203-U-I-105 203 Piping 1327200.00 2032500.00 116600.00 114900 Instrument Air 4" T-A06T1 FLGD N To be updated 4"-AI-614034-T-A06T1-N R2B-P2-203-2-A-DTI-10301
303PKG6-000020
IP-P-203-1PKG2/
6 203-U-I-107 203 Piping 1321400.00 2032600.00 115711.93 114900 HP Steam 12" T-D61T1 FLGD EC To be updated 12"-VA-614130-T-D61T1-EC R2B-P2-203-2-A-DTI-10303
303PKG6-000021
IP-P-203-1PKG2/
6.1 203-U-I-157 203 Piping 1320700.00 2033100.00 116098.24 114900 High Pressure Steam 1" T-D61T1 FLGD EC To be updated 1"-VA-614130-T-D61T1-EC R2B-P2-203-2-A-DTI-10303
303PKG6-000022
IP-P-203-1PKG2/
7 203-U-I-108 203 Piping 1323020.00 2033100.00 115636.53 114900 Medium Pressure Steam 10" T-B04T1 FLGD EC To be updated 10"-VM-614136-T-B04T1-EC R2B-P2-203-2-A-DTI-10303
303PKG6-000023
IP-P-203-1PKG2/
7.1 203-U-I-158 203 Piping 1323450.00 2033100.00 116097.44 114900 Medium Pressure Steam 1" T-B04T1 FLGD EC To be updated 1"-VM-614136-T-B04T1-EC R2B-P2-203-2-A-DTI-10303
303PKG6-000024
IP-P-203-1PKG2/
8 203-U-I-109 203 Piping 1324550.00 2033100.00 115661.93 114900 Low Pressure Steam 12" T-A18T1 FLGD EC To be updated 12"-VB-614143-T-A18T1-EC R2B-P2-203-2-A-DTI-10303
303PKG6-000025
IP-P-203-1PKG2/
8.1 203-U-I-159 203 Piping 1324050.00 2033100.00 116148.24 114900 Low Pressure Steam 1" T-A18T1 FLGD EC To be updated 1"-VB-614143-T-A18T1-EC R2B-P2-203-2-A-DTI-10303
303PKG6-000026
IP-P-203-1PKG2/
9 203-U-I-101 203 Piping 1326060.00 2032600.00 116600.00 114900 Fuel Gas 8" T-A03T1 FLGD N To be updated 8"-GC-614004-T-A03T1-N R2B-P2-203-2-A-DTI-10301
303PKG6-000016
IP-P-203-1PKG2/
10 203-P-I-116 203 Piping 1326750.00 2032800.00 115544.45 114900 MP BFW from UTOS 3" T-B04T1 FLGD EC To be updated 3"-ACAM-610901-T-B04T1-EC R2B-P2-203-2-A-DTI-10107
303PKG6-000031
IP-P-203-1PKG2/
10.1 203-P-I-166 203 Piping 1326400.00 2032800.00 115844.45 114900 MP BFW from UTOS 1" T-B04T1 FLGD EC To be updated 1"-ACAM-610901-T-B04T1-EC R2B-P2-203-2-A-DTI-10107
303PKG6-000032
IP-P-203-1PKG2/
11 203-U-I-114 203 Piping 1327640.00 2032500.00 116600.00 114900 Service Water 4" T-A01T1 FLGD N To be updated 4"-AS-614401-T-A01T1-N R2B-P2-203-2-A-DTI-10304
303PKG6-000030
IP-P-203-1PKG2/
12 203-U-I-111 203 Piping 1328450.00 2032800.00 115530.16 114900 High Pressure Boiler Feed Water 2" T-D61T1 FLGD EC To be updated 2"-ACAA-614077-T-D61T1-EC R2B-P2-203-2-A-DTI-10305
303PKG6-000027
IP-P-203-1PKG2/
12.1 203-U-I-161 203 Piping 1328160.00 2032800.00 115844.45 114900 High Pressure Boiler Feed Water 1" T-D61T1 FLGD EC To be updated 1"-ACAA-614077-T-D61T1-EC R2B-P2-203-2-A-DTI-10305
303PKG6-000028
IP-P-203-1PKG2/
13 203-U-I-102 203 Piping 1329470.00 2033350.00 115444.45 114900 Natural Gas 3" T-A04T1 FLGD N To be updated 3"-GNB-614010-T-A04T1-N R2B-P2-203-2-A-DTI-10301
303PKG6-000017
IP-P-203-1PKG2/
14 203-P-O-114 203 Piping 1321980.00 2032228.00 110924.13 110400 Sour Water to PAA Unit 2" T-A34T1 FLGD N To be updated 2"-AAM-612404-T-A34T1-N R2B-P2-203-2-A-DTI-10106
303PKG6-000045
IP-P-203-1PKG2/
15 203-P-O-102 203 Piping 1322380.00 2032250.00 110957.15 110400 Rich Amine to URA Unit 4" T-A34T1 FLGD N To be updated 4"-MDEAR-611106-T-A34T1-N R2B-P2-203-2-A-DTI-10103
303PKG6-000033
IP-P-203-1PKG2/
16 203-P-O-121 203 Piping 1323950.00 2032250.00 110930.16 110400 Heavy Naphtha to DCU Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-612071-T-B31T1-N R2B-P2-203-2-A-DTI-10105
303PKG6-000050
IP-P-203-1PKG2/
17 203-P-O-120 203 Piping 1324250.00 2032250.00 110930.16 110400 Heavy Naphtha (Wash Oil) to FCC Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-612072-T-B31T1-N R2B-P2-203-2-A-DTI-10105
303PKG6-000049
IP-P-203-1PKG2/
18 203-P-O-107 203 Piping 1325850.00 2032250.00 110930.16 110400 Sour LPG to PTRG Unit 2" T-B32T2 FLGD N To be updated 2"-LPG-611712-T-B32T2-N R2B-P2-203-2-A-DTI-10105
303PKG6-000038
IP-P-203-1PKG2/
19 203-U-O-106 203 Piping 1326340.00 2032250.00 110984.14 110400 Closed Oily Drain 6" T-A60T1 FLGD PP To be updated 6"-DAC-614085-T-A60T1-PP R2B-P2-203-2-A-DTI-10303
303PKG6-000054
IP-P-203-1PKG2/
20 203-U-O-110 203 Piping 1327480.00 2032250.00 110957.15 110400 Clean Condensate 4" T-A18T1 FLGD PP To be updated 4"-CLIBP-610002-T-A18T1-N R2B-P2-203-2-A-DTI-10304
303PKG6-000057
IP-P-203-1PKG2/
21 203-P-I-117 203 Piping 1321100.00 2043600.00 110930.16 110400 Wash Water from PAA Unit 2" T-A01T1 FLGD N To be updated 2"-AAE-610901-T-A01T1-N R2B-P2-203-2-A-DTI-10107
303PKG6-000029
IP-P-203-1PKG2/
22 203-P-O-115 203 Piping 1321300.00 2038600.00 110930.16 110400 HC Slop to UTOS 2" T-A31T1 FLGD N To be updated 2"-AR-612404-T-A31T1-N R2B-P2-203-2-A-DTI-10106
303PKG6-000046
IP-P-203-1PKG2/
23 203-P-I-111 203 Piping 1322630.00 2043400.00 111057.15 110400 Lean Amine from URA Unit 4" T-A34T1 FLGD PP To be updated 4"-MDEA-611201-T-A34T1-PP R2B-P2-203-2-A-DTI-10103
303PKG6-000010
IP-P-203-1PKG2/
