Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE I
City of San Fernando, La Union

Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-O1C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
PART A FACILITIES FOR THE ENGINEER
AS EVALUATED #REF! 3.80 mo. 38,000.00 0.00 0.00 38,000.00 8% 3,040.00 2,052.00 43,092.00
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis)
AS SUBMITTED #REF! 3.80 mo. 38,000.00 0.00 0.00 38,000.00 8% 3,040.00 2,052.00 43,092.00
Operation and Maintenance of Field Office for the AS EVALUATED #REF! 3.80 mo. 1,045.00 30,825.60 0.00 31,870.60 8% 2,549.65 1,721.01 36,141.26
A.1.1(16)
Engineer AS SUBMITTED #REF! 3.80 mo. 1,045.00 30,825.60 0.00 31,870.60 8% 2,549.65 1,721.01 36,141.26
Provision of 4x4 Pick Up Type Service Vehicle for the AS EVALUATED #REF! 0.00 mo. 0.00 0.00 0.00 0.00 0% 0.00 0.00 0.00
A.1.2(1)
Engineer on Bare Rental Basis AS SUBMITTED #REF! 0.00 mo. 0.00 0.00 0.00 0.00 0% 0.00 0.00 0.00
AS EVALUATED #REF! 39,045.00 30,825.60 0.00 69,870.60 5,589.65 3,773.01 79,233.26
TOTAL OF PART A
AS SUBMITTED #REF! 39,045.00 30,825.60 0.00 69,870.60 5,589.65 3,773.01 79,233.26
PART B OTHER GENERAL REQUIREMENTS
AS EVALUATED #REF! 2.00 ea. 5,398.40 685.10 0.00 6,083.50 20% 1,216.70 365.01 7,665.21
B.5 Project Billboard / Signboard (DPWH)
AS SUBMITTED #REF! 2.00 ea. 5,398.40 685.10 68.51 6,152.01 20% 1,230.40 369.12 7,751.53
AS EVALUATED #REF! 3.80 mo. 27,390.89 80,573.38 0.00 107,964.26 8% 8,637.14 5,830.07 122,431.47
B.7(1) Occupational Safety and Health Program
AS SUBMITTED #REF! 3.80 mo. 27,390.89 80,573.38 0.00 107,964.26 8% 8,637.14 5,830.07 122,431.47
AS EVALUATED #REF! 3.80 mo. 79,952.76 113,799.36 0.00 193,752.12 8% 15,500.17 10,462.61 219,714.90
B.8(1) Traffic Management
AS SUBMITTED #REF! 3.80 mo. 87,442.56 113,799.36 3,556.80 204,798.72 8% 16,383.90 11,059.13 232,241.75
AS EVALUATED #REF! 1.00 L.S. 0.00 0.00 113,507.60 113,507.60 0% 0.00 5,675.38 119,182.98
B.9 Mobilization / Demobilization
AS SUBMITTED #REF! 1.00 L.S. 0.00 0.00 113,507.60 113,507.60 0% 0.00 5,675.38 119,182.98
AS EVALUATED #REF! 112,742.05 195,057.84 113,507.60 421,307.48 25,354.01 22,333.07 468,994.57
TOTAL OF PART B
AS SUBMITTED #REF! 120,231.85 195,057.84 117,132.91 432,422.59 26,251.44 22,933.70 481,607.73
PART C EARTHWORKS
AS EVALUATED #REF! 21500.00 sq.m. 0.00 6,339.06 262,730.00 269,069.06 20% 53,813.81 16,144.14 339,027.02
1700(1) Clearing & Grubbing
AS SUBMITTED #REF! 21500.00 sq.m. 0.00 6,339.06 262,730.00 269,069.06 20% 53,813.81 16,144.14 339,027.02
AS EVALUATED #REF! 0.00 sq.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
101(6)b Removal of Existing PCC Pavement
AS SUBMITTED #REF! 0.00 sq.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
AS EVALUATED #REF! #REF! cu.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
1702(1)a Structure Excavation (Common Soil)
AS SUBMITTED #REF! #REF! cu.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
AS EVALUATED #REF! 0.00 cu.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
103(1)b Structure Excavation (Soft Rock)
AS SUBMITTED #REF! 0.00 cu.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
AS EVALUATED #REF! #REF! cu.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
1704(1) Embankment
AS SUBMITTED #REF! #REF! cu.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
AS EVALUATED #REF! 28235.00 cu.m. 12,352,812.50 83,248.07 2,615,408.05 15,051,468.62 20% 3,010,293.72 903,088.12 18,964,850.47
104(2)d Embankment from Borrow (Granular Coarse Material)
AS SUBMITTED #REF! 28235.00 cu.m. 12,352,812.50 83,248.07 2,615,408.05 15,051,468.62 20% 3,010,293.72 903,088.12 18,964,850.47
AS EVALUATED #REF! 39.98 cu.m. 0.00 189.35 4,782.57 4,971.92 20% 994.38 298.32 6,264.62
104(1)a Embankment from roadway/structure excavation (Common
AS SUBMITTED #REF! 39.98 cu.m. 0.00 189.35 4,782.57 4,971.92 20% 994.38 298.32 6,264.62
AS EVALUATED #REF! 2365.80 sq.m. 0.00 1,867.40 47,167.78 49,035.19 20% 9,807.04 2,942.11 61,784.34
105(1)a Subgrade Preparation (Common Material)
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-O1C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
105(1)a Subgrade Preparation (Common Material)
AS SUBMITTED #REF! 2365.80 sq.m. 0.00 1,867.40 47,167.78 49,035.19 20% 9,807.04 2,942.11 61,784.34
AS EVALUATED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL OF PART C
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PART D SUBBASE AND BASE COURSE
AS EVALUATED #REF! 473.17 cu.m. 223,099.65 2,240.93 56,602.54 281,943.12 20% 56,388.62 16,916.59 355,248.34
200(1) Aggregate Subbase Course
AS SUBMITTED #REF! 473.17 cu.m. 223,099.65 2,240.93 56,602.54 281,943.12 20% 56,388.62 16,916.59 355,248.34
AS EVALUATED #REF! 223,099.65 2,240.93 56,602.54 281,943.12 56,388.62 16,916.59 355,248.34
