Professional Documents
Culture Documents
4500
A B
16000
8-16mmØ VERTICAL BARS
w/ 10mmØ LATERAL TIES
SPACED AT 1-0.05, 8-0.075, REST
AT 0.15m O.C.
C1F1 C1F1 FINISH FLOOR LINE
4 FTB
100
NATURAL GROUND LINE
FTB FTB
w/ 10mmØ STIRRUPS
SPACED AT 1-0.05,
8-0.075, REST
AT 0.15m O.C.
1500
C1F1 C1F1
3 FTB
300
± ELEV. 0.10m FROM N.G.L.
ON-SLAB FILL (0.10m THICKNESS)
3 - 16mmØ
FTB
18000
6000
400
FTB FTB
3 - 16mmØ
350
12-16mmØ BASE BARS
C1F1 C1F1
BOTHWAYS
2
FTB
FTB
VAR.
± ELEV. 0.10m FROM N.G.L.
FOOTING TIE BEAM
ON-SLAB FILL (0.10m THICKNESS) D E T A I L SECTION
6000
FTB FTB
1800
300
C1F1 C1F1 8-16mmØ VERTICAL BARS
1800
400
FOUNDATION PLAN
12-16mmØ BASE BARS
BOTHWAYS
PLAN
C 1 F 1
DETAIL OF COLUMNS AND FOOTINGS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO: SHEET NO:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MARC DARED F. CAGAOAN
REGIONAL OFFICE I ENGINEER I (COS)
PANGASINAN 2ND CONSTRUCTION OF MULTI-PURPOSE BUILDING AT - FOUNDATION PLAN PREPARED:
S 06
SHEBA M. ESTRADA FERNANDO F. BUGARIN ERICSON A. PAZ EDITA L. MANUEL
DISTRICT ENGINEERING OFFICE BRGY. BUGTONG BUNAO, MANGATAREM, PANGASINAN - DETAIL OF COLUMNS AND FOOTINGS
ASSISTANT CHIEF / ENGINEER III OIC-CHIEF, PLANNING AND DESIGN SECTION CARETAKER-OFFICE OF THE OIC-DISTRICT ENGINEER 02 05 11
ALVEAR STREET, LINGAYEN, PANGASINAN ERNESTO M. FLOR PLANNING AND DESIGN SECTION DATE: ASSISTANT DISTRICT ENGINEER DATE:
ENGINEER II DATE: DATE: