EL. 95.00
EL. 100.00
STA. 0+000
OUTLET OCB EL. 99.034
0+000
0+200
0+400
EL. 85.00
0+600
STA. 0+731
EXISTING TURNOUT L/S CB EL. 90.52
EXISTING ROAD CROSSING CL OF ROAD EL. 91.68
STA. 0+738
EXISTING TURNOUT L/S CB EL. 90.43
0+800
STA. 0+842
EXISTING TURNOUT CB EL. 89.74
EL. 80.00
STA. 1+021
EXISTING SLAB BRIDGE TOP SLAB EL. 89.33
1+000
STA. 1+406
EXISTING SLAB BRIDGE TOP SLAB EL. 84.45
STA. 1+445 ICB EL. 82.87
EXISTING DROP OCB EL. 82.39
STA. 1+448
1+400
STA. 1+590
EXISTING ROAD CROSSING EL. 80.43
STA. 1+600
EL. 80.61
1+600
STA. 1+913
PROP. TURNOUT L/S TOP SLAB EL. 77.51
STA. 1+916
EXISTING CHECK STRUCTURE W/ DROP EL. 77.77
STA. 1+918
EL. 76.16
EL. 70.00
2+000
STA. 2+286
2+200
STA. 2+555
EXISTING ROAD CROSSING EL. 70.68
STA. 2+558 EL. 70.55
2+600
2+800
3+000
STA. 3+068
CREEK EL. 65.69
LEGEND:
RIGHT TOP BANK:
EXISTING CANAL BOTTOM:
LEFT TOP BANK: