REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM

REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY, MARIKINA CITY
(DUE TO VARIATION ORDER NO. 2)

L E G E N D:
S 1 1 2 3 5 6 7 8 9 10 13 14 15
CRITICAL PATH 0 0 1 1 1 1 33 33 48 48 94 94 199 199 215 215 230230 245 245 276276 337337 368368 390 390

ACTIVITY
4 11
64 94 306337

DUMMY 12
306337

EVENT NO. - N
N
EARLY START - ES
ES LF

LATE FINISH - LF

PREPARED BY: PROJECT AND LOCATION: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SHEET CONTENTS: SHEET No.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REHABILITATION/MAJOR REPAIR OF PERMANENT
BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG
NATIONAL CAPITAL REGION REVISED PERT-CPM DIAGRAM 1
CEFERINO A. LONDINA MARCOS HIGHWAY, MARIKINA CITY CONSTRUCTION DIVISION EDGARDO S. RAMOS EDWIN M. LUZON JUBY B. CORDON ADOR G. CANLAS, CESO IV BAR CHART
AUTHORIZED MANAGING OFFICER 2ND STREET, PORT AREA MANILA ENGINEER III CHIEF, CONSTRUCTION DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR S-CURVE 1