Disclosure record of construction scheme and operation instruction
Construction Unit: CRCC Number: UAQ-CGGC-CRCC-03-20200409-0015
AALS EMEA INTAKE PUMPING STATION DEEP an
‘Name, number and revision of EXCAVATION Comping
isclosure documents person
ANAC) thal i EIA eon
Number of first kobe
disclosure (person) | Plan Actual Conduetor: Ty’ |
E2286 A SLDisclosed personnel
Te TH
Be ee TH 88
| Professiol Sen —(Protessol gn prtetaon| age
Poicd
a8 HT. ay |
AB
cath | Keay [Bincl-f |
General
construction
personne |_ em Ga
(edeitional
pages may be 3
aa Pa
a Ay Ro. pry
& TH BA
=| i ‘sign
z Professo i Su4_—
. ha. #8)
g Me
8 Welder,
fs iheat
treatment
worker
RL AT.
AR
Cort | aT
Tester
zat. |
Crane
Fete
OtherDisclosure record of construction scheme and operation instruction
REA LE eam
Wir securty
‘Security offcer) area Department
Cir TK Cr
Quaity | Werk uty
Checker | area Department
cacy | act) (aca)
he A
Location Date
TH ae Aa
Profession : sn Date
wt a
a
fie setae
7
7
3
a
g
2 Bi fh ® Disclosure contents
> Permitto work PT forthe excavation works willbe submitted by CRCC and aporoved fom
CGGC prior to start any activity at te
> Each area of works wil be cleared from obstructions in order to ensue @ continuly of wok
sequence,
* Excavated material will be stocked temporarily (if required) as per standard safety|
requirements minimum of 15m fom the edge of the shoring and immediately ransierd to
the cient approved dumping yard as per approved legal procedure
> Safe access will be provided for the excavation area, Temporary fence, hard rail and
baricading or edge protection tobe provided for excavated area
> Ramp il be provided wth proper slope and compaction Access wil be maintained everyday
TRIER throughout the completion of works.
_cameal |, accas wl be provided wih a stl sandrd ke hanras oe boards te
Excavation wil be from -6.0 to -13.45 below ground level (+0.00) and inside the shoring
‘Toe boards must be installed at deep excavations.
Before starting the excavation, the water table level shall be recorded and verified by the|
‘QA/QC Engineer/inspector from CRCC and CGGC.
Excavator and wheel loader to be provided with proper safety arrangements.
‘The above procedure will be followed al every sequence of works.
‘The entire works willbe carried out as per the guidelines established in the project HSE plan.
Utmost importance shall be given to safety of personnel and protection of services. It wil be|
‘ensured that the personal involved area thoroughly aware of the Employer safety regulations.
To achieve the above the following shall be ensured,
‘Too! box meetings will be conducted before starting the works.Disclosure record of construction scheme and operation instruction
‘Al personnel willbe provided with suliable Personal Protediive Equipment
Required permits will be obtained from the authorities concerned before starting the works.
Plant and equipment will be fully tested and certified by an independent testing agency|
Copies of cerifcates will be made available.
Proper safe access willbe provided forthe workmen to reach the work spot and cary out thei
works safely,
Lighting system wil be provided in order to make proper ilumination for the entire work sie
while doing excavation works in night ios.
Ifthe scaffolding and working platforms area tobe provided to facta the work, the same wil
be checked for its safety.
SURVEY SETTING OUT SHORING INSTALLATION EXCAVATION AS PER|
|echnobyical APPROVED MS-DUMPING THE EXCAVATED MATERIAL TRANSPORTING THE
process MATERIAL TO APPROVED DUMPINGYARD,
> Full-time safety management personnel are responsible for inspecting the safety
protection equipment of construction personnel, and prohibiting personnel who do not)
meet the site safety requirements from entering the construction site
> The construction site machinery and equipment operations, a person responsible for
directing construetion to prevent mechanical equipment safety accidents
> The construction site shall be fully enclosed, set up import and export, and have special
measures construction
> All personnel involved in the activity must be properly trained as required (e.g: special
tools and/or heavy equipment operators must have specific accreditation / licenses)
> All plant and machinery must have all valid documentation (vehicle register, insurance
policy, third party inspections, ete.) as required
> All required PPE must be availableDisclosure record of construction scheme and operation instruction
> Establish obvious safety warning signs and safety precautions
Lee? Alll personne! involved in the activity must be properly trained as required (e.g.: special
| protection tools and/or heavy equipment operators must have specific accreditation / licenses).
requirements| -
> The site construction materials are neatly arranged at the designated place.
> Safe and orderly parking of construction machinery and equipment.sipemQVEOUA UNM AL QUWAIN INDEPENDENT WATER 150 MIGD PROJECT naan
1 HERA BAER IRAE eet
Disclosure record of site operation safety and technology
Construction Unit: CRCC Number: UAQ-CGGC-CRCC-04-20200425-0015
faba
Construction INTAKE DEEP EXCAVATION
item
tent ‘tral INTAKE DEEP
Date eae Location EXCAVATION
LTD HEL AHA
Construction | diet /UmsiiaIAMA ICRC |Person in charge
unit of construction
wen
fas
Hazard source
(1) Design and construction strictly according to the constructio
jorganization
(2) Ensure that the site’ s safety protection facilities are complete}
land effective, with obvious warning signs
RA BASIRA) (3) ALL the areas, machine, equipment or any areas where coordination
a fer y frith mechanical, electrical (or any other works) will be properly
Saiety Of lcoordinated and will conmence the works only after getting the approval for,
technology [the same team for casting
discioeure (4 Establish obvious safety warning signs and safety precautions.
(5) ALL personal involved in the activity must be properly trained
las required (eg: special tools and/or heavy equipment operators mist have
lspecific accreditation/licenses)
Pie AF Signature of disclosure charge person:
MiDate: 07.08.2020Disclosure record of site operation safety and technology