TOTAL OF PART D
AS SUBMITTED #REF! 223,099.65 2,240.93 56,602.54 281,943.12 56,388.62 16,916.59 355,248.34
PART E SURFACE COURSE
Portland Cement Concrete Pavement (Unreinforced, AS EVALUATED #REF! 0.00 sq.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
311(1)b1
0.20 m thick) AS SUBMITTED #REF! 0.00 sq.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
AS EVALUATED #REF! #REF! #REF! #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
#REF! #REF!
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
AS EVALUATED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL OF PART E
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PART F BRIDGE CONSTRUCTION
AS EVALUATED #REF! 4200.00 m. 13,366,080.00 14,453.83 153,462.05 13,533,995.88 20% 2,706,799.18 812,039.75 17,052,834.81
400(6) Structural Steel Sheet Piles, furnished
AS SUBMITTED #REF! 4200.00 m. 13,366,080.00 14,453.83 153,462.05 13,533,995.88 20% 2,706,799.18 812,039.75 17,052,834.81
AS EVALUATED #REF! 4200.00 m. 794,596.32 253,890.00 3,471,812.40 4,520,298.72 20% 904,059.74 271,217.92 5,695,576.39
400(12) Structural Steel Sheet Piles, driven
AS SUBMITTED #REF! 4200.00 m. 794,596.32 253,890.00 3,471,812.40 4,520,298.72 20% 904,059.74 271,217.92 5,695,576.39
Concrete Piles Cast in Drilled Holes, 1.5m Ø (ordinary AS EVALUATED #REF! 72.00 m. 1,423,758.92 98,861.24 1,463,484.61 2,986,104.77 20% 597,220.95 179,166.29 3,762,492.02
400(17)d
soil condition) AS SUBMITTED #REF! 72.00 m. 1,423,758.92 98,861.24 1,463,484.61 2,986,104.77 20% 597,220.95 179,166.29 3,762,492.02
Concrete Piles Cast in Drilled Holes, 2.30m Ø (ordinary AS EVALUATED #REF! 180.00 m. 11,796,099.20 376,106.25 6,501,367.54 18,673,572.99 20% 3,734,714.60 1,120,414.38 23,528,701.97
400(17)j
soil condition) AS SUBMITTED #REF! 180.00 m. 11,796,099.20 376,106.25 6,501,367.54 18,673,572.99 20% 3,734,714.60 1,120,414.38 23,528,701.97
AS EVALUATED #REF! 43865.12 kg. 2,503,108.20 22,406.22 219,272.84 2,744,787.27 20% 548,957.45 164,687.24 3,458,431.96
400(25) Permanent Casing (2.30m dia., 16mm thick)
AS SUBMITTED #REF! 43865.12 kg. 2,503,108.20 22,406.22 219,272.84 2,744,787.27 20% 548,957.45 164,687.24 3,458,431.96
AS EVALUATED #REF! 2.00 ea. 200.00 634.40 74,301.52 75,135.92 20% 15,027.18 4,508.16 94,671.26
400(27)b Pile Integrity Testing (Low Strain)
AS SUBMITTED #REF! 2.00 ea. 200.00 634.40 74,301.52 75,135.92 20% 15,027.18 4,508.16 94,671.26
AS EVALUATED #REF! 2.00 ea. 284,249.43 3,854.24 289,901.84 578,005.51 20% 115,601.10 34,680.33 728,286.94
400(28) High Strain Dynamic Testing (P.D.A.)
AS SUBMITTED #REF! 2.00 ea. 284,249.43 3,854.24 289,901.84 578,005.51 20% 115,601.10 34,680.33 728,286.94
Structural Steel, Furnished and Fabricated (ASTM Grade AS EVALUATED #REF! 118,536.91 kg. 11,182,772.09 140,425.41 1,263,839.79 12,587,037.29 20% 2,517,407.46 755,222.24 15,859,666.98
403(4)a
50) AS SUBMITTED #REF! 118,536.91 kg. 11,182,772.09 140,425.41 1,263,839.79 12,587,037.29 20% 2,517,407.46 755,222.24 15,859,666.98
Structural Steel, Furnished and Fabricated (ASTM Grade AS EVALUATED #REF! 124,373.00 kg. 10,516,980.88 147,339.16 1,326,064.15 11,990,384.19 20% 2,398,076.84 719,423.05 15,107,884.08
403(4)b
36) AS SUBMITTED #REF! 124,373.00 kg. 10,516,980.88 147,339.16 1,326,064.15 11,990,384.19 20% 2,398,076.84 719,423.05 15,107,884.08
AS EVALUATED #REF! 118,536.91 kg. 2,664,087.10 140,242.62 1,088,808.41 3,893,138.12 20% 778,627.62 233,588.29 4,905,354.03
403(5) Structural Steel (Erection)
AS SUBMITTED #REF! 118,536.91 kg. 2,664,087.10 140,242.62 1,088,808.41 3,893,138.12 20% 778,627.62 233,588.29 4,905,354.03
AS EVALUATED #REF! 30,190.60 kg. 1,730,827.10 129,635.08 84,436.73 1,944,898.91 20% 388,979.78 116,693.93 2,450,572.63
404(1)a Reinforcing Steel (Grade 40)
AS SUBMITTED #REF! 30,190.60 kg. 1,730,827.10 129,635.08 84,436.73 1,944,898.91 20% 388,979.78 116,693.93 2,450,572.63
AS EVALUATED #REF! - kg. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
404(1)b Reinforcing Steel (Grade 60)
AS SUBMITTED #REF! - kg. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-O1C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
AS EVALUATED #REF! 197.30 cu.m. 2,252,637.59 247,653.78 28,496.46 2,528,787.83 20% 505,757.57 151,727.27 3,186,272.67
405(1)a2 Structural Concrete, Class "A" (20.68 Mpa), 14 days
AS SUBMITTED #REF! 197.30 cu.m. 1,410,067.94 247,653.78 28,496.46 1,686,218.18 20% 337,243.64 101,173.09 2,124,634.91
AS EVALUATED #REF! 3920.00 sq.m. 280,182.00 113,725.73 11,372.57 405,280.31 20% 81,056.06 24,316.82 510,653.19
411(1) Paint (Steel Structure)
AS SUBMITTED #REF! 3920.00 sq.m. 280,182.00 113,725.73 11,372.57 405,280.31 20% 81,056.06 24,316.82 510,653.19
AS EVALUATED #REF! 1.00 L.S. 2,405,955.35 21,100.65 29,916.31 2,456,972.30 20% 491,394.46 147,418.34 3,095,785.10