24 203-U-O-109 203 Piping 1322930.00 2039300.00 111057.15 110400 LP Oily Condensate 4" T-A18T1 FLGD PP To be updated 4"-CACBP-614158-T-A18T1-PP R2B-P2-203-2-A-DTI-10304
303PKG6-000056
IP-P-203-1PKG2/
25 203-P-O-103 203 Piping 1327050.00 2046800.00 111009.54 110400 Hydrogen Recovery to UTOS 8" T-B32T1 FLGD N To be updated 8"-GR-611303-T-B32T1-N R2B-P2-203-2-A-DTI-10103
303PKG6-000034
IP-P-203-1PKG2/
26 203-P-O-122 203 Piping 1324850.00 2041600.00 110930.16 110400 Heavy Naphtha to PTRG Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-612073-T-B31T1-N R2B-P2-203-2-A-DTI-10105
303PKG6-000051
IP-P-203-1PKG2/
27 203-P-O-119 203 Piping 1325150.00 2041600.00 110930.16 110400 Heavy Naphtha to PCR Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-612074-T-B31T1-N R2B-P2-203-2-A-DTI-10105
303PKG6-000048
IP-P-203-1PKG2/
28 203-P-O-106 203 Piping 1326050.00 2046300.00 110930.16 110400 Sour LPG to Storage 2" T-B32T2 FLGD N To be updated 2"-LPG-611727-T-B32T2-N R2B-P2-203-2-A-DTI-10105
303PKG6-000037
IP-P-203-1PKG2/
29 203-U-O-107 203 Piping 1326312.00 2035222.50 110944.45 110400 Amine Drain 3" T-A09T1 FLGD N To be updated 3"-DDA-614121-T-A09T1-N R2B-P2-203-2-A-DTI-10303
303PKG6-000055
IP-P-203-1PKG2/
30 203-P-O-110 203 Piping 1327940.00 2040600.00 111009.54 110400 Heavy Naphtha to off Spec Storage 8" T-B31T1 FLGD N To be updated 8"-NAPS-612037-T-B31T1-N R2B-P2-203-2-A-DTI-10105
303PKG6-000041
IP-P-203-1PKG2/
31 203-P-O-118 203 Piping 1326870.00 2038600.00 111130.16 110400 Hydrogen to ISOC4 Unit 2" T-D32T1 FLGD N To be updated 2"-H-611540-T-D32T1-N R2B-P2-203-2-A-DTI-10104
303PKG6-000047
IP-P-203-1PKG2/
32 203-P-O-108 203 Piping 1328750.00 2032250.00 111009.54 110400 Heavy Naphtha to REF Unit 8" T-B31T1 FLGD EC To be updated 8"-NAPS-612002-T-B31T1-EC R2B-P2-203-2-A-DTI-10105
303PKG6-000039
IP-P-203-1PKG2/
33 203-P-O-112 203 Piping 1329130.00 2040600.00 110984.14 110400 LIGHT NAPHTHA TO STORAGE 6" T-B31T1 FLGD N To be updated 6"-NAL-612315-T-B31T1-N R2B-P2-203-2-A-DTI-10106
303PKG6-000043
BATTERY LIMIT IN/OUT DIAGRAM LIST (HDN)
IP No. Type North East Elev Line Line Term'n Insul Insul Line No. P&ID
No. Complex IP No. Plant Elev(mm) Medium
(Tag No.) (Disc) Coord(m) Coord(m) Loc(mm) Size Spec Type & Trace Thk (Description) (w/Rev No.)
IP-P-203-1PKG2/
34 203-P-O-111 203 Piping 1329450.00 2032500.00 110984.14 110400 Light Naphtha to PNX Unit 6" T-B31T1 FLGD N To be updated 6"-NAL-612317-T-B31T1-N R2B-P2-203-2-A-DTI-10106
303PKG6-000042
IP-P-203-1PKG2/
35 203-P-O-109 203 Piping 1329800.00 2045900.00 111009.54 110400 Heavy Naphtha to Storage 8" T-B31T1 FLGD N To be updated 8"-NAPS-612006-T-B31T1-N R2B-P2-203-2-A-DTI-10105
303PKG6-000040
IP-P-203-1PKG2/
36 203-P-I-113 203 Piping 1323600.00 2032250.00 107084.14 106400 Light Naphtha from Storage 6" T-B31T1 FLGD N To be updated 6"-NAL-611601-T-B31T1-N R2B-P2-203-2-A-DTI-10104
303PKG6-000013
IP-P-203-1PKG2/
37 203-P-I-107 203 Piping 1324200.00 2032250.00 107057.15 106400 Naphtha from HDDI Unit 4" T-B31T1 FLGD N To be updated 4"-P-610105-T-B31T1-N R2B-P2-203-2-A-DTI-10102
303PKG6-000006
IP-P-203-1PKG2/
38 203-P-I-110 203 Piping 1325830.00 2032210.35 107030.16 106400 Naphtha from PTRG Unit 2" T-B31T1 FLGD N To be updated 2"-P-610107-T-B31T1-N R2B-P2-203-2-A-DTI-10102
303PKG6-000009
IP-P-203-1PKG2/
39 203-P-I-112 203 Piping 1327070.00 2032250.00 107084.14 106400 Make-up Hydrogen from UTOS 6" T-B32T1 FLGD N To be updated 6"-H-611501-T-B32T1-N R2B-P2-203-2-A-DTI-10103
303PKG6-000011
IP-P-203-1PKG2/
39.1 203-P-I-162 203 Piping 1327420.00 2032156.64 107493.46 106400 Make-up Hydrogen from UTOS 1" T-B32T1 FLGD N To be updated 1"-H-611501-T-B32T1-N R2B-P2-203-2-A-DTI-10103
303PKG6-000012
IP-P-203-1PKG2/
40 203-P-I-101 203 Piping 1329300.00 2032250.00 107084.14 106400 Coker Naphtha from PCR Unit 6" T-B31T1 FLGD N To be updated 6"-P-610103-T-B31T1-N R2B-P2-203-2-A-DTI-10101
303PKG6-000001
IP-P-203-1PKG2/
41 203-P-O-105 203 Piping 1320000.00 2038300.00 107057.15 106400 Sour Gas To PTRG Unit 4" T-A34T1 FLGD N To be updated 4"-GAM-611602-T-A34T1-N R2B-P2-203-2-A-DTI-10104
303PKG6-000036
IP-P-203-1PKG2/
42 203-P-I-105 203 Piping 1321850.00 2035370.00 107436.53 106400 Primary Naphtha from Storage 10" T-B31T1 FLGD N To be updated 10"-P-610109-T-B31T1-N R2B-P2-203-2-A-DTI-10101
303PKG6-000004
IP-P-203-1PKG2/
43 203-P-I-104 203 Piping 1322423.00 2035730.00 107436.53 106400 Heavy Naphtha from Storage 6" T-B31T1 FLGD N To be updated 6"-P-610117-T-B31T1-N R2B-P2-203-2-A-DTI-10101
303PKG6-000003
IP-P-203-1PKG2/
44 203-P-I-109 203 Piping 1324150.00 2039000.00 107030.16 106400 Heavy Naphtha from HDTGO Unit 2" T-B31T1 FLGD N To be updated 2"-P-610108-T-B31T1-N R2B-P2-203-2-A-DTI-10102
303PKG6-000008
IP-P-203-1PKG2/
45 203-P-I-108 203 Piping 1324450.00 2039000.00 107030.16 106400 Wild Naphtha from HDTGO Unit 2" T-B31T1 FLGD N To be updated 2"-P-610106-T-B31T1-N R2B-P2-203-2-A-DTI-10102
