You are on page 1of 1

International Well Control Forum Grading Analysis Sheet Level 4

Combined Surface and Subsea BOP Equipment Test Paper

Schedule ID: 38856 CR-Number: CR-711397 Candidate Name: BANGALORE SREENIVASA PRASANNA Session ID: 691973

Std. Ref. Standards Descriptor Question Summary


*DR-SF-EQP-01.01.01 BOP Stack Configuration BOP function, configuration and the well control operations
that can be carried out.
*DR-SF-EQP-03.02.01 Manual and Remote Chokes The operating principles and limitations of adjustable chokes
(reference API STD 53).
*DR-SF-EQP-06.01.07 BOP Control Systems Possible functional problems during BOP/Diverter operations.
*DR-SS-EQP-06.02.04 Subsea BOP Control Systems Functional problems during operations of a subsea installed
BOP.
*DR-SS-EQP-06.02.01 Subsea BOP Control Systems The general operating principles of subsea BOP control
systems.
*DR-SS-EQP-06.02.04 Subsea BOP Control Systems Functional problems during operations of a subsea installed
BOP.

4SSE/EN/691973/2107 Page 1 of 1

You might also like