Action plan of Airtel:

 Formulation and finalising the Research problem ( 2 days ).


 Formulating the Hypothesis ( 1 day ).
 Data collection ( 6 days).
 Data Analysis ( 3 days ).
 Report Preparation ( 1 day ).

Total time required to complete the project = 13 days.