1047(1) Structural Steel (Finger Type Expansion Joint)
AS SUBMITTED #REF! 1.00 L.S. 2,405,955.35 21,100.65 29,916.31 2,456,972.30 20% 491,394.46 147,418.34 3,095,785.10
AS EVALUATED #REF! 61,201,534.18 1,710,328.62 16,006,537.23 78,918,400.02 15,783,680.00 4,735,104.00 99,437,184.03
TOTAL OF PART F
AS SUBMITTED #REF! 60,358,964.53 1,710,328.62 16,006,537.22 78,075,830.37 15,615,166.07 4,684,549.82 98,375,546.27
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS EVALUATED #REF! #REF! #REF! #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
#REF! #REF!
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
AS EVALUATED #REF! - cu.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
506(1) Stone Masonry
AS SUBMITTED #REF! - cu.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
AS EVALUATED #REF! #REF! cu.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
1714(1) Gabions (1m x 1m x 2m)
AS SUBMITTED #REF! #REF! cu.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
AS EVALUATED #REF! #REF! sq.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
1714(3) Filter Cloth
AS SUBMITTED #REF! #REF! sq.m. #REF! #REF! #REF! #REF! 20% #REF! #REF! #REF!
AS EVALUATED #REF! 45.60 l.m. 260,980.42 3,754.40 1,118.34 265,853.16 20% 53,170.63 15,951.19 334,974.98
517(1)a Drain Pipe (Galvanized)
AS SUBMITTED #REF! 45.60 l.m. 260,980.42 3,754.40 1,118.34 265,853.16 20% 53,170.63 15,951.19 334,974.98
AS EVALUATED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL OF PART G
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PART H MISCELLANEOUS STRUCTURES
AS EVALUATED #REF! 757.08 l.m. 1,812,619.86 58,724.17 103,361.97 1,974,706.00 20% 394,941.20 118,482.36 2,488,129.57
603(3)a1 Metal Guardrail (Metal Beam) including Post (W-beam)
AS SUBMITTED #REF! 757.08 l.m. 1,812,619.86 58,724.17 103,361.97 1,974,706.00 20% 394,941.20 118,482.36 2,488,129.57
AS EVALUATED #REF! 12.00 each 11,760.00 395.20 2,443.76 14,598.96 20% 2,919.79 875.94 18,394.69
603(4)a Metal Beam End Piece (Fish Tail)
AS SUBMITTED #REF! 12.00 each 11,760.00 395.20 2,443.76 14,598.96 20% 2,919.79 875.94 18,394.69
AS EVALUATED #REF! 2.00 each 31,600.20 395.20 431.02 32,426.42 20% 6,485.28 1,945.59 40,857.29
605(2)ag3 Regulatory SIgns (R6-4)
AS SUBMITTED #REF! 2.00 each 31,600.20 395.20 431.02 32,426.42 20% 6,485.28 1,945.59 40,857.29
AS EVALUATED #REF! 4.00 each 15,777.80 790.40 862.04 17,430.24 20% 3,486.05 1,045.81 21,962.10
605(6)d1 Hazard Markers (225mm x 450mm, Width Marker L or R)
AS SUBMITTED #REF! 4.00 each 15,777.80 790.40 862.04 17,430.24 20% 3,486.05 1,045.81 21,962.10
AS EVALUATED #REF! 69.60 sq.m. 45,939.40 1,804.37 5,131.14 52,874.91 20% 10,574.98 3,172.49 66,622.39
612(1) Reflectorized Thermoplastic Pavement Markings White
AS SUBMITTED #REF! 69.60 sq.m. 45,939.40 1,804.37 5,131.14 52,874.91 20% 10,574.98 3,172.49 66,622.39
AS EVALUATED #REF! 20.00 sq.m. 14,891.29 323.02 883.70 16,098.02 20% 3,219.60 965.88 20,283.50
612(2) Reflectorized Thermoplastic Pavement Markings Yellow
AS SUBMITTED #REF! 20.00 sq.m. 14,891.29 323.02 883.70 16,098.02 20% 3,219.60 965.88 20,283.50
AS EVALUATED #REF! 0.00 mo. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
SPL-1 Provision of Barges (1500DWT)
AS SUBMITTED #REF! 0.00 mo. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
AS EVALUATED #REF! 6.00 mo. 60,000.00 646,451.52 27,989,302.69 28,695,754.21 20% 5,739,150.84 1,721,745.25 36,156,650.31
SPL-2 Provision of Barges (2500DWT)
AS SUBMITTED #REF! 6.00 mo. 60,000.00 646,451.52 27,989,302.69 28,695,754.21 20% 5,739,150.84 1,721,745.25 36,156,650.31
AS EVALUATED #REF! 2.00 set 997,286.29 162.89 1,203.52 998,652.70 20% 199,730.54 59,919.16 1,258,302.40
SPL-3 High Damping Rubber Bearing Device (Movable Joint)
AS SUBMITTED #REF! 2.00 set 997,286.29 162.89 1,203.52 998,652.70 20% 199,730.54 59,919.16 1,258,302.40
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-O1C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
AS EVALUATED #REF! 2.00 set 997,286.29 162.89 1,203.52 998,652.70 20% 199,730.54 59,919.16 1,258,302.40
SPL-4 High Damping Rubber Bearing Device (Fixed Joint)
AS SUBMITTED #REF! 2.00 set 997,286.29 162.89 1,203.52 998,652.70 20% 199,730.54 59,919.16 1,258,302.40
AS EVALUATED #REF! 3,987,161.13 709,209.66 28,104,823.36 32,801,194.16 6,560,238.83 1,968,071.65 41,329,504.64
TOTAL OF PART H
AS SUBMITTED #REF! 3,987,161.13 709,209.66 28,104,823.36 32,801,194.16 6,560,238.83 1,968,071.65 41,329,504.64
AS EVALUATED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GRAND TOTAL
AS SUBMITTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Department of Public Works and Highways
Contract ID:
Contract Name:
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348
Location of the Contract: Sudipen, La Union

