You are on page 1of 66

Best Practices Guide | PUBLIC

SAP S/4HANA 1909


2020-10-02

Transportation Management in SAP S/4HANA:


Combination of Inbound and Outbound
Transportation (Advanced Transportation
© 2020 SAP SE or an SAP affiliate company. All rights reserved.

Management)

THE BEST RUN


Content

1 Purpose. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

2 Prerequisites. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.1 System Access. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2 Roles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.3 Master Data, Organizational Data, and Other Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.4 Business Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
2.5 Preliminary Steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Set Initial Stock for Material. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Create Profile and Layout Sets. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

3 Overview Table. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

4 Test Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.1 Create Sales Order. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.2 Create Outbound Delivery. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.3 Create Purchase Order (with Confirmation Control Key for Inbound Delivery). . . . . . . . . . . . . . . . . . 18
4.4 Create Inbound Delivery. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
4.5 Create Stock Transport Order (Without MRP). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
4.6 Create Replenishment Delivery for Stock Transport Order. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
4.7 Freight Planning and Carrier Selection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
4.8 Execute Picking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
4.9 Execute Picking for Stock Transport Order. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
4.10 Print Loading Instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
4.11 Loading Freight. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
4.12 Print Transportation Documents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
4.13 Post Goods Issue. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
4.14 Post Goods Issue for Stock Transport Order. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
4.15 Departure of Truck. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
4.16 Arrival at Customer or Plant 2 (Supplying Plant) / Departure at Vendor and in Plant 2 (Supplying
Plant). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
4.17 Confirm Quantities for Putaway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
4.18 Post Goods Receipt for Inbound Delivery. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
4.19 Create Supplier Invoice with PO/GR Relation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
4.20 Check Status of Stock Transport. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
4.21 Arrival of Truck at Receiving Plant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49
4.22 Post Goods Receipt for Stock Transport Order. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
4.23 Proof of Delivery (Optional). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
2 PUBLIC Content
4.24 Create Customer Billing Document. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53
4.25 Charge Calculation / Freight Settlement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
4.26 Invoice Verification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

5 Appendix. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
5.1 Scheduling Job (Alternative). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Job Scheduling for Optimizer Run. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Content PUBLIC 3
1 Purpose

This business scenario is for shippers that is like to manage domestic inbound and outbound freight based on
automatic transportation planning with the optimizer. The capability is part of Integrated Transportation
Management.

The shipper is a manufacturer and distributes products through its network. The shipper has a logistics
organization that is responsible for the timely, cost effective, and efficient transportation of products between

● the shipper’s facilities and the end customer.


● the vendor and the own plants.
● two own plants (shipping plant and receiving plant) within the same company code.

The process starts with the creation of customer sales orders (scope item BD9), purchase orders (scope item
J45) and stock transport purchase orders (scope item Transportation Management in SAP S/4HANA: Stock
Transport Orders).

Afterwards, the outbound deliveries are created for the customer sales orders and stock transport orders and
the inbound deliveries for the purchase orders. During saving of the deliveries, freight units are automatically
generated. The system considers freight unit building rules to create for example freight units per order item,
splits deliveries based on quantity, or consolidates as much as possible.

Once the freight units are generated, the optimizer is used to perform an automatic transportation planning.
The optimizer run can be planned nightly to assign freight units to capacities in a cost-effective way while
adhering to constraints, or it can be triggered in the Transportation Cockpit.

Either way, the transportation cockpit is used to check the planning results and to perform the final planning.
Still unplanned freight units can be assigned to existing freight orders or new ones can be created.

Transportation execution is started when the material is available.

During transportation execution, the truck is loaded, transportation documents are printed, and the transport
is tracked.

After the transportation is executed, the expected freight costs are calculated. A freight settlement document
is created as the basis for the posting of accruals and the settlement with the carrier.

Once the carrier invoice is received, the invoice verification can be performed based on the expected freight
costs.

This document provides a detailed procedure for testing this scope item after solution activation (via BC sets),
reflecting the predefined scope of the solution. Each process step is covered in its own section, providing the
system interactions (test steps) in a table view. Customer project-specific steps must be added.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
4 PUBLIC Purpose
2 Prerequisites

This section summarizes all prerequisites to conducting the test in terms of systems, users, master data,
organizational data, and other test data and business conditions.

2.1 System Access

The test should be conducted with the following system:

Details

System Accessible via SAP Fiori Launchpad. Your system adminis­


trator provides you with the URL to access the various apps
assigned to your role.

2.2 Roles

Assign the following business roles to your individual test users.

 Note

The following roles are provided as example roles from SAP. You can use these as templates to create your
own roles.

Business Role ID as Deliv­


Test User Business Role ered by SAP Scenario

SALES_REP Internal Sales Representative SAP_BR_INTER­ BD9


NAL_SALES_REP

PURCHASER Purchaser SAP_BR_PURCHASER J45

RSCV_SPEC Receiving Specialist SAP_BR_RECEIVING_SPE­ J45


CIALIST

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Prerequisites PUBLIC 5
Business Role ID as Deliv­
Test User Business Role ered by SAP Scenario

TRANS_PLANNR Transportation Planner SAP_BR_TRANSPORTA­


TION_PLANNER

STLMT_CLERK Freight Settlement Clerk SAP_BR_FRGHT_SETTLE­


MENT_CLERK

Accounts Payable Account­ SAP_BR_AP_ACCOUNTANT J45


ant

SHIP_SPEC Shipping Specialist SAP_BR_SHIPPING_SPE­ BD9


CIALIST

WRHS_CLERK Warehouse Clerk SAP_BR_WARE­ BD9, J45


HOUSE_CLERK

BILL_CLERK Billing Clerk SAP_BR_BILLING_CLERK BD9

For more information about business roles, refer to Assigning business roles to a user in the Administration
Guide for the Implementation of SAP S/4HANA.

2.3 Master Data, Organizational Data, and Other Data

The organizational data reflects the structure of your company. The master data represents materials,
customers, vendors and carriers as well as additional master data necessary to build the underlying
transportation network (like locations and transportation zones) for this scenario.

The organizational structure and master data of your company has been created in your system during the
implementation phase.

You can find general information on how to create master and organizational data objects in the following
Master Data Scripts (MDS):

MDS Description

TM_in_SAP_S4HANA_ MasterDataGuide_Customers Transportation Management in SAP S/4HANA: Master Data


Guide for Customers

TM_in_SAP_S4HANA_ MasterDataGuide_Vendors Transportation Management in SAP S/4HANA: Master Data


Guide for Vendors

TM_in_SAP_S4HANA_ MasterDataGuide_Carriers Transportation Management in SAP S/4HANA: Master Data


Guide for Carriers

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
6 PUBLIC Prerequisites
MDS Description

TM_in_SAP_S4HANA_ MasterDataGuide_Organizational­ Transportation Management in SAP S/4HANA: Master Data


Structure Guide for Organizational Structure

TM_in_SAP_S4HANA_ MasterDataGuide_Transportation­ Transportation Management in SAP S/4HANA: Master Data


Network_General Guide for Transportation Network – General

TM_in_SAP_S4HANA_ MasterDataGuide_Transportation­ Transportation Management in SAP S/4HANA: Master Data


Network_Outbound Guide for Transportation Network – Outbound

TM_in_SAP_S4HANA_ MasterDataGuide_Transportation­ Transportation Management in SAP S/4HANA: Master Data


Network_Inbound Guide Transportation Network – Inbound

TM_in_SAP_S4HANA_ MasterDataGuide_ChargeManage­ Transportation Management in SAP S/4HANA: Master Data


ment Guide for Charge Management

TM_in_SAP_S4HANA_MasterDataGuide_StockTransportOr­ Transportation Management in SAP S/4HANA: Configura-


ders_BasicScenario tion Guide for Stock Transport Orders (Basic Scenario)

TM_in_SAPS4HANA_MasterDataGuide_In-OutboundTran­ Transportation Management in SAP S/4HANA: Master Data


sport Guide for Combination of Inbound and Outbound Transpor­
tation

Transportation Network:

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Prerequisites PUBLIC 7
Use the following master data described in the process steps of this document or create your own master data:

Master Data Object Value Description Comments

Company Code 1710 (Defined in Enterprise Company Code US (Palo The Company defined in Or­
Structure) Alto) ganizational Management is
required for Transportation
CC_US_1710 (Defined in Or­
Management. The Company
ganizational Mgmt.)
Code defined in the Enter­
prise Structure is relevant for
the preceding processes and
assigned to the Company of
the Organizational Manage­
ment.

Sales Organization / Distri­ 1710 / 10 / 00 Sales Organization 1710 (Palo This Sales Area is relevant for
bution Channel / Division Alto), Distribution Channel 10 the Sales Scenario BD9
(Direct Sales), Product Divi­
sion 00

Purchasing Organization 1710 (Defined in Enterprise Purchasing Organization Relevant for Transportation
Structure) 1710 (Palo Alto) Management, Purchasing
Scenario J45 and Stock
PO_US_171 (1710 (Defined in
Transport Order
Organizational Mgmt.)

Purchasing Group 001 Purchasing Group 001 Relevant for Transportation


Management
PG_US_1710

Purchasing Group 002 Purchasing Group 002 Relevant for Purchasing Sce­
nario J45

Planning and Execution Or­ PE_US_1710 Planning and Execution Or­ Relevant for Transportation
ganization ganization US 1 (Palo Alto) Management

Plant 1710 Plant 1710 (Palo Alto) Mainly relevant for Sales Sce­
nario BD9 and Purchasing
Scenario J45

Plant 1720 Plant 1720 (Sacramento) Relevant for Stock Transport


Orders

Storage Location 171A Storage Location 171A of


plant 1710

Storage Location 172A Storage Location 172A of Relevant for Stock Transport
plant 1720 Orders

Shipping Point 1710 Shipping Point assigned to Mainly relevant for Sales Sce­
Plant 1710 nario BD9

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
8 PUBLIC Prerequisites
Master Data Object Value Description Comments

Shipping Point 1720 Shipping Point assigned to Relevant for Stock Transport
Plant 1720 Orders

Customer 17186001 -17186012 Domestic US TM Customer1 Relevant for Sales Scenario


-12 for Outbound Deliveries BD9

Internal Customer 17411710 – 17411720 Customer representing Plant Relevant for Stock Transport
1710 and 1720 (Basic Proc­ Orders
esses)

Vendor 17386005 Domestic US TM Supplier Relevant for Purchasing Sce­


005 nario J45

Carrier 17386001 – 17386004 Domestic US TM Carrier1 – 4

Customer Locations 0017186001 -0017186012 Domestic US TM Customer1


– 12

Plant Locations 0017411710 and 0017411720 Location Plant 1710 and 1720

Vendor Locations 0017386005 Location Domestic US TM


Supplier 005

Shipping Point Location SP_1710 Shipping point 1710

Shipping Point Location SP_1720 Shipping point 1720 for deliv­


ering plant of stock transport

Transportation Zone ZIP_ZONE_1 Santa Clara / Santa Cruz /


San Mateo

Transportation Zone ZIP_ZONE_2 San Francisco/Sacramento /


San Joaquin

Transportation Zone ZIP_ZONE_3 Los Angeles / San Diego

Transportation Zone ZIP_ZONE_4 Tarant

Transportation Lane SP_1710 to ZIP_ZONE1, Transportation Lane from


ZIP_ZONE2, ZIP_ZONE3, Shipping Point to Customer /
ZIP_ZONE_4 Vendor Zones

Intra-Zone Lanes ZIP_ZONE_1 – ZIP_ZONE_4 Intra-Zone Lanes for Cus­


tomer Zones

Vehicle Resource LTL_US Truck Resource LTL-US To be used for Tour 1, Tour 2
and Tour 3

Vehicle Resource FTL_US Truck Resource FTL-US To be used for Tour 4 and
Tour 5

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Prerequisites PUBLIC 9
Master Data Object Value Description Comments

Material TG11 Trading Good for sales Relevant for the Sales Sce­
nario BD9, no serial number,
no batch

Material TG12 Trading Goods for stock Relevant for the Stock Trans­
movement port Scenario, no serial num­
ber, no batch

Material TG0013 Trading Good 0013,PD,Regu­ Relevant for the Purchasing


lar Procurement Scenario J45

Organizational Structure for Transportation Management:

CDO:/content/authoring/ujw1597040896901.image

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
10 PUBLIC Prerequisites
2.4 Business Conditions

List conditions in the correct sequence. Specify the related scope item. The information is required to create
the Test Cycle document which explains the dependencies between scope items and lists the requirements for
testing a scope item.

Scope Item ID Business Condition

J45_US – Procurement of Direct Materials To run this scenario, scope item J45_US needs to be config-
ured/activated.

BD9_US – Sell from Stock To run this scenario, scope item BD9_US needs to be config-
ured/activated. Additionally, following business conditions
from BD9_US needs to be met:

● BNZ – Create New Open MM Posting Period: Posting


Period must be up to date.
● Set Initial Stock for Material (described in Preliminary
Steps)

2.5 Preliminary Steps

2.5.1 Set Initial Stock for Material

Refer to chapter Set Initial Stock for Material in scope item BD9 - Sell From Stock.

2.5.2 Create Profile and Layout Sets

Procedure

Describe the detailed steps for this procedure.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Prerequisites PUBLIC 11
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Trans­ pad displays.
portation Planner.

2. Creation of Profile and Start the Transporta­


Layout sets tion Cockpit and create
your own Profile and
Layout Sets as descri­
bed in document
Transportation Man­
agement in SAP S/
4HANA: Master Data
Guide for Combination
of Inbound and Out­
bound Transportation.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
12 PUBLIC Prerequisites
3 Overview Table

This scope item consists of several process steps that are listed in the following table:

Process Step Business Role App/Transaction Expected Results

Create Sales Order Internal Sales Representative Create Sales Order Sales Order is created and
the Sales Order number is
displayed.

Create Outbound Delivery Shipping Specialist Create Outbound Deliveries Outbound Delivery is created
and the Delivery number is
displayed.

Furthermore the related


Freight Units are generated.

Create Purchase Order (with Purchaser Create Purchase Order Ad­ Purchase Order is created
Confirmation control Key for vanced and the Purchase Order
Inbound Delivery) number is displayed.

Create Inbound Delivery Receiving Specialist Open Inbound Deliveries for Inbound Delivery is created
Purchase Orders and the Delivery number is
displayed.

Furthermore the related


Freight Unit is generated.

