LOGSHEET: NO

ID Visit Type Clause Details Correction Due By LA Verification Date

Evidence indicates that the last


A full set of internal audits shall
set of audits conducted November
be conducted as soon as is viable
1 Surv 2 Minor 9.2 06 2018 did not cover the full
that will cover the full scope of the
scope of the system and checklists
QMS.
were unavailable

Management Reviews are not


A Management Review will be
being conducted as per the 2019
held within a month and the 2019
2 Surv 2 Minor 9.3.1 Work Plan. MRs are scheduled for
Work Plan will be suitably
January & July 2019. Last MR
amended.
conducted November 2018.

The forthcoming Management


At the MR of November 2018, not
Review (as per above) will
all agenda items were addressed
3 Surv 2 Minor 9.3.2 address and minute all agenda
and minuted as per the
items as per the requirements of
requirements of ISO 9001:2015
ISO 9001:2015

The two NCs raised at the The two NCs raised at the
November 2018 internal audit November 2018 internal audit will
remain incomplete and it is not be checked to ensure that
4 Surv 2 Minor 10.2
possible to determine that corrective action has been taken
corrective action has been and the respective forms will be
effected. completed.
Due By: 30 days Minor
90 days Major

LA Verification: To be filled up by Lead Auditor only

Date: The receipt of the Correction, Root Cause & Corrective Action acceptable by the Lead Auditor (ref. Due by)
including the documented evidence of compliance for Part 2/Stage 2 audits
LOGSHEET: NON-CONFORMITIES

Root Cause & Corrective Action Due By LA Verification Date

Regarding the last audit It is necessary to


conducted November,6 2018 immediately carry out a
does not cover the full scope of June'30 complete internal audit by June'30
the system, so it is incomplete covering the full scope of
and the checklist is not available the QMS.

The Management Review should


be carried out accordance with Management review will
the 2019 Work Plan. MR is take place within one
scheduled to be implemented in June'30 month by appropriately June'30
January, no later than July 2019. changing the 2019 Work
because the last MR was carried Plan.
out in November 2018.

Management reviews need


Regarding the last internal audit
to be done immediately by
did not include all agenda items
discussing the coverage
in accordance the requirements
June'30 all of agenda items June'30
of ISO 9001: 2015, so that the
accordance with the
MR carried out in November 2018
requirements of ISO 9001:
became incomplete
2015

Next conducting the


Corrective action is not possible,
internal audit, filling in NC
because when carried out the
June'30 must be complete so that June'30
internal audit , data filling the
corrective action can be
NC is incomplete
determined