Cylinder Head, Valves and Manifolds
_Mounting cap
‘Screw (14)
Dip entire cap screw in clean
engine oil before instaling
Fiywhoe!
ou
4, Remove fuel injection nozzles. (See Fuel System
in this section.)
5, Remove glow plugs. (See procedure in
ACCESSORIES - SERIES 220 POWER UNIT
ENGINES section.)
6. Disassemble and inspect cylinder head and
valves. (See Disassembly/ Assembly and
Inspection/Replacement procedures.)
IMPORTANT: Oil passage in gasket must be
located over oil passage in cylinder block.
Install gasket as shown.
7. Tighten mounting cap screws, in the sequence
shown, in three stages of gradually-increasing
torque.
IMPORTANT: Cylinder head mounting cap
screws must be checked for proper torque
after 50 hours of engine operation.
R220
Exhaust Manifold Side
Fiywhee! Side
Timing Gear Case Side
Intake Manifold Side
Torque Specifications - 3TN66:
First ..ecceeeeeeeeeeeee LLNem (97 Ib-in,)
Second ......++++0++++ 22 Nem (195 Ib-in.)
Final ...ceeeeeeeeeeee4 34 Nem (25 Ib-ft)
Torque Specifications - 3TNA72 (3009):
First .0..06ee0eeeeeee5 19 Nem (168 Ib-in,)
38 Nem (28 Ib-ft)
61 Nem (45 Ib-ft)
Second
Final
1-22
amsPistons, Rods and Cylinder Block
Inspection/Replacement
1. Inspect all parts for wear or damage. Replace as
necessary,
2. Measure crankshaft connecting rod journal
diameter. (See Crankshaft, Main Bearings and
Flywheel in this section.)
3. Install connecting rod cap and bearing inserts on
connecting rod. Install old connecting rod cap
setews and tighten to 23 Nem (203 tb-in.).
‘4, Measure connecting rod bearing diameter.
Connecting Rod Bearing LD. - 31N66:
Standard . . 36.00 - 36.042 mm
eee e eee eeeeeee eee e eee (L417 ~ 1419 in.)
Wear Limit........... 37.07 mm (1.459 in.)
= 0.16 mm (0.006 in.)
Clearance.
Connecting Rod Bearing ID. - 3TNA72 (3009):
Standard . - 40.00 - 40.042 mm
(1.575 - 1.577 in)
Wear Limit.........-. 40.07 mm (1.578 in.)
= 0.16 mm (0,006 in.)
Clearance.
If bearing diameter exceeds wear limit, replace
bearing inserts.
If bearing clearance (bearing LD. minus crankshaft
joumal O.D.) exceeds specification, grind crankshaft
connecting rod journals and install undersized
bearing inserts, ‘or replace bearing inserts and
crankshaft.
5, With rings installed on piston, measure piston
ring groove clearance. Measure several places
around each piston.
135960
Piston Ring Groove Clearance - 3TN66:
First Compression Ring
Standard .........+++++, 0.065 - 0.100 mm.
= (0.0026 - 0.0039 in.)
0.20 mm (0.0079 in.)
Wear Limi
Second Compression Ring
Standard
‘Wear Limit.
0.030 - 0.065 mm
ss see es «(0.0012 - 0.0026 in.)
= 0.20 mm (0.0079 in.)
Oil Ring
Standard .......66.+6++-0,020- 0.055 mm
= (0.0008 - 0.0022 in.)
0.20 mm (0.0079 in.)
Wear Limi
1:36
amsCrankshaft, Main Bearings and Flywheel
| ” Ge
ZO
Main Bearing Gap —
Is
Main Bearing Cap Scrow (8)
Dip in clean engine ol,
3TNG6: 54 Nem (40 Ib-f)
3TNA72 (3009):79 Nem (68 Ib-t)
9. Tighten main bearing cap screws to
specifications. When tightening, start at center
main bearing cap and work your way out,
alternating to the ends. Turn crankshaft by hand.
If it does not tum easily, disassemble the parts
and find the cause.
IMPORTANT: Connecting rod caps must be
installed on the same connecting rods they
‘were removed from.
Never reuse connecting rod cap
replace with new.
screws,
10.Match the connecting rod caps to the rods using
alignment marks. Install caps.
Crankshaft
‘Smooth Bearing Insert
HRA
1LDip entire connecting rod cap screws in clean
engine oil. Install new cap screws and tighten to
23 Nem (203 Ib-in.),
12.Install timing gear housing. (See Camshaft and
Timing Gear Train in this section.)
13.Install crankcase extension housing, if equipped.
(See procedure in this group.)
14.Install flywheel housing,
if equipped. (See
procedure in this group.)
15.Install rear oil seal. (See procedure in this group.)
1-48
amsCamshaft and Timing Gear Train
CAMSHAFT
Removal
1, Remove rocker arm assembly and push rods. (See
Cylinder Head, Valves and Manifolds in this
section.)
2. Remove timing gear cover. (See procedure in this
group.)
Check camshaft end play. (See Checks, Tests and
Adjustments in this section.)
4. Check backlash of timing gears. (See Checks,
Tests and Adjustments in this section.)
NOTE: Ifa magnetic follower holder kit is not
available, turn engine until oil pan is
upward, to hold cam followers away from
camshaft.
5. Hold cam followers away from camshaft using a
magnetic follower holder kit such as D15001NU.
NOTE: Due to the odd number of teeth on the idler
gear; timing marks will only align
periodically.
6, Rotate crankshaft and align timing marks,
IMPORTANT: DO NOT allow camshaft lobes to
hit bearing surfaces while removing camshaft.
Machined surfaces can be damaged.
7. Remove two cap screws and camshaft.
8. Inspect all parts for wear or damage. (See
Inspection/Replacement procedures.)
Mounting Cap Screws
arene
STN66, Later 3TINAT2
Mounting Cap Screws
Camshaft
Early 3TNATZ
Installation
+ Apply clean engine oil on all parts during
instailation.
IMPORTANT: DO NOT allow camshaft lobes to
hit bearing surfaces while installing camshaft.
Machined surfaces can be damaged.
1. Rotate crankshaft to align timing marks.
2. Install camshaft.
3. Install and tighten mounting cap screws to 11
Nem (96 Ib-in.).
4, Install timing gear cover. (See procedure in this
group.)
5. Install push rods and rocker arm assembly. (See
Cylinder Head, Valves and Manifolds in this
section.)
1-56
ams