You are on page 1of 1

12 11 10 9 8 7 6 5 4 3 2 1

This drawing is the property of L&T Construction ,TI-IC-EDRC and must not be passed on to any person or body not authorised by
P16
P18
P20
1 2
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
TN N in writing.
1 2
1 2 PC10 c
a PCB6 PC11
PCB5 c
P13 a
.82"
14°39'44
2
1 3 d 4
P11 6 d 3 4 b 3
c PC8 b
2 4 P15
1 PCB 5 PC9 4 P19 P21
a P17
P9 d 4
2 3
PC7
1 b P14
c PC6 4
3
B3 P12
P7 PC
2 d 4
a 3
1 P10
c

H B 2 d
b
4 H
PC PC5
P5 3
2
P8
a
P3

B1
1
c

PC4
b
4
P6
P44
PROCEDURE FOR INITIAL LOAD TEST OF PILE
PC d P43
P1 3 P4
2
a 1
P42 P46
1 2

P1c b PC18 1 P48


PC3 2 P36 P54
2 4 2
PC2 3
1 4
3 P2 P34 P56
c P37 1
4 1 P45
4 3 2
d P32 P47 PC20 4 P55
3 2 P35

1A
P1d 2

B
P49

PC
PC16 P57
P1a P28 P30 P40 P50 3
3
2 2 1 4
a P52 P58 PC22
4 1 4 1
1 P38
1 c 2 1
b PC14 PC15 P60
PC1 4 P33
P26 3 P39 P41 2
2 P31 3 PC17 P59
3 d 4
a 3
P1b P24 3 P29
B7 P51 PC19 4
1 PC 3
P61
c b P53
4 PC21 4

PC13 P27
d
3 P25

A
P22 2

B7
a

PC
1 b
4
PC12
3 P23

G G

A A
TEST PILE
-IVTP
TEST PILE
-ILTP

NOTES:-
F LOCATION PLAN OF TEST PILES F

C C

E E

NOTES ON TEST PILE CONSTRUCTION:-


B B

REFERENCE DOCUMENT:

SECTION A-A SECTION B-B SECTION C-C LEGEND:


D D

L&T Construction
REINFORCEMENT DETAILS OF TEST PILE IN SOILS GOOD FOR CONSTRUCTION

24 MARCH 2020

SCHEDULE OF REINFORCEMENT

C C
0 GOOD FOR CONSTRUCTION

AL 23.03.2020 SC 23.03.2020 AL 23.03.2020 AYM 23.03.2020


REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED

REVISIONS
CHECKED BY SIGN DATE CHECKED BY SIGN DATE CHECKED BY SIGN DATE

ARCHITECTURE HVAC GIS


CIVIL & STRUCTURAL FPS GEOTECH.
ELECTRICAL PIPING AIRPORT
SYSTEMS

ELV SYSTEM PHE VHT

B
MESH TYPE -M1-(2 NOS) B
10 MESH REINFORCEMENT
CLIENT : DELHI INTERNATIONAL AIRPORT LIMITED PROJECT: INDIRA GANDHI INTERNATIONAL AIRPORT
PHASE-3A DEVELOPMENT WORKS

CONCEPT : PROJECT Engineering Design and Research Center (EDRC),


AECOM India Private Limited CONSULTANT: L&T Construction

TEST PILE DATA SECTION/


JOB No : O19037 TITLE: ELEVATION
NAME SIGN DATE MARKING
PHASE - 3A WORKS:
DSGN AL 23.03.2020

DRWN SC 23.03.2020
DETAILS OF TEST PILES - LATERAL DRAWING
NUMBER
(FOR PILES IN SOIL)
CHKD AL 23.03.2020 SCALE
A T1D ENTRY RAMP A
APPD AYM 23.03.2020 AS SHOWN
PROJECTION SIZE REV
GENERALIZED DRAWING No. DIAL-LT-D-LDS-S-70-010 A1 0
SOIL PROFILE FIRST ANGLE

RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION

12 11 10 9 8 7 6 5 4 3 2 1

You might also like