The views expressed in this document are the views of the author/s and/or their organizations and do not necessarily reflect
the views or policies of the Asian Development Bank, or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy
and/or completeness of the material’s contents, and accepts no responsibility for any direct or indirect consequence of their use or reliance, whether
wholly or partially. Please feel free to contact the authors directly should you have queries.
NO. OF FAMILIES NO. OF STRUCTURES
GO TO I. DANGER AREAS
I.1. SIDEWALK 2,878 2,325
I.2. CREEKSIDE 5,138 3,501
I.3. PRRP 4,274 2,486
I.4. TULLAHAN RIVER 1,237 1,328
I.5. TRANSMISSION LINE 4,483 3,279
I.6. MWSS 5,767 4,261
I.7. DUMPSITE 953 899
I.8. UNDER THE BRIDGE 745 678
I.9. RROW/ROAD LOTS 6,365 5,067
JUSTICE
CECILIA
MUÑOZ-PALMA
HS
SITE
LOCATION
SOCIALIZED HOUSING AT OVIEDO PROPERTY (Bgy. Payatas)
TOPOGRAPHIC SURVEY
BEFORE
SOCIALIZED HOUSING AT OVIEDO PROPERTY (Bgy. Payatas)
PRESENT
SOCIALIZED HOUSING AT OVIEDO PROPERTY (Bgy. Payatas)
PRESENT
BISTEKVILLE II
PROPOSED
SITE
TO SM FAIRVIEW
TO NOVALICHES
TOWN PROPER
SOCIALIZED HOUSING PROJECT AT ARCE PROPERTY (Bgy. Kaligayahan)
PRESENT
SOCIALIZED HOUSING PROJECT AT ARCE PROPERTY (Bgy. Kaligayahan)
(Model House)
SOCIALIZED HOUSING PROJECT AT ARCE PROPERTY (Bgy. Kaligayahan)
SOCIALIZED HOUSING PROJECT AT ARCE PROPERTY (Bgy. Kaligayahan)
PROPOSED MASTER DEVELOPMENT PLAN
TO VAC
ANT LOT
LOT 383-B, TALA ESTATE 1
31.90
25
ALLE
28 32.10
11 28
28
28
24
28 28 28
37 38
BANABA S T. 28 28 36
Y-12
35
28
-1
CK31 34
28
BLO30 33
23
28 28 32
10 1 28
2 28 29
(3.00
1
28
3 28
34
28
22
4 28 27
.40
26
36
28
BLOC
1
5 29.40 25
RO
6
WIDE)
24
3
2
7 K-1 12 23
28
29
22
(5.50 M.
BL28 2 6
21
8
M. W 7
21
.10
AD
9
2
-1
1
ROAD
28
2
10
ROAD
OC8 8
11 20
5
.60
4
-1
30
40
28
-1
(5.50 12 19
20
18
.50
.80
13
3
M. WID 17
IDE)
14
(5.5
41
1
33
AL
2
16
K-28
15
8
E)
27.90
.30
.80
BL28 26
3
19
2
LE 7 28
32
5
4 3 9
0
28
.40
2
5
28
OC8 8
4
4
Y-1
OPEN SPACE E
AC
M
28
18
6
1
SP
5.8
3
33
7
5
196.00 sq.m. 2
.W
EN .10
WIDE)
28
1(3
1
AL
2
0
28
K 28
OP 156 17
M. WIDE)
28
4
.30
-5
2
ID
1
9
8
LE
.00 1 13 8 32
M. WIDE)
1
M. WIDE)
28
7
E)
9
5
28
Y-1 5 28
28
11
6
4
15
OC8 10
6
28
BLOCK-17
M.
27
6
3
10
2
M.
WIDE)
BLOCK-18
10
3
RO
3
5
.50
1
28
9
0(
28
7
14
28
BLOCK-15
28
27
W
2
K- 8
4
7
ROAD - 2 (5.50
AD
6
.50
3.0
BL28
8
BLOCK-13
13 28
IDE
5
12
12
BLOCK-11
5
11
ALLEY-5 (3.00
9
2
28
6
2
K-
2
3
0
4
12
OC8 8
ALLEY-6 (3.00
-4
4
6
ALLEY-1 (3.00
)
M.
28
7
8
10
8
N
OC
15
11
28
14
2
11
7
E)
9
13
AL 1
6
28
(6.5
12
6
K-28
BL
.80
5
ROAD - 3 (5.00
8
WID
10
BL 12
9
9
13
10 0 28
LE
32
9
12
28
M.
16
11
.80
9
8
0M
8
15
.8
10
14
Y-9
9 38
E)
OC 14 IDE)
1
7
0 3 15 14
15
12
28
10
14
28
(5.5
8
.W
28
10
10
11
18
13
(3.0
10
BL 14 3.00 8 1
K-
17
1 8
13
GREEN FI ELDS-1 7
1
-1
3
28
28
2
IDE
7
14
12
12
8
13
11
OC 16 M. 0
BLOCK-
16
AL
0M 7 1
AD 6
13
15
28
15
20
12
27
19
36
)
RO
19
SUBDI VI SI ON
LE
11
1 2 3
.50
5 4
28
28
.W 9
5
K-
14
16
12
6 12
16
Y-8 6
15
1
4 8 7
18
17
28
21
8
9 18 2 IDE)
22
14
21
13
4
10
3
37 7
3
28
18
(
13
K- 6 11
23
ALLEY-4 (3.00 M. WIDE) 2 28
OC 5 11
BL
D
20
1
OA 5.0
21
28
BL 4
14
0M
- PROPOSED SOCIALIZED
1
5
ER
OC
.50
2
2 3 .W 1
0
1
2
27
22
1
2
23
W
ID IDE
3
3
.W
3
RO
K-
22
2
3
15
4
31 10
1
3
0M
7
2 AD
25
4
2
4
10
.50
4
30
2
9 5.0 3
24
27
5
5
8 1
12
6
5
29
5
9
28
6
5
4
4
2
1
7
26
HOUSING (A = 44,544 SQ.M.)
7
28 28
4
AL 9
14
BL 12 M. WID 7
11
8
7
27
6
6
3
BLO
28
9
LE
19
8
3
9
PA
16
OC 14
5
26
3.0 13
28
10
Y-7
BL
2
8
18
13
7
10
4
11
11
10
9
R
11
25
5
28
0 M 15
BL
CK-1
K-1
KI
17
OC
AL
6
(3.0
24
10
10
11
8
5
28
15
N
13
16
11
12
.W
LE
12
OC 16 WIDE)
13
23
G
2 6 17
K-
28
3.0 17
7
0
15
RO
12
12
Y-3
13
6
BL
6
ID
9
9
22
B
9
15
28
27
E)
13
14
15
K
0 M 19
14
14
BL 6 18
E A 19
LO
AD
3.0 13
21
8
OC 8
WID
-14
28
8
1
(3.0 7 19
7
14
14
10
15
11
13
17
. W 21
M.
15
O
LL
20
0 M 15
CK
28
-
K-
1
10
9
0M
CK 20
38 1
EY
2 (5
1
0
16
E)
8
11
19 G
ID
7
6
28
(5.5 K- 0 1 IN
.W
1
-29
28
18
E A 23
18 3 8 RK
1
.
-16
OC 1
10
-1
.50
K8- 2
12
9
8
21
19
ID 7 19
12
BL
6 17 PA
LL
8.0
AD BL8 9
20
OC 2
EA
PA
C Y P R E S S S T. D
20
20
M.
EY
RO
OC 8
11
16
14
10
OA
23
B8 L 28
TH
0M
16 )
1
13 IDE
LL
21
ER
WA
21
15
WID
.W
22
14
22
22
K-
0M
16
E
7
. W
25
12
LK
2
14 WID
25
(3.0 3 28 T
23
15 UR
30
6 .
E)
Y-2
24
24
24
13 CO
LE 28
0M
27
21
ID
PA
13
AL 2 5 LL
BL1O4 15
12 0 28 5.0 BA 27
26
R
ET
20
E
25
29
11
23
26
1
20
.8
SK
K
30
1
21 K.- CE BA
4 3
IN
10 25
RO
K.- CE AD
0
CK-216
22
28
BLPEN SPsAq.m. 28.2
25
BLN SPA.m. 9
LOT 310, TALA ESTATE
G
2
23
31
RO
3
E 28
OP 4 sq 8 16
AD
30
1
24
O 3 E 21
21
27
8 K 28
AR
2
WAL 7 E
YC
6
5
PA
TH
1 6 28
DA ID 19 26
26
M.
29
32
& ER 17
. W
28
4
5
1
2.00 3 10 TH NT 24
17
7
15
35 28
15
4 AL CE 0M
28
5 9
28 28 9 HE
8.0 K- 22
31
K-3 7
9
7 3 8 13
18
OC 18
28 .60 28 20
31
30
4.0
2 35 2 2
OC 11
-2
2
BL 21
8
K- CE
0 28
11
43.5
K. 28 BL 5 6
5
1
6.5
0 M 15
19
OC PA . Y
28 9
BL28 28 6 4 Y 16 LE
32
19
10
4
BL EN S0 SQ.M
1
0M
7
AL
1
30
.W
7
MU
4 14
3
17
20
LLE
1 5
IDE
28 3
LT
BL
8
12
12
ID
EA 3 15
OP2,834
6
. W
9
33.7
2 .6
.W
3
9 0
I-P
27.5 2 3
ER 9
WID
21
10 20
3.0 13
13
OC
6.5
10 0M
UR
2
14
28 1
4 11 1
14
17
0M -2328
I
5
.0
0M
OA
1 9
PO
8
0 M 15
K-
1
3 1 18
DE
3.0 6
K-
CK
22
5
10
SE
16
6
. W
OC
1
4
16
D
9
7
25
LO28 28
.W
32
BU
BL
4
3
B 7 14
23
1
1
7
ID
BL
12
RO
17
6
21
ILD
ID 7 19
2
1 2 2 5 12 EY
K-4 3
8 28
E
EA LL
5
28
IN
3.0 13
OC
20
15
8
8
E A 13
3
14
OC 4 10
G
23
RO
11
AD
19
1
4
LLE LL
50
0 M 15
BL 5 WID
7
1
K-
1
EA 17 8
22
10
AD
16
1
25
5 3 . 11
6
ID Y
.W
0M
6
3
15
9
6
.W
3
17
13 16
5
1
24
21 3.0 7 9
BL
0M
12
27
8
7
21
ID 7 19
13
8
K-
2
PA
7
3.0
11
8
0 20 14
EA
20
3.0
OC
OC
11
K-4
26
2
20
9
R
K-
14
29
23
18
10
5 12
1
BL
3
KI
BL 14 1
OC
LL
0 M 5 17
11
13
AD
9
OC 14 Y
2
K-
16 3 10
22
28
BL LE
N
16
EY
23
25
7
BL
OC 6
12
RO AL
4
31
G
.W
34
4
1 10
1
21 8.0 8
IDE
6 D 5
30
1
24
OA E EY
27
8
12
21
ID 9 2
K-
8 0M 6
.R ID 3
LL 19 25 .W 7 9
5
EA
BLO6 7
10 10 31 .