BID FORM

Date:

To: JOSE G. GINETE, JR.


District Engineer
DPWH - LUED 1
Lingsat, City of San Fernando, La Union

We, the undersigned, declare that:

a. we have examined and have no reservation on the Bidding Documents (BDs), including
Supplemental/Bid Bulletins, for the above stated Contract;

b. we offer to execute the Works for this Contract in accordance with the said BDs, including
the Bid Data Sheet, General and Special Conditions of Contract, Specifications and
Drawings therein;

c. we present our Bid to execute the Works, consisting of our Technical Proposal (Annex “A”)
and our Financial Proposal (Annex “B”);

d. our Technical Proposal includes the following required documents:

(1) Bid Security in the required form, amount and validity period, using Form DPWH-
INFR- 09, 10, or 11, as applicable (Annex “A-1”)
(2) Organizational Chart for the Contract, using Form DPWH-INFR-13 (Annex “A-3”)
(3) Contractor’s Certification on Key Personnel for the Contract, with the Key Personnel’s
Affidavits of Commitment to Work on the Contract, using Form DPWH-INFR-14
(Annex “A-4”)
(4) List of Contractor’s Major Equipment Pledged for the Contract, using Form DPWH-
INFR-15 (Annex “A-5)
(5) Omnibus Sworn Statement required under RA 9184-IRR Sec. 25.2b)iv), using Form
DPWH-INFR-15 (Annex “A-6”);

e. our Financial Proposal includes the following required documents:

(1) Tis Bid Form (Annex “B-1”)


(2) Bid prices in the Bill of Quantities Form, using Forms DPWH-INFR-16 and 17
(Annex “B-2”)
(3) Detailed estimates (Annex “B-3”)
(4) Cash flow by quarter, using Form DPWH-INFR-18 (Annex “B-4”);

DPWH-INFR-09-2016 Page 5 of 924


f. the total price of our Bid for this Contract based on the unit prices in the said Bill of
Quantities, excluding any discounts offered in item (g) below, is:
#NAME?
Php #NAME? ;

g. the discounts we offer and the methodology for their application for this Contract are:
________________________;

h.
our Bid shall be valid for a period of _______________________ days after the date fixed
for the opening of bids in accordance with the Bidding Documents, and it shall remain
binding upon us and may be accepted by you at any time before the expiration of that
period;

i. if our Bid is accepted and we receive from you a Notice of Award, we commit, within ten
(10) calendar days after our receipt of the said Notice, (1) to submit to you the required
Performance Security and other documents prescribed in the Bidding Documents, and (2) to
sign the Contract Agreement;

j. we understand that, if the contract is awarded to us, this Bid, together with your written
acceptance thereof through your Notice of Award, shall constitute a binding contract
between us, until a formal Contract Agreement is prepared and executed;

k. we understand that you are not bound to accept the Lowest Calculated Bid or any other Bid
that you may receive; and

l. we acknowledge that failure to sign each page of this Form of Bid and the accomplished Bill
of Quantities shall be a ground for the rejection of our Bid.

Name:
In the capacity of:
Signed:
Duly authorized to sign the Bid for and on behalf of:
Date:

DPWH-INFR-09-2016 Page 6 of 924


DPWH-INFR-09-2016 Page 7 of 924
COMPUTATION FOR CONSTRUCTION DURATION

CY 2023
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Calendar Days 31 28 31 30 31 30 31 31 30 31 30 31
Sundays 5 4 4 5 4 4 5 4 4 5 4 5
National Holidays 1 4 1 1 2 3 3
*Rainy Days 1 1 1 1 4 4 5 4 4 5 1 1
Working Days 24 23 26 20 22 21 21 21 22 21 22 22

Paved Concrete to Paved Concrete


5 10.169 20 0 50 0 100
36 63.913 117 173 228
64 ### ###
COMPUTATION FOR
CONSTRUCTION DURATION

Paved Concrete to Paved Concrete


5 10.169 20
36 64 117

CY 2023
Month Jan Feb Mar Total
Days 31 28 22 81
Sundays 5 4 4 13
National Holidays 1 0 0 1
*Rainy Days 1 1 1 3
Working Days 24 23 17 64

TOTAL CALENDAR DAYS 81 days


in months 2.7 months
DERIVATION OF UNIT COST FOR AGGREGATES

A. Loading
Reference Volume: 1,000.00 cu.m.
Average Hauling Distance: K0307+000 - BANGAR, LA UNION
Bangar - San Juan, La Union (Project Site) = 27.00 kms

Capacity of 1 Dump Truck: 10.00 cu.m.

B. Handling
BANGAR - SAN JUAN, LA UNION (PROJECT SITE)
LOADED EMPTY
Flat - Paved 35.00 55.00
LOADING TIME (min) 3.00
UNLOADING TIME (min) 2.00
ALLOWANCE FOR DELAY (min) 10% of Cycle Time

FORMULA FOR THE CALCULATION OF DUMP TRUCK TRAVEL TIME


FORMULA: T=D/R
WHERE: T = Time, Time of Travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)

COMPUTATION OF CYCLE TIME, T

Average Hauling Distance = 27.00 km


Loading Time = 3.00 min
Loaded Travel Time
First 200.00 m @ 30.00 kph = 0.40 min
Succeeding 26,600.00 m @ 35.00 kph = 45.60 min
Next 200.00 m @ 30.00 kph = 0.40 min
Unload and Maneuver = 2.00 min
Return Empty
First 200.00 m @ 45.00 kph = 0.27 min
Succeeding 26,600.00 m @ 55.00 kph = 29.02 min
Next 200.00 m @ 45.00 kph = 0.27 min
= 80.96 min

Loading Time: = 3.00 min

Unloading Time: = 2.00 min


Cycle Time = 85.96 min
Allowance for delay (10% of cycle time) = 8.60 min
Total Cycle Time = 94.56 min

C. Hauling Cost

No. of Trips 8.00 hrs x 60.00 mins / hr


= 5.08 trips
94.56 mins

Note: Assume 4 Dump Trucks to be utilized @ 10.00 cu.m. / D.T. = 40.00 cu.m.

No. of Days Required 1,000.00 cu.m.


= 4.92 days
40.00 cu.m. x 5.08 trips

D. Equipment Cost
Dump Truck @ 1,420.00 /hr x 8hrs = 11,360.00 /day x 4.00 units
= 45,440.00 /day x 4.92 days
= 223,782.53

Payloader @ 1,733.00 /hr x 8hrs = 13,864.00 /day x 0.49 days


= 6,827.73 /day x

Payloader @ 1,733.00 /hr x 8hrs = 13,864.00 /day x 0.49 days


= 6,827.73 /day x

= 237,438.00 /cu.m.

237,438.00
Unit cost of Hauling =
Unit cost of Hauling =
1,000.00

= 237.44 /cu.m.
Unit cost of Aggregate Subbase Course
Cost/sq.m. at source = 395.00 /cu.m.
UNIT COST OF AGGREGATE SUBBASE COURSE = 632.44 /cu.m.

Unit cost of Fine Aggregates


Cost/sq.m. at source = 547.00 /cu.m.
UNIT COST OF FINE AGGREGATES = 784.44 /cu.m.

Unit cost of Gravel (G 3/4)


Cost/sq.m. at source = 625.00 /cu.m.
UNIT COST OF GRAVEL (G 3/4) = 862.44 /cu.m.

Unit cost of Gravel (G1)


Cost/sq.m. at source = 630.00 /cu.m.
UNIT COST OF GRAVEL (G1) = 867.44 /cu.m.

Unit cost of Boulders


Cost/sq.m. at source = 589.00 /cu.m.
UNIT COST OF BOULDERS = 826.44 /cu.m.
DERIVATION OF UNIT COST FOR READY MIX CONCRETE

A. Loading
Reference Volume: 1,000.00 cu.m.
Average Hauling Distance: Batching Plant - K0275+000
Sudipen, La Union - K0311+000 36.00 kms

Capacity of 1 Transit Mixer: 5.00 cu.m.

B. Handling
SUDIPEN, LA UNION - K0311+000
LOADED EMPTY
Flat - Paved 35.00 55.00
LOADING TIME (min) 3.00
UNLOADING TIME (min) 2.00
ALLOWANCE FOR DELAY (min) 10% of Cycle Time

FORMULA FOR THE CALCULATION OF DUMP TRUCK TRAVEL TIME


FORMULA: T=D/R
WHERE: T = Time, Time of Travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)

COMPUTATION OF CYCLE TIME, T

Average Hauling Distance = 36.00 km


Loading Time = 5.00 min
Loaded Travel Time
First 200.00 m @ 25.00 kph = 0.48 min
Succeeding 35,600.00 m @ 35.00 kph = 61.03 min
Next 200.00 m @ 25.00 kph = 0.48 min
Unload and Maneuver = 2.00 min
Return Empty
First 200.00 m @ 45.00 kph = 0.27 min
Succeeding 35,600.00 m @ 55.00 kph = 38.84 min
Next 200.00 m @ 45.00 kph = 0.27 min
= 108.37 min

Cycle Time = 108.37 min


Allowance for delay (10% of cycle time) = 10.84 min
Total Cycle Time = 119.21 min

C. Hauling Cost

No. of Trips 8.00 hrs x 60.00 mins / hr


= 4.03 trips
119.21 mins
Assume = 4.00 trips

No. of Days Required 1,000.00 cu.m.


= 50.00 days
5.00 cu.m. x 4.00 trips

D. Equipment Cost
Transit Mixer @ 2,210.29 /hr x 8hrs = 17,682.32 /day x 50.00 days
= 884,116.00 /cu.m.

884,116.00
=
1,000.00

Unit cost of Hauling = 884.12 /cu.m.

Unit cost of Ready Mix Concrete, 3500 psi


Cost/cu.m. at source = 4,800.00 /cu.m.
UNIT COST OF READY MIX CONCRETE, 3500 PSI = 5,684.12 /cu.m.

Unit cost of Ready Mix Concrete, 3000 psi


Cost/cu.m. at source = 4,500.00 /cu.m.
UNIT COST OF READY MIX CONCRETE, 3000 PSI = 5,384.12 /cu.m.
Project Category = Drainage Project Category = Drainage
Contract Cost = PHP 5,000,000.00 Contract Cost = PHP 20,000,000.00
Contract Duration = 32 Calendar Days Contract Duration = 102 Calendar Days

Project Category = Gravel to Concrete


Contract Cost = PHP 17,400,000.00
Contract Duration = 90.00 Calendar Days (by interpolation)

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
31 31 31 21
Working 25 25 25 15 90
Non Working 4 4 4 4 16
Holiday 1 1 1 1 4
Rainy Day 1 1 1 1 4
114
Contract Duration incl = 114 Calendar Days 3.80
Sundays and Holidays 3.80 Month/s
Project Category = Grouted Riprap resting on Concrete with Steel Sheet PiProject Category = Grouted Riprap resting on Concrete with Steel Sheet Pile Foundation
Contract Cost = PHP 50,000,000.00 Contract Cost = PHP 100,000,000.00
Contract Duration = 171 Calendar Days Contract Duration = 243 Calendar Days

Project Category = Grouted Riprap resting on Concrete with Steel Sheet Pi


Contract Cost = PHP 85,982,000.00
Contract Duration = 223.00 Calendar Days (by interpolation)

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July
31 29 31 30 31 30 31 31 30 31 30 31 31 29 31 30 31 30 31
Working 20 17 15 15 8 5 5 0 2 10 14 15 20 17 15 15 8 5 5
Non Working 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4
Holiday 1 1 3 1 1 1 0 2 0 0 2 2 1 1 3 1 1 1 0
Rainy Day 6 7 8 10 18 19 22 25 23 17 10 9 6 7 8 10 18 19 22
Contract Duration incl = 579 Calendar Days
Sundays and Holidays
Grouted Riprap resting on Concrete with Steel Sheet Pile Foundation
PHP 100,000,000.00

211
82
22
264
579
OLD RENTAL
Total Eqpt Cost Operated Dry Fuel Oil/Lubricant Oil/Lubricant
Description RATE ACEL Fuel Cost
NEW Rental Consumption Consumption Cost
26TH ED
Dump Truck (12 yd3, 290Hp) 1,420.00 2,822.47 1,193.00 25.4524 63.75 0.0382 180.00

Cargo Truck (9-10 mt, 270 Hp) 1,212.00 2,442.08 925.00 23.6971 63.75 0.0355 180.00

