Fortis Chemicals (P) Limited

ACM Avg.
Maintenance Production
Sl.No Job Type Issue Date Department Area Equipment Description Maintence Date Time Completion Date Time Handover Supervisor Frequency of Occurance Lesson Learnt working Production/
Performed By Done
Hr. Hr.
1 - 17-Nov-20 - ACM-10 - No break down - - - - - - 21 2250 107
2 - 18-Nov-20 - ACM-10 - No break down - - - - - - 21 2250 107
3 - 19-Nov-20 - ACM-10 - No break down - - - - - - 21 2250 107
4 - 20-Nov-20 - ACM-10 - No break down - - - - - - 21 2250 107
Magenet to placed
Classifier Jam due to foreign particalls. Cleaning of in feed hopper to
5 General 21-Nov-20 MECHANICAL ACM-10 Mill Gopal 21-Nov-20 11:00 AM 21-Nov-20 3.00 PM Mr. Khana 1 17 1750 103
classifier done and installed avoid foreign
particals
6 General 21-Nov-20 MECHANICAL ACM-10 Mill Belt Slip for classifier.New belt replaced Gopal 21-Nov-20 11:00 AM 21-Nov-20 3.00 PM Mr. Khana 1
7 22-Nov-20 - - - No break down - - - - - - 21 2250 107
Classifier Jam due to foreign particalls. Cleaning of Mr. Khana 2
Gopal 23-Nov-20 7:00 AM 23-Nov-20 9:30 AM 14 1500 107
classifier done and installed
8 General 23-Nov-20 MECHANICAL ACM-10 Mill Classifier Motor cable Shot in Panel Mr.Khana 1
D.B.Sahoo 23-Nov-20 11:20 AM 23-Nov-20 1:00 PM
Classifier Motor Shot D.B.Sahoo 23-Nov-20 2:00 PM 23-Nov-20 5:00 PM Mr.Khana 1
9 24-Nov-20 MECHANICAL ACM-10 Mill No break down - - - - - - 21 2250 107
10 Minor 25-Nov-20 ELECTRICAL ACM-10 Crusher Starter short rectified Dhujo 25-Nov-20 3:02 PM 25-Nov-20 4:00 PM Mr. Jeeth 1 20 2143 107
11 26-Nov-20 ACM-10 - No break down - - - - - - 21 2250 107
12 27-Nov-20 ACM-10 - No break down - - - - - - 21 2250 107
Classifier Jam due to foreign particalls. Cleaning of
13 General 28-Nov-20 MECHANICAL ACM-10 Mill Gopal 28-Nov-20 10:40 AM 28-Nov-20 12:10 PM Mr. Khana 3 19 2000 105
classifier done and installed

Planned Actual Shortfall


Total production from 17th Nov to 28th Nov'20 (MT) 27000 25393 1607
Total ACM-10 Working hours 252 238 14