3 FABRICATION PREPARATION
Isometric drawings,
Calculation of cut lengths of Limitation of software cutting
dimensional WP &
c. straight pipes and preparation of optimizer programme for the sake Cutting work order 100% P/R
inspection report in QA/QC
cutting work orders of material traceability.
ref. to 1.b.
CIS-QP-002, CIS-QP-
Cutting / Bevelling of Pipes & ± 2 mm for pipes without Cross check of the pipe length on MRW by
d. 003, Cutting work 100% WP P/I
Heat Number Transfer overlength. warehouse
order
Preparation of material request Isomteric drawings
from warehouse forms; detailed WP
e. Technical Material Request Form (MRW) from warehouse 100& P
list of materials to be received
from warehouse for each spool. Specification
4 WELDING
Overview of Joint Types vs. Isomteric drawings, List of joint types for which WPS and/or PQR is
a. 100% QA/QC P
available WPS`s Available WPS`s required.
Welding Procedure Qualification ISO 15614-1, ISO Additional impact test if required
b. Approved WPQR 100% QA/QC P
(WPQR) 15613 by technical specification.
Welding Procedure Specification ISO 15609-1, ISO Limited to qualification range
c. Approved WPS 100% QA/QC P
(WPS) 9692-1, EN 1011 defined in PQR
Qualification testing of welders Approval of NoBo for the
d. ISO 9606-1 NoBo Approved Welder Certificates 100% QA/QC P
(Welder Certification) qualification ranges
INSPECTION TEST PLAN FOR Project Name: F-CPB-QA-026
SPOOL PREFABRICATION Project No: Date:
ITP-CIS-001 Rev0 Applicable Legislation: EN 13480, 2014/68/EU Pressure equipment
ABBREVIATIONS :
R= Review TO: Technical Office Department
P= Perform or Prepare WP: Workshop Production Department
W= Witness (Client Notification is Mandatory) QA/QC: Quality Department
H= Hold (Client Presence is Mandatory) SM: Site Management
I= Inspection, Testing or Examination