This document provides budget details for the construction of a multi-purpose building in Brgy. Malimpuec, Basista, Pangasinan. It outlines costs for various project requirements and construction works divided into parts and items. The total approved budget for the contract is ₱2,587,876.16 over a 90 calendar day duration. Major costs include structural concrete, reinforcing steel, formworks, masonry works, insulation, and painting.
This document provides budget details for the construction of a multi-purpose building in Brgy. Malimpuec, Basista, Pangasinan. It outlines costs for various project requirements and construction works divided into parts and items. The total approved budget for the contract is ₱2,587,876.16 over a 90 calendar day duration. Major costs include structural concrete, reinforcing steel, formworks, masonry works, insulation, and painting.
This document provides budget details for the construction of a multi-purpose building in Brgy. Malimpuec, Basista, Pangasinan. It outlines costs for various project requirements and construction works divided into parts and items. The total approved budget for the contract is ₱2,587,876.16 over a 90 calendar day duration. Major costs include structural concrete, reinforcing steel, formworks, masonry works, insulation, and painting.
Construction of Multi-Purpose Building, Brgy. Malimpuec
Basista, Pangasinan
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 90 Calendar Days TOTAL DIRECT TOTAL MARK-UP TOTAL INDIRECT ITEM NO. DESCRIPTION QTY UNIT 5% VAT TOTAL COST UNIT COST COST % VALUE COST PART II OTHER GENERAL REQUIREMENTS AS EVALUATED B.5 Project Billboard/ Sign Board AS SUBMITTED 2.00 ea. 8,278.98 25% 2,069.74 517.44 2,587.18 10,866.16 5,433.08 AS EVALUATED B.7(1) Occupational Safety and Health Program AS SUBMITTED 3.00 mo. 23,512.21 10% 2,351.22 1,293.17 3,644.39 27,156.61 9,052.20 AS EVALUATED TOTAL OF PART II AS SUBMITTED 31,791.19 4,420.97 1,810.61 6,231.57 38,022.76 PART III CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS PART A EARTHWORK AS EVALUATED 801(1) Removal of Structures and Obstruction AS SUBMITTED 1.00 L.S. 14,713.86 25% 3,678.47 919.62 4,598.08 19,311.95 19,311.95 AS EVALUATED 803(1)a Structure Excavation (Common Soil) AS SUBMITTED 86.50 m3 20,120.44 25% 5,030.11 1,257.53 6,287.64 26,408.08 305.31 AS EVALUATED 804(1)a Embankment (from Structure Excavation) 3 AS SUBMITTED 75.27 m 11,629.22 25% 2,907.30 726.83 3,634.13 15,263.35 202.79 AS EVALUATED 804(4) Gravelfill 3 AS SUBMITTED 36.01 m 32,793.43 25% 8,198.36 2,049.59 10,247.95 43,041.37 1,195.29 AS EVALUATED SUB TOTAL OF PART III-A AS SUBMITTED 79,256.95 19,814.24 4,953.56 24,767.80 104,024.75 PART B PLAIN AND REINFORCED CONCRETE WORK AS EVALUATED 900(1)c2 Structural Concrete for Footing and Slab on Fill (Class A, 28 days) AS SUBMITTED 39.00 m3 185,138.09 25% 46,284.52 11,571.13 57,855.65 242,993.75 6,231.09 AS EVALUATED 900(1)c3 Structural Concrete for Footing Tie Beam (Class A, 28 days) AS SUBMITTED 11.57 m3 60,966.83 25% 15,241.71 3,810.43 19,052.13 80,018.96 6,917.27 AS EVALUATED 900(1)c4 Structural Concrete for Column (Class A, 28 days) 3 AS SUBMITTED 6.05 m 31,874.77 25% 7,968.69 1,992.17 9,960.87 41,835.64 6,917.27 AS EVALUATED 902(1)a Reinforcing Steel, Grade 40 AS SUBMITTED 3,756.16 kgs. 196,273.59 25% 49,068.40 12,267.10 61,335.50 257,609.09 68.58 AS EVALUATED 903(2) Formworks and Falseworks AS SUBMITTED 167.84 m2 63,560.61 25% 15,890.15 3,972.54 19,862.69 83,423.30 497.04 AS EVALUATED SUB TOTAL OF PART III-B AS SUBMITTED 537,813.90 134,453.47 33,613.37 168,066.84 705,880.74 PART C FINISHING AND OTHER CIVIL WORKS AS EVALUATED 1046(2)a1 100mm CHB Non-Load Bearing(Incldg. Reinforced Steel) AS SUBMITTED 34.00 m² 19,396.09 25% 4,849.02 1,212.26 6,061.28 25,457.37 748.75 AS EVALUATED 1027(1) Cement Plaster Finish AS SUBMITTED 70.80 m² 11,583.06 25% 2,895.76 723.94 3,619.71 