Groundwater Sampling Methodology Guide

1. Groundwater sampling is required during a site investigation at Sumatra Gold in Indonesia, but sampling will be tricky due to drilling fluid and water used during diamond drilling. 2. The suggested methodology is to flush the borehole after drilling to remove drilling fluid, lower the packer and overshot to purge 10 meters of water 3 times until the pH stabilizes at the groundwater level of around 5. 3. The required field gear includes a pH meter, water level dipper, sample bottles, syringe, filter, and driller's overshot.

Uploaded by

Erfandi Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views2 pages

Groundwater Sampling Methodology Guide

1. Groundwater sampling is required during a site investigation at Sumatra Gold in Indonesia, but sampling will be tricky due to drilling fluid and water used during diamond drilling. 2. The suggested methodology is to flush the borehole after drilling to remove drilling fluid, lower the packer and overshot to purge 10 meters of water 3 times until the pH stabilizes at the groundwater level of around 5. 3. The required field gear includes a pH meter, water level dipper, sample bottles, syringe, filter, and driller's overshot.

Uploaded by

Erfandi Rahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

DATE 25 May 2012 PROJECT No.

127641034

TO Luis Espinoza, Jakarta Field Staff

Golder Associates

CC Craig Wicenciak, Scott Marisett

FROM Geneviève Marchand EMAIL gmarchand@golder.com.au

GROUNDWATER SAMPLING PROCEDURE AT SUMATRA GOLD, INDONESIA

1.0 INTRODUCTION
Groundwater samples have to be collected during the site investigation at Sumatra Gold. Since we are
drilling using diamond rigs, and we are using drilling fluid and water during the drilling, groundwater sampling
will be slightly tricky.

You will find below a suggested methodology for groundwater sampling.

2.0 SUGGESTED METHODOLOGY


The important thing is to sample groundwater and not flushing water or drilling fluid. Following the drilling
and prior to the packer testing, the borehole will be flush of drilling fluid. Following the flushing, the rods will
be lowered as low as possible, in an area where the packer can be inflated with no risk of blow up.

Once the packer is lowered and inflated, the driller overshot is lowered in the drill rod to a depth
approximately 10 m below the water level and lifted quickly. This will purge the borehole of 10 m of water.
Repeat the operation several time until you have removed approximately 3 times the volume of water in the
rods and until the pH is stable. The local groundwater has a pH of about 5, whilst the water used for flushing
may have a higher pH. You can measure the pH of the flushing water prior to confirm this hypothesis.

When the water is representative of the groundwater in the formation, samples can be collected.

3.0 REQUIRED FIELD GEAR


The following will be required:
 pH meter

 water level dipper

 sample bottles

 syringe and filter

 driller’s overshot

Golder Associates Pty Ltd

Level 3, 1 Havelock Street, West Perth, Western Australia 6005, Australia (PO Box 1914, West Perth WA 6872)

Tel: +61 8 9213 7600 Fax: +61 8 9213 7611 www.golder.com

Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America

A.B.N. 64 006 107 857

Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation.
Luis Espinoza, Jakarta Field Staff 127641034

Golder Associates 25 May 2012

Geneviève Marchand
Senior Hydrogeologist