303PKG6-000007
IP-P-203-1PKG2/
46 203-P-I-103 203 Piping 1326150.00 2041100.00 107084.14 106400 Coker Naphtha from Storage 6" T-A31T1 FLGD N To be updated 6"-P-610116-T-A31T1-N R2B-P2-203-2-A-DTI-10101
303PKG6-000002
IP-P-203-1PKG2/
47 203-P-O-104 203 Piping 1327610.00 2041100.00 107084.14 106400 Make-up Hydrogen to UTOS 6" T-B32T1 FLGD N To be updated 6"-H-611516-T-B32T1-N R2B-P2-203-2-A-DTI-10104
303PKG6-000035
IP-P-203-1PKG2/
48 203-P-I-115 203 Piping 1328450.00 2032250.00 107030.16 106400 Sweet LPG from PTRG Unit 2" T-A34T1 FLGD N To be updated 2"-LPG-611725-T-A34T1-N R2B-P2-203-2-A-DTI-10104
303PKG6-000015
IP-P-203-1PKG2/
49 203-P-I-106 203 Piping 1328920.00 2038910.00 107009.54 106400 Primary Naphtha from UDC Unit 8" T-B31T1 FLGD N To be updated 8"-P-610104-T-B31T1-N R2B-P2-203-2-A-DTI-10102
303PKG6-000005
IP-P-203-1PKG2/
50 203-P-I-114 203 Piping 1331300.00 2040000.00 107109.54 106400 Heavy Naphtha from Storage 8" T-B31T1 FLGD N To be updated 8"-NAPS-611601-T-B31T1-N R2B-P2-203-2-A-DTI-10104
303PKG6-000014
IP-P-203-2PKG2/
51 203-U-O-201 203 Piping 1192500.00 2032800.00 122402.91 121400 Low Pressure Flare 28" T-A13T1 FLGD N To be updated 28"-DBP-624039-T-A13T1-N R2B-P2-203-2-A-DTI-20302
303PKG6-000118
IP-P-203-2PKG2/
52 203-U-O-202 203 Piping 1194450.00 2032800.00 122414.98 121400 High Pressure Flare 28" T-A13T1 FLGD N To be updated 28"-DAP-624059-T-A13T1-N R2B-P2-203-2-A-DTI-20302
303PKG6-000119
IP-P-203-2PKG2/
53 203-U-I-203 203 Piping 1197800.00 2032600.00 116600.00 114900 Nitrogen 8" T-A03T1 FLGD N To be updated 8"-GI-624031-T-A03T1-N R2B-P2-203-2-A-DTI-20301
303PKG6-000084
IP-P-203-2PKG2/
54 203-U-I-204 203 Piping 1197200.00 2032600.00 116600.00 114900 Plant air 4" T-A06T1 FLGD N To be updated 4"-AP-624036-T-A06T1-N R2B-P2-203-2-A-DTI-20301
303PKG6-000085
IP-P-203-2PKG2/
55 203-U-I-205 203 Piping 1194000.00 2032500.00 116600.00 114900 Instrument Air 4" T-A06T1 FLGD N To be updated 4"-AI-624034-T-A06T1-N R2B-P2-203-2-A-DTI-20301
303PKG6-000086
IP-P-203-2PKG2/
56 203-U-I-207 203 Piping 1189400.00 2032600.00 115711.93 114900 High Pressure Steam 12" T-D61T1 FLGD EC To be updated 12"-VA-624130-T-D61T1-EC R2B-P2-203-2-A-DTI-20303
303PKG6-000087
IP-P-203-2PKG2/
56.1 203-U-I-257 203 Piping 1188700.00 2033100.00 116098.24 114900 High Pressure Steam 1" T-D61T1 FLGD EC To be updated 1"-VA-624130-T-D61T1-EC R2B-P2-203-2-A-DTI-20303
303PKG6-000088
IP-P-203-2PKG2/
57 203-U-I-208 203 Piping 1191020.00 2033100.00 115636.53 114900 Medium Pressure Steam 10" T-B04T1 FLGD EC To be updated 10"-VM-624136-T-B04T1-EC R2B-P2-203-2-A-DTI-20303
303PKG6-000089
IP-P-203-2PKG2/
57.1 203-U-I-258 203 Piping 1191450.00 2033100.00 116097.44 114900 Medium Pressure Steam 1" T-B04T1 FLGD EC To be updated 1"-VM-624136-T-B04T1-EC R2B-P2-203-2-A-DTI-20303
303PKG6-000090
IP-P-203-2PKG2/
58 203-U-I-209 203 Piping 1192550.00 2033100.00 115661.93 114900 Low Pressure Steam 12" T-A18T1 FLGD EC To be updated 12"-VB-624143-T-A18T1-EC R2B-P2-203-2-A-DTI-20303
303PKG6-000091
IP-P-203-2PKG2/
58.1 203-U-I-259 203 Piping 1192050.00 2033100.00 116148.24 114900 Low Pressure Steam 1" T-A18T1 FLGD EC To be updated 1"-VB-624143-T-A18T1-EC R2B-P2-203-2-A-DTI-20303
303PKG6-000092
IP-P-203-2PKG2/
59 203-U-I-201 203 Piping 1193319.08 2032600.00 116600.00 114900 Fuel Gas 8" T-A03T1 FLGD N To be updated 8"-GC-624004-T-A03T1-N R2B-P2-203-2-A-DTI-20301
303PKG6-000082
IP-P-203-2PKG2/
60 203-P-I-216 203 Piping 1194750.00 2032800.00 115544.45 114900 MP BFW from UTOS 3" T-B04T1 FLGD EC To be updated 3"-ACAM-620901-T-B04T1-EC R2B-P2-203-2-A-DTI-20107
303PKG6-000097
IP-P-203-2PKG2/
60.1 203-P-I-266 203 Piping 1194400.00 2032800.00 115844.45 114900 MP BFW from UTOS 1" T-B04T1 FLGD EC To be updated 1"-ACAM-620901-T-B04T1-EC R2B-P2-203-2-A-DTI-20107
303PKG6-000098
IP-P-203-2PKG2/
61 203-U-I-214 203 Piping 1195640.00 2032500.00 116600.00 114900 Service Water 4" T-A01T1 FLGD N To be updated 4"-AS-624401-T-A01T1-N R2B-P2-203-2-A-DTI-20304
303PKG6-000096
IP-P-203-2PKG2/
62 203-U-I-211 203 Piping 1196450.00 2032800.00 115530.16 114900 High Pressure Boiler Feed Water 2" T-D61T1 FLGD EC To be updated 2"-ACAA-624077-T-D61T1-EC R2B-P2-203-2-A-DTI-20305
303PKG6-000093
IP-P-203-2PKG2/
62.1 203-U-I-261 203 Piping 1196160.00 2032800.00 115844.45 114900 High Pressure Boiler Feed Water 1" T-D61T1 FLGD EC To be updated 1"-ACAA-624077-T-D61T1-EC R2B-P2-203-2-A-DTI-20305
303PKG6-000094
IP-P-203-2PKG2/
63 203-U-I-202 203 Piping 1197470.00 2033350.00 115444.45 114900 Low Pressure Natural Gas 3" T-A04T1 FLGD N To be updated 3"-GNB-624010-T-A04T1-N R2B-P2-203-2-A-DTI-20301
303PKG6-000083
IP-P-203-2PKG2/
64 203-P-O-214 203 Piping 1189980.00 2032228.00 110924.13 110400 Sour Water to PAA Unit 2" T-A34T1 FLGD N To be updated 2"-AAM-622404-T-A34T1-N R2B-P2-203-2-A-DTI-20106
303PKG6-000111
IP-P-203-2PKG2/
65 203-P-O-202 203 Piping 1190380.00 2032250.00 110957.15 110400 Rich Amine to URA Unit 4" T-A34T1 FLGD N To be updated 4"-MDEAR-621106-T-A34T1-N R2B-P2-203-2-A-DTI-20103
303PKG6-000099
BATTERY LIMIT IN/OUT DIAGRAM LIST (HDN)
IP No. Type North East Elev Line Line Term'n Insul Insul Line No. P&ID
No. Complex IP No. Plant Elev(mm) Medium
(Tag No.) (Disc) Coord(m) Coord(m) Loc(mm) Size Spec Type & Trace Thk (Description) (w/Rev No.)
IP-P-203-2PKG2/
66 203-P-O-221 203 Piping 1191950.00 2032250.00 110930.16 110400 Heavy Naphtha to DCU Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-622071-T-B31T1-N R2B-P2-203-2-A-DTI-20105
303PKG6-000116
IP-P-203-2PKG2/
67 203-P-O-220 203 Piping 1192250.00 2032250.00 110930.16 110400 Heavy Naphtha (Wash Oil) to FCC Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-622072-T-B31T1-N R2B-P2-203-2-A-DTI-20105
303PKG6-000115
IP-P-203-2PKG2/
68 203-P-O-207 203 Piping 1193850.00 2032250.00 110930.16 110400 Sour LPG to PTRG Unit 2" T-B32T2 FLGD N To be updated 2"-LPG-621712-T-B32T2-N R2B-P2-203-2-A-DTI-20105
303PKG6-000104
IP-P-203-2PKG2/
69 203-U-O-206 203 Piping 1194340.00 2032250.00 110984.14 110400 Closed Oily Drain 6" T-A60T1 FLGD PP To be updated 6"-DAC-624085-T-A60T1-PP R2B-P2-203-2-A-DTI-20303
303PKG6-000120
IP-P-203-2PKG2/
70 203-U-O-210 203 Piping 1195480.00 2032250.00 110957.15 110400 Clean Condensate 4" T-A18T1 FLGD PP To be updated 4"-CLIBP-620002-T-A18T1-N R2B-P2-203-2-A-DTI-20304
303PKG6-000123
IP-P-203-2PKG2/
71 203-P-I-217 203 Piping 1189100.00 2043600.00 110930.16 110400 Wash Water from PAA Unit 2" T-A01T1 FLGD N To be updated 2"-AAE-620901-T-A01T1-N R2B-P2-203-2-A-DTI-20107
303PKG6-000095
IP-P-203-2PKG2/
72 203-P-O-215 203 Piping 1189300.00 2038600.00 110930.16 110400 HC Slop to UTOS 2" T-A31T1 FLGD N To be updated 2"-AR-622404-T-A31T1-N R2B-P2-203-2-A-DTI-20106
303PKG6-000112
IP-P-203-2PKG2/
73 203-P-I-211 203 Piping 1190630.00 2043400.00 111057.15 110400 Lean Amine from URA Unit 4" T-A34T1 FLGD PP To be updated 4"-MDEA-621201-T-A34T1-PP R2B-P2-203-2-A-DTI-20103
303PKG6-000076
IP-P-203-2PKG2/
74 203-U-O-209 203 Piping 1190930.00 2039300.00 111057.15 110400 LP Oily Condensate 4" T-A18T1 FLGD PP To be updated 4"-CACBP-624158-T-A18T1-PP R2B-P2-203-2-A-DTI-20304
303PKG6-000122
IP-P-203-2PKG2/
75 203-P-O-203 203 Piping 1193000.00 2046800.00 111009.54 110400 Hydrogen Recovery to UTOS 8" T-B32T1 FLGD N To be updated 8"-GR-621303-T-B32T1-N R2B-P2-203-2-A-DTI-20103
303PKG6-000100
IP-P-203-2PKG2/
76 203-P-O-222 203 Piping 1192850.00 2041600.00 110930.16 110400 Heavy Naphtha to PTRG Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-622073-T-B31T1-N R2B-P2-203-2-A-DTI-20105
303PKG6-000117
IP-P-203-2PKG2/
77 203-P-O-219 203 Piping 1193150.00 2041600.00 110930.16 110400 Heavy Naphtha to PCR Unit 2" T-B31T1 FLGD N To be updated 2"-NAPS-622074-T-B31T1-N R2B-P2-203-2-A-DTI-20105
303PKG6-000114
IP-P-203-2PKG2/
78 203-P-O-206 203 Piping 1194050.00 2046300.00 110930.16 110400 Sour LPG to Storage 2" T-B32T2 FLGD N To be updated 2"-LPG-621727-T-B32T2-N R2B-P2-203-2-A-DTI-20105
303PKG6-000103
IP-P-203-2PKG2/
79 203-U-O-207 203 Piping 1194312.00 2035222.50 110944.45 110400 Amine Drain 3" T-A09T1 FLGD N To be updated 3"-DDA-624121-T-A09T1-N R2B-P2-203-2-A-DTI-20303
303PKG6-000121
IP-P-203-2PKG2/
80 203-P-O-210 203 Piping 1195940.00 2040600.00 111009.54 110400 Heavy Naphtha to off Spec Storage 8" T-B31T1 FLGD N To be updated 8"-NAPS-622037-T-B31T1-N R2B-P2-203-2-A-DTI-20105
303PKG6-000107
IP-P-203-2PKG2/
81 203-P-O-218 203 Piping 1194870.00 2038600.00 111130.16 110400 Hydrogen to ISOC4 Unit 2" T-D32T1 FLGD N To be updated 2"-H-621540-T-D32T1-N R2B-P2-203-2-A-DTI-20104
303PKG6-000113
IP-P-203-2PKG2/
82 203-P-O-208 203 Piping 1196750.00 2032250.00 111009.54 110400 Heavy Naphtha to REF Unit 8" T-B31T1 FLGD EC To be updated 8"-NAPS-622002-T-B31T1-EC R2B-P2-203-2-A-DTI-20105
303PKG6-000105
IP-P-203-2PKG2/
83 203-P-O-212 203 Piping 1197130.00 2040600.00 110984.14 110400 LIGHT NAPHTHA TO STORAGE 6" T-B31T1 FLGD N To be updated 6"-NAL-622315-T-B31T1-N R2B-P2-203-2-A-DTI-20106
303PKG6-000109
IP-P-203-2PKG2/
84 203-P-O-211 203 Piping 1197450.00 2032500.00 110984.14 110400 Light Naphtha to PNX Unit 6" T-B31T1 FLGD N To be updated 6"-NAL-622317-T-B31T1-N R2B-P2-203-2-A-DTI-20106
303PKG6-000108
IP-P-203-2PKG2/
85 203-P-O-209 203 Piping 1197800.00 2045900.00 111009.54 110400 Heavy Naphtha to Storage 8" T-B31T1 FLGD N To be updated 8"-NAPS-622006-T-B31T1-N R2B-P2-203-2-A-DTI-20105
303PKG6-000106
IP-P-203-2PKG2/
86 203-P-I-213 203 Piping 1191600.00 2032250.00 107084.14 106400 Light Naphtha from Storage 6" T-B31T1 FLGD N To be updated 6"-NAL-621601-T-B31T1-N R2B-P2-203-2-A-DTI-20104
303PKG6-000079
IP-P-203-2PKG2/
87 203-P-I-207 203 Piping 1192200.00 2032250.00 107057.15 106400 Naphtha from HDDI Unit 4" T-B31T1 FLGD N To be updated 4"-P-620105-T-B31T1-N R2B-P2-203-2-A-DTI-20102
303PKG6-000072
IP-P-203-2PKG2/
88 203-P-I-210 203 Piping 1193830.00 2032210.35 107030.16 106400 Naphtha from PTRG Unit 2" T-B31T1 FLGD N To be updated 2"-P-620107-T-B31T1-N R2B-P2-203-2-A-DTI-20102
303PKG6-000075
IP-P-203-2PKG2/
89 203-P-I-212 203 Piping 1195070.00 2032250.00 107084.14 106400 Make-up Hydrogen from UTOS 6" T-B32T1 FLGD N To be updated 6"-H-621501-T-B32T1-N R2B-P2-203-2-A-DTI-20103
303PKG6-000077
IP-P-203-2PKG2/
89.1 203-P-I-262 203 Piping 1195420.00 2032156.64 107493.46 106400 Make-up Hydrogen from UTOS 1" T-B32T1 FLGD N To be updated 1"-H-621501-T-B32T1-N R2B-P2-203-2-A-DTI-20103
303PKG6-000078
IP-P-203-2PKG2/
90 203-P-I-201 203 Piping 1197300.00 2032250.00 107084.14 106400 Coker Naphtha from PCR Unit 6" T-B31T1 FLGD N To be updated 6"-P-620103-T-B31T1-N R2B-P2-203-2-A-DTI-20101
303PKG6-000067
IP-P-203-2PKG2/
91 203-P-O-205 203 Piping 1188000.00 2038300.00 107057.15 106400 Sour Gas To PTRG Unit 4" T-A34T1 FLGD N To be updated 4"-GAM-621602-T-A34T1-N R2B-P2-203-2-A-DTI-20104
303PKG6-000102
IP-P-203-2PKG2/
92 203-P-I-205 203 Piping 1189850.00 2035370.00 107436.53 106400 Primary Naphtha from Storage 10" T-B31T1 FLGD N To be updated 10"-P-620109-T-B31T1-N R2B-P2-203-2-A-DTI-20101
303PKG6-000070
IP-P-203-2PKG2/
93 203-P-I-204 203 Piping 1190423.00 2035730.00 107436.53 106400 Heavy Naphtha from Storage 6" T-B31T1 FLGD N To be updated 6"-P-620117-T-B31T1-N R2B-P2-203-2-A-DTI-20101
303PKG6-000069
IP-P-203-2PKG2/
94 203-P-I-209 203 Piping 1192150.00 2039000.00 107030.16 106400 Heavy Naphtha from HDTGO Unit 2" T-B31T1 FLGD N To be updated 2"-P-620108-T-B31T1-N R2B-P2-203-2-A-DTI-20102
303PKG6-000074
IP-P-203-2PKG2/
95 203-P-I-208 203 Piping 1192450.00 2039000.00 107030.16 106400 Wild Naphtha from HDTGO Unit 2" T-B31T1 FLGD N To be updated 2"-P-620106-T-B31T1-N R2B-P2-203-2-A-DTI-20102
303PKG6-000073
IP-P-203-2PKG2/
96 203-P-I-203 203 Piping 1194150.00 2041100.00 107084.14 106400 Coker Naphtha from Storage 6" T-A31T1 FLGD N To be updated 6"-P-620116-T-A31T1-N R2B-P2-203-2-A-DTI-20101
303PKG6-000068
IP-P-203-2PKG2/
97 203-P-O-204 203 Piping 1195610.00 2041100.00 107084.14 106400 Make-up Hydrogen to UTOS 6" T-B32T1 FLGD N To be updated 6"-H-621516-T-B32T1-N R2B-P2-203-2-A-DTI-20104
303PKG6-000101
IP-P-203-2PKG2/
98 203-P-I-215 203 Piping 1196450.00 2032250.00 107030.16 106400 Sweet LPG from PTRG Unit 2" T-A34T1 FLGD N To be updated 2"-LPG-621725-T-A34T1-N R2B-P2-203-2-A-DTI-20104
303PKG6-000081
IP-P-203-2PKG2/
99 203-P-I-206 203 Piping 1196920.00 2038910.00 107009.54 106400 Primary Naphtha from UDC Unit 8" T-B31T1 FLGD N To be updated 8"-P-620104-T-B31T1-N R2B-P2-203-2-A-DTI-20102
303PKG6-000071
IP-P-203-2PKG2/
100 203-P-I-214 203 Piping 1199300.00 2040000.00 107109.54 106400 Heavy Naphtha from Storage 8" T-B31T1 FLGD N To be updated 8"-NAPS-621601-T-B31T1-N R2B-P2-203-2-A-DTI-20104
303PKG6-000080
IP-F-203-1PKG2/
101 203-U-I-116 203 Piping 1364400.00 2030000.00 101029.00 Ground Fire Water 18" T-A15T1U FLGD N To be updated 18"-ACI-610004-T-A15T1U-N R2B-P2-203-02-S-DTI-50101
302PKG6-000058
IP-F-203-1PKG2/
102 203-U-I-117 203 Piping 1365500.00 2315000.00 101029.00 Ground Fire Water 18" T-A15T1U FLGD N To be updated 18"-ACI-610007-T-A15T1U-N R2B-P2-203-02-S-DTI-50101
302PKG6-000059
BATTERY LIMIT IN/OUT DIAGRAM LIST (HDN)
IP No. Type North East Elev Line Line Term'n Insul Insul Line No. P&ID
No. Complex IP No. Plant Elev(mm) Medium
(Tag No.) (Disc) Coord(m) Coord(m) Loc(mm) Size Spec Type & Trace Thk (Description) (w/Rev No.)
IP-F-203-2PKG2/
103 203-U-I-216 203 Piping 1125000.00 2047500.00 101029.00 Ground Fire Water 18" T-A15T1U FLGD N To be updated 18"-ACI-620013-T-A15T1U-N R2B-P2-203-02-S-DTI-50102
302PKG6-000124
IP-F-203-2PKG2/
104 203-U-I-217 203 Piping 1125000.00 2308500.00 101029.00 Ground Fire Water 18" T-A15T1U FLGD N To be updated 18"-ACI-620022-T-A15T1U-N R2B-P2-203-02-S-DTI-50102
302PKG6-000125
IP-P-203-1PKG2/
105 203-U-I-110 203 Piping 1318500.00 2034255.00 100860.00 Ground Cooling Water Supply 20" T-A01T1 FLGD N To be updated 20"-SAE-614146-T-A01T1-N R2B-P2-203-02-A-DTI-10304
302PKG6-000060
IP-P-203-1PKG2/
106 203-U-O-108 203 Piping 1317500.00 2034255.00 100860.00 Ground Cooling Water Return 20" T-A01T1 FLGD N To be updated 20"-RAE-614147-T-A01T1-N R2B-P2-203-02-A-DTI-10304
302PKG6-000061
IP-P-203-2PKG2/
107 203-U-I-210 203 Piping 1186500.00 2034255.00 100860.00 Ground Cooling Water Supply 20" T-A01T1 FLGD N To be updated 20"-SAE-624146-T-A01T1-N R2B-P2-203-02-A-DTI-20304
302PKG6-000126
IP-P-203-2PKG2/
108 203-U-O-208 203 Piping 1185500.00 2034255.00 100860.00 Ground Cooling Water Return 20" T-A01T1 FLGD N To be updated 20"-RAE-624147-T-A01T1-N R2B-P2-203-02-A-DTI-20304
302PKG6-000127
PLANT
NORTH