0M EA
4
35
26
17 0M
20
. W WID
29
23
5.0 32 1
WID 3.0
1
8 24
LL
0M 15
12
2 5
1 ER
K-
22
28
. 27
EY
6 22
8.0
18
25
13
CK-1
0M OA 3
31
OC
2
1
25 4
3.0 11 20 25 D
30
24
8
BL
3 1
27
23 2
19 6 18 23 7
20
6.5 6
22
K-
4 9 K
AL
26
1
0M 21 1 21 29
29
5 4 HW
32
OC 14
7
. W AT
8
6 19 19 . P
5
BL 12 Y 28 2
28
7 ID 17 LE 17 0M ITY
12
23
AL
31
E 3 2.0 KC R
8 24 5 26 31 TE KE
9
RO 15
IDE
30
1 10 1 BISMAR
BL 9 1 AD 22 24 29
OC 0 13 8 .W 13
22
10
20 27
25 0M
32
K-1 11 11 6 11
K- 18 31 3.0 18 20 25 33
0 K-
4 9
OC
12 9
11
16 29 18 23 32
OC
7
BL
13 7 2
14 27 16 21 35
BL 30
14 5
12
5 2
Y 251 14 Y 19
15 28 33
1 LE10
3 LE 1217
16 AL 23 30 1 AL 26 31 6
IDE 3 1
5
IDE 9 2 10
8 1
28 24 29 37
6 .W 1 26
8 .W 1 22 27
PA
4 0 M 17
2 4 6 0M 11 36
1
31
1 3.0 K- 24 3.0 17 20 25
R
34
6.50 M. W
15
K-
3 4
KI
9
13 OC 22 29
OC
18 23 32
N
2 7
BL 20 27 16 21
2
BL 30
2
G
11 8 5 5 14
Y Y 19
2.0
1 2 28
9 LE 3 12 LE
0M
16 AL 17
3
AL 23 32
2
26
P 138
GUOUS
7
. P
IDE 3 1
BL
14
IDE 9 21 10
1 5
H
A .5
30 24
ID E RO
AT
AR E
R 0
5
.W .W
4
4
12
OC
1
8
HW
1 5
K
1 22
7
28
D
0M 23 0M
2.0
IN
1 17
AL
10 6 11
31 20
3.0 K- 26 3.0 -16
6
0M
K
K-
3
5
G
9
8 15 4
OC
9
K 18
. P
BL
24
GREEN FI ELDS-1 29
1
OC
2
13
8
AT
6
BL
2 7 16
5
22 27
6
OC
BL
HW
11
2.0
4 11 5 14
SUBDI VI SI ON
AD
4
20 25
AL
1
Y
0M
7
3 LE
10
3
K
K-
9 12
7
18 23
. P
AL 32
6
7
AT
2
2
10
16
IDE
1
9
21
BLOCK-9
BL
30
HW
5
8
14 .W
2
19 8
8
2.0
AL
5
28
K-
0M
3
K
0M
12 17
22
6
26 23
4
3.0 K-
9
3
1
. P
7
1 10 15 4
24 21
OC
AT
13
6
HW
AD
8
BL
3
2
BL 22 19
10
AL
6 11 17 RO
2
20
K-
K
Y
D
5
LE
OUN
4 9 15
11
18 AL E
2.0
ACCE
24
4
7 ID
1
OMP
0M
2 16
IDE 1 13
22 . W
. P
5
12
14 .W
EZ C
1
3
0M
AT
6
20
3
0M BL
VEL
12
HW
9
21 6.5
SS RO
3.0
2
18
13
K-
AL
5
1 10 7 OC
16
K
PA
OC
4
8 5
1
14
BL
2.0
14
7
K-
R
6 3
0M
KI
2
5
1
6
3
. P
AD TO
4 2
N
15
10
G
AT
2
2
5
HW
BL
8
8
1
16
AL
4
6
OC
1
K
7
QUIR
6
K-
17
2.0
9
0M
SUBDI VI SI ON SCHEM E
2
6.50 M. W I D
8
5
BL
. P
E RO AD
AT
INO H
10
4
OC
1 2
HW
7
3 4 5
2.0
6 7
AL
8 9
6
0M
10
K-
11
SCALE 1 : 800 M. BLOCK-8 12
9
2 13
11
14 15
. P
16
7
17
IWAY
8
AT
HW
11
AL
10
K
3
LOT 615, TAL
A ESTATE
NO. OF FAMILIES RELOCATED
YEAR
OTHER
WATERWAYS DANGER AREAS/ TOTAL
PRIORITY PROJECTS
2010 1192 166 1,358
BROOKSIDE, BINHI NI
ABRAHAM, BAKAS, NEW LIFE
AND AREAS 5 & 6, PALTOK
EXT., TUMANA, BGY. TOWERVILLE FOOD (SSDD) MARCH 2, 3, 23-
BAGONG SILANGAN * 175 SJDM, BULACAN TRUCKING NHA 25, APRIL 13, 2010
CULIAT CREEK, BGY. CULIAT TOWERVILLE FOOD (SSDD) FEB. 9, MARCH 26,
* 11 SJDM, BULACAN TRUCKING NHA APRIL 8, 2010
OBER ‘D BAKOD, SAN JUAN
RIVER, BGY. DAMAYANG TOWERVILLE FOOD (SSDD) APRIL 19-20, 23,
LAGI * 140 SJDM, BULACAN TRUCKING NHA 2010
Cenacle Drive (Culiat Bgy. San Isidro, FOOD (SSDD) Aug. 10 & 25, Sep
Creek), Brgy. Culiat* 27 Rodriguez, Rizal TRUCKING NHA 20, 2010
RELOCATION AND ASSISTANCE OPERATIONS
(Year 2010) WATERWAYS
ASSISTANCE
POINT OF NO. OF RELO SITE DATE OF
ORIGIN FAMILIES FINANCIAL RELOCATION OTHER OWNER OPERATION
Aug. 11, Sep 6, 8,
San Juan River, Ober Da 17, 28, Oct 13,
Bakod, Bgy. Damayang Bgy. San Isidro, FOOD (SSDD) 19, Nov 17, 19, &
Lagi* 100 Rodriguez, Rizal TRUCKING NHA Dec 13, 2010
Sitio Uno, Auburn St., Bgy. San Isidro, FOOD (SSDD)
Brgy. North Fairview* 2 Rodriguez, Rizal TRUCKING NHA Aug. 13, 2010
Aug. 13 & Sept.
13 & 15, Nov 9,
Merry Homes, Brgy. Bgy. San Isidro, FOOD (SSDD) Dec 8-9 & 16
Sauyo* 30 Rodriguez, Rizal TRUCKING NHA 2010
Marikina River, Aug. 20, 23 & 24,
Manggahan Ext. Sapang Sep. 22, Oct 1,
Bato, F. Manalo, Bgy. Bgy. San Isidro, FOOD (SSDD) 14, Nov 26, Dec 2
Bagumbayan* 106 Rodriguez, Rizal TRUCKING NHA & 8, 2010
Aug. 18, Sep 29,
Culiat Creek, Brgy. Bgy. San Isidro, FOOD (SSDD) Oct 13, & Dec 1,
Ramon Magsaysay* 34 Rodriguez, Rizal TRUCKING NHA 2010
Bgy. San Isidro, FOOD (SSDD) Sep 8-9 & 30,
Barangay Tatalon* 41 Rodriguez, Rizal TRUCKING NHA 2010
TOTAL 1192
RELOCATION AND ASSISTANCE OPERATIONS
(Year 2010)
ROAD RIGHT OF WAY
ASSISTANCE
POINT OF NO. OF RELO SITE DATE OF
ORIGIN FAMILIES FINANCIAL RELOCATION OTHER OWNER OPERATION
Bgy. Paligsahan Sct.
Reyes St. infront of
Manuel Roxas HS Sept 13-22,
(sidewalk/pathwalk) 25 FIN.ASST. NONE TRUCKING 2010
Bgy. Santol (Baloy St. Sept 15-30,
sidewalk/pathwalk) 46 FIN.ASST. NONE 2010
Bgy. San Isidro, FOOD Oct 21 & 27,
Barangay Sto. Rodriguez, (SSDD) Nov 4 & 18,
Domingo* 42 Rizal TRUCKING NHA 2010
Bgy. San Isidro, FOOD Nov 12, 19 &
Rodriguez, (SSDD) 24, Dec 16,
Bgy. Masambong* 53 Rizal TRUCKING NHA 2010
TOTAL 166
2011 RELOCATION
WATERWAYS
NO. OF ENGINEERING
NO. OF ISF’s RESETTLEMENT DATE OF
AREA AFFECTED STATUS WORKS /
RELOCATED SITE RELOCATION
ISF”s PARKS DEVT.
Site 4 Southville
NISSAN (San May 11 & 17 10 STRUCTURES PROPOSED
8, Bgy. San
Juan River) 100 82 Isidro,
June 1 & 23 REMAINING DEVT. OF
Bgy. Tatalon 2011 (16 Families) PARKS
Rodriguez, Rizal
BEFORE
DURING
WATERWAYS NO. OF ENGINEERING
NO. OF ISF’s RESETTLEMENT DATE OF
AREA AFFECTED STATUS WORKS /
RELOCATED SITE RELOCATION
ISF”s PARKS DEVT.
April 27
Site 4 Southville
San Juan River May 3-4 & 31 7 STRUCTURES
8, Bgy. San ON-GOING
(Timex), 92 92 Isidro,
June 1, 10, REMAINING
RIPRAPPING
Bgy. Sta. Cruz 16, 23 & (10 Families)
Rodriguez, Rizal
July 22, 2011
BEFORE
DURING
WATERWAYS
NO. OF ENGINEERING
NO. OF ISF’s RESETTLEMENT DATE OF
AREA AFFECTED STATUS WORKS /
RELOCATED SITE RELOCATION
ISF”s PARKS DEVT.
Site 4 Southville AREA CLEARED
Parkway,
8, Bgy. San June 15, 22 & ON-GOING
Bgy. Apolonio 17 17 Isidro, June 14, 2011 COMPLETED RIPRAPPING
Samson Rodriguez, Rizal RELOCATION
DURING
WATERWAYS
NO. OF ENGINEERING
NO. OF ISF’s RESETTLEMENT DATE OF
AREA AFFECTED STATUS WORKS /
RELOCATED SITE RELOCATION
ISF”s PARKS DEVT.
San Juan River 62 FAMILIES FOR
Site 4 Southville SUBMITTED IMPLEMENTA
(Accretion -
8, Bgy. San FOLDERS/DOCU TION OF
Magdalena 260 18 Isidro,
November 9,
MENTS TO NHA RIPRAP AND
2011
Estate), Bgy. Rodriguez, Rizal FOR PRE- DREDGING
Damayang Lagi QUALIFICATION OF RIVER
WATERWAYS NO. OF
NO. OF ISF’s DATE OF
AREA AFFECTED RESETTLEMENT SITE STATUS
RELOCATED RELOCATION
ISF”s
Culiat Bridge 4, Bgy.
Site 4 Southville 8, AREA CLEARED
Bahay Toro, Bgy. March 2 & 3,
53 53 Bgy. San Isidro, (COMPLETED
Bagong Pag-Asa, and 2011
Rodriguez, Rizal RELOCATION)
Bgy. Project 6
BEFORE
AFTER
WATERWAYS NO. OF
NO. OF ISF’s DATE OF
AREA AFFECTED RESETTLEMENT SITE STATUS
RELOCATED RELOCATION
ISF”s
WAITING FOR
Sitio Uno, Tullahan Site 4 Southville 8, May 5 & 20, &
PREQUALIFICATIO
Creek, Bgy. North 65 44 Bgy. San Isidro, July 19
N OF 28 FAMILIES
Fairview Rodriguez, Rizal 2011
FROM NHA
BEFORE
AFTER
WATERWAYS
NO. OF NO. OF ISF’s RESETTLEMENT DATE OF
AREA STATUS
AFFECTED ISF”s RELOCATED SITE RELOCATION
Site 4 Southville
Ober Da Bakod, 8, Bgy. San Feb 8, 10 & COMPLETED
14 14 Isidro,
Bgy. Damayang Lagi 22, 2011 RELOCATION
Rodriguez, Rizal
BEFORE
AFTER
RIGHT OF WAY (ROAD ROW)
NO. OF ENGINEERING
NO. OF ISF’s RESETTLEMENT DATE OF
AREA AFFECTED REMARKS WORKS /
RELOCATED SITE RELOCATION
ISF”s PARKS DEVT.