15,202.76 214.73 AS EVALUATED 1038(1) Reflective Insulation AS SUBMITTED 402.27 m² 78,172.38 25% 19,543.10 4,885.77 24,428.87 102,601.25 255.05 AS EVALUATED 1051(6) Railing AS SUBMITTED 1.00 L.S. 8,355.81 25% 2,088.95 522.24 2,611.19 10,967.00 10,967.00 AS EVALUATED 1032(1)a Painting Works (Masonry/Concrete) AS SUBMITTED 70.80 m² 15,701.99 25% 3,925.50 981.37 4,906.87 20,608.86 291.09 AS EVALUATED 1032(1)c Painting Works (Steel) AS SUBMITTED 470.34 m² 140,077.85 25% 35,019.46 8,754.87 43,774.33 183,852.18 390.89 AS EVALUATED 1014(1)b2 Prepainted Metal Sheets ( Long Span,Rib-Type,0.427mm thk) AS SUBMITTED 462.81 m² 237,155.89 25% 59,288.97 14,822.24 74,111.22 311,267.11 672.55 AS EVALUATED 1013(2)a1 Fabricated Metal Roofing Accessory (Ridge Roll/Hip); (gauge 26) AS SUBMITTED 20.00 L.M. 4,690.68 25% 1,172.67 293.17 1,465.84 6,156.52 307.83 AS EVALUATED 1013(2)a2 Fabricated Metal Roofing Accessory (Flashings); (gauge 26) AS SUBMITTED 40.00 L.M. 9,381.37 25% 2,345.34 586.34 2,931.68 12,313.05 307.83 AS EVALUATED 1013(2)b1 Fabricated Metal Roofing Accessory (Gutters); (gauge 24) AS SUBMITTED 40.00 L.M. 14,886.58 25% 3,721.64 930.41 4,652.06 19,538.63 488.47 Page 1 of 2 REGION I FORM ABC-2015-02A-00
Construction of Multi-Purpose Building, Brgy. Malimpuec
Basista, Pangasinan
APPROVED BUDGET FOR THE CONTRACT
Contract Duration : 90 Calendar Days TOTAL DIRECT TOTAL MARK-UP TOTAL INDIRECT ITEM NO. DESCRIPTION QTY UNIT 5% VAT TOTAL COST UNIT COST COST % VALUE COST AS EVALUATED 1047(2)a Structural Steel, Trusses AS SUBMITTED 3,923.24 kgs. 307,942.81 25% 76,985.70 19,246.43 96,232.13 404,174.93 103.02 AS EVALUATED 1047(2)b Structural Steel Purlins AS SUBMITTED 3,441.71 kgs. 253,657.27 25% 63,414.32 15,853.58 79,267.90 332,925.17 96.73 AS EVALUATED 1047(6) Metal Structure Accessories (Steel Plates) AS SUBMITTED 54.95 kgs. 4,083.45 25% 1,020.86 255.22 1,276.08 5,359.52 97.53 AS EVALUATED 1047(3)a Metal Structure Accessories (Bolts) AS SUBMITTED 48.00 kgs. 7,495.55 25% 1,873.89 468.47 2,342.36 9,837.90 204.96 AS EVALUATED 1047(3)b Metal Structure Accessories (Sagrods) AS SUBMITTED 11.00 kgs. 2,602.24 25% 650.56 162.64 813.20 3,415.44 310.49 AS EVALUATED 1047(4) Metal Structure Accessories (Crossbracing) AS SUBMITTED 198.87 kgs. 12,197.52 25% 3,049.38 762.35 3,811.73 16,009.25 80.50 AS EVALUATED 1047(3)c Metal Structure Accessories (Turnbuckle) AS SUBMITTED 12.00 e.a. 2,642.77 25% 660.69 165.17 825.87 3,468.64 289.05 AS EVALUATED 1001(19) Storm Drainage and Downspout AS SUBMITTED 1.00 L.S. 23,813.24 25% 5,953.31 1,488.33 7,441.64 31,254.88 31,254.88 AS EVALUATED SUB TOTAL PART OF III-C AS SUBMITTED 1,153,836.54 288,459.14 72,114.78 360,573.92 1,514,410.46 PART D ELECTRICAL WORKS AS EVALUATED 1100(10) Conduit, Boxes, & Fittings (Conduit Works/Conduit Rough-in) AS SUBMITTED 1.00 L.S. 10,481.44 25% 2,620.36 655.09 3,275.45 13,756.89 13,756.89 AS EVALUATED 1101(33) Wires and Wiring Devices AS SUBMITTED 1.00 L.S. 24,482.14 25% 6,120.54 1,530.13 7,650.67 32,132.81 32,132.81 AS EVALUATED 1102(1) Panelboard with Main & Branch Breakers AS SUBMITTED 1.00 L.S. 9,934.10 25% 2,483.52 620.88 3,104.41 13,038.50 13,038.50 AS EVALUATED 1103(1) Lighting Fixtures and Lamps AS SUBMITTED 1.00 L.S. 40,939.49 25% 10,234.87 2,558.72 12,793.59 53,733.08 53,733.08 AS EVALUATED SUB TOTAL PART OF III-D AS SUBMITTED 85,837.17 21,459.29 5,364.82 26,824.12 112,661.28 AS EVALUATED TOTAL PART OF III AS SUBMITTED 1,856,744.56 464,186.14 116,046.54 580,232.68 2,436,977.24 AS EVALUATED GRAND TOTAL AS SUBMITTED 1,888,535.75 468,607.11 117,857.14 586,464.25 2,475,000.00
Preparation and Submission Evaluation:
Prepared by: Checked / Submitted by: Reviewed as to Unit Cost:
ALEJANDRO M. DE VERA, III SHEBA M. ESTRADA FERNANDO F. BUGARIN
Architect II Assistant Chief/Engineer III OIC-Chief/Engineer III Planning and Design Section Planning and Design Section Planning and Design Section