You are on page 1of 7

Bridge Structural Optimization Through Step-by-Step

Evolutionary Process

Abstract
In this paper, the structural optimization process aiming to reduce the weight
of the superstructure of a five span arch bridge, built in the Province of Venice,
Italy, and spanning the Piave River in the town of San Donà, is presented. The
original project, with a pre-stressed concrete superstructure, was re-considered
during construction because of the following two unexpected events. First, the
approved new seismic national regulation became effective when the bridge
was already partially built. As a result, existing foundations became unable to
withstand the prescribed new seismic action. Furthermore, the Venice Water
Authority, responsible for the management of the river spanned by the bridge,
Tobia Zordan, declared that erection phases without any provisional supports and scaffolding
Prof., Dr, College of Civil Engineering, resting on the riverbed, as foreseen by the original project, should be preferred.
Tongji University, Shanghai, China Between the two possible identified design strategies able to deal with the men-
tioned problems, namely, the strengthening of the foundations or the lightening
Contact: zordan@bolinaingegneria.com
of the superstructure, the second option was chosen, on the basis of engineering
judgement concerning the simplification of construction procedures, timing and
budget. The search for the lightest possible solution, with the restraint given by
the approved aesthetics of the original design and the need of keeping within the
former budget, brought to the conclusion that an evolutionary structural optimi-
zation (ESO) process could be suitably applied to a composite steel and concrete
superstructure.
Keywords: bridge design; structural optimization; step-by-step ESO procedure.

The original layout for the San Donà


Introduction
Bridge consisted of a pre-stressed con-
An optimization process applied to the crete five span arch solution with a
Bruno Briseghella,
superstructure of a bridge, built in the length of 100 m for each span.
Prof., Dr, College of Civil Engineering,
Fuzhou University, Province of Venice, Italy, is presented The aesthetics of the original design
Fuzhou, Fujian, China in the following paragraphs. The pro- could not be subjected to much varia-
cess, as widely explained in the paper, tion because of the constraint imposed
aimed to reduce the mass of the struc- by the Landscape Authority on the for-
ture after the introduction of a new mer solution, and given the restraint
seismic national regulation, character- to not exceed the original budget of 13
ized by increased ground acceleration million euros, an evolutionary struc-
levels, during the construction of the tural optimization (ESO) process was
bridge. As a consequence, the founda- applied to a composite steel and con-
tions of the bridge, designed for lower crete superstructure chosen as a start-
seismic actions, became inadequate to ing solution on the basis of former
the new prescriptions. experience.
This was concomitant to the position, The application of the optimization
expressed by the Venice Water Author- process led to an original layout with
Enrico Mazzarolo, ity, to deny permission to use tempo- the definition of a rather new shape for
PhD Candidate,
rary supports resting on the riverbed this kind of structure.
University IUAV of Venice,
for the construction phases, as original-
ly planned. Between the two possible Generally, performing an optimization
Venice, Italy
identified design strategies able to deal process, of every kind, takes into ac-
with the mentioned problems, namely, count the following problem1:
the strengthening of the foundations Minimize:
Peer-reviewed by international ex-
perts and accepted for publication
or the lightening of the superstructure, f ( x) ⫽ [ f1 ( x), f2 ( x), … , fQ ( x)]T
by SEI Editorial Board the second option was chosen, on the
basis of engineering judgement con- ⎪⎧ g j ( x) ⱕ K j j ⫽ 1, … , p
Paper received: April 17, 2009 cerning the simplification of construc- Subject to: ⎨
Paper accepted: October 8, 2009 tion procedures, budget and timing. ⎩⎪ g j ( x) ⫽ K j j ⫽ p ⫹ 1, … , m

72 Science and Technology Structural Engineering International 1/2010

X439_72-78.indd 72 2/1/10 10:09:44 AM


With: reached in every part of a well-dimen- attainment of a relative optimum so-
⎧⎪ xi ⑀ Di , Di ⫽ (di 1 , di 2 , … , diqi ); i ⫽1, … , nd sioned structure should ideally be at lution not just from a structural point
⎨ the same level of safety. of view but also from an architectural
⎪⎩ xiL ⱕ xi ⱕ xiU ; i ⫽ nd ⫹ 1, …, n (1) point of view with the achievement of
High stress state related to material
an aesthetically innovative solution,
where x = (x1, x2,…, xn) is the vector resistance means low safety level. In-
able to underline the performed opti-
of the n design variables, continuous stead, low stress level means higher
mization process.9
or discrete, f( x ) is the vector of the safety coefficient.3 The optimization
i = 1, 2,…, Q object criteria function procedure is therefore based on the
fi( x ) that are each to be minimized concept of slowly removing ineffi- Case Study
for the design and gj( x ) defines the cient material from a structure upon a
sets of equality or inequality constraint check and design approach, adding it The project taken into consideration is
governing the design. where found to be necessary, so that the newly built San Donà Bridge over
the structure can progressively evolve Piave River.10 The original project
This is generally referred to as multi-
towards an optimum.4–9 was characterized by a five arch pre-
criteria optimization procedure, which is
stressed concrete structure over a total
the search for an optimum point chosen From the beginning of the 1990s, this
length of 500 m arranged on five bays
between the whole design variables.2 method has been identified as suitable
of 100 m each (Fig. 1).
for achieving effective topological and
The application field of this relation is
shape optimization.1 However, like The cross section of the original proj-
manifold because it is proper for quite
other automatic optimization tech- ect, with a total width of 17,86 m, as
every structural problem for which an
niques, it presents the unfavourable presented in Fig. 2, was conceived with
optimum function or parameter can be
aspect of hindering the possibility of cast-in-place concrete, poured on pre-
clearly identified among constraints
controlling the process by the designer, fabricated arched concrete segments
of different kinds (budget, aesthetics,
which is given the final solution as a supported by provisional scaffolding.
physical constraints, etc.).
result of a non-manageable progres-
The construction of the bridge slowed
However, the definition of an absolute sion supplied by a kind of “black box”
down because of financial problems
optimum in the field of engineering which forgets to take into account for
and the building yard had to deal with
and architecture (the two complemen- non-quantifiable parameters such as,
interruptions and resumptions. During
tary aspects in the usual design process for instance, constructability, durabil-
this period certain unforeseen events
of a building, a bridge or another civil ity, aesthetics and others.
not taken into account in the initial
structure) is a very difficult and subjec-
Therefore, for the case presented, a project, occurred.
tive task, especially if the shape of the
fully automatic procedure was re-
structure, as in the case presented, is an First the publication of the new Italian
placed by a step-by-step procedure
input data derived from a formerly ap- seismic code O.P.C.M. no 3274 brought
hand-controlled by the designer. In
proved project. in the definition of new seismic classifi-
this way, the optimization procedure
cation of the national territory; in par-
For the case presented, as mentioned has revealed itself as an effective tool
ticular, the site under consideration was
before, the search for the lightest pos- able to lead to a final solution charac-
defined as seismic zone 3, which means
sible layout of the superstructure being terized by a minimization of structural
low seismic hazard (base acceleration
the main goal of the optimization pro- weight, which is not just structurally
equal to 0,15 g). Because the structure
cess, a procedure based on a classic efficient but also fully consistent to all
was dimensioned without taking into
ESO process was applied to the start- initial requirements, including desired
account any horizontal seismic action,
ing layout of the Finite Element Model aesthetical outcome.
its foundations, already built, became
(FEM model) of the bridge.
Hence, the possibility of controlling inappropriate for this new seismic
The principle at the base of the ap- the whole optimization process by a specification, requiring an increment
plied technique is that the stress level human decision maker allowed for the of about 35% in resistance capacity.

Sp1 P1 P2 P3 P4 Sp2
92 m 100 100 100 92

Piave River

Previously Built
Structure

Fig. 1: The original solution as planned and as built (in black hatch) before the interruption of the works

