MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra:

Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
0+000.00 -10.00 3254.81 -9.54 3254.87 0.01 -10.00 3253.78 -1.95 3253.62 -8.99
-9.54 3254.87 -8.87 3254.46 -0.10 -1.95 3253.62 -1.80 3253.92 -0.16
-8.87 3254.46 -7.22 3255.28 0.09 -1.80 3253.92 0.00 3253.95 -1.58
-7.22 3255.28 -5.15 3254.25 -0.10 0.00 3253.95 1.80 3253.92 -1.58
-5.15 3254.25 -4.25 3254.15 -0.55 1.80 3253.92 1.95 3253.62 -0.16
-4.25 3254.15 -2.18 3254.23 -1.29 1.95 3253.62 2.59 3253.63 -0.76
-2.18 3254.23 -2.00 3254.23 -0.11
-2.00 3254.23 0.04 3254.16 -1.27
0.04 3254.16 0.08 3254.17 -0.03
0.08 3254.17 0.31 3254.19 -0.14
0.31 3254.19 1.77 3254.14 -0.95
1.77 3254.14 1.79 3254.14 -0.01
1.79 3254.14 2.59 3254.17 -0.53
-4.98 -13.23 8.25
TOTAL AREAS(M2): 8.25 0.00
0+010.00 -8.10 3254.79 -7.89 3254.86 0.01 -8.10 3253.08 -1.95 3252.96 -10.84
-7.89 3254.86 -7.65 3254.45 -0.03 -1.95 3252.96 -1.80 3253.26 -0.25
-7.65 3254.45 -6.78 3255.45 0.14 -1.80 3253.26 0.00 3253.30 -2.71
-6.78 3255.45 -4.43 3253.66 -0.55 0.00 3253.30 1.80 3253.26 -2.71
-4.43 3253.66 -3.32 3253.31 -1.44 1.80 3253.26 1.95 3252.96 -0.25
-3.32 3253.31 -2.82 3253.40 -0.72 1.95 3252.96 3.40 3252.99 -2.63
-2.82 3253.40 -2.53 3253.39 -0.40
-2.53 3253.39 -1.65 3253.41 -1.22
-1.65 3253.41 -0.55 3253.49 -1.46
-0.55 3253.49 1.43 3253.60 -2.45
1.43 3253.60 1.83 3253.60 -0.48
1.83 3253.60 2.26 3253.55 -0.53
2.26 3253.55 2.79 3253.58 -0.64
2.79 3253.58 3.40 3252.99 -0.92
-10.69 -19.39 8.70
TOTAL AREAS(M2): 8.70 0.00
0+020.00 -7.29 3254.82 -6.81 3255.00 0.04 -7.29 3252.40 -1.95 3252.29 -13.22
-6.81 3255.00 -6.24 3254.04 -0.17 -1.95 3252.29 -1.80 3252.59 -0.36
-6.24 3254.04 -4.11 3256.42 0.87 -1.80 3252.59 0.00 3252.63 -3.98
-4.11 3256.42 -3.90 3256.27 0.32 0.00 3252.63 1.80 3252.59 -3.98
-3.90 3256.27 -3.82 3256.24 0.10 1.80 3252.59 1.95 3252.29 -0.36
-3.82 3256.24 -2.08 3254.88 1.30 1.95 3252.29 2.74 3252.31 -1.99
-2.08 3254.88 0.15 3252.77 -2.21
0.15 3252.77 0.23 3252.74 -0.16
0.23 3252.74 0.30 3252.73 -0.14
0.30 3252.73 1.93 3252.66 -3.47
1.93 3252.66 1.93 3252.66 -0.01
1.93 3252.66 2.58 3252.39 -1.48
2.58 3252.39 2.74 3252.31 -0.39
-5.40 -23.88 18.48
TOTAL AREAS(M2): 18.48 0.00
0+030.00 -6.60 3254.86 -5.80 3255.16 0.12 -6.60 3251.73 -1.95 3251.64 -14.77
-5.80 3255.16 -4.82 3253.53 -0.50 -1.95 3251.64 -1.80 3251.94 -0.46
-4.82 3253.53 -3.97 3254.50 -0.73 -1.80 3251.94 0.00 3251.98 -5.23
-3.97 3254.50 -2.49 3252.70 -1.87 0.00 3251.98 1.80 3251.94 -5.23
-2.49 3252.70 -2.43 3252.77 -0.12 1.80 3251.94 1.95 3251.64 -0.46

Página 1
Areas 07/18/2021 15:06:01

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra:

Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-2.43 3252.77 -2.27 3252.70 -0.35 1.95 3251.64 2.65 3251.65 -2.26
-2.27 3252.70 -1.85 3252.52 -0.95
-1.85 3252.52 1.60 3252.09 -8.82
1.60 3252.09 2.65 3251.65 -3.15
-16.36 -28.42 12.06
TOTAL AREAS(M2): 12.06 0.00
0+040.00 -6.30 3254.91 -5.18 3255.32 0.23 -6.30 3251.32 -1.95 3251.23 -15.79
-5.18 3255.32 -4.72 3254.55 0.01 -1.95 3251.23 -1.80 3251.53 -0.53
-4.72 3254.55 -3.91 3254.01 -0.50 -1.80 3251.53 0.00 3251.57 -6.04
-3.91 3254.01 -3.38 3253.56 -0.59 0.00 3251.57 1.80 3251.53 -6.04
-3.38 3253.56 -2.49 3252.79 -1.54 1.80 3251.53 1.95 3251.23 -0.53
-2.49 3252.79 -1.57 3251.84 -2.38 1.95 3251.23 3.59 3251.26 -5.98
-1.57 3251.84 2.10 3251.79 -11.35
2.10 3251.79 2.61 3251.80 -1.59
2.61 3251.80 2.85 3251.79 -0.72
2.85 3251.79 2.89 3251.77 -0.13
2.89 3251.77 3.59 3251.26 -2.37
-20.94 -34.92 13.98
TOTAL AREAS(M2): 13.98 0.00
0+050.00 -7.96 3254.95 -7.83 3255.00 0.00 -7.96 3250.63 -1.95 3250.51 -26.31
-7.83 3255.00 -7.12 3254.98 0.03 -1.95 3250.51 -1.80 3250.81 -0.64
-7.12 3254.98 -5.35 3254.14 -0.70 -1.80 3250.81 0.00 3250.85 -7.42
-5.35 3254.14 -2.52 3251.58 -5.93 0.00 3250.85 1.80 3250.81 -7.42
-2.52 3251.58 -2.24 3251.49 -0.93 1.80 3250.81 1.95 3250.51 -0.64
-2.24 3251.49 -1.21 3251.39 -3.64 1.95 3250.51 3.35 3250.54 -6.19
-1.21 3251.39 1.50 3251.01 -10.17
1.50 3251.01 2.48 3250.90 -3.90
2.48 3250.90 3.35 3250.54 -3.69
-28.94 -48.63 19.69
TOTAL AREAS(M2): 19.69 0.00
0+060.00 -10.00 3254.05 -9.55 3253.89 -0.04 -10.00 3250.01 -1.95 3249.85 -33.22
-9.55 3253.89 -8.86 3253.46 -0.26 -1.95 3249.85 -1.80 3250.15 -0.61
-8.86 3253.46 -7.67 3252.85 -1.07 -1.80 3250.15 0.00 3250.18 -7.00
-7.67 3252.85 -6.67 3252.59 -1.34 0.00 3250.18 1.80 3250.15 -7.00
-6.67 3252.59 -3.39 3251.36 -6.81 1.80 3250.15 1.95 3249.85 -0.61
-3.39 3251.36 -3.37 3251.36 -0.05 1.95 3249.85 2.67 3249.86 -3.01
-3.37 3251.36 -3.34 3251.33 -0.09
-3.34 3251.33 -2.21 3250.32 -3.65
-2.21 3250.32 0.25 3250.39 -9.07
0.25 3250.39 0.86 3250.40 -2.24
0.86 3250.40 1.58 3250.47 -2.61
1.58 3250.47 2.23 3250.45 -2.34
2.23 3250.45 2.67 3249.86 -1.69
-31.27 -51.44 20.18
TOTAL AREAS(M2): 20.18 0.00
0+070.00 -8.42 3252.74 -7.07 3252.26 -0.33 -8.42 3249.49 -1.95 3249.36 -21.45
-7.07 3252.26 -5.32 3251.17 -1.79 -1.95 3249.36 -1.80 3249.66 -0.48
-5.32 3251.17 -3.39 3250.17 -4.00 -1.80 3249.66 0.00 3249.70 -5.51
-3.39 3250.17 -3.18 3250.03 -0.55 0.00 3249.70 1.80 3249.66 -5.51
-3.18 3250.03 -2.94 3250.00 -0.65 1.80 3249.66 1.95 3249.36 -0.48
-2.94 3250.00 -1.06 3249.85 -5.31 1.95 3249.36 3.95 3249.40 -6.74

Página 2
Areas 07/18/2021 15:06:01

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN


Obra:

Autor:

SEGMENTOS TERRENO A1(M2) SEGMENTOS RASANTE A2(M2) AREA(M2)


ESTACION INICIAL FINAL AREA BAJO SA1(M2) INICIAL FINAL AREA BAJO SA2(M2) SA1-SA2
OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) SEGMENTO CORTE TERRAPLEN
-1.06 3249.85 0.72 3249.89 -5.09
0.72 3249.89 1.58 3249.83 -2.48
1.58 3249.83 1.91 3249.83 -0.97
1.91 3249.83 2.25 3249.85 -0.99
2.25 3249.85 3.95 3249.40 -5.31
-27.48 -40.19 12.71
TOTAL AREAS(M2): 12.71 0.00
0+080.00 -6.76 3251.40 -4.58 3250.62 -0.84 -6.76 3248.73 -1.95 3248.64 -13.06
-4.58 3250.62 -3.42 3249.90 -1.33 -1.95 3248.64 -1.80 3248.94 -0.39
-3.42 3249.90 -2.66 3249.64 -1.24 -1.80 3248.94 0.00 3248.97 -4.40
-2.66 3249.64 -2.51 3249.61 -0.26 0.00 3248.97 1.80 3248.94 -4.40
-2.51 3249.61 -2.08 3249.40 -0.81 1.80 3248.94 1.95 3248.64 -0.39
-2.08 3249.40 -1.22 3249.38 -1.73 1.95 3248.64 4.36 3248.68 -6.61
-1.22 3249.38 -0.62 3249.18 -1.28
-0.62 3249.18 0.37 3249.22 -2.18
0.37 3249.22 1.33 3249.22 -2.10
1.33 3249.22 2.38 3249.22 -2.28
2.38 3249.22 2.80 3249.27 -0.91
2.80 3249.27 4.36 3248.68 -3.79
-18.74 -29.26 10.52
TOTAL AREAS(M2): 10.52 0.00
0+090.00 -5.09 3250.06 -3.05 3249.33 -0.75 -5.09 3248.34 -1.95 3248.28 -5.49
-3.05 3249.33 -3.00 3249.00 -0.04 -1.95 3248.28 -1.80 3248.58 -0.24
-3.00 3249.00 -2.67 3248.93 -0.36 -1.80 3248.58 0.00 3248.62 -2.63
-2.67 3248.93 -0.46 3248.83 -2.60 0.00 3248.62 1.80 3248.58 -2.63
-0.46 3248.83 1.18 3248.82 -2.02 1.80 3248.58 1.95 3248.28 -0.24
1.18 3248.82 2.03 3248.83 -1.04 1.95 3248.28 4.83 3248.34 -5.04
2.03 3248.83 2.45 3248.83 -0.52
2.45 3248.83 4.83 3248.34 -3.51
-10.84 -16.28 5.43
TOTAL AREAS(M2): 5.43 0.00
0+100.00 -3.46 3248.83 -3.39 3248.82 0.00 -3.46 3248.14 -1.95 3248.11 -1.07
-3.39 3248.82 -2.82 3248.78 -0.02 -1.95 3248.11 -1.80 3248.41 -0.09
-2.82 3248.78 -2.50 3248.78 -0.01 -1.80 3248.41 0.00 3248.44 -0.73
-2.50 3248.78 0.59 3248.64 -0.37 0.00 3248.44 1.80 3248.41 -0.73
0.59 3248.64 0.95 3248.62 -0.07 1.80 3248.41 1.95 3248.11 -0.09
0.95 3248.62 2.67 3248.61 -0.37 1.95 3248.11 4.06 3248.15 -1.48
2.67 3248.61 4.06 3248.15 -0.63
-1.47 -4.18 2.71
TOTAL AREAS(M2): 2.71 0.00

Página 3
Elevaciones 07/18/2021 15:06:01

ELEVACIONES Y ESPESORES DE TERRENO Y SUBRASANTE


Obra:

Autor:

ELEVACIONES(M) ESPESORES(M)
ESTACION
TERRENO SUBRASANTE CORTE TERRAPLEN
0+000.00 3254.16 3253.95 0.21
0+010.00 3253.52 3253.30 0.23
0+020.00 3252.92 3252.63 0.29
0+030.00 3252.29 3251.98 0.31
0+040.00 3251.82 3251.57 0.25
0+050.00 3251.22 3250.85 0.37
0+060.00 3250.39 3250.18 0.20
0+070.00 3249.87 3249.70 0.18
0+080.00 3249.20 3248.97 0.23
0+090.00 3248.83 3248.62 0.21
0+100.00 3248.67 3248.44 0.22

Página 4
Compactación T.N. 07/18/2021 15:06:01

VOLUMENES DE COMPACTACION TERRENO NATURAL


Obra:

Autor:

ESPESORES(M) AREAS(M2) DISTANCIA FACTOR VOLUMENES(M3)


ESTACION
CORTE TERRAPLEN CORTE TERRAPLEN D/2 ABUND. CORTE
0+000.00 0.20 0.00 2.47 0.00 0.00 1.00 0.00
0+010.00 0.20 0.00 2.25 0.00 5.00 1.00 28.32
0+020.00 0.20 0.00 1.96 0.00 5.00 1.00 25.23
0+030.00 0.20 0.00 1.80 0.00 5.00 1.00 22.54
0+040.00 0.20 0.00 1.93 0.00 5.00 1.00 22.38
0+050.00 0.20 0.00 2.21 0.00 5.00 1.00 24.83
0+060.00 0.20 0.00 2.48 0.00 5.00 1.00 28.17
0+070.00 0.20 0.00 2.43 0.00 5.00 1.00 29.46
0+080.00 0.20 0.00 2.17 0.00 5.00 1.00 27.60
0+090.00 0.20 0.00 1.94 0.00 5.00 1.00 24.66
0+100.00 0.20 0.00 1.45 0.00 5.00 1.00 20.34
TOTAL VOLUMENES DE COMPACTACION T.N.(M3): 253.53

Página 5
Compactación T.N. 07/18/2021 15:06:01

ES DE COMPACTACION TERRENO NATURAL


Obra:

Autor:

VOLUMENES(M3)
TERRAPLEN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Página 6
ESTACAS LATERALES
A B C D E
1
2
3
4 CAMINO:
5 TRAMO: ESTACION:
6 SUBTRAMO: ORIGEN:
7
8 ESTACION ELEVACION
DISTANCIA
ELEVACIONES
9 IZQ DER
10
11 0+000.000 3,253.953 0.000 3,253.953
12 10.000 3,253.778
13 1.950 3,253.617
14 1.800 3,253.917
15 1.800 3,253.917
16 1.950 3,253.617
17 2.591 3,253.630
18 0+010.000 3,253.297 0.000 3,253.297
19 8.096 3,253.084
20 1.950 3,252.961
21 1.800 3,253.261
22 1.800 3,253.261
23 1.950 3,252.961
24 3.404 3,252.990
25 0+020.000 3,252.626 0.000 3,252.626
26 7.286 3,252.397
27 1.950 3,252.290
28 1.800 3,252.590
29 1.800 3,252.590
30 1.950 3,252.290
31 2.737 3,252.306
32 0+030.000 3,251.977 0.000 3,251.977
33 6.601 3,251.734
34 1.950 3,251.641
35 1.800 3,251.941
36 1.800 3,251.941
37 1.950 3,251.641
38 2.654 3,251.655
39 0+040.000 3,251.567 0.000 3,251.567
40 6.300 3,251.318
41 1.950 3,251.231
42 1.800 3,251.531
43 1.800 3,251.531
44 1.950 3,251.231
45 3.586 3,251.264
46 0+050.000 3,250.848 0.000 3,250.848
47 7.956 3,250.632
48 1.950 3,250.512
49 1.800 3,250.812
50 1.800 3,250.812
51 1.950 3,250.512
52 3.347 3,250.540
53 0+060.000 3,250.183 0.000 3,250.183
54 10.000 3,250.008
55 1.950 3,249.847
56 1.800 3,250.147
57 1.800 3,250.147
58 1.950 3,249.847
59 2.667 3,249.862

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
A B C D E
60 0+070.000 3,249.697 0.000 3,249.697
61 8.419 3,249.490
62 1.950 3,249.361
63 1.800 3,249.661
64 1.800 3,249.661
65 1.950 3,249.361
66 3.955 3,249.401
67 0+080.000 3,248.972 0.000 3,248.972
68 6.756 3,248.732
69 1.950 3,248.636
70 1.800 3,248.936
71 1.800 3,248.936
72 1.950 3,248.636
73 4.364 3,248.684
74 0+090.000 3,248.616 0.000 3,248.616
75 5.093 3,248.343
76 1.950 3,248.280
77 1.800 3,248.580
78 1.800 3,248.580
79 1.950 3,248.280
80 4.833 3,248.337
81 0+100.000 3,248.441 0.000 3,248.441
82 3.462 3,248.136
83 1.950 3,248.105
84 1.800 3,248.405
85 1.800 3,248.405
86 1.950 3,248.105
87 4.056 3,248.148

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
1
2
3
4
5
6
7
8 DESCRIPCION
9
10
11 CL
12 Cero
13
14 Hombro Subrasante
15 Hombro Subrasante
16
17 Cero
18 CL
19 Cero
20
21 Hombro Subrasante
22 Hombro Subrasante
23
24 Cero
25 CL
26 Cero
27
28 Hombro Subrasante
29 Hombro Subrasante
30
31 Cero
32 CL
33 Cero
34
35 Hombro Subrasante
36 Hombro Subrasante
37
38 Cero
39 CL
40 Cero
41
42 Hombro Subrasante
43 Hombro Subrasante
44
45 Cero
46 CL
47 Cero
48
49 Hombro Subrasante
50 Hombro Subrasante
51
52 Cero
53 CL
54 Cero
55
56 Hombro Subrasante
57 Hombro Subrasante
58
59 Cero

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
ESTACAS LATERALES
F
60 CL
61 Cero
62
63 Hombro Subrasante
64 Hombro Subrasante
65
66 Cero
67 CL
68 Cero
69
70 Hombro Subrasante
71 Hombro Subrasante
72
73 Cero
74 CL
75 Cero
76
77 Hombro Subrasante
78 Hombro Subrasante
79
80 Cero
81 CL
82 Cero
83
84 Hombro Subrasante
85 Hombro Subrasante
86
87 Cero

SECCIONO________________ REVISO_________________ APROBO_________________


FECHA___________________ FECHA__________________ FECHA___________________
CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

NOTA: Los conceptos que se incluirán


SIMBOLOGIA en el cálculo de volúmenes aparecen
DC DESPALME EN CORTE subrayados. Se ha considerado el
DT DESPALME EN TERRAPLEN terreno ya despalmado al calcular áreas
y volúmenes de corte y terraplén.
C CORTE
T TERRAPLEN

COORDENADA INICIAL DE CURVA


MASA 10,000.00 AREAS VOLUMENES
SECCIONES DE ELEVACIONES ESPESORES DESPALME Factor de DESPALME
TN SEMI-
LEVANTADAS
C T abundamiento DISTANCIA
C
EN CAMPO TN SUBRASANTE C T DC DT en corte DC DT

0+000.000 3254.159 3253.953 0.21 0.00 0.00 0.00 8.25 0.00


0+010.000 3253.523 3253.297 0.23 0.00 0.00 0.00 8.70 0.00 1.20 5.00 0.00 0.00 101.69
0+020.000 3252.918 3252.626 0.29 0.00 0.00 0.00 18.48 0.00 1.20 5.00 0.00 0.00 163.09
0+030.000 3252.291 3251.977 0.31 0.00 0.00 0.00 12.06 0.00 1.20 5.00 0.00 0.00 183.22
0+040.000 3251.818 3251.567 0.25 0.00 0.00 0.00 13.98 0.00 1.20 5.00 0.00 0.00 156.24
0+050.000 3251.218 3250.848 0.37 0.00 0.00 0.00 19.69 0.00 1.20 5.00 0.00 0.00 202.04
0+060.000 3250.386 3250.183 0.20 0.00 0.00 0.00 20.18 0.00 1.20 5.00 0.00 0.00 239.20
0+070.000 3249.874 3249.697 0.18 0.00 0.00 0.00 12.71 0.00 1.20 5.00 0.00 0.00 197.33
0+080.000 3249.204 3248.972 0.23 0.00 0.00 0.00 10.52 0.00 1.20 5.00 0.00 0.00 139.37
0+090.000 3248.828 3248.616 0.21 0.00 0.00 0.00 5.43 0.00 1.20 5.00 0.00 0.00 95.71
0+100.000 3248.665 3248.441 0.22 0.00 0.00 0.00 2.71 0.00 1.20 5.00 0.00 0.00 48.85
VOLUMENES

RESUMEN (ORDENADAS DE LA
T
CURVA MASA)

0+000.000 10,000.00
0.00 0+010.000 10,101.69
0.00 0+020.000 10,264.78
0.00 0+030.000 10,447.99
0.00 0+040.000 10,604.24
0.00 0+050.000 10,806.28
0.00 0+060.000 11,045.48
0.00 0+070.000 11,242.81
0.00 0+080.000 11,382.19
0.00 0+090.000 11,477.90
0.00 0+100.000 11,526.75