Create Stock Transport Or­ Purchaser Create Purchase Order A Stock Transport Order is
der (without MRP) created.

Create Replenishment Deliv­ Shipping Specialist My Purchase Orders Due for Outbound Delivery is cre­
ery for Stock Transport Order Delivery ated.

Furthermore the related


Freight Unit is generated.

Freight Planning and Carrier Transportation Planner Transportation Cockpit The Freight Units are plan­
Selection ned. Freight Orders are cre­
ated and assigned with carri­
ers.

Execute Picking Shipping Specialist My Outbound Delivery Moni­ The delivery is picked.
tor

Execute Picking for Stock Shipping Specialist Change Outbound Delivery The delivery is picked.
Transport Order

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Overview Table PUBLIC 13
Process Step Business Role App/Transaction Expected Results

Print Loading Instructions Transportation Planner Edit Freight Order Loading instructions are
printed.

Loading Freight Transportation Planner Edit Freight Order The freight is loaded.

Print Transportation Docu­ Transportation Planner Edit Freight Order Transportation documents
ments are printed.

Post Goods Issue Shipping Specialist My Outbound Delivery Moni­ Goods issue is posted.
tor

Post Goods Issue for Stock Shipping Specialist Change Outbound Delivery Goods Issue is posted
Transport Order

Departure of Truck Transportation Planner Edit Freight Order Truck has departed.

Arrival at Customer or plant Transportation Planner Edit Freight Order Truck has arrived at cus­
tomer or own plant.
Depature at Vendor and Plant

Confirm Quantities for Put­ Receiving Specialist Inbound Deliveries for Put­ Quantities are confirmed for
away away putaway.

Post Goods Receipt for In­ Receiving Specialist Inbound Deliveries for Goods Goods Receipt is posted.
bound Delivery Receipt

Create Supplier Invoice with Accounts Payable Account­ Create Supplier Invoice Supplier Invoice is posted.
PO/GR relation ant

Check Status of Stock Trans­ Warehouse Clerk Stock Single material Status for Stock Transport is
port (MB5T) checked.

Arrival of Truck at Receiving Transportation Planner Edit Freight Order Truck has arrived at receiving
Plant plant.

Post Goods Receipt for Stock Warehouse Clerk Post Goods Receipt for Stock Goods Receipt is posted.
Transport Order Transport Order

Proof of Delivery (Optional) Shipping Specialist POD – Change Outbound De­ The Outbound Delivery docu­
livery ment is saved with confirma-
tion for actually delivered
quantities.

Create Customer Billing Billing Clerk Create Billing Documents Customer Invoice is created.
Document

Charge Calculation/Freight Transportation Planner Edit Freight Order Charge calculation is per­
Settlement formed in the freight order
and the Freight Settlement is
created and posted.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
14 PUBLIC Overview Table
Process Step Business Role App/Transaction Expected Results

Invoice Verification Freight Settlement Clerk Invoice Verification (MIRO) MM service invoice created
are received from the Carrier.

Accounts are posted.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Overview Table PUBLIC 15
4 Test Procedures

This section describes test procedures for each process step that belongs to this scope item.

4.1 Create Sales Order

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Customer project: Fill in the project-specific parts (highlighted).

Procedure

In this process step, the Internal Sales Representative creates sales orders.

Refer to the Create Sales Order process step in scope item BD9 – Sell From Stock.

 Caution

Create sales orders by using the following business partners, materials, and quantities instead of the ones
mentioned in the BD9 scenario. Please verify weight and volume for the used material:

Material Gross Weight Net Weight Volume

TG11 18 KG 16,2 KG 0,18 M3

Sold-to Party/Ship-to
Party Req. Delivery Date Material Quantity Sales Order No.

17186001 Today + 5 days TG11 99 PC

17186002 Today + 5 days TG11 22 PC

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
16 PUBLIC Test Procedures
Sold-to Party/Ship-to
Party Req. Delivery Date Material Quantity Sales Order No.

17186003 Today + 5 days TG11 27 PC

17186004 Today + 5 days TG11 122 PC

17186005 Today + 5 days TG11 105 PC

17186006 Today + 5 days TG11 144 PC

17186007 Today + 5 days TG11 138 PC

17186008 Today + 5 days TG11 122 PC

17186009 Today + 5 days TG11 83 PC

17186010 Today + 5 days TG11 222 PC

17186011 Today + 5 days TG11 138 PC

17186012 Today + 5 days TG11 111 PC

4.2 Create Outbound Delivery

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Customer project: Fill in the project-specific parts (highlighted).

Procedure

In this process step, the Shipping Specialist creates outbound deliveries for the sales orders created in the
previous step Create Sales Order .

Refer to process step Create Delivery in scope item BD9 – Sell From Stock.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 17
 Note

Create the deliveries by using the following data:

● Shipping Point: 1710


● Selection Date: Req. Deliv. Date of the Sales Order (today plus 5 days)
● Order: Sales Orders created in step Create Sales Order

Write down the delivery numbers:

Ship-to Party Delivery No.

17186001

17186002

17186003

17186004

17186005

17186006

17186007

17186008

17186009

17186010

17186011

17186012

4.3 Create Purchase Order (with Confirmation Control Key


for Inbound Delivery)

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
18 PUBLIC Test Procedures
Customer project: Fill in the project-specific parts (highlighted).

Procedure

In this process step, the purchaser creates a purchase order.

Refer to process step Creating Purchase Order (with Confirmation control KTGey for Inbound Delivery) in scope
item J45 – Procurement of Direct Materials.

 Caution

Create purchase orders for the following vendors:

Vendor Material Quantity Del. Date Net Price

17386005 TG0013 900 PC Today + 5 days 20 USD

Please verify weight and volume for used material:

Material Gross Weight Net Weight Volume

TG0013 5 KG 4,5 KG 20 CD3

Write down the purchase order number:

Purchase Order Number

4.4 Create Inbound Delivery

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Customer project: Fill in the project-specific parts (highlighted).

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 19
Procedure

In this process step, the Receiving Specialist creates an inbound delivery for the purchase order created in the
previous step.

Refer to process step Create Inbound Delivery in scope item J45 – Procurement of Direct Materials.

Inbound Delivery No.

Note down the inbound delivery / STO number.

4.5 Create Stock Transport Order (Without MRP)

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Customer project: Fill in the project-specific parts (highlighted).

Procedure

 Caution

Please verify the weight and volume for the used material:

Material Gross Weight Net Weight Volume

TG12 10 KG 9 KG 1 M3

In this process step, the Purchaser creates a stock transport order.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
20 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

1 Log onto SAP Fiori Log on to the SAP Fiori The Fiori Launch Pad is
Launchpad Launchpad as a Pur­ displayed.
chaser.

2 Open Create Purchase Open Create Purchase The Create Purchase


Order Order Advanced. Order screen displays.

3 Enter Purchase Order Enter the following


Document Type data:

Order Type: UD
(StockTranspOrd
erDel)

Then choose Enter.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 21
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

4 Enter Purchase Order Enter the following All data are entered,
data data: the item detail screen
displays.
Supplying Plant: 1720

In the Org. Data tab:

Purchasing Org.: 1710

Purchasing Group: 002

Company Code: 1710

In the area of Item


Overview:

Material: TG12

Quantity: 20 pc

Delivery Date: any


date in the
future

Plant: 1710

Storage Location:
171A

Then choose Enter.

Currently the system


triggers an availability
check. Based on the
results of the check, if
the requested availa­
bility cannot be fulfil-
led, the Confirmation
Proposal screen shows
up. You need to make a
decision based on the
result of the checks.

5 Save Purchase Order Choose Save. When A new Purchase order


the purchase order is created. The Pur­
number is displayed, chase Order Number is
write it down for fur­ displayed.
ther use.
Write down the Stock
Transport Order num­
ber for further usage.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
22 PUBLIC Test Procedures
STO Number

Write down the STO number: ________

4.6 Create Replenishment Delivery for Stock Transport


Order

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Customer project: Fill in the project-specific parts (highlighted).

Procedure

In this process step, the Shipping Specialist creates a replenishment delivery for the stock transport order
created in the previous step.

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1. Log onto SAP Fiori Log on to the SAP Fiori The Fiori Launchpad
Launchpad Launchpad as a Ship­ displays.
ping Specialist.

2. Access the App Open My Purchase The Goods Movement


Orders Due for screen displays.
Delivery.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 23
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

3. Enter data for PO dis­ Choose the Purchase The Activities Due for
play Orders tab and make Shipping Purchase
the following entries: Orders, Fast Display
screen appears. PO
Shipping Point: 1720
due to delivery is listed
Delivery creation dates out.
(From): deliver
y creation From
date Delete the
default date

Delivery creation dates


(To delivery
creation To
date Delete the
default date

Calc Rule:
calculation
rule

Choose Execute.

Purchasing Document:
Choose a stock trans­
port order that was
created in step Create
Stock Transport Order.

4. Create delivery Select the stock trans­ The Activities Due for
port orders from the Shipping Purchase
list. Choose Orders, Fast Display
Background to create screen appears.
the delivery in the
background.

5. Check delivery number Choose More A delivery is created.

Show/Hide Delivery
and note down the de­
livery number shown in
the SD Doc. field.

With the creation of the delivery, freight unit(s) are created automatically. You may check the freight unit(s) by
navigating to theStatus Tab in the delivery document. Open Document Flow to review the freight unit(s).

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
24 PUBLIC Test Procedures
 Caution

With the creation of the first delivery for the stock transport order, the system creates a one-time location.
For this newly created location, geocoordinates need to be maintained manually. For details, follow the
steps in Transportation Management in the SAP S/4HANA: Master Data Guide for Stock Transport Orders
(Basic Scenario).

Replenishment Delivery No.

4.7 Freight Planning and Carrier Selection

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

In this process step, the Transportation Planner plans the freight units for West US. The planner starts to plan
the demands manually on the map, but at the end of the planning he sees that the results are not very optimal
and cost-saving as the trucks are not fully loaded. He deletes his planning session and runs the optimizer
engine. He uses the optimizer to create the tours (Freight Orders) for the inbound and outbound deliveries
created in previous steps. The result look better and trucks are utilized well. The aim of this scenario is to test
the manual planning on the map, test the undo button and to use optimized planning.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 25
The optimizer run creates the following tours:

Quan­ Total Total Dura­ Dis­ Freight


Loca­ tity in Volume Weight Volume Weight tion in tance in Order
tion Event City Material PC in m³ in kg in m³ in kg h/min km No.

Tour 1 FTL Lo­ 84.60 8.460 3:05 171,13


cal Dis­
tribution
Tour
South,
Carrier
173860
01

Plant Load Palo TG11 470 84,60 8.460 84,60 8.460 0:45 41,74
1710 Out­ Alto
bound
Deliver­
ies for
con­
signee’s
1718600
6,
1718600
4,
1718600
1, and
1718600
5

1718600 Unload Pesca­ TG11 144 25,92 2.592 58,68 5.868 0:45 41,76
6 Out­ dero
bound
Delivery

1718600 Unload Santa TG11 122 21,96 2.196 36,72 3.672 1:00 55,40
4 Out­ Cruz
bound
Delivery

1718600 Unload Gilroy TG11 99 17,82 1.782 18,90 1.890 0:35 31,23
1 Out­
bound
Delivery

1718600 Unload Hollistor TG11 105 18,90 1.890 0 0


5 Out­
bound
Delivery

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
26 PUBLIC Test Procedures
Quan­ Total Total Dura­ Dis­ Freight
Loca­ tity in Volume Weight Volume Weight tion in tance in Order
tion Event City Material PC in m³ in kg in m³ in kg h/min km No.

Tour 2 FTL Lo­ 66.80 10.674 8:32 472.62


cal Dis­
tribution
Tour
North,
Carrier
173860
02

Plant Load Palo TG11 343 61,74 6.174 61,74 6.174 2:24 132,74
1710 Out­ Alto
bound
Deliver­
ies for
con­
signee’s
1718600
9,
1718600
8,
1718600
7

1718600 Unload Stock­ TG11 83 14,94 1.494 46,80 4.680 1:39 91.18
9 Out­ ton
bound
Delivery

Plant Load Sacra­ TG12 20 20.00 2.000 66.80 6.680 0:09 8,87
1720 Replen­ mento
ishment
Delivery
f. Plant
1710

1718600 Unload Sacra­ TG11 122 21,96 2.196 44,84 4.484 2:56 161,79
8 Out­ mento
bound
Delivery

1718600 Unload San TG11 138 24,84 2.484 20,00 2.000 0:11 10.48

7 Out­ Fran­
bound cisco
Delivery

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 27
Quan­ Total Total Dura­ Dis­ Freight
Loca­ tity in Volume Weight Volume Weight tion in tance in Order
tion Event City Material PC in m³ in kg in m³ in kg h/min km No.

173860 Load In­ San TG0013 900 18.00 4.500 38,00 6.500 1:13 67,56
05 bound Fran­
Delivery cisco
f. plant
1710

Plant Unload Palo TG12 20 20.00 2.000 18.00 4.500 0 0


1710 Replen­ Alto
ishment
Delivery
f. Plant
1720

Plant Unload Palo TG0013 900 18.00 4.500 0 0 Same Same


1710 Inbound Alto loc. loc.
Delivery
f. vendor
173860
05

Tour 3 FTL 84.78 8.478 16:19 899,63

Long
Haul
Trans­
port,
Carrier
173860
03

Plant Load Palo TG11 471 84,78 8.478 84,78 8.478 11:50 651,74
1710 Out­ Alto
bound
Deliver­
ies for
con­
signee’s

1718601
0,
1718601
1, and
1718601
2

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
28 PUBLIC Test Procedures
Quan­ Total Total Dura­ Dis­ Freight
Loca­ tity in Volume Weight Volume Weight tion in tance in Order
tion Event City Material PC in m³ in kg in m³ in kg h/min km No.

1718601 Unload Los An­ TG11 222 39,96 3.996 44,82 4.482 0:38 35,28
0 Out­ geles
bound
Delivery

1718601 Unload Long TG11 138 24,84 2.484 19,98 1.998 3:51 212,61
1 Out­ Beach
bound
Delivery

1718601 Unload San TG11 111 19,98 1.998 0 0


2 Out­ Diego
bound
Delivery

Tour 4 LTL 4 400 55:07 3.031,73


Ship­
ment 1,
Carrier
173860
04

Plant Load Palo TG11 22 3.96 396 3,96 396 55:07 3.031,73
Out­
1710 Alto
bound
Delivery
for con­
signee
1718600
2

1718600 Unload Arling­ TG11 22 3.96 396 0 0


2 Out­ ton
bound
Delivery

Tour 5 LTL 4.86 486 54:40 3.007


Ship­
ment 2,
Carrier
173860
04

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 29
Quan­ Total Total Dura­ Dis­ Freight
Loca­ tity in Volume Weight Volume Weight tion in tance in Order
tion Event City Material PC in m³ in kg in m³ in kg h/min km No.

Plant Load Palo TG11 27 4,86 486 4,86 486 54:40 3.007
Out­
1710 Alto
bound
Delivery
for con­
signee
1718600
3

1718600 Unload Fort TG11 27 4,86 486 0 0


3 Out­ Worth
bound
Delivery

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Trans­ pad displays.
portation Planner.

2 Access App In Section Planning,


open the
Transportation Cockpit
tile.

3 Show unplanned re­ Select Profile and The number of unplan­


quirements Layout Set ned requirements is re­
US_OPT_02 and freshed.
choose Refresh
Unplanned
Requirements.

4 Start Transportation Choose Continue. The Transportation


Cockpit Cockpit starts with the
predefined selection of
freight units and vehi­
cles. Freight units due
for delivery in 5 days
get listed.

5 Sort Freight Units Select column Loading FUs are sorted.


Location and sort the
freigh units in ascend­
ing order.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
30 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

6 Show all FUs on the Select all freight units All FUs are shown on
map and make the following the map.
drop-down choices:

Update Map Add

Selected Entries

7 Hide Planned FUs on 1. In the map, Planned FUs will not be


the map choose Show shown on the map
Display Profile.
2. For Freight Unit Unplanned demands
Stages (Planned), are shown as location
deselect the bubbles without links
checkbox in col­ on the map.
umn Show.
3. For Freight Unit
Stages
(Unplanned), de­
select the check­
box in column
Link.

 Note
Add the col­
umn Link to
your table lay­
out by choos­
ing
Personalize
on the very
top right of
your screen.
Select the en­
try Link and
choose OK.

4. Choose OK .

8 Start Manual Planning Select all Freight Units Freight units are plan­
and one resource and ned, one freight order
choose Assign is created, and the ve­
Selected Items. hicle is overloaded.

Check the planned Maximize the map to


freight units on the full screen mode, if
map. needed.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 31
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

9 Undo your planning Choose Undo to un­ All freight units are un­
plan the freight units, planned and the freight
because the planning order is cancelled.
result is not sufficient
(truck overloaded).
Another planning
method is used in the
following steps.

10 Manual Planning on 1. On the map, 2 freight units are se­


the map choose lected. The Aggregated
Selection Mode Info screen on the map
Lasso . shows updated data.
2. Select freight
units with the fol­
lowing locations
near Sacramento:

● Unloading Loca­
tion
0017186008
● Unloading Loca­
tion SP_1720

11 Manual Planning 1. Deselect all FUs in The freight order is


the FU List. created and is shown
2. Select the truck on the map as line be­
FTL_US_OPT1.
tween source and des­
3. Choose Assign
tination location.
Selected Items.

12 Manual Planning on On the map, select a The freight order is up­


the map freight unit near Stock­ dated. A new stage ap­
ton with location pears and is visible on
0017186009 and the map.
drag and drop it onto
the line between
SP_1710 and
SP_1720.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
32 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

13 Manual Planning on Choose Selection FUs are selected and it


the map is visible on the map
Mode Lasso and
select the 4 Freight
Units near San Jose
with locations
0017186006,
0017186004,
0017186001,
0017186005.

14 Manual Planning on Select resource A new freight order is


the map FTL_US_OPT1 and created according to
choose Assign the selection. The
Selected Items. route is visible on the
map.

15 Manual Planning on Select 2 freight units FO without resource is


the map near San Francisco created and is shown
with locations on the map
0017386005 and
0017186007 and
press Create Capacity
Document

16 Manual Planning In the Trucks list, select The freight order is up­
resource dated and the resource
FTL_US_OPT1 and is added.
drag and drop it on the
new freight order (in
Road Freight Orders
List).

17 Manual Planning on Choose Selection FUs are selected and


the map colored grey on the
Mode Lasso and
map.
select 2 freight units
near Los Angeles with
locations
0017186010,
0017186011 and the
one near San Diego
with loca­
tion0017186012.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 33
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

18 Manual Planning Select resource A new freight order is


FTL_US_OPT1 and created and shown on
choose Assign the map.
Selected Items.

19 Manual Planning on On the map, select the Two freight orders


the map remaining unplanned without resource as­
FUs 0017186002 signment are created.
and 0017186003 They are shown on the
and choose Create map.
Multiple Road Freight
Orders.

20 Manual Planning 1. In the Road Freight The freight orders are


Orders list, select updated and the truck
the newly created
is assigned to both.
freigth orders.
2. Go to the Trucks
list and select re­
source
LTL_US_OPT1.
3. Choose Assign
Selected Items .

21 Finalize Manual Plan­ Check your manual Manual planning is fi-


ning planning results. nalized.

22 Reset Planning Status Choose Refresh. All freight orders are


deleted. Freight units
On the pop-up screen
changed their status to
choose OK.
unplanned.

23 Start Optimizer Plan­ Select Optimizer Five freight orders are


ning created. All freight
Planning All .
units are planned

24 Check Freight Orders 1. Open the Road


Freight Order
Hierarchy tab and
check all stages of
created freight or­
ders.
2. Display the freight
orders on the map
as described be­
fore.

25 Save Optimizer Run Choose Save. All freight orders are


planned and saved.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
34 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

26 Carrier Selection 1. Choose all freight Respective carriers


orders created in have been assigned to
tab Road Freight
the freight orders.
Orders.

2. Choose Carrier
Selection
Automatic .
3. Choose Save.

 Note
To be able to
do carrier se­
lection with
charge calcu­
lation, please
ensure that
the Purchas­
ing Organiza­
tion in Freight
Order is filled
with
PO_US_171
0.

27 Verify Carrier Ranking Select the freight or­


ders one by one and
navigate to the Carrier
Ranking tab (at the
bottom right corner) to
check the selected car­
rier and the calculated
freight costs.

4.8 Execute Picking

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 35
Test Case ID <X.XX> Tester Name Testing Date Enter a date

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

In this process step, the Shipping Specialist in the first plant picks the goods for the outbound deliveries and
moves them to the staging area. Refer to process step Execute Picking in scope item BD9 - Sell From Stock.

4.9 Execute Picking for Stock Transport Order

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

In this process step, the Shipping Specialist in the second plant (supplying plant) picks the goods for the
replenishment deliveries and moves them to the staging area.

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Ship­ pad displays.
ping Specialist.

2 Access App Open Change The Change Outbound


Outbound Delivery. Delivery screen dis­
plays.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
36 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

3 Enter delivery number Enter the delivery


document number
created in the previous
step and choose
Continue.

4 Enter picking data Navigate to the Picking


tab, and enter the
Picked Qty :
complete
quantity of the
delivery .

5 Save Document Choose Save.

4.10 Print Loading Instructions

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Trans­ pad displays.
portation Planner.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 37
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

2 Access App In the Order The Freight Orders-


Management section, Worklist opens.
select Freight Orders
Worklist.

3 Select query Road


Freight Orders –
loading unplanned.

4 Open the Freight Order The Edit Freight Order


by choosing document screen opens.
link.

5 Navigate to the
Subcontracting tab.

6 Enter the Partner refer­


ence number per
freight order (for ex­
ample 471108153).

7 Navigate to the Notes


tab.

8 1. Choose Insert to
create a new line
item in the table.
2. Select Text Type
Special
Instructions
and enter the fol­
lowing texts in
field Content:
○ Multiple
Stop load
○ Fragile
cargo.
Please
handle
with care

9 Choose Execution

Status Set to Ready


for Transportation

Execution .

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
38 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

10 Save Document Choose Save.

11 Navigate to the Output


Management tab.

12 1. Select Shipping
Manifest (Pre-
Manifest).
2. Select Document
Preview to preview
and print the Bill
of Lading docu­
ment.

13 Choose Load Plan

Status (Stop) Set


Load Plan to

Planned .

14 Choose Load Plan

Status (Stop) Set


Load Plan to

Finalized .

15 Save Document Choose Save.

4.11 Loading Freight

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 39
Procedure

After the truck is loaded and the loading report is received from the warehouse staff, the respective status is
set in the freight order.

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Trans­ pad displays.
portation Planner.

2 Access App In the Order The Freight Orders-


Management section, Worklist opens.
select Freight Orders
Worklist.

3 Select query Road


Freight Orders –
loading planned, not
loaded.

4 Open the Freight Order The Edit Freight Order


by choosing document screen opens.
link.

5 Choose Execution

Status Set to

Loaded .

6 Save Document Choose Save. The freight has been


loaded.

4.12 Print Transportation Documents

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
40 PUBLIC Test Procedures
Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Trans­ pad displays.
portation Planner.

2 Access App In the Order The Freight Orders-


Management section, Worklist opens.
select Freight Orders
Worklist.

3 Select query Road


Freight Orders –
loaded.

4 Open the Freight Order The Edit Freight Order


by choosing document screen opens.
link.

5 Navigate to the
Notestab.

6 1. Choose Insert to
create a new line
item.
2. Select the Text
Type
Additional
Shipper
Information
and enter
Topmost
floor loaded
loose.

7 Save Document Choose Save.

8 Navigate to the Output


Management tab.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 41
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

9 1. Select Bill of
Lading VICS US.
2. Select Document
Preview to preview
and print the Bill
of Lading.
3. Select Shipping
Manifest.
4. Select Document
Preview to preview
and print the
Shipping Mani­
fest.

10 Save Document Choose Save.

4.13 Post Goods Issue

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

In this process step, the goods issue is posted for the outbound deliveries. Refer to process step Post Goods
Issue in scope item BD9 - Sell From Stock.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
42 PUBLIC Test Procedures
4.14 Post Goods Issue for Stock Transport Order

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

In this process step the goods issue is posted for the replenishment deliveries.

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Ship­ pad displays.
ping Specialist.

2 Access App Open Change The Change Outbound


Outbound Delivery. Delivery screen dis­
plays.

3 Enter delivery number Enter the delivery


document number
created in the previous
step and choose
Continue.

4 Post Goods Issue Mark the item line for You can see the goods
the material to post movement information
and choose Post in the document flow.
Goods Issue.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 43
4.15 Departure of Truck

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

Test Step Pass / Fail / Com­


# Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launchpad


Launchpad as a Transporta­ displays.
tion Planner.

2 Access App In the Order Management The Freight Orders- Worklist


section, select Freight opens.
Orders Worklist.

3 Select query Road Freight


Orders – truck departure

4 Open the Freight Order by The Edit Freight Order


choosing document link. screen opens.

5 Choose Execution Status The Logistical Execution


Status changes to Departed
Set to Departed .
at current location.

6 Save Document Choose Save. The truck has departed.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
44 PUBLIC Test Procedures
4.16 Arrival at Customer or Plant 2 (Supplying Plant) /
Departure at Vendor and in Plant 2 (Supplying Plant)

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Trans­ pad displays.
portation Planner.

2 Access App In the Order Freight Orders-


Management section, Worklist opens.
select Freight Orders
Worklist.

3 Select the query Road


Freight Orders – truck
arrival.

4 Open the Freight Order The Edit Freight Order


by choosing document screen opens.
link.

5 Choose Execution The Logistical


Execution Status
Status Set to
changes to Arrived at
Arrived . next location.

6 Choose Execution

Status Set to

Unloaded .

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 45
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

7 Choose Execution The Logistical


Execution Status
Status Set to
changes to Departed at
Departed . current location.

8 Repeat step 5 to until Logistical Execution


the last destination lo­ Status changes to
cation is arrived. Arrived at next location

9 Press Execution Status Logistical Execution


-> Set to Unloaded. Status changes to
Unloaded at last
destination location.

Event Unloading End


created (to be found in
tab Execution).

10 Navigate to tab
Execution.

11 1. Choose Insert Logistical Execution


Event. Status changes to
2. Select Event Last Departed at receiving
Departure. plant.
3. For Location enter
Load Plan Status
last (Stop) Not Planned at
destination last destination
location. location changes to
4. Choose Report Unload Plan Status
Event. (Stop) Not Planned at
last destination
location.

The Execution Status


changes to Executed.

12 Save Document Choose Save.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
46 PUBLIC Test Procedures
4.17 Confirm Quantities for Putaway

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

In this process step, the receiving spcialist confirms the quantiy for the putaway.

Refer to process step Procurement of Stock Material with Inbound Delivery under the Confirm Quantities for
Putaway in scope item J45 - Procurement of Direct Materials.

4.18 Post Goods Receipt for Inbound Delivery

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

In this process step the Receiving Specialist posts the Goods Receipt for the Inbound Delivery.

Refer to process step Procurement of Stock Material with Inbound Delivery under the Option A: Post Goods
Receipt for Inbound Delivery in scope item J45 - Procurement of Direct Materials.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 47
4.19 Create Supplier Invoice with PO/GR Relation

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

In this process step, the Receiving Specialist posts the Goods Receipt for the Inbound Delivery.

Refer to process step Procurement of Stock Material with Inbound Delivery under the Option A: Post Goods
Receipt for Inbound Delivery in scope item J45 - Procurement of Direct Materials.

In this process step, the Accounts Payable Accountant – Procurement creates the supplier invoice with PO/GR
relation. There are two options to create the supplier invoice:

● Option A: Create Supplier Invoice with PO/GR relation. Refer to process step: Supplier Invoice Processing
under the Option A: Create Supplier Invoice with PO/GR Relation in scope item J45 - Procurement of Direct
Materials.
● Option B: Create Supplier Invoice with PO/GR relation (with Invoice Reduction) Please refer to process
step: Supplier Invoice Processing under the Option B: Create Supplier Invoice with PO/GR relation (with
Invoice Reduction) in scope item J45 - Procurement of Direct Materials.

4.20 Check Status of Stock Transport

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
48 PUBLIC Test Procedures
Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log on Log onto the SAP Fiori The SAP Fiori Launch­
Launchpad as a Ware­ pad displays.
house Clerk.

2 Access the App Open Stock Single The Stock – Single


Material. Material screen dis­
plays.

3 Enter Transfer Order Enter material TG12 You receive an over­


data and choose Enter. view of the material.
This concerns all ma­
terial that has left the
supplying plant and
has not yet reached
the receiving plant.

4.21 Arrival of Truck at Receiving Plant

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori 1. The SAP Fiori


Launchpad as a Trans­ Launchpad dis­
portation Planner. plays.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 49
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

2 Access App In the Order Freight Orders-


Management section, Worklist opens.
select Freight Orders
Worklist.

3 Open POWL Query Select query Road


Freight Orders – truck
arrival.

4 Select Freight Order Open Freight Order by Edit Freight Order


pressing the document Screen opens.
link.

5 Set Execution Status Press Execution Status Logistical Execution


-> Set to Arrived . Status changes to
Arrived at receiving
location.

Event Arrival at
Destination created (to
be found in tab
Execution)

6 Save Document Press Save. Truck has arrived at re­ 6


ceiving plant.

7 Set Execution Status Press Execution Status Logistical Execution


-> Set to Unloaded. Status changes to
Unloaded at receiving
plant

Event Unloading End


created (to be found in
tab Execution)

8 Navigate to Execution Navigate to tab


Screen Execution.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
50 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

9 Create New Event. 1. Choose Insert Logistical Execution


Event. Status changes to
2. Select Event Last Departed at receiving
Departure. plant.
3. For Location enter
Load Plan Status
Location of (Stop) Not Planned at
Plant 1720. receiving plant location
4. Choose Report changes to Unload Plan
Event. Status (Stop) Not
Planned at receiving.

Execution Status
changes to Executed.

10 Save Freight Order Press Save.

4.22 Post Goods Receipt for Stock Transport Order

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log on Log onto the SAP Fiori The Fiori launchpad


launchpad as a Ware­ displays.
house Clerk role.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 51
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

2 Open Post Goods Re­ Open Post Goods The Post Goods
ceipt for Purchase Or­ Receipt for Purchase Receipt for Purchase
der Order. Order screen displays.

3 Search for Purchase Open Purchase Order A list of Purchase Or­


Order Search. ders displays.

4 Select the Stock Trans­ Select your purchase The system displays
port Order order. the data for the goods
receipt on the Goods
Receipt screen.

5 Enter Delivery Note Make the following en­


tries:

Delivery Note: xxx

Printing (Controls
output management
after posting):
Individual slip

Choose Enter.

6 Select Item and Post Select the items for The Post button is acti­
Goods Receipt which a goods receipt vated.
is to be posted.
The system displays
Choose Post. the message
Material
document xxx
posted.

4.23 Proof of Delivery (Optional)

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
52 PUBLIC Test Procedures
Procedure

Refer to process step Proof of Delivery in scope item BD9 - Sell From Stock.

4.24 Create Customer Billing Document

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Procedure

Refer to process step Create Billing Document in scope item BD9 - Sell From Stock.

4.25 Charge Calculation / Freight Settlement

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 53
Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Freight pad displays.
Settlement Clerk.

2 Access App In the Freight Freight Orders for


Settlement Section, se­ Settlement opens.
lect Freight Orders for
Settlement.

3 Select Freight Order 1. Select the freight Edit Freight Order


order. screen opens.
2. Choose Edit.

4 Calculate Charges Select Charges/

Settlement Calculate

Charges . (This is
only necessary, if
charges have not al­
ready been calculated
in the section 4.7
Freight Planning and
Carrier Selection, Car­
rier Selection).

 Note
To be able to cal­
culate charges,
first check
whether the Pur­
chasing Organiza­
tion is filled with
PO_US_1710.

5 Navigate to Charges Go to the Charges tab. Charges should be cal­


Screen culated for the freight
order

Charge Calc. Status:


Calculated

6 Save Document Choose Save. The freight order is


saved.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
54 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

7 Create Freight Settle­ Choose Charges/ The Freight Settlement


ment Document Document screen
Settlement Create
opens.
Freight Settlement

Document .

8 Save Document Verify the Freight Set­ The freight settlement


tlement document and document is created.
choose Save ALL.
The following statuses
should be set in the
Status tab of the
freight order:

Invoicing Status:
Completely Invoiced.

The following statuses


should be set in the
Freight Settlement
Document (FSD):

Life cycle status: Ready


for Accruals
Consistency status:
Consistent
Confirmation status:
Not Posted

The cost distribution


should have been trig­
gered when the save
action is performed on
the freight settlement
document.

Check the distribution


of charges in cost dis­
tribution tab of freight
settlement document.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 55
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

9 Post Freight Settle­ 1. Check that the As long as the subse­


ment Document line item with the quent documents are
Freight Settle­ not posted, you can
ment Document is see the following sta­
selected in Settle­ tuses:
ment Documents
Life cycle status:
table.
Posting Started
2. Choose Post.
3. You can check the Consistency status:
details of created Consistent
documents (Pur­ Confirmation status:
chase Order, Serv­ First Not Confirmed
ice Entry Sheet) and then SES Posting
by navigating to Started
the Document
The purchase order
Flow tab and
and SES are created
opening the men­ automatically. The fol­
tioned docu­ lowing statuses are set
ments. in Status tab of the
Freight Order:

Life cycle status of


FSD: Accruals Posted

Consistency status:
Consistent

Confirmation status:
Confirmed

10 Access App In the SAP Fiori The Overview Freight


Launchpad, select Cost Distribution
Display Cost opens.
Distribution
Documents -

11 Execute Freight Settle­ Enter the freight settle­ The payment docu­
ment Document ment document num­ ment number is dis­
ber and choose played on the result
Execute. screen.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
56 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

12 Display Freight Cost Al­ ● Select the line The gross invoice
location and related item to open the amount of line items
Documents freight cost alloca­ should be same as dis­
tion document. tribution amount in
● For freight cost al­ distribution tab of FSD.
location docu­
ment, check the
invoice item on
the Basic Data tab
.
● Select items and

choose More

Goto Item

Details .
● Go to the Basic
Data B tab and
check reference
documents (for
example, the pur­
chase order, in­
bound delivery,
freight order,
freight settlement
document and
purchasing docu­
ment/contract for
freight).

4.26 Invoice Verification

Test Case ID <X.XX> Tester Name Testing Date Enter a date

Business Role(s)

Responsibility <State Service Provider, Customer, or Joint Service Provider Duration <Enter a dura­
and Customer> tion,for example,
60 minutes>

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 57
Procedure

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Log on to the SAP Fiori The SAP Fiori Launch­


Launchpad as a Freight pad displays.
Settlement Clerk.

2 Access App Select Create Supplier MIRO opens.


Invoice Advanced.

3 Enter Details for In­ Enter Company Code


voice Creation 1710 and choose
Continue.

4 Enter Details for In­ For the


voice Creation Transactionfield, select
value Invoice.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
58 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

5 Enter Details for In­ On the Basic Data tab


voice Creation make the following en­
tries:

● Invoice Date:
todays date
● Reference:
Invoice
Number of
the carrier
(e.g. 47110815)
● Posting
Date:todays
date
● Amount :
Gross Amount
according to
the carrier
invoice (Total
Amount in
Document
Currency in
Freight Settle­
ment Document +
Tax (if setup to
calculate any))
● Currency: USD
● Calculate Tax:
Select.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 59
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

6 For single document 1. Navigate to TM Check calculated Tax


REF tab Amount
2. Select any entry
from the drop­
down (e.g.
Freight
Order) and enter
the no of the se­
lected object (e.g.
Freight
Order
Number) in the
input field.
3. Select Layout
Land Freight.
4. Press Enter.

7 Select Invoice Items Select the Invoice You should see mate­
Items you want to cre­ rial items and delivery
ate invoice for. costs items, which re­
fer to the entered
freight order docu­
ment.

8 Check the Invoice Check the Amount, the The Amount, the
Items data Quantity, and the Tax Quantity, and the Tax
Code. Code are consistent.

9 For multiple selections Navigate to the TM Selection of multiple


(optional step) REF tab and select any documents at once is
entry from the drop­ possible.
down list. Choose More
Allocation Criteria next
to the input field and
enter additional ob­
jects (like Freight
Order Numbers).

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
60 PUBLIC Test Procedures
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

10 Simulate Supplier In­ 1. Choose Simulate.


voice and Check Mes­ 2. Check the data in
sages the dialog box
Simulate
Document (for ex­
ample G/L Ac­
counts, Cost Cen­
ter).
3. Choose Back.

11 Check Details Check the value in field The balance is the dif­
Balance. ference between the
Total Amount in
Document Currency in
Freight Settlement
Document + Tax (if
setup to calculate any)
and the gross amount
you entered in step 5.

The balance value


should be 0 or within
the defined tolerance.

12 Open details for charge On the TM REF tab, Freight Settlement


calculation (optional choose Reference Document is dis­
step) Document (TM) in col­ played.
umn Details to display
the corresponding
freight settlement
document.

13 Post Invoice Choose Post. Invoice document is


created and the docu­
ment number is dis­
played in the message
tab.

14 Access App In SAP Fiori Launchpad Freight Settlement


select Freight Worklist opens.
Settlement Worklist.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Test Procedures PUBLIC 61
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

15 Edit Freight Settlement 1. Select Active Freight Settlement


Document Query All Freight Document opens. FSD
Settlement has Life Cycle Status
Documents. Invoice Verified. that
2. Open Freight Set­ can be used as selec­
tlement Docu­ tion criteria.
ment.

16 Navigate to Document 1. Navigate to the Invoice Document


Flow Screen Document Flow opens
tab.
2. Open Invoice
Document by se­
lecting the docu­
ment number.

17 Check Details In the Invoice Docu­


ment

● Choose Follow-On
Documents
● In case there is a
dialog box, select
line Accounting
Document and
chooses Display
Document.
● Check the ac­
counts in the be­
low table by se­
lecting them and
choosing Details.
● Choose Back to
get back to the di­
alog box.
● In dialog box (in
case there is one),
select line
Controlling
Document and
choose Display
Document.
● Expand the list of
entries and check
the details.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
62 PUBLIC Test Procedures
5 Appendix

5.1 Scheduling Job (Alternative)

5.1.1 Job Scheduling for Optimizer Run

Procedure

In this process step, you can schedule a background job for the planning of the freight units, for example during
the night.

This app can be used as an alternative instead of the planning via the Transportation Cockpit.

Pass / Fail / Com­


Test Step # Test Step Name Instruction Expected Result ment

1 Log On Logon to the respec­ SAP Easy Access ap­


tive backend system pears.
using your credentials.

2 Open ABAP Editor On theSAP Easy The ABAP Editor Initial


Access screen under Screen opens.
SAP Menu navigate to
Tools ABAP
Workbench
Development ABAP
Editor (Transaction
SE38).

3 Open Report to ac­ Enter Program as / The Planning Run


screen appears.
cess optimizer run job SCMTMS/
VSR_OPT_BGD and
choose Execute.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Appendix PUBLIC 63
Pass / Fail / Com­
Test Step # Test Step Name Instruction Expected Result ment

4 Enter data Define scheduling op­ An Optimizer Run Job


tions and parameters is created.
for the batch job if nec­
essary, then choose
Execute.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
64 PUBLIC Appendix
Important Disclaimers and Legal Information

Hyperlinks
Some links are classified by an icon and/or a mouseover text. These links provide additional information.
About the icons:

● Links with the icon : You are entering a Web site that is not hosted by SAP. By using such links, you agree (unless expressly stated otherwise in your
agreements with SAP) to this:

● The content of the linked-to site is not SAP documentation. You may not infer any product claims against SAP based on this information.
● SAP does not agree or disagree with the content on the linked-to site, nor does SAP warrant the availability and correctness. SAP shall not be liable for any
damages caused by the use of such content unless damages have been caused by SAP's gross negligence or willful misconduct.

● Links with the icon : You are leaving the documentation for that particular SAP product or service and are entering a SAP-hosted Web site. By using such
links, you agree that (unless expressly stated otherwise in your agreements with SAP) you may not infer any product claims against SAP based on this
information.

Videos Hosted on External Platforms


Some videos may point to third-party video hosting platforms. SAP cannot guarantee the future availability of videos stored on these platforms. Furthermore, any
advertisements or other content hosted on these platforms (for example, suggested videos or by navigating to other videos hosted on the same site), are not within
the control or responsibility of SAP.

Beta and Other Experimental Features


Experimental features are not part of the officially delivered scope that SAP guarantees for future releases. This means that experimental features may be changed by
SAP at any time for any reason without notice. Experimental features are not for productive use. You may not demonstrate, test, examine, evaluate or otherwise use
the experimental features in a live operating environment or with data that has not been sufficiently backed up.
The purpose of experimental features is to get feedback early on, allowing customers and partners to influence the future product accordingly. By providing your
feedback (e.g. in the SAP Community), you accept that intellectual property rights of the contributions or derivative works shall remain the exclusive property of SAP.

Example Code
Any software coding and/or code snippets are examples. They are not for productive use. The example code is only intended to better explain and visualize the syntax
and phrasing rules. SAP does not warrant the correctness and completeness of the example code. SAP shall not be liable for errors or damages caused by the use of
example code unless damages have been caused by SAP's gross negligence or willful misconduct.

Gender-Related Language
We try not to use gender-specific word forms and formulations. As appropriate for context and readability, SAP may use masculine word forms to refer to all genders.

Transportation Management in SAP S/4HANA: Combination of Inbound and Outbound


Transportation (Advanced Transportation Management)
Important Disclaimers and Legal Information PUBLIC 65
www.sap.com/contactsap

© 2020 SAP SE or an SAP affiliate company. All rights reserved.

No part of this publication may be reproduced or transmitted in any form


or for any purpose without the express permission of SAP SE or an SAP
affiliate company. The information contained herein may be changed
without prior notice.

Some software products marketed by SAP SE and its distributors


contain proprietary software components of other software vendors.
National product specifications may vary.

These materials are provided by SAP SE or an SAP affiliate company for


informational purposes only, without representation or warranty of any
kind, and SAP or its affiliated companies shall not be liable for errors or
omissions with respect to the materials. The only warranties for SAP or
SAP affiliate company products and services are those that are set forth
in the express warranty statements accompanying such products and
services, if any. Nothing herein should be construed as constituting an
additional warranty.

SAP and other SAP products and services mentioned herein as well as
their respective logos are trademarks or registered trademarks of SAP
SE (or an SAP affiliate company) in Germany and other countries. All
other product and service names mentioned are the trademarks of their