ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: I-4 TO STRUCTURE NO: End I

DATE: Monday, July 05, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 End I 180 190 5.56%
TOP
2 20 End I 180 188 4.44%
1 20 End I 180 188 4.44%
MIDDLE
2 20 End I 180 188 4.44%
1 20 End I 180 189 5.00%
BOTTOM
2 20 End I 180 190 5.56%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 End I 180 190 5.56%
TOP
2 20 End I 180 188 4.44%
1 20 End I 180 189 5.00%
MIDDLE
2 20 End I 180 190 5.56%
1 20 End I 180 189 5.00%
BOTTOM
2 20 End I 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: End I TO STRUCTURE NO: I-4

DATE: Thursday, July 01, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 I-4 180 188 4.44%
TOP
2 20 I-4 180 188 4.44%
1 20 I-4 180 190 5.56%
MIDDLE
2 20 I-4 180 189 5.00%
1 20 I-4 180 189 5.00%
BOTTOM
2 20 I-4 180 188 4.44%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-4 180 188 4.44%
TOP
2 20 I-4 180 189 5.00%
1 20 I-4 180 190 5.56%
MIDDLE
2 20 I-4 180 188 4.44%
1 20 I-4 180 189 5.00%
BOTTOM
2 20 I-4 180 190 5.56%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: I-4 TO STRUCTURE NO: I-3

DATE: Monday, June 28, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 I-4 180 190 5.56%
TOP
2 20 I-4 180 189 5.00%
1 20 I-4 180 188 4.44%
MIDDLE
2 20 I-4 180 190 5.56%
1 20 I-4 180 188 4.44%
BOTTOM
2 20 I-4 180 190 5.56%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-4 180 189 5.00%
TOP
2 20 I-4 180 190 5.56%
1 20 I-4 180 188 4.44%
MIDDLE
2 20 I-4 180 188 4.44%
1 20 I-4 180 190 5.56%
BOTTOM
2 20 I-4 180 190 5.56%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: I-2 TO STRUCTURE NO: I-3

DATE: Saturday, June 26, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 I-3 180 189 5.00%
TOP
2 20 I-3 180 188 4.44%
1 20 I-3 180 189 5.00%
MIDDLE
2 20 I-3 180 190 5.56%
1 20 I-3 180 190 5.56%
BOTTOM
2 20 I-3 180 190 5.56%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-3 180 188 4.44%
TOP
2 20 I-3 180 189 5.00%
1 20 I-3 180 189 5.00%
MIDDLE
2 20 I-3 180 188 4.44%
1 20 I-3 180 189 5.00%
BOTTOM
2 20 I-3 180 190 5.56%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: I-1 TO STRUCTURE NO: I-2

DATE: Wednesday, June 23, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 I-2 180 188 4.44%
TOP
2 20 I-2 180 189 5.00%
1 20 I-2 180 189 5.00%
MIDDLE
2 20 I-2 180 188 4.44%
1 20 I-2 180 190 5.56%
BOTTOM
2 20 I-2 180 189 5.00%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-2 180 190 5.56%
TOP
2 20 I-2 180 189 5.00%
1 20 I-2 180 188 4.44%
MIDDLE
2 20 I-2 180 190 5.56%
1 20 I-2 180 189 5.00%
BOTTOM
2 20 I-2 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: I-1 TO STRUCTURE NO: I-2

DATE: Sunday, June 20, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 I-1 180 190 5.56%
TOP
2 20 I-1 180 188 4.44%
1 20 I-1 180 189 5.00%
MIDDLE
2 20 I-1 180 190 5.56%
1 20 I-1 180 189 5.00%
BOTTOM
2 20 I-1 180 189 5.00%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-1 180 188 4.44%
TOP
2 20 I-1 180 188 4.44%
1 20 I-1 180 189 5.00%
MIDDLE
2 20 I-1 180 190 5.56%
1 20 I-1 180 190 5.56%
BOTTOM
2 20 I-1 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: JRSD Gantry TO STRUCTURE NO: I-1

DATE: Monday, June 14, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 I-1 180 189 5.00%
TOP
2 20 I-1 180 190 5.56%
1 20 I-1 180 189 5.00%
MIDDLE
2 20 I-1 180 188 4.44%
1 20 I-1 180 189 5.00%
BOTTOM
2 20 I-1 180 188 4.44%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 I-1 180 189 5.00%
TOP
2 20 I-1 180 188 4.44%
1 20 I-1 180 190 5.56%
MIDDLE
2 20 I-1 180 190 5.56%
1 20 I-1 180 189 5.00%
BOTTOM
2 20 I-1 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: I-1 TO STRUCTURE NO: JRSD Gantry

DATE: Monday, June 07, 2021

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 JRSD Gantry 180 188 4.44%
TOP
2 20 JRSD Gantry 180 188 4.44%
1 20 JRSD Gantry 180 189 5.00%
MIDDLE
2 20 JRSD Gantry 180 190 5.56%
1 20 JRSD Gantry 180 189 5.00%
BOTTOM
2 20 JRSD Gantry 180 189 5.00%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 JRSD Gantry 180 189 5.00%
TOP
2 20 JRSD Gantry 180 190 5.56%
1 20 JRSD Gantry 180 190 5.56%
MIDDLE
2 20 JRSD Gantry 180 188 4.44%
1 20 JRSD Gantry 180 189 5.00%
BOTTOM
2 20 JRSD Gantry 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G5 TO STRUCTURE NO: G5/1

DATE: 22-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G5/1 180 189 5.00%
TOP
2 20 G5/1 180 188 4.44%
1 20 G5/1 180 190 5.56%
MIDDLE
2 20 G5/1 180 190 5.56%
1 20 G5/1 180 189 5.00%
BOTTOM
2 20 G5/1 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G3 TO STRUCTURE NO: G2

DATE: 26-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G2 180 188 4.44%
TOP
2 20 G2 180 190 5.56%
1 20 G2 180 189 5.00%
MIDDLE
2 20 G2 180 190 5.56%
1 20 G2 180 188 4.44%
BOTTOM
2 20 G2 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 16 TO STRUCTURE NO: BSE 15

DATE: 19-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 BSE 15 180 188 4.44%
TOP
2 20 BSE 15 180 188 4.44%
1 20 BSE 15 180 190 5.56%
MIDDLE
2 20 BSE 15 180 188 4.44%
1 20 BSE 15 180 190 5.56%
BOTTOM
2 20 BSE 15 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 14 TO STRUCTURE NO: BSE 15

DATE: 19-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 BSE 15 180 190 5.56%
TOP
2 20 BSE 15 180 188 4.44%
1 20 BSE 15 180 189 5.00%
MIDDLE
2 20 BSE 15 180 189 5.00%
1 20 BSE 15 180 190 5.56%
BOTTOM
2 20 BSE 15 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 14 TO STRUCTURE NO: End H

DATE: 16-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 BSE 14 180 188 4.44%
TOP
2 20 BSE 14 180 188 4.44%
1 20 BSE 14 180 190 5.56%
MIDDLE
2 20 BSE 14 180 189 5.00%
1 20 BSE 14 180 189 5.00%
BOTTOM
2 20 BSE 14 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 13 TO STRUCTURE NO: End H

DATE: 18-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 End H 180 188 4.44%
TOP
2 20 End H 180 190 5.56%
1 20 End H 180 190 5.56%
MIDDLE
2 20 End H 180 188 4.44%
1 20 End H 180 189 5.00%
BOTTOM
2 20 End H 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BK 11 TO STRUCTURE NO: End I

DATE: 5-Jun

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 End I 180 189 5.00%
TOP
2 20 End I 180 190 5.56%
1 20 End I 180 189 5.00%
MIDDLE
2 20 End I 180 188 4.44%
1 20 End I 180 188 4.44%
BOTTOM
2 20 End I 180 190 5.56%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 End I 180 188 4.44%
TOP
2 20 End I 180 189 5.00%
1 20 End I 180 190 5.56%
MIDDLE
2 20 End I 180 188 4.44%
1 20 End I 180 189 5.00%
BOTTOM
2 20 End I 180 189 5.00%
REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BK 2 TO STRUCTURE NO: BNJ 1A, 1B, 1C

DATE: 2-Jun

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 BNJ 1A, 1B, 1C 180 190 5.56%
TOP
2 20 BNJ 1A, 1B, 1C 180 190 5.56%
1 20 BNJ 1A, 1B, 1C 180 188 4.44%
MIDDLE
2 20 BNJ 1A, 1B, 1C 180 189 5.00%
1 20 BNJ 1A, 1B, 1C 180 190 5.56%
BOTTOM
2 20 BNJ 1A, 1B, 1C 180 188 4.44%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 BNJ 1A, 1B, 1C 180 190 5.56%
TOP
2 20 BNJ 1A, 1B, 1C 180 189 5.00%
1 20 BNJ 1A, 1B, 1C 180 189 5.00%
MIDDLE
2 20 BNJ 1A, 1B, 1C 180 190 5.56%
1 20 BNJ 1A, 1B, 1C 180 188 4.44%
BOTTOM
2 20 BNJ 1A, 1B, 1C 180 189 5.00%
REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 14 TO STRUCTURE NO: G7A

DATE: 5-May

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G7A 180 188 4.44%
TOP
2 20 G7A 180 190 5.56%
1 20 G7A 180 189 5.00%
MIDDLE
2 20 G7A 180 188 4.44%
1 20 G7A 180 190 5.56%
BOTTOM
2 20 G7A 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 14 TO STRUCTURE NO: G7A

DATE: 5-May

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 BSE 14 180 190 5.56%
TOP
2 20 BSE 14 180 190 5.56%
1 20 BSE 14 180 188 4.44%
MIDDLE
2 20 BSE 14 180 189 5.00%
1 20 BSE 14 180 188 4.44%
BOTTOM
2 20 BSE 14 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 14 TO STRUCTURE NO: G6A

DATE: 22-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G6A 180 188 4.44%
TOP
2 20 G6A 180 190 5.56%
1 20 G6A 180 190 5.56%
MIDDLE
2 20 G6A 180 189 5.00%
1 20 G6A 180 189 5.00%
BOTTOM
2 20 G6A 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G5/1 TO STRUCTURE NO: G6A

DATE: 22-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G6A 180 188 4.44%
TOP
2 20 G6A 180 188 4.44%
1 20 G6A 180 190 5.56%
MIDDLE
2 20 G6A 180 190 5.56%
1 20 G6A 180 189 5.00%
BOTTOM
2 20 G6A 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G6A TO STRUCTURE NO: G5/1

DATE: 22-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G5/1 180 190 5.56%
TOP
2 20 G5/1 180 188 4.44%
1 20 G5/1 180 189 5.00%
MIDDLE
2 20 G5/1 180 190 5.56%
1 20 G5/1 180 188 4.44%
BOTTOM
2 20 G5/1 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 14 TO STRUCTURE NO: End H

DATE: 16-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 End H 180 190 5.56%
TOP
2 20 End H 180 190 5.56%
1 20 End H 180 188 4.44%
MIDDLE
2 20 End H 180 190 5.56%
1 20 End H 180 189 5.00%
BOTTOM
2 20 End H 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: BSE 14 TO STRUCTURE NO: BSE 15

DATE: 16-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 BSE 14 180 190 5.56%
TOP
2 20 BSE 14 180 188 4.44%
1 20 BSE 14 180 189 5.00%
MIDDLE
2 20 BSE 14 180 190 5.56%
1 20 BSE 14 180 189 5.00%
BOTTOM
2 20 BSE 14 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G4 TO STRUCTURE NO: G5

DATE: 16-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G5 180 189 5.00%
TOP
2 20 G5 180 188 4.44%
1 20 G5 180 190 5.56%
MIDDLE
2 20 G5 180 188 4.44%
1 20 G5 180 189 5.00%
BOTTOM
2 20 G5 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G1 TO STRUCTURE NO: G2

DATE: 26-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G2 180 190 5.56%
TOP
2 20 G2 180 190 5.56%
1 20 G2 180 189 5.00%
MIDDLE
2 20 G2 180 188 4.44%
1 20 G2 180 188 4.44%
BOTTOM
2 20 G2 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G3 TO STRUCTURE NO: G2

DATE: 19-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G3 180 188 4.44%
TOP
2 20 G3 180 190 5.56%
1 20 G3 180 188 4.44%
MIDDLE
2 20 G3 180 188 4.44%
1 20 G3 180 189 5.00%
BOTTOM
2 20 G3 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G3 TO STRUCTURE NO: G4

DATE: 19-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G3 180 190 5.56%
TOP
2 20 G3 180 189 5.00%
1 20 G3 180 188 4.44%
MIDDLE
2 20 G3 180 189 5.00%
1 20 G3 180 188 4.44%
BOTTOM
2 20 G3 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G5 TO STRUCTURE NO: G4

DATE: 19-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G4 180 188 4.44%
TOP
2 20 G4 180 189 5.00%
1 20 G4 180 189 5.00%
MIDDLE
2 20 G4 180 190 5.56%
1 20 G4 180 188 4.44%
BOTTOM
2 20 G4 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G1 TO STRUCTURE NO: G2

DATE: 13-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 G1 180 188 4.44%
TOP
2 20 G1 180 188 4.44%
1 20 G1 180 190 5.56%
MIDDLE
2 20 G1 180 189 5.00%
1 20 G1 180 188 4.44%
BOTTOM
2 20 G1 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL Portion-2

CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: G1 TO STRUCTURE NO: Gantry

DATE: 11-Apr

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 Gantry 180 188 4.44%
TOP
2 20 Gantry 180 189 5.00%
1 20 Gantry 180 189 5.00%
MIDDLE
2 20 Gantry 180 188 4.44%
1 20 Gantry 180 189 5.00%
BOTTOM
2 20 Gantry 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities
Portion-3 ( PTS – 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: Gantry TO STRUCTURE NO: A1

DATE: 28.02.2017

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 A1 180 191 6.11%
TOP
2 20 A1 180 190 5.56%
1 20 A1 180 190 5.56%
MIDDLE
2 20 A1 180 190 5.56%
1 20 A1 180 190 5.56%
BOTTOM
2 20 A1 180 189 5.00%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 A1 180 189 5.00%
TOP
2 20 A1 180 190 5.56%
1 20 A1 180 190 5.56%
MIDDLE
2 20 A1 180 190 5.56%
1 20 A1 180 190 5.56%
BOTTOM
2 20 A1 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities
Portion-3 ( PTS – 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: Gantry TO STRUCTURE NO: CA14

DATE: 02.03.2017

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 CA14 180 189 5.00%
TOP
2 20 CA14 180 190 5.56%
1 20 CA14 180 190 5.56%
MIDDLE
2 20 CA14 180 191 6.11%
1 20 CA14 180 190 5.56%
BOTTOM
2 20 CA14 180 189 5.00%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 CA14 180 190 5.56%
TOP
2 20 CA14 180 189 5.00%
1 20 CA14 180 189 5.00%
MIDDLE
2 20 CA14 180 191 6.11%
1 20 CA14 180 190 5.56%
BOTTOM
2 20 CA14 180 190 5.56%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities
Portion-3 ( PTS – 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: Gantry TO STRUCTURE NO: B1

DATE: 06.03.2017

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 B1 180 188 4.44%
TOP
2 20 B1 180 190 5.56%
1 20 B1 180 191 6.11%
MIDDLE
2 20 B1 180 189 5.00%
1 20 B1 180 190 5.56%
BOTTOM
2 20 B1 180 189 5.00%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 B1 180 190 5.56%
TOP
2 20 B1 180 189 5.00%
1 20 B1 180 191 6.11%
MIDDLE
2 20 B1 180 188 4.44%
1 20 B1 180 190 5.56%
BOTTOM
2 20 B1 180 189 5.00%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities Portion-3 ( PTS
– 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: Gantry TO STRUCTURE NO: D1

DATE: 26.02.2017

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 D1 180 190 5.56%
TOP
2 20 D1 180 188 4.44%
1 20 D1 180 189 5.00%
MIDDLE
2 20 D1 180 190 5.56%
1 20 D1 180 190 5.56%
BOTTOM
2 20 D1 180 188 4.44%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1
TOP
2
1
MIDDLE
2
1
BOTTOM
2

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name:
ACSR CONDUCTOR DEAD-END STEEL SPLICING REPORT

PROJECT: 230KV OHTL from Integration of additional Saudi ARAMCO Co-Generation Facilities Portion-3 ( PTS
– 11E0208)
CONTRACTOR: AL SHARIF GROUP & KEC LTD CO CONTRACT # 4400003961

FROM STRUCTURE NO: Gantry TO STRUCTURE NO: CB1

DATE: 21.03.2017

CIRCUIT NO. I

PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER


ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION
BC AC
1 20 CB1 180 190 5.56%
TOP
2 20 CB1 180 188 4.44%
1 20 CB1 180 189 5.00%
MIDDLE
2 20 CB1 180 188 4.44%
1 20 CB1 180 189 5.00%
BOTTOM
2 20 CB1 180 188 4.44%

CIRCUIT NO. II
PHASE AND SUB- DIE SPLICING LENGTH/DIAMETER
ELONGATION (%) REMARKS
CONDUCTOR NO. REFERENCE LOCATION BC AC
1 20 CB1 180 190 5.56%
TOP
2 20 CB1 180 188 4.44%
1 20 CB1 180 189 5.00%
MIDDLE
2 20 CB1 180 190 5.56%
1 20 CB1 180 190 5.56%
BOTTOM
2 20 CB1 180 188 4.44%

REPAIR WORK:

CONTRACTOR'S REPRESENTATIVE SEC REPRESENTATIVE

Name: Name: