Project: Sta.

Lucia Mall Davao


Location: Ponte Verde, Brgy. Communal, Davao City
Subject: Technical Bid Tabulation for Supply and Delivery of Cooling Tower
Date: July 5, 2021
As per plan LIANG CHI INDUSTRY
Item No. Description Specification Quantity Specification
1.00 Capacity 450TR at 5110LPM 5110 LPM, 30HP
2.00 Power Supply 400V, 3Ø, 60Hz 380V, 3Ø, 60Hz
3.00 Ambient Wet Bulb Temperature 26.7°C 3.00 26.7°C
4.00 Inlet Temperature 35°C 35°C
5.00 Outlet Temperature 29.4°C 29.4°C

ORIGIN TAIWAN / CHINA


BRAND LIANG CHI COOLING TOWER
LEAD TIME 3-5 MONTHS
DELIVERY UNLOADING AT SITE

50% Downpayment, 50% after


Payment
Installation

Warranty 1 Year (Upon Acceptance before


release of 10% Retention)
NG CHI INDUSTRY CTHVAC DUNHAM BUSH NEW BAC COOLINE
Quantity Specification Quantity Specification Quantity Specification
500TR 5110 LPM 450TR (85.17 L/S)
380V, 60Hz 380V, 3Ø, 60Hz 29.84kW, 400Volts
3.00 26.7°C 3.00 26.7°C 3.00 35°C
35°C 35°C 29.4°C
29.4°C 29.4°C 26.7°C

AIWAN / CHINA MALAYSIA CHINA


CHI COOLING TOWER NEWIN TRUWATER BALTIMORE
3-5 MONTHS 12-14 Weeks 16 - 18 weeks
14 - 16 weeks at project site from
NLOADING AT SITE Including Unloading receipt of PO. / Downpayment / Including Unloading
60% Approval of Shopdrawings
Downpayment upon receipt of
P.O. thru telegraphic transfer; 40%
wnpayment, 50% after 20% Downpayment ; 70% Upon
Balance by irrevocable Domestic LC
Installation Delivery ; 10% Retention
in full upon submission of packing
list / 13months
1 Year upon start-up
pon Acceptance before from date of delivery whichever 1 Year (Upon Acceptance before
se of 10% Retention) comes first release of 10% Retention)
EW BAC COOLINE
Quantity

3.00

CHINA
BALTIMORE
16 - 18 weeks

cluding Unloading

wnpayment ; 70% Upon


ery ; 10% Retention

pon Acceptance before


se of 10% Retention)