Portion 2, E - Steel Splicing
Portion 2, E - Steel Splicing
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 End I 180 190 5.56%
TOP
2 20 End I 180 188 4.44%
1 20 End I 180 189 5.00%
MIDDLE
2 20 End I 180 190 5.56%
1 20 End I 180 189 5.00%
BOTTOM
2 20 End I 180 188 4.44%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-4 180 188 4.44%
TOP
2 20 I-4 180 189 5.00%
1 20 I-4 180 190 5.56%
MIDDLE
2 20 I-4 180 188 4.44%
1 20 I-4 180 189 5.00%
BOTTOM
2 20 I-4 180 190 5.56%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-4 180 189 5.00%
TOP
2 20 I-4 180 190 5.56%
1 20 I-4 180 188 4.44%
MIDDLE
2 20 I-4 180 188 4.44%
1 20 I-4 180 190 5.56%
BOTTOM
2 20 I-4 180 190 5.56%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-3 180 188 4.44%
TOP
2 20 I-3 180 189 5.00%
1 20 I-3 180 189 5.00%
MIDDLE
2 20 I-3 180 188 4.44%
1 20 I-3 180 189 5.00%
BOTTOM
2 20 I-3 180 190 5.56%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-2 180 190 5.56%
TOP
2 20 I-2 180 189 5.00%
1 20 I-2 180 188 4.44%
MIDDLE
2 20 I-2 180 190 5.56%
1 20 I-2 180 189 5.00%
BOTTOM
2 20 I-2 180 188 4.44%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-1 180 188 4.44%
TOP
2 20 I-1 180 188 4.44%
1 20 I-1 180 189 5.00%
MIDDLE
2 20 I-1 180 190 5.56%
1 20 I-1 180 190 5.56%
BOTTOM
2 20 I-1 180 188 4.44%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-1 180 189 5.00%
TOP
2 20 I-1 180 188 4.44%
1 20 I-1 180 190 5.56%
MIDDLE
2 20 I-1 180 190 5.56%
1 20 I-1 180 189 5.00%
BOTTOM
2 20 I-1 180 188 4.44%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 JRSD Gantry 180 189 5.00%
TOP
2 20 JRSD Gantry 180 190 5.56%
1 20 JRSD Gantry 180 190 5.56%
MIDDLE
2 20 JRSD Gantry 180 188 4.44%
1 20 JRSD Gantry 180 189 5.00%
BOTTOM
2 20 JRSD Gantry 180 189 5.00%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 22-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 26-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 19-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 19-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 16-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 18-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 5-Jun
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 End I 180 188 4.44%
TOP
2 20 End I 180 189 5.00%
1 20 End I 180 190 5.56%
MIDDLE
2 20 End I 180 188 4.44%
1 20 End I 180 189 5.00%
BOTTOM
2 20 End I 180 189 5.00%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 2-Jun
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 BNJ 1A, 1B, 1C 180 190 5.56%
TOP
2 20 BNJ 1A, 1B, 1C 180 189 5.00%
1 20 BNJ 1A, 1B, 1C 180 189 5.00%
MIDDLE
2 20 BNJ 1A, 1B, 1C 180 190 5.56%
1 20 BNJ 1A, 1B, 1C 180 188 4.44%
BOTTOM
2 20 BNJ 1A, 1B, 1C 180 189 5.00%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 5-May
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 5-May
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 22-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 22-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 22-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 16-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 16-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 16-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 26-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 19-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 19-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 19-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 13-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
DATE: 11-Apr
CIRCUIT NO. I
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities
Portion-3 ( PTS – 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961
DATE: 28.02.2017
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 A1 180 189 5.00%
TOP
2 20 A1 180 190 5.56%
1 20 A1 180 190 5.56%
MIDDLE
2 20 A1 180 190 5.56%
1 20 A1 180 190 5.56%
BOTTOM
2 20 A1 180 189 5.00%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities
Portion-3 ( PTS – 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961
DATE: 02.03.2017
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 CA14 180 190 5.56%
TOP
2 20 CA14 180 189 5.00%
1 20 CA14 180 189 5.00%
MIDDLE
2 20 CA14 180 191 6.11%
1 20 CA14 180 190 5.56%
BOTTOM
2 20 CA14 180 190 5.56%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities
Portion-3 ( PTS – 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961
DATE: 06.03.2017
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 B1 180 190 5.56%
TOP
2 20 B1 180 189 5.00%
1 20 B1 180 191 6.11%
MIDDLE
2 20 B1 180 188 4.44%
1 20 B1 180 190 5.56%
BOTTOM
2 20 B1 180 189 5.00%
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities Portion-3 ( PTS
– 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961
DATE: 26.02.2017
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1
TOP
2
1
MIDDLE
2
1
BOTTOM
2
REPAIR WORK:
Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT
PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities Portion-3 ( PTS
– 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961
DATE: 21.03.2017
CIRCUIT NO. I
CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 CB1 180 190 5.56%
TOP
2 20 CB1 180 188 4.44%
1 20 CB1 180 189 5.00%
MIDDLE
2 20 CB1 180 190 5.56%
1 20 CB1 180 190 5.56%
BOTTOM
2 20 CB1 180 188 4.44%
REPAIR WORK:
Name: Name: