You are on page 1of 6
SDeMQVEOUA yu AL QUNAIN INDEPENDENT WATER 150 MIGD PROJECT 0 AK cee =e HILAR, (RSI | SSUES Disclosure record of construction scheme and operation instruction Construction Unit: CRCC Number: UAQ-CGGC-CRCC-03-20200409-0015 AALS EMEA INTAKE PUMPING STATION DEEP an ‘Name, number and revision of EXCAVATION Comping isclosure documents person ANAC) thal i EIA eon Number of first kobe disclosure (person) | Plan Actual Conduetor: Ty’ | E2286 A SLDisclosed personnel Te TH Be ee TH 88 | Professiol Sen —(Protessol gn prtetaon| age Poicd a8 HT. ay | AB cath | Keay [Bincl-f | General construction personne |_ em Ga (edeitional pages may be 3 aa Pa a Ay Ro. pry & TH BA =| i ‘sign z Professo i Su4_— . ha. #8) g Me 8 Welder, fs iheat treatment worker RL AT. AR Cort | aT Tester zat. | Crane Fete Other Disclosure record of construction scheme and operation instruction REA LE eam Wir securty ‘Security offcer) area Department Cir TK Cr Quaity | Werk uty Checker | area Department cacy | act) (aca) he A Location Date TH ae Aa Profession : sn Date wt a a fie setae 7 7 3 a g 2 Bi fh ® Disclosure contents > Permitto work PT forthe excavation works willbe submitted by CRCC and aporoved fom CGGC prior to start any activity at te > Each area of works wil be cleared from obstructions in order to ensue @ continuly of wok sequence, * Excavated material will be stocked temporarily (if required) as per standard safety| requirements minimum of 15m fom the edge of the shoring and immediately ransierd to the cient approved dumping yard as per approved legal procedure > Safe access will be provided for the excavation area, Temporary fence, hard rail and baricading or edge protection tobe provided for excavated area > Ramp il be provided wth proper slope and compaction Access wil be maintained everyday TRIER throughout the completion of works. _cameal |, accas wl be provided wih a stl sandrd ke hanras oe boards te Excavation wil be from -6.0 to -13.45 below ground level (+0.00) and inside the shoring ‘Toe boards must be installed at deep excavations. Before starting the excavation, the water table level shall be recorded and verified by the| ‘QA/QC Engineer/inspector from CRCC and CGGC. Excavator and wheel loader to be provided with proper safety arrangements. ‘The above procedure will be followed al every sequence of works. ‘The entire works willbe carried out as per the guidelines established in the project HSE plan. Utmost importance shall be given to safety of personnel and protection of services. It wil be| ‘ensured that the personal involved area thoroughly aware of the Employer safety regulations. To achieve the above the following shall be ensured, ‘Too! box meetings will be conducted before starting the works. Disclosure record of construction scheme and operation instruction ‘Al personnel willbe provided with suliable Personal Protediive Equipment Required permits will be obtained from the authorities concerned before starting the works. Plant and equipment will be fully tested and certified by an independent testing agency| Copies of cerifcates will be made available. Proper safe access willbe provided forthe workmen to reach the work spot and cary out thei works safely, Lighting system wil be provided in order to make proper ilumination for the entire work sie while doing excavation works in night ios. Ifthe scaffolding and working platforms area tobe provided to facta the work, the same wil be checked for its safety. SURVEY SETTING OUT SHORING INSTALLATION EXCAVATION AS PER| |echnobyical APPROVED MS-DUMPING THE EXCAVATED MATERIAL TRANSPORTING THE process MATERIAL TO APPROVED DUMPINGYARD, > Full-time safety management personnel are responsible for inspecting the safety protection equipment of construction personnel, and prohibiting personnel who do not) meet the site safety requirements from entering the construction site > The construction site machinery and equipment operations, a person responsible for directing construetion to prevent mechanical equipment safety accidents > The construction site shall be fully enclosed, set up import and export, and have special measures construction > All personnel involved in the activity must be properly trained as required (e.g: special tools and/or heavy equipment operators must have specific accreditation / licenses) > All plant and machinery must have all valid documentation (vehicle register, insurance policy, third party inspections, ete.) as required > All required PPE must be available Disclosure record of construction scheme and operation instruction > Establish obvious safety warning signs and safety precautions Lee? Alll personne! involved in the activity must be properly trained as required (e.g.: special | protection tools and/or heavy equipment operators must have specific accreditation / licenses). requirements| - > The site construction materials are neatly arranged at the designated place. > Safe and orderly parking of construction machinery and equipment. sipemQVEOUA UNM AL QUWAIN INDEPENDENT WATER 150 MIGD PROJECT naan 1 HERA BAER IRAE eet Disclosure record of site operation safety and technology Construction Unit: CRCC Number: UAQ-CGGC-CRCC-04-20200425-0015 faba Construction INTAKE DEEP EXCAVATION item tent ‘tral INTAKE DEEP Date eae Location EXCAVATION LTD HEL AHA Construction | diet /UmsiiaIAMA ICRC |Person in charge unit of construction wen fas Hazard source (1) Design and construction strictly according to the constructio jorganization (2) Ensure that the site’ s safety protection facilities are complete} land effective, with obvious warning signs RA BASIRA) (3) ALL the areas, machine, equipment or any areas where coordination a fer y frith mechanical, electrical (or any other works) will be properly Saiety Of lcoordinated and will conmence the works only after getting the approval for, technology [the same team for casting discioeure (4 Establish obvious safety warning signs and safety precautions. (5) ALL personal involved in the activity must be properly trained las required (eg: special tools and/or heavy equipment operators mist have lspecific accreditation/licenses) Pie AF Signature of disclosure charge person: MiDate: 07.08.2020 Disclosure record of site operation safety and technology fikiKA (4251) 5 Signature of The receiver (full member): Bie) ROSHE | DYgL| “CONT ERE Pabdir snaevoa HAG Meg hina ore $4) AL

You might also like