Structural Engineering International 1/2010 Science and Technology 73

X439_72-78.indd 73 2/1/10 10:09:48 AM


17,86 17,86 In order to simplify the problem, the
3,25 11,36 3,25 3,25 11,36 3,25
number of variables under evaluation
has been reduced, neglecting the ef-
fect of the variability of the steel plate
Var. Var. thicknesses and focusing more specifi-
cally on the bottom steel plate topol-
ogy. The optimal set of thicknesses has
0,48 3,07 0,48 2,98 0,48 3,07 0,48 2,00 7,36 2,00 been identified only in the second mo-
Fig. 2: Typical cross section of the original Fig. 4: Typical cross section of the updated ment during the effective dimension-
solution (Units: m) solution (Units: m) ing phase when the optimum shape of
the deck had already been identified.
Furthermore, the Venice Water Au- recognized: the steel structure is com- Starting from the initial FEM model
thority, responsible for the manage- posed of two lateral box girders con- characterized by the fully continuous
ment of the river spanned by the nected by a steel bottom flange, thus bottom flange, the individuation of the
bridge, declared that erection phases re-creating the shape of the former less stressed zone proceeded together
without any provisional supports and pre-stressed cross section, as required with their consequent removal from
scaffolding resting on the riverbed, as by the Landscape Authority. the model (creating a hole) and further
foreseen in the original project, should FEM analysis, on the basis of an ESO
The new deck was connected to the
be preferred. procedure (Fig. 5).
already built piers by means of non-
For this reason, a simple foundation conventional steel-to-concrete con- A complete three-dimensional (3D)
retrofitting was not sufficient and a nections ensuring negative moment model of the deck of the bridge was
global review of the project had to be resistance at supports. implemented with the general pur-
performed. pose Strand7 finite element software,11
using four nodes plate elements. Simple
It is necessary to underline that at the
time of the project updating, part of the
Structural Modelling and linear static analyses were performed
Optimization Process because the bridge was dimensioned in
piers and the abutments had already
the elastic domain.
been built, as shown in Figs. 1 and 3.
From the beginning of the retrofitting
The model is characterized by the pres-
Hence, considering that the concrete project, the global shape of the struc-
ence of four different segments, with
piers represented a remarkable part of ture had to be considered as invariable
different material properties (Table 1)
the overall mass of the bridge, a signif- because of the requirement to guaran-
to facilitate the analysis; a specific
icant reduction of the superstructure tee the original layout and re-use the
distribution of thicknesses at the bot-
weight was a required goal to comply already built parts of abutments and
tom flange has been used to achieve
with the new seismic prescriptions. piers. Thus, after considering several
an homogeneous distribution of stress
possible solutions able to reduce the
Furthermore, the owner, because of level at mid-span and at supports, and
overall mass of the superstructure, a
the already occurred delays, professed therefore better identifies the effect of
composite steel and concrete layout,
to keep the construction schedule as the variation of the hole topology and
characterized by two lateral steel box
close as possible to the original pro- dimensions on the response of the bot-
girders with a full bottom flange (in
gram, without introducing any further tom flange.
the initial non-optimized solution),
delays.
was chosen. Starting from this solution, Because there is not any crack model
These constraints called for a thorough the fundamental idea was to remove implemented in the considered FE
review of the former solution with a unexploited material from the lower software to describe the concrete be-
completely new layout for the deck: a stressed zones with the objective to haviour,11 an elastic relationship has
suitable option was found in a compos- find the optimal solution, correspond- been used for this purpose. For tak-
ite steel concrete deck because of its ing to the lightest possible one. ing into account the contribution of
lightness, acceptable costs and favour- cracked concrete in negative bending
Consequently, a manual optimization
able construction phases on the spans moment zones, indications contained
process has been performed. The ob-
considered. in CEB FIB model code 90 have been
jective of this procedure was that of
considered, with reference to a resist-
The comparison between the cross achieving a relatively handy means for
ing area of concrete around the rein-
section of the bridge, before and after attaining the final optimum deck con-
forcement of 15 times the bar diameter.
re-design, is presented in Fig. 4. Typical figuration with the support of numeri-
Furthermore, the elastic modulus of
composite steel concrete section can be cal results.
the material has been reduced to 50%
to simulate concrete cracking effect.
Elastoplastic material has not been
used because no deep penetration of
concrete section in plastic domain was
expected.
In the following paragraphs, the opti-
mization process applied is explained:
– A fictitious unitary load was applied
Fig. 3: Some of the parts of the bridge built before the introduction of the new seismic to the concrete slab; this load was
regulation used just for the optimization

74 Science and Technology Structural Engineering International 1/2010

X439_72-78.indd 74 2/1/10 10:09:49 AM


Nodes n. in reference model: 15260
A
B
C Plates n. in reference model: 14840
D

Fig. 5: FEM model

Concrete Concrete modulus Steel modulus


Segment Top flange (mm) Web (mm) Bottom flange (mm) thickness (mm) EC (MPa) ES (MPa)
A 30 12 30 300 15 000 210 000
B 30 12 20 300 15 000 210 000
C 30 10 20 300 30 000 210 000
D 30 10 15 300 30 000 210 000

Table 1: Material properties and thicknesses

stage, allowing for the evaluation been considered in the model: a during the optimization process, it can
of the stress variation from one uniformly distributed load along be seen that an elliptical hole with
optimization step to another, thus all the deck, an asymmetric load increasing axes can be progressively
identifying the zones eligible for the along the principal axis and a skew- bored as far as the parts of material
material removal. symmetric load (Fig. 6). subjected to lower stress are removed.
– Taking the non-optimized FE model The topology of the steel bottom plate
like the reference one, the percentage During the optimization process, to relative to the different steps is clearly
in stress increment related to each evaluate the stress distribution in the recognizable. The first model corre-
specific optimization step can be structure, eight points located at the sponds to the reference non-optimized
obtained. Consequently, a curve connection between the web of the box initial. Model number 10 relates to the
relating the percentages in stress girder and its bottom flange have been solution where the bottom flange is
increments and area bottom flange monitored. Four of these points were completely removed.
removal at each step can be traced. located at the mid-span of the deck, and
Observing the stress variation, the
– Comparing a linear relation linking the other four were located over the
structural response of the superstruc-
the stress increment with the area of supports. In order to describe the global
ture can be clearly identified.
the hole surface (which is referred to behaviour of the deck and proceed to
the weight decrease of the bottom the identification of the optimum solu- Until the hole is absent (continuous
steel plate) and the numerical curves tion, the values recorded from the mon- bottom plate) or rather limited in di-
referred to mid-span and supports itoring points have then been averaged. mensions, a balanced behaviour be-
(Fig. 9), the optimization index for tween internal and external webs is
The first optimization process was car-
the problem under consideration recognizable with a commonly shared
ried out with the uniform load condi-
can be identified as the distance level of stress. With the hole increas-
tion: the sequence of the optimization
between the numerical curves and ing in dimensions, the stress increases
process is presented in Fig. 7, where
the linear relationship, being the remarkably at supports in a zone close
the longitudinal stress distribution at
optimal solution corresponding to the to the external web and remains al-
the bottom flange of the FE models is
maximum distance between the two. most constant at the internal web.
mapped.
– In order to assess structural response On the other side, at mid-span, an
under different load conditions, From the investigation of the stress anti-symmetric behaviour of internal
different load distributions have level attained from the FE analyses and external webs compared with the
one at support can be identified (Fig.
8); from step 6 to step 7 a reversal in
the trend of stress distribution can be
identified between the internal and the
external webs. This tendency leads to
a balanced stress condition when the
hole reaches its maximum dimensions
exceeding the span of the bay, and the
two box girders are no more connected
(a) (b) (c) by the steel plate. This phenomenon
Fig. 6: Load condition used for optimization: (a) uniform load, (b) asymmetric load, is visible also at supports, even in a
(c) skew-symmetric load more sudden way, with the stress level

Structural Engineering International 1/2010 Science and Technology 75

X439_72-78.indd 75 2/1/10 10:09:52 AM


Plate Stress:XX Mid plane (MPa) Plate Stress:XX Mid plane (MPa)
154 215
82 112
1 6
−27 −44
−135 −200
−171 −252
Plate Stress:XX Mid plane (MPa) Plate Stress:XX Mid plane (MPa)
158 208
85 106
2 −25 7 −47
−134 −199
−171 −250
Plate Stress:XX Mid plane (MPa) Plate Stress:XX Mid plane (MPa)
159 240
85 122
3 −25 8 −55
−136 −233
−173 −292
Plate Stress:XX Mid plane (MPa) Plate Stress:XX Mid plane (MPa)
173 246
93 124
4 −28 9 −57
−148 −239
−189 −300
Plate Stress:XX Mid plane (MPa) Plate Stress:XX Mid plane (MPa)
201 263
105 144
5 10
−38 −35
−181 −214
−229 −273

Fig. 7: Stress distribution for different optimization steps: longitudinal stress with uniform load condition

260 −100 model referred to optimization step


Internal web; bay 7 was used (Fig. 10a), as explained at
External web; bay −140
220 the end of previous section. The model
−180 is characterized by 10 850 nodes and
MPa
MPa

180 10 176 plate elements. In this model,


−220 the thickness of the steel plates has
Internal web; support
140
−260 External web; support
been varied to achieve an optimum
solution, both for the shape of the bot-
100 −300 tom flange and to the related thick-
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
nesses of the steel plates. Similar to the
Model Model previous optimization phase, in the di-
Fig. 8: Von Mises stress versus optimization steps; uniform load condition mensioning phase also a good balance
between stress distribution at supports
immediately balanced as soon as the been applied to other two different and stress distribution at mid-span
bottom flange is completely removed load conditions: asymmetric and skew- has been attained, reaching the 93%
and the side box girders become dis- symmetric (Fig. 9). The global response of stress level allowed by the code for
connected (step 10). of the structure showed no major dif- steel S355 (Fig. 10c).
ferences from that observed with the Local stability problems have been
After assessing the global structural
uniform load condition, thus validat- taken into account: the most critical sit-
behaviour due to the bottom flange
ing the topology obtained through the uation was displayed by the web panels
topology modification, the optimum
uniformly distributed load case, corre- at the supports; the adopted longitudinal
condition has been chosen with the
sponding to that of step 7 in Fig. 7. and transversal stiffeners determined a
procedure mentioned above: first the
stress increment ratio at the monitored In conclusion, model 7 displayed the buckling factor of 1,77 (Fig. 10d).
points has been related to the percent- best compromise towards optimization With reference to the original concrete
age of bored flange; then the optimiza- procedure. solution, a global weight reduction of
tion index has been evaluated for the 60% was obtained for the superstruc-
different FE models to clearly identify ture spanning two adjacent piers. Con-
the optimum layout: two optimum so- Final Structural Layout and sidering that piles, abutments and piers
lutions can be identified, corresponding were already partially built at the mo-
to models 7 and 10, the first represent- Bridge Construction
ment of the project updating, an over-
ing a slightly more favourable condi- From the findings of the optimized all weight reduction of roughly 40%
tion, as it can be seen from comparing solution identified from the step-by- was obtained for the whole superstruc-
the histograms presented in Fig. 9. step ESO-type process, the bridge to- ture. No further improvement in the
In order to generalize the results ob- pology has been clearly identified. For seismic performance of the bridge was
tained, the same kind of procedure has the final project of the bridge, the FE obtained because the mass decrease

76 Science and Technology Structural Engineering International 1/2010

X439_72-78.indd 76 2/1/10 10:09:54 AM


100 40 can be considered complementary to
Bay 9 Bay
% Tension increment 8 architectural needs, as required by the
80 Support 10 Support

Optimisation index
Average
30
Average
fundamentals of structural architec-
60 6 ture discipline (Fig. 11).
5 20
40

4 7 10
Conclusions
20
1 2 3
The bridge presented, characterized in
0 0
0 20 40 60 80 100 1 2 3 4 5 6 7 8 9 10 the original version of the project by
% Bottom flange removal Model a pre-stressed concrete superstructure,
was re-considered during construction
100 80 due to the approval of the new Ital-
Bay Bay
80 ian seismic regulation with more re-
Support
% Stress increment

Support

Optimisation index
60
Average
strictive prescriptions and due to the
60 Average 9
8 10 advice of the Venice Water Authority
40 6 40 who favoured a construction proce-
5
20 dure not requiring any provisional
7
20 supports and scaffolding resting on the
0
1 2 3 4 riverbed.
−20 0
0 20 40 60 80 100 1 2 3 4 5 6 7 8 9 10 The solution finally identified had to
% Bottom flange removal Model deal with the search for the lighter
possible superstructure compatible
100 80
Bay Bay with a number of constraints, including
80 Support Support budget, construction schedule and aes-
% Stress increment

Optimisation index

9 60
60 Average 8
10 Average thetical issues.
40 6 40 On the basis of engineering judgement,
5
20
a composite steel and concrete super-
4 structure was identified as the most
20
0 7 suitable one. The search for a final de-
1 2 3
−20 0 sign characterized by a reduced weight
0 20 40 60 80 100 1 2 3 4 5 6 7 8 9 10 gave rise to the opportunity and need
% Bottom flange removal Model
to perform a structural optimization
Fig. 9: Stress increment versus hole dimension ratio and optimization index for different process, based on a non-conventional
load conditions step-by-step ESO procedure, an effec-
tive technique when a single variable
continuum structural design optimiza-
tion process has to be processed.
Plate disp:DZ (mm)
2 The definition of a suitable optimi-
−18
−39 zation index has allowed for an easy
−59 identification of the optimum solution
−80
−100 for the deck, guaranteeing almost a
−110
(a) (b) 40% weight reduction for the whole
Plate Stress:VM Mid plane (MPa) structure, when compared with the ini-
329 tial pre-stressed concrete solution.
269
209 Because the optimization process ad-
(d)
150 opted is not based on an automatic pro-
90
cedure but is oriented by the designer,
30
0 (c) the final result has led to a remarkable
relationship between shape and struc-
Fig. 10: (a) Final FE model implemented for structural analysis, (b) and (c) maximum ture, with a global topology of the deck
stress and displacement at the ULS: dead + live load, (d) detail buckling analysis of the emphasizing the flow of forces in the
web at support: buckling factor = 1,77 structure and the way they are chan-
nelled from the point of application
to the foundations; this result could
It can be observed that the achieved so-
achieved through the optimization pro- have been achieved with difficulty by
lution is not only an optimum solution
cess made the fundamental frequency a completely automatic optimization
considering the final goal of reducing
of the bridge remain in the plateau process.
the global weight of the structure but
field of the acceleration spectra.
also represents a desirable and innova- This step-by-step kind of “design and
Nevertheless, the reduced mass made tive layout with reference to the bridge check” optimization process highlight-
the original foundations suitable for aesthetics where the flow of forces is ed the fundamental role played by the
final design under the new seismic re- emphasized by the geometry of the conceptual design in the achievement
quirements. superstructure, and structural issues of a fully integrated design.

Structural Engineering International 1/2010 Science and Technology 77

X439_72-78.indd 77 2/1/10 10:09:56 AM


[4] Querin OM. Evolutionary Structural Optimi-
zation: Stress Based Formulation and Implemen-
tation. PhD Thesis, Department of Aeronautical
Engineering, University of Sydney, Australia,
1997.
[5] Xie YM, Steven GP. Evolutionary Structural
Optimization. Springer-Verlag: Berlin, 1997.
[6] Lucia P. Progettazione Ottimale Di Ponti In
Struttura Mista Acciaio-Calcestruzzo Ad Asse
Rettilineo Mediante Algoritmi Evolutivi. PhD
Thesis, Università degli Studi di Trieste, Trieste,
Italy, 2008.
[7] Yang RJ, Chung CH. Optimal topology de-
sign using linear programming. Comput. Struct.
1994; 52: 265–275.
[8] Buhl T, Pedersen W, Sigmund O. Stiffness
design of geometrically nonlinear structures
using topology optimization. Struct. Multidiscip.
Optim. 2000; 19: 93–104.
[9] Mattheck C. Design in Nature: Learning from
Trees. Springer-Verlag: Berlin, 1997.

Fig. 11: The completed optimized superstructure makes clear the correspondence between [10] Olivieri S, Siviero E, Zanchettin F. Il ponte
shape and structural response sul Piave della Variante alla Statale 14. Le Strade
5/99, 1999.
References Methodology, Chicago, IL, USA, American So- [11] STRAND 7. User Manual. G+D Comput-
ciety of Mechanical Engineering Division, 1990; ing, 2003.
[1] Scott AB. Recent Advantage in Optimal Struc- 239–250.
tural Design. Structural Engineering Institute of [3] Liang Q, Xie YM, Steven GP. Optimal se-
the American Society of Civil Engineers, 2002. lection of topologies for the minimum-weight
[2] Kota S, Ward AC. Functions, Structures and design of continuum structures with stress con-
Constraints in Conceptual Design. Second In- straints. Proc. Inst. Mech. Eng., Part C, J. Mech.
ternational Conference on Design Theory and Eng. Sci. 1998.

78 Science and Technology Structural Engineering International 1/2010

x356.indd 154 78
X439_72-78.indd 1/2/70 10:10:03
2/1/10 5:44:38 AM
PM

You might also like