April 4-6, AREA
6th and 7th 12-15, & 26 CLEARED
Site 4 Southville ASPHALTING
Streets, May 4, 10, & 17 FAMILIES
200 193 8, Rodriguez, OF ROADS
Bgy. Rizal
30-31 AWAITING FOR
COMPLETED
Mariana June 10 RELOCATION
July 22, 2011 (APPROVED)
TOTAL 454
RIGHT OF WAY (ROAD WIDENIG)
NO. OF
NO. OF ISF’s DATE OF
AFFECTED RESETTLEMENT SITE REMARKS
RELOCATED RELOCATION
AREA ISF”s
26
IBP Road, and April 1 – AREA
86 NGC East Side
Bgy. Commonwealth 42 Financial June 7 CLEARED
(Widening) Asst. Only 2011
BEFORE/DURING
AFTER
2012 RELOCATION
Resettlement Site
No. of Total No. of
Southville 8-C
Place of Origin Affected Towerville ISFs
ISFs Site 1 Site 3 Site 3 Relocated
4-B
(1-N) (1K) (1K1)
Riverview, Bgy. Batasan Hills 24 24 24
Sitio Uno, Bgy. North Fairview 10 10 10
(Waterways)
Dumalay Creek, Bgy. Nova Proper 5 5 5
NISSAN, Bgy. Tatalon (Waterways) 18 12 6 18
Buwaya Creek 3 3 3
Magdalena Estate, Bgy. Damayang 260 19 19 38
Lagi (Accretion)
TOTAL 320 27 43 28 98
Resettlement Site
No. of Total No. of
Southville 8-C
Place of Origin Affected Towerville ISFs
ISFs Site 1 Site 3 Site 3 Relocated
4-B
(1-N) (1K) (1K1)
GO TO Cardiz, Bgy. Tatalon (Road Lot) 160 160 160
Sitio Looban, Bgy. Kaligayahan 200 93 48 10 151
GO TO Lilac, Bgy. West Fairview (Road Lot) 37 37 37
Kasunduan/Katuparan Ext., Bgy. 115 54 8 62
Commonwealth
West Kamias (Creekside & Road 300 37 37
Lot)
TOTAL 812 344 93 10 447
RIGHT OF WAY (ROAD ROW)
NO. OF
NO. OF ISF’s DATE OF
AREA AFFECTED RESETTLEMENT SITE REMARKS
RELOCATED RELOCATION
ISF”s
2011 2012
341 2 1K1 RODRIGUEZ, RIZAL
May 17 –
TOWERVILLEPHASE 6, BGY. November 28
BIR Road, 73 4 GAYA-GAYA, SAN JOSE DEL December 16,
576 MONTE, BULACAN 2011
Bgy. Central
ONGOING
RELOCATI
SITE 4 SOUTHVILLE 8B, Jan 18, 2012 ON
40 6 RODRIGUEZ, RIZAL Feb 1, 17,
2012
2 1K Southville 8-C,
454 14
2012 PRIORITY
FOR RELOCATION
NO. OF AFFECTED
AREA REMARKS
ISFs
1. BIR Road, Bgy. Central 123 Rod Lot (DPWH
Project)
2. San Juan River (Accretion), Bgy. Damayang Lagi 242 Waterways (City
Government
Riprapping Project)
3. Cardiz St., Bgy. Tatalon 160 Road Lot (City
Government Project)
4. Sitio Looban, Bgy. Kaligayahan, Quezon City 200 Bistekville II (City
Government Project)
5. (Dupax, Liwanag and Pook De La Paz), Bgy. Old 239 Road Lot (City
Balara Government Project)
6. Bgy. West Kamias 300 Waterways & Road
Lot (City
Government
Riprapping Project)
7. Lagarian Creek, Bgy. Obrero/Bgy. Kalusugan, 300 Waterways (DPWH
Quezon City Project)
8. Ninoy Aquino Parks & Wildlife & Phil. Children 320 Waterways (City
Medical Center, Government Project)
Bgy. Bagong Pag-asa, Quezon City
9. NIA Rd., Postal Site, Bgy. Pinyahan, Quezon City 250 Waterways (City
Government Project)
10. Pansol Center Island, Bgy. Pansol, Quezon City 150 Road Lot (City
Government Project)
NO. OF
AREA REMARKS
AFFECTED ISFs
11. Bernardo Park, Bgy. Kamuning, Quezon City 300 Road Lot (City
Government
Project)
12. Ermitanyo Creek, Bgy. Mariana, Quezon City 150 Waterways (City
Government
Project)
13. Kaliraya/Roxas Bridge, Quezon City 150 Waterways (DPWH
Project)
14. Abra/Lagoon Creek, Bgy. Ramon Magsaysay, Quezon 100 Road Lot (City
City Government
Project)
15. Road 5 & Creek, Bgy. Project 6, Quezon City 40 Creekside (City
Government
Project)
16. Araneta Creek, Bgy. Masambong, Quezon City 150 Waterways (City
Government
Project)
17. Judge Juan Luna, Bgy. Bungad, Quezon City 200 Road Lot (City
Government
Project)
18. Creekside, Bgy. E. Rodriguez, Quezon City 200 Waterways (City
Government
Project)
NO. OF
AREA REMARKS
AFFECTED ISFs
19. Dario Creek, Bgy. Bahay Toro, Quezon City 100 Waterways (City
Government Project)
20. Diliman Creek, Bgy. Roxas, Quezon City 300 Waterways (City
Government Project)
21. Calamiong Creek/Riverside, Bgy. Commonwealth, 275 Waterways (City
Quezon City Government Project)
22. Bgy. Balingasa (RROW), Quezon City 30 Road Lot (City
Government Project)
23. Araneta Ave., Bgy. Manresa 17 Road Lot (DPWH
Along Sto. Domingo St., Bgy. Manresa 81 Project)
Mauban St., Bgy. Manresa, Quezon City 95
24. SSS Tullahan Creek, Bgy. North Fairview, Quezon 45 Waterways (City
City Government Project)
25. Geronima St., Bgy. Novaliches Proper, Quezon City 200 Road Lot
TOTAL 5,292
Task force
waterways
PRESENT STATE
SAN JUAN RIVER &
SAN FRANCISCO RIVER
MAJOR River CHANNEL
2. Construction of Grouted
Riprap @ San Francisco Talayan 800 meters 15,110,033.44
River (Col. Moran Street)
3. Construction of Grouted
Riprap @ San Francisco Masambong 300 meters 5,654,468.33
River (Korokan Street)
Proposed
Project Title Location Amount
1. Dredging of San Juan River
District 4 5,000,000.00
(Aurora Blvd. Bridge – E. Rodriguez Bridge)
2. Construction of Salapan Pumping Station Boundary of Q.C.
-
& San Juan City
MMDA PROJECTS
SAN FRANCISCO RIVER
On-going
Project Title Location Length Amount
1. Dredging of San Francisco River
District 1 325 meters 3,000,000.00
(Sta. 0+700 to Sta. 1+025)
Proposed
Project Title Location Length Amount
1. Dredging of San Francisco River
District 1 225 meters 1,999,919.42
(Sta. 1+025 to Sta. 1+250)