Professional Documents
Culture Documents
This drawing is the property of L&T Construction ,TI-IC-EDRC and must not be passed on to any person or body not authorised by
P16
P18
P20
1 2
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
TN N in writing.
1 2
1 2 PC10 c
a PCB6 PC11
PCB5 c
P13 a
.82"
14°39'44
2
1 3 d 4
P11 6 d 3 4 b 3
c PC8 b
2 4 P15
1 PCB 5 PC9 4 P19 P21
a P17
P9 d 4
2 3
PC7
1 b P14
c PC6 4
3
B3 P12
P7 PC
2 d 4
a 3
1 P10
c
H B 2 d
b
4 H
PC PC5
P5 3
2
P8
a
P3
B1
1
c
PC4
b
4
P6
P44
PROCEDURE FOR INITIAL LOAD TEST OF PILE
PC d P43
P1 3 P4
2
a 1
P42 P46
1 2
1A
P1d 2
B
P49
PC
PC16 P57
P1a P28 P30 P40 P50 3
3
2 2 1 4
a P52 P58 PC22
4 1 4 1
1 P38
1 c 2 1
b PC14 PC15 P60
PC1 4 P33
P26 3 P39 P41 2
2 P31 3 PC17 P59
3 d 4
a 3
P1b P24 3 P29
B7 P51 PC19 4
1 PC 3
P61
c b P53
4 PC21 4
PC13 P27
d
3 P25
A
P22 2
B7
a
PC
1 b
4
PC12
3 P23
G G
A A
TEST PILE
-IVTP
TEST PILE
-ILTP
NOTES:-
F LOCATION PLAN OF TEST PILES F
C C
E E
REFERENCE DOCUMENT:
L&T Construction
REINFORCEMENT DETAILS OF TEST PILE IN SOILS GOOD FOR CONSTRUCTION
24 MARCH 2020
SCHEDULE OF REINFORCEMENT
C C
0 GOOD FOR CONSTRUCTION
REVISIONS
CHECKED BY SIGN DATE CHECKED BY SIGN DATE CHECKED BY SIGN DATE
B
MESH TYPE -M1-(2 NOS) B
10 MESH REINFORCEMENT
CLIENT : DELHI INTERNATIONAL AIRPORT LIMITED PROJECT: INDIRA GANDHI INTERNATIONAL AIRPORT
PHASE-3A DEVELOPMENT WORKS
DRWN SC 23.03.2020
DETAILS OF TEST PILES - LATERAL DRAWING
NUMBER
(FOR PILES IN SOIL)
CHKD AL 23.03.2020 SCALE
A T1D ENTRY RAMP A
APPD AYM 23.03.2020 AS SHOWN
PROJECTION SIZE REV
GENERALIZED DRAWING No. DIAL-LT-D-LDS-S-70-010 A1 0
SOIL PROFILE FIRST ANGLE
12 11 10 9 8 7 6 5 4 3 2 1