1700000

(NE)

PREVAILING
WIND

(SW)

R01 R01
B A

P01 P01 P01 P01 P01


01 02 03 04 05
2000 6000 6000 6000 6000

E.2032.000
N.1330.500
R01
A
10000

N.1320.500 R01
B

HPP EL. 100200

SIMBOLOGY
REFERENCE POINT

BOUNDARY OF BATTERY LIMIT CP DATE REVISIONS REFERENCE DRAWINGS REVIEWED BY

N.P.T.+000.000 MCA DESCRIPTION DATE BY APR NUMBER TITLE


DRAWING THK
DOS BOCAS REFINERY PARAISO, TABASCO
INDICATE ELEVATION 0 1 2 3 4 6 10 A ISSUE FOR INFORMATION 05.MAR.2020 SHC KHL
SPECIALIST
PROJECT SHC NAPHTHA HYDRODESULFURIZATION UNIT - HDN
B ISSUE FOR INFORMATION 21.OCT.2020 SHC KHL
PTI INFRAESTRUCTURA DE
GRAPHIC SCALE 1:100 METERS C ISSUE FOR INFORMATION 29.JAN.2021 SHC KHL
DESARROLLO, S.A. DE C.V.
DBNR REVIEW DHJ
TRAIN #1(U-61000)
0 ISSUE FOR CONSTRUCTION 22.MAR.2021 SHC KHL
COORDINATOR
Samsung Engineering Co., Ltd. ASOCIADOS CONSTRUCTORES DBNR S.A. DE C.V.
APPROVAL KHL BATTERY LIMIT IN/OUT BLOCK DIAGRAM DWG
REV
COORDINATION MHL PROJECT No. : SO6625
R2B-P2-203-02-K-PL-10001 0
PROJECT DIRECTOR
CONTRACT NO. : PTI-ID-S-003/2019 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : 22.MAR.2021 SCALE : 1:100 DIMENSION: mm. PLACE : Dos Bocas, Paraiso, TAB.
CAD FILE : R2B-P2-203-02-K-PL-10001_0
PLANT
NORTH

1700000

(NE)

PREVAILING
WIND

(SW)

R01 R01
B A

P01 P01 P01 P01 P01


01 02 03 04 05
2000 6000 6000 6000 6000

E.2032.000
N.1198.500
R01
A
10000

N.1188.500 R01
B

HPP EL. 100200

SIMBOLOGY
REFERENCE POINT

BOUNDARY OF BATTERY LIMIT CP DATE REVISIONS REFERENCE DRAWINGS REVIEWED BY

N.P.T.+000.000 MCA DESCRIPTION DATE BY APR NUMBER TITLE


DRAWING THK
DOS BOCAS REFINERY PARAISO, TABASCO
INDICATE ELEVATION 0 1 2 3 4 6 10 A ISSUE FOR INFORMATION 05.MAR.2020 SHC KHL
SPECIALIST
PROJECT SHC NAPHTHA HYDRODESULFURIZATION UNIT - HDN
B ISSUE FOR INFORMATION 21.OCT.2020 SHC KHL
PTI INFRAESTRUCTURA DE
GRAPHIC SCALE 1:100 METERS C ISSUE FOR INFORMATION 29.JAN.2021 SHC KHL
DESARROLLO, S.A. DE C.V.
DBNR REVIEW DHJ
TRAIN #1(U-62000)
0 ISSUE FOR CONSTRUCTION 22.MAR.2021 SHC KHL
COORDINATOR
Samsung Engineering Co., Ltd. ASOCIADOS CONSTRUCTORES DBNR S.A. DE C.V.
APPROVAL KHL BATTERY LIMIT IN/OUT BLOCK DIAGRAM DWG
REV
COORDINATION MHL PROJECT No. : SO6625
R2B-P2-203-02-K-PL-10001 0
PROJECT DIRECTOR
CONTRACT NO. : PTI-ID-S-003/2019 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : 22.MAR.2021 SCALE : 1:100 DIMENSION: mm. PLACE : Dos Bocas, Paraiso, TAB.
CAD FILE : R2B-P2-203-02-K-PL-10001_0
N.C.

(NE)

REIGNING
WINDS

N.C. (SW)

E.2040.000

E.2080.000

E.2120.000

E.2160.000

E.2200.000

E.2240.000

E.2280.000

E.2320.000
COOLING TOWER
COOLING TOWER

(NE)

COOLING TOWER

126

125
138

137

136

135

134

133

132

131

130

129

128

127
76
75
74
73
72
71
70

ESTACIONAMIENTO

PRINCIPAL
ACCESO
69
68
67
66
VIENTOS

65
64
63

11

1213
1

10

14

15
REINANTES COOLING TOWER

COOLING TOWER GPS-1 IMP

GPS-2 IMP

DWG. LIMIT N.1420.000


(SW) THIS DRAWING
CL INTEGRATION ROAD (WIDTH 10M)
N. 1410.000
KEY PLAN

COOLING WATER
BATTERY LIMIT N.1374.000

FA-61055

FA-61056

EA-61007A(LOWER)
EA-61007B(UPPER)
GB-61001
CL PLANT ROAD (WIDTH 7M)

BC-61001B
EA-61014B
EA-61014A
BC-61001A
203-U-I-117

EA-61015
N. 1370.500

SYSTEM

DS-61001
HDN1-SHT-002

FA-61005

FA-61006
203-U-I-116
A4

LUBE OIL
GA-61057A A4 DROP AREA
GA-61056A

CL ACCESS ROAD (WIDTH 6M)


DROP AREA

EA-61011

EA-61013
CL ACCESS ROAD (WIDTH 6M)
A4 GA-61056B GA-61057B DROP AREA HDN1-STR-002

FA-61008
A4
SPE-61021 FA-61010 DS-61002

GA-61006B
GA-61006A

BA-61003
FA-61009
GA-61003A

GA-61003B

DA-61001

GA-61008B
GA-61021A

GA-61008A
A4

GA-61009B
GA-61009A
GA-61005B
GA-61007A

GA-61007B

GA-61010B
GA-61010A
GA-61021B FA-61013

GA-61004B
GA-61004A
LUBE R=

FA-61012A

FA-61004
LUBE

FA-61012B

E. 2197.000
15M

E. 2249.000
FG-61051B
A4

FA-61011

FG-61051A
OIL OIL MAINTENANCE
A4 AREA
A4 HDN1-STR-004
HDN1-SHT-001
HDN1-STR-008
SPILL WALL HDN1-STR-005 A4

GA-61005A
EA-61006
A4

FA-61051

BD-61004A
BD-61004B
BD-61003A
BD-61003B
HDN1-PAR-003

BA-61002
BATTERY LIMIT HDN1-PAR-002 EC-61052 EC-61001 EC-61003 EC-61004 EC-61002
203-U-I-110 VALVE PLATFORM HDN1-PR-001 A4 A4 HDN1-PAR-004 HDN1-PAR-005 HDN1-PAR-006

SPILL WALL A4 A4 A4 HDN1-STR-006 MAINTENANCE


AREA
FA-61003

BD-61002A
GA-61051A
GA-61051B

GA-61052A
GA-61052B

GA-61002A

BD-61002B
GA-61002B
DC-61004

HDN1-PR-002

LUBE OIL
LUBE OIL
A4

SPE-61004
GA-61058A
GA-61058B
SPE-61050

FA-61060

FA-61057
SA-61051
FG-61001

FA-61061
203-U-O-108

FA-61059

FA-61058

GA-61001A

GA-61001B
A4

SPE-61002
SPE-61001

SPE-61003
A4 15M A4
A4 A4 A4 R=

FA-61007
FA-61052

FA-61053

DC-61001

BA-61001
CL ACCESS ROAD (WIDTH 6M) A4

EA-61002

CATALYST UNLOADING AREA


N. 1297.000
R=
3

HDN1-STR-007
0M

EA-61016
MAINTENANCE

EA-61004
DC-61002A AREA

EA-61001A(LOWER)

EA-61003A(LOWER)
EA-61001B(UPPER)

EA-61003B(UPPER)
EA-61003C
5M
BATTERY LIMIT E.2030.000

BATTERY LIMIT E.2315.000


M
A4 HDN1-STR-003

30

FA-61002
HDN1-PR-002
1

R=
R=

A4 A4
CL ACCESS ROAD (WIDTH 6M)
DWG. LIMIT E.2005.000

DWG. LIMIT E.2345.000


A4

FA-61001
6000
CYLINDER SHED

CL ACCESS ROAD (WIDTH 6M)


(TYP.) A4 1 5M
CYLINDER DC-61002B R=
CL INTEGRATION ROAD (WIDTH 10M)

CL INTEGRATION ROAD (WIDTH 10M)


SHED
E. 2076.750

HDN SATELLITE HDN1-SE-03


CONTROL ROOM
HDN-CCS-61000 ELECTRICAL SUBSTATION
DC-61003

E. 2180.000

CL ACCESS ROAD (WIDTH 6M)


TRANSFORMERS

E. 2335.000
E. 2015.000

R= HDN1-STR-001
3 0M
3 0M
R=

E. 2262.000
A4

CL PLANT ROAD (WIDTH 7M)


N. 1246.000
COOLING WATER

EA-62007A(LOWER)
FA-62055
FA-62056

EA-62007B(UPPER)
GB-62001
BC-62001B
EA-62014B
BC-62001A
EA-62014A

EA-62015

SYSTEM

DS-62001

CL ACCESS ROAD (WIDTH 6M)


CL ACCESS ROAD (WIDTH 6M)
HDN2-SHT-002

FA-62005

FA-62006
A4 A4 A4
LUBE OIL

GA-62057A DROP AREA


GA-62056A
DROP AREA

EA-62011

EA-62013
GA-62056B GA-62057B DROP AREA HDN2-STR-002
FA-62008

E. 2249.000
E. 2197.000
A4
SPE-62021 FA-62010 DS-62002

GA-62006B
GA-62006A

BA-62003
FA-62009
GA-62003A

GA-62003B

GA-62008B
DA-62001

GA-62008A
GA-62021A A4

GA-62009A

GA-62009B
GA-62005B
GA-62007B
GA-62007A

GA-62010B
GA-62010A
GA-62021B

GA-62004B
GA-62004A
R=
FA-62012A

FA-62004

LUBE
FA-62012B

LUBE FA-62013 15M


FA-62011

FG-62051B

A4
FG-62051A

OIL OIL MAINTENANCE


A4 AREA
A4 HDN2-STR-004
HDN2-SHT-001
HDN2-STR-008
SPILL WALL HDN2-STR-005 A4

GA-62005A
EA-62006

A4
FA-62051

BD-62004A
BD-62004B
BD-62003A
BD-62003B

HDN2-PAR-003
BATTERY LIMIT HDN2-PAR-002 EC-62052 EC-62001 EC-62003 EC-62004 EC-62002
HDN2-PR-001

BA-62002
203-U-I-210 VALVE PLATFORM
A4 A4 HDN2-PAR-004 HDN2-PAR-005 HDN2-PAR-006

A4 A4 HDN2-STR-006
SPILL WALL A4 MAINTENANCE
AREA
FA-62003
GA-62051A

BD-62002A
GA-62051B

GA-62052A
GA-62052B

GA-62002A

BD-62002B
GA-62002B

DC-62004
HDN2-PR-002

LUBE OIL
LUBE OIL
A4
GA-62058A
GA-62058B
SPE-62050

SPE-62004
FA-62057
SA-62051
FA-62060
FG-62001

FA-62061

203-U-O-208
FA-62059

FA-62058

GA-62001A

GA-62001B
A4
SPE-62002
SPE-62001

SPE-62003

A4 15M A4
A4 A4 A4 R=
FA-62007
FA-62052

FA-62053

DC-62001

BA-62001
CL ACCESS ROAD (WIDTH 6M) A4

CATALYST UNLOADING AREA


EA-62002
N. 1165.000
HDN2-STR-007

EA-62016
MAINTENANCE

EA-62004
R=

DC-62002A AREA

EA-62001A(LOWER)

EA-62003A(LOWER)
EA-62001B(UPPER)

EA-62003B(UPPER)
3

M
0M

A4 HDN2-STR-003
30

FA-62002

HDN2-PR-002
R=

A4 A4

EA-62003C
A4
CL ACCESS ROAD (WIDTH 6M)

FA-62001

CYLINDER SHED A4 5M
DC-62002B 1
R=

IP Pipe
HDN2-SE-04 COMPLEX IP No. IP Coordinate Size IP Elevation Line No.
ELECTRICAL SUBSTATION No.
E. 2180.000

DC-62003 (inch)
IP-F-203-1PKG2/
TRANSFORMERS 203-U-I-116 E.2030.000 N.1364.400 18 COP EL.101,029 18"-ACI-610004-T-A15T1U-N
CL ACCESS ROAD (WIDTH 6M)
302PKG6-000061
HDN2-STR-001
IP-F-203-1PKG2/
203-U-I-216
BATTERY LIMIT N.1125.000 302PKG6-000062 203-U-I-117 E.2315.000 N.1365.500 18 COP EL.101,029 18"-ACI-610007-T-A15T1U-N
203-U-I-217
E. 2262.000

IP-F-203-2PKG2/
302PKG6-000130 203-U-I-216 E.2047.500 N.1125.000 18 COP EL.101,029 18"-ACI-620013-T-A15T1U-N
CL INTEGRATION ROAD (WIDTH 10M)
N. 1110.000 IP-F-203-2PKG2/
302PKG6-000131 203-U-I-217 E.2308.500 N.1125.000 18 COP EL.101,029 18"-ACI-620022-T-A15T1U-N
IP-F-203-1PKG2/
DWG. LIMIT N.1100.000 302PKG6-000063 203-U-I-110 E.2034.255 N.1318.500 20 COP EL.100,860 20"-SAE-614146-T-A01T1-N
IP-F-203-1PKG2/
302PKG6-000064 203-U-O-108 E.2034.255 N.1317.500 20 COP EL.100,860 20"-RAE-614147-T-A01T1-N
IP-F-203-2PKG2/
302PKG6-000132 203-U-I-210 E.2034.255 N.1186.500 20 COP EL.100,860 20"-SAE-624146-T-A01T1-N
IP-F-203-2PKG2/
302PKG6-000133 203-U-O-208 E.2034.255 N.1185.500 20 COP EL.100,860 20"-RAE-624147-T-A01T1-N
SIMBOLOGY
REFERENCE POINT

BOUNDARY OF BATTERY LIMIT CP DATE REVISIONES REFERENCE DRAWINGS REVIEWD BY


DRAWING THK
N.P.T.+22.100 INDICATE ELEVATION 0 5 10 15 20 25 50
MCA DESCRIPCION DATE BY APR NUMBER TITLE DOS BOCAS REFINERY PARAISO, TABASCO
A ISSUE FOR INFORMATION 05.MAR.2020 SHC KHL R2B-P2-203-02-E-PL-00001 OVERALL PLOT PLAN
SPECIALIST
PROJECT SHC
NAPHTHA HYDRODESURFURIZATION UNIT - HDN
B ISSUE FOR INFORMATION 21.OCT.2020 SHC KHL
PTI INFRAESTRUCTURA DE
GRAPHIC SCALE 1:500 METERS C ISSUE FOR INFORMATION 29.JAN.2021 SHC KHL
DESARROLLO, S.A. DE C.V.
DBNR REVIEW DHJ
TRAIN #1(U-61000), TRAIN #2(U-62000)
0 ISSUE FOR CONSTRUCTION 22.MAR.2021 SHC KHL
COORDINATOR
Samsung Engineering Co., Ltd. ASOCIADOS CONSTRUCTORES DBNR S.A. DE C.V.
APPROVAL KHL UNDERGROUND PIPING IP LOCATION DRAWING
REV
COORDINATION MHL PROJECT No. : SO6465
R2B-P2-203-02-K-PL-10001 0
PROJECT DIRECTOR
CONTRACT NO. : PTI-ID-S-003/2019 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : 22.MAR.2021 SCALE : 1:500 DIMENSION: mm. PLACE : Dos Bocas, Paraiso, TAB.
CAD FILE : R2B-P2-203-02-K-PL-10001

You might also like