You are on page 1of 4

 856-456-2899  info@americanasphaltcompany.

com

Select Page
a

Parking Lot Life Cycle: A Brief Timeline


by Frank Bilotta | Mar 23, 2020 | Articles

Everything has a life cycle, including your asphalt parking lot. Having
a preventative maintenance plan in place will extend the life of your
parking lot up to 25 years.
Below is breakdown of the life cycle to your parking lot.
The First Five Years – Your asphalt pavement is fresh and durable. You may see a few small cracks develop or
a little discoloration from the sun or traffic. On a larger scale, the asphalt is in excellent condition. Within the
first year of new asphalt being installed, you should sealcoat and restripe, and continue this maintenance
every 3-5 years.
Five to Ten Years – As your parking lot reaches a decade, minor repairs will be needed. Asphalt patch repairs
are less invasive and help prolong the asphalt life. Standard maintenance like crack sealing, seal coating, line
striping and patch repairs should be performed.

Ten to Twenty Five Years – Over time, you parking lot will continue to need more extensive parking lot
repairs. Larger cracks will begin to form, or if the asphalt is highly trafficked, a resurfacing may be
recommended.

Twenty Five Years and Up – The asphalt life cycle is coming to an end. At this stage the asphalt is old and
brittle from traffic and exposure to the elements, resulting in significant damage. Reconstruction is most
likely required.

Having the appropriate maintenance plan in place will extend the life of the parking lot. Preventative
maintenance includes services such as sealcoating and crack sealing. These are typically performed
periodically, to prevent cracks from becoming larger and requiring more extensive repairs.  Another
procedure would be asphalt patching or pothole repair, as mentioned above, will not only help extend the life
but avoid potential liabilities.

As an owner or manager, the best way to maximize the lifespan of your asphalt parking lot is by walking the
property and evaluating the current conditions. With freeze thaw cycles, the water and moisture will leak
beneath the surface and weaken the structure of the asphalt causing further damage. Always keep your
parking lot clean. When your parking lot is filled with debris and spills, it will impact the structural integrity of
your parking lot and cause further damage.

Search

Recent Posts

Here We Grow Again!

American Asphalt Receives STEP Award

Never Give Up

The Gift of Giving

Welcome to the Family

Recent Comments

Archives

May 2020

January 2020

December 2019

June 2019
May 2019

February 2019

January 2019

November 2018

October 2018

September 2018

December 2017

Categories

Community Impact

Company News

Home Page Services 1

Home Page Services 2

Home Page Services 3

Home Page Services 4

Uncategorized

Meta

Log in

Entries feed

Comments feed

WordPress.org

OUR TEAM

Management Team

Material Sales

Solutions Team

SUPERINTENDENTS

Support Team
OUR SERVICES

Paving

Hot Mix Asphalt Manufacturing

Parking Lot Maintenance

EZ Street Cold Patch

PRODUCT TOOLS

Asphalt Tonnage Calculator

Estimator Tools

Contact Sales

Contractors Login

CORPORATE OFFICE NORTH JERSEY OFFICE


 100 Main Street, W
 2504 Plainfield Ave

Collingswood Heights, NJ 08059 Scotch Plains, NJ 07076

 (856) 456-2899  (908) 373-2000

 info@americanasphaltcompany.com  info@americanasphaltcompany.com

 
© 2015-2019 American Asphalt Company. All Rights Reserved.

Web Design & Marketing by:

You might also like