Professional Documents
Culture Documents
Aiming to achieve entry level position with a growth oriented organization where the
experiences, knowledge and suggestions can be shared, accepted and enriched and will be
utilized towards the advancement of the organization.
ACADEMIC PROFILE
EXAM / YEAR OF MARKS/CPI INSTITUTE UNIVERSITY PERCENTAGE/CPI
DEGREE PASSING / BOARD
Sem 1-9.09 CPI
M.Tech. Sem 2- 9.18CPI Sardar Patel University of
(Structural May Sem 3-10 CPI College of Mumbai 9.31
Engg.) 2016 Engg.,Andheri
Rizvi College of
B.E.(Civil University of
May 1123/1500 Engineering, 74.86%
Engg.) Mumbai
2014 Bandra
HSC
G.N.Khalsa
Class XII Feb 2010 368/600 Maharashtra 61.33%
College,Mahim
State Board
SSC
Kilbil St.Joseph’s
Class X March 2008 528/650 Maharashtra 81.23%
High School
State Board
TECHNICAL SKILLS
Computer Skills: MS Office & Internet
Software Skills: Staad Pro V8i, AutoCAD,ETABS, Basics of Abaqus and Matlab,
PROJECTS
FINAL YEAR PROJECT:
NAME OF PROJECT (M.Tech.):
COMPARATVE STUDY ON RC FRAME WITH FIXED BASE, BASE ISOLATED RC FRAME USING
FRICTION PENDULUM BEARING AND RC FRAME WITH FRICTION DAMPER USING TIME
HISTORY ANALYSIS
Abstract: Earthquake occurrence is still remaining unpredictable to the engineers. Damping and base isolation
techniques and energy dissipation techniques such as a damper, reduce response of structure, hence there is
necessity to investigate the effect of base isolators and dampers on the response of structure.
The scope of present study aims at evaluation of seismic performance of RC frame structure using time history
analysis and response spectrum method. The parametric study of seismic performance in terms of storey
displacement, storey acceleration, storey velocity, modal time period ,effective time period, spectral
displacement, spectral acceleration, base shear, storey drift etc of three models with varying height is done using
ETABS.
NAME OF PROJECT (B.E.): INTERLINKING OF RIVERS
Abstract: According to the National Water Policy, 2002, first priority has been given to drinking water. As such
provision for drinking water should be primary consideration for any water resources project.
In order to cope up with the requirements, it is proposed to divert surplus available water from Damanganga
basin to Greater Mumbai through Pinjal reservoir. In the proposed study design of dams, spillway and canals is
done to interlink these rivers.
Attended two day workshop on “Technical Aspects in Design and Construction of Bridges”.
LANGUAGES KNOWN
English
Hindi
Marathi
STRENGTHS
Presentation Skills
Working with team
Good Listening ability
HOBBIES
Dancing,
Going to gym
Listening to music
PERSONAL DETAILS
EMAIL ID ruchitasjadhav@gamil.com
CONTACT NUMBER 9769207466
ADDRESS B-34/4, Bandra Govt. Colony,Bandra East,
Mumbai-400051.
DECLARATION
I hereby declare that the information given herewith is correct to my knowledge and I will responsible for any
discrepancy.