Exhibit 3 Netbook Assembly Line

Station Operation #

1
2
1
3
4
5
2 6
7
8
3 9
10
11
4 12
13
14
15
5
16
17
18
19
6
20
21
22
23
7
24
25
26
27
8
28
29
30
31
9 32
33
34
35
36
10 37
38
39

Total Assembly Line Workers per Line


Material Handlers per Line
Supervisors per Line
Planned
Planned Time (in
Description of Operation Workers per
seconds)
Station

Lay out principal components on conveyor 10


Examine parts for visible defects (scratches, dents) 12
1
Scan serial number barcodes 12
Peel adhesive backing from cover assembly 6
Attach webcam cable and secure to frame of cover assembly 15
Insert webcam into cover assembly 20 1
Put screws for station 3 in tray on conveyor 5
Connect LCD cable to display 12
Install LCD display panel in cover assembly and secure with screws 22 1
Put screws for station 4 in tray on conveyor 5
Install Kota motherboard onto base assembly 17
Secure Kota motherboard with 6 screws 18 1
Put screws for station 5 in tray on conveyor 5
Install and screw in solid-state hard disk drive 19
Connect hard drive cable to motherboard 11
1
Place insulator sheet on hard drive 4
Put screws for station 6 in tray on conveyor 5
Screw in microphone to base assembly 16
Connect microphone to motherboard 11
1
Install support frame on base assembly 8
Put screws for station 7 in tray on conveyor 5
Install speaker holders and speakers 16
Secure speaker assembly with screws 10
1
Connect speaker cables to sound card 9
Put screws for station 8 in tray on conveyor 5
Connect backup battery and clock battery 9
Check voltage of clock battery and backup battery 13
1
Install wireless card to motherboard 10
Put screws for station 9 in tray on conveyor 5
Install touchpad and screw onto base assembly 5
Install keyboard support plate on base assembly 8
Screw in support plate 13 1
Install keyboard onto base assembly 10
Put screws for station 10 in tray on conveyor 5
Turn machine over and put screws into base assembly 8
Tighten screws to secure base assembly 12
Install connector protective flap to base assembly and cover assembly 8 1
Install battery pack and cover 8
Place assembled laptop on rack for transport to QA 4

ine Workers per Line 10


0.5
1
Actual Time Actual
(measured Workers per
October 15) Station

10
12
1
12
6
23 130000 7.6923077E-06
21 1.2 42.535384615
6
12
22 1.2
5
20
19 1.2
6
19
11
1.2
4
5
21
14
1.2
9
6
22
11
1.25
10
6
9
13
1.25
10
5
6
9
15 1.25
12
6
9
13
10 1.25
9
5

12
0.5
1
Exhibit 4 AIC Systems QuiN 816 cost breakdown

Selling Price (FOB Yantian) $ 240.00

Manufacturer GM 8% $ 19.20

Processor and other integrated circuit boards 21% $ 50.40


RAM 4% $ 9.60
Solid-State Hard Drive 24% $ 57.60
LCD 13% $ 31.20
Battery 3% $ 7.20
Software 5% $ 12.00
Other Components 11% $ 26.40
Labor (Assembly, Packing, Loading, Delivery) 2% $ 4.80
Manufacturing Overhead 9% $ 21.60
Manufacturer COGS 92% $ 220.80
Process t Duration (Sec)
S10 397.00 40
S9 356.00 41
S8 318.00 37
S7 278.00 40
S6 238.00 40
S5 199.00 39
S4 159.00 40
S3 120.00 39
S2 80.00 40
S1 40.00 40
Gantt Chart - Plann
S10 356.00 40
S1
S9 315.00 41
S8 278.00 37 S2
S7 238.00 40 S3
S6 198.00 40 S4
S5 159.00 39
S5
S4 119.00 40
S3 80.00 39 S6
S2 40.00 40 S7
S1 0.00 40
S8
396
S9
Process Stations

S10
Process t Duration (Sec) S1
S10 447 46
S2
S9 399 48
S8 362 37 S3
S7 313 49 S4
S6 263 50
S5
S5 224 39
S4 179 45 S6
S3 140 39 S7
S2 90 50 S8
S1 40 40
S9
S10 397 46
S9 349 48 S10
S8 312 37 0 50 100 150 200 250
S7 263 49
S6 213 50 Process time Durati
S5 174 39
S4 129 45
S3 90 39
S2 40 50
S1 0 40 Gantt Chart - Actua
S1
S2
S3
S4
S5
S6
S7
S8
S9
ocess Stations

S10
S1
S2
S5
S6
S7
S8
S9

Process Stations
S10
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
0 100 200 300

Process time Duration


Gantt Chart - Planned Process

150 200 250 300 350 400 450 500

Process time Duration (Sec)

Gantt Chart - Actual Process


200 300 400 500 600

Process time Duration (Sec)


Start time Duration (Sec) 487
S10 447 40
S9 399 41
S8 362 37
S7 313 40
S6 263 40
S5 224 39
S4 179 40
S3 140 39
S2 90 40
S1 40 40
S10 397 40
S9 349 41
S8 312 37
S7 263 40
S6 213 40
S5 174 39
S4 129 40
S3 90 39
0:00 S2 40 40
0 40 S1 0 40

S1
S2
S3
S4
S5
S6
S7
S8
S9
Process Stations

S10
S1
S2
S3
S7
S8
S9

Process Stations
S10
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
0 50 100
40
50
39
45
39
50
49
37
48
46

Gantt Chart - Actual Process


S1
S2
S3
S4
S5
S6
S7
S8
S9
10
S1
S2
S3
S7
S8
S9
10
S1
S2
S3
S4
S5
S6
S7
S8
S9
10
0 50 100 150 200 250 300 350 400 450 500

Process time Duration (Sec)


Process Time Activity Duration Idle Time
S10 410 40 1
S9 369 41 0
S8 328 37 4
S7 287 40 1
S6 246 40 1
S5 205 39 2
S4 164 40 1 Gan
S3 123 39 2
S2 82 40 1
S1 41 40 1 S1
S10 369 40 1 S2
S9 328 41 0
S8 287 37 4 S3
S7 246 40 1
S4
S6 205 40 1
S5 164 39 2 S5
S4 123 40 1
S3 82 39 2 S6
S2 41 40 1
S7
S1 0 40 1
S8

S9

S10
Stations

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

0 50 100 150

Process Time Activity Duration Idle Time


S10 500 46 4
S9 450 48 2
S8 400 37 13
S7 350 49 1
S6 300 50 0 G
S5 250 39 11
S4 200 45 5
S1
S3 150 39 11
S2
S3
S4
S5
G
S1

S2 100 50 0 S2
S1 50 40 10 S3
S10 450 46 4 S4
S9 400 48 2
S5
S8 350 37 13
S7 300 49 1 S6
S6 250 50 0 S7
S5 200 39 11 S8
S4 150 45 5
S9
S3 100 39 11
S2 50 50 0 S10

Stations
S1 0 40 10 S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
0 100
Gantt Chart - Planned Process

100 150 200 250 300 350 400 450 500

Process Time Activity Duration Idle Time

Gantt Chart - Actual Process


Gantt Chart - Actual Process

100 200 300 400 500 600

Process Time Activity Duration Idle Time


0 500
600
57.5 46 4 1.25 5 0.92
60 48 2 1.25 2.5 0.96
46.25 37 13 1.25 16.25 0.74
61.25 49 1 1.25 1.25 0.98
60 50 0 1.2 0 1
46.8 39 11 1.2 13.2 0.78
54 45 5 1.2 6 0.9
46.8 39 11 1.2 13.2 0.78
60 50 0 1.2 0 1
40 40 10 1 10 0.8
532.6 443 67.4 0.887667

0.867947