Cargo Truck (5 m.t.) 783.00 1,497.02 598.00 14.0427 63.75 0.0211 180.00

Boom Truck (197 Hp) 1,930.00 2,784.92 1,678.00 17.2901 63.75 0.0260 180.00

Water Truck (16000 L, 360 Hp) 2,450.00 4,080.78 2,058.00 31.5961 63.75 0.0474 180.00

Payloader (1.50 cu.m.), LX80-2C 1,733.00 2,073.08 1,455.00 9.6544 63.75 0.0145 180.00
Motorized Road Grader (140 Hp), G710A (Spreading & Compaction) 2,173.00 2,611.65 1,825.00 12.2874 63.75 0.0185 180.00

Bulldozer (167 Hp), DX175 3,642.00 3,997.35 3,059.00 14.6571 63.75 0.0220 180.00

Bulldozer with Ripper (167 Hp), DX175 4,188.30 4,456.20 3,517.85 14.6571 63.75 0.0220 180.00

Backhoe (0.80 cu.m., 138 Hp) 2,096.00 2,536.41 1,761.00 12.1119 63.75 0.0182 180.00

Backhoe, Wheel Mounted (0.28 cu.m., 50 Hp) 922.00 1,054.95 774.00 4.3884 63.75 0.0066 180.00

Backhoe with attachments (0.80 cu.m., 138 Hp) 2,724.80 3,064.71 2,289.30 12.1119 63.75 0.0182 180.00

Tandem Steel Roller, 123.40 2,061.00 2,591.94 1,839.00 11.7608 63.75 0.0177 180.00

Vibratory Roller (125 Hp, 10 mt), SD100DC 1,846.00 2,349.36 1,647.00 10.9709 63.75 0.0165 180.00

Diesel Hammer 7500 kg-m 1,286.00 1,080.00

Vibro Hammer 272.22 hp 3,069.00 4,107.57 2,578.00 23.8919 63.75 0.0359 180.00

Vibro Hammer 222 hp 4,118.00 4,706.40 3,459.00 19.4843 63.75 0.0293 180.00

Vibro Hammer 201 hp 2,123.00 2,915.74 1,784.00 17.6412 63.75 0.0395 180.00

Drilling Rig 300 HP 12,637.00 12,300.65 10,615.00 26.3301 63.75 0.0395 180.00

6.1 Asphalt Distributor, 100 hp 936.00 1,347.89 786.00 8.7767 63.75 0.0132 180.00

6.2 Asphalt Paver, 80 hp 1,833.00 1,988.50 1,539.00 7.0214 63.75 0.0105 180.00

Asphalt Concrete Plant 4,286.63 4,286.63

Plate Compactor 123.00 123.00

Air Compressor (69Hp, 161-185 cfm) 502.00 789.70 402.00 6.0559 63.75 0.0091 180.00

Air Compressor (130Hp, 356-450cfm) 965.00 1,502.45 772.00 11.4097 63.75 0.0171 180.00

Pnuematic Drilling Machine - 170.00 170.00 - 63.75 - 180.00

Concrete Screeder 545.00 487.90 457.00 0.4827 63.75 0.0007 180.00

One Bagger Mixer 172.00 172.00 172.00 - 63.75 - 180.00

Concrete Batching Plant 1,759.00 1,759.00

Transit Mixer 5m3 175 1,461.00 2,210.29 1,227.00 15.3592 63.75 0.0230 180.00

Concrete Pump, 130 hp 2,076.00 2,474.46 1,744.00 11.4097 63.75 0.0172 180.00

Grouting Machine (Air Driven) 866.25 866.25 866.25 - 63.75 - 180.00

Generator Set (300 kW) 872.87 872.87 872.87 63.75 180.00

Welding Machine (500 A, Electric Driven) 391.00 391.00 391.00 - 63.75 - 180.00

Welding Machine (500 A, Gas/Diesel Driven), 70 hp 539.00 846.32 453.00 6.1437 63.75 0.0092 180.00

Welding Machine (300 A, Electric Driven), 48 hp 371.00 580.70 311.00 4.2128 63.75 0.0063 180.00

Hydroseeding Machine 952.00 952.00 952.00 - 63.75 - 180.00

Bar Cutter 25mm Max 105.47 105.47 105.47 - 63.75 - 180.00

Bar Bender 25mm Max 168.75 168.75 168.75 - 63.75 - 180.00

Bar Cutter 32 mm Max 185.63 185.63

Bar Bender 32 mm Max 210.94 210.94

3.1 Crawler Crane 21-25 mt 145 hp 1,522.00 2,173.73 1,359.00 12.7262 63.75 0.0191 180.00

3.2 Crawler Crane 36-40 mt 190 hp 1,902.00 2,765.58 1,698.00 16.6758 63.75 0.0250 180.00

3.3 Crawler Crane 36-40 mt 190 hp W/ Bucket 2,282.40 3,105.18 2,037.60 16.6758 63.75 0.0250 180.00

3.4 Crawler Crane 41-45 mt 190 hp 2,151.00 2,987.58 1,920.00 16.6758 63.75 0.0250 180.00

3.5 Crawler Crane 51-60 mt 275 hp 2,778.00 4,025.18 2,480.00 24.1359 63.75 0.0362 180.00

3.6 Crawler Crane 61-70 mt 275 hp 3,572.00 4,733.18 3,188.00 24.1359 63.75 0.0362 180.00

3.7 Crawler Crane 71-80 mt 285 hp 3,595.00 4,809.39 3,208.00 25.0136 63.75 0.0376 180.00

3.8 Truck Mounted Crane 21-25 mt 200 hp 1,631.00 2,391.78 1,268.00 17.5534 63.75 0.0264 180.00

3.9 Truck Mounted Crane 31-35 mt 238 hp 1,861.00 2,878.30 1,541.00 20.8886 63.75 0.0314 180.00

3.10 Truck Mounted Crane 41-45 mt 246 hp 2,606.00 3,140.24 1,758.00 21.5907 63.75 0.0324 180.00

3.11 Truck Mounted Crane 41-45 mt 246 hp, W Bucket 3,127.00 3,491.84 2,109.60 21.5907 63.75 0.0324 180.00

3.12 Truck Mounted Crane 51-60 mt 280 hp 3,237.00 4,035.28 2,462.00 24.5747 63.75 0.0369 180.00

Concrete Vibrator 57.17 57.17 57.17 - 63.75 - 180.00

Fuel Cost 63.75


Lubricant Cost 180.00
Labor
Cost
Foreman 112.02
Skilled Laborer 80.88
Unskilled Laborer 62.39

Materials
Field Office (rental) including electric and water bills 10,000.00
Marine Plywood, 3/16" x 4' x 8' 460.00
Coco Lumber 6 - 2" x 3" x 10' 21.00
5 - 2" x 2" x 8' 21.00
Hardware, CWN (assorted) 80.00
Tarpaulin (4' x 8') 1,280.00
Tarpaulin (8' x 8') 2,560.00
Safety Helmet 0.25
Safety Shoes 2.77
Safety Vest 0.78
Working Gloves 7.67
Rain Coats 0.38
Rubber Boots 0.96
Barricades Flasher Light 0.65
(3 Volts, Battery Operated, Amber Color w/ lifespan
consideration of 6 months)
Two-way Radio 2.60
(w/ life span consideration of 2 years)
Roadwork Ahead (T1-1) 10.95
Speed Restriction (R4-1) 4.73
Workmen Ahead (T1-5) 5.64
Temporary Hazard Marker (Chevron T5-5) 5.76
End Speed Restriction (R4-2) 4.73
End Roadwork (T2-16) 10.98
Prepare to Stop (T1-18) 5.64
Road Machinery (T1-3) 6.54
Roadwork Next 300m 10.95
Roadwork Next 200m 10.95
Roadwork Next 100m 10.95
Roadwork Next 50m 10.95
Plastic Safety Barriers 2.74
Temporary Bollards (@5 meters apart) 1.64
Oxy/Acetylene 2,500.00
Filler Material 450.00
Common Borrow (w/ 25% Shrinkage Factor) 170.00
Steel Forms (Rental), 28 cm width 75.00
Steel Forms (Rental), 30 cm width 77.00
Asphalt Sealant 44.00
Curing Compound 80.00
Concrete Saw (14", 7.5hp) 8,000.00
Pipe Sleeve, 2" dia. 1,425.00
Grease 200.00
Tie Wires, #16 80.00
Marine Plywood, 1/2" x 4' x 8' 750.00
Form Lumber Good 65.00
600mm x 600mm, Steel Grate with Frame 20,000.00
Cement 235.00
Filter Cloth 164.00
Weep Holes (PVC Ø4") 590.00
Thermoplastic Paint (White) 1,750.00
Glass Beads 805.00
Primer White 140.00
LPG, per kg 72.00
Calsumine 3.00
Thermoplastic Paint (Yellow) 1,950.00
Primer Yellow 210.00
Transhipment
Aggregate Subbase Course (w/ 15% Shrinkage Factor) 410.00 410.00
Ready Mix Concrete, 3500 psi, 14 days 5,100.00 5,100.00
Reinforcing Steel Bar, Grade 60 55.00 40.11
Reinforcing Steel Bar, Grade 40 53.00 40.95
Ready Mix Concrete , 3000psi @ 14 days 4,800.00 4,800.00
Sand 680.00 680.00
Boulders (15-25 kg.) / Stone Masonry 589.00 589.00
Gravel 3/4 790.00 790.00
Gravel G1 690.00 690.00
Emulsified Asphalt SS-1 55.50 55.50 55,500.00
Bituminous Concrete Surface Course 8,321.23 6,580.00 6,500.00

Equipment
Joint Sealer Machine 84.55 84.55
Bar Cutter 42mm, Three Phase 210.94 210.94
Low Bed Trailer Truck (25MT capacity) 18,000.00 18,000.00
Cargo Truck (9-10 MT, 270Hp) 2,442.08 2,442.08
Dump Truck (12 cu.yd.) 2,822.47 2,822.47
Backhoe with breaker (0.80 cu.m.) 3,064.71 3,064.71
Payloader (1.5 cu.m., 110hp) 2,073.08 2,073.08
Backhoe (0.80 cu.m.) - for loading 2,536.41 2,536.41
Bulldozer, DX175 3,997.35 3,997.35
Plate Compactor (5 Hp) 123.00 123.00
Water Truck/Pump (16000 L) 4,080.78 4,080.78
Motorized Road Grader, G710A 2,611.65 2,611.65
Vibratory Roller (10 mt.), SD100DC 2,349.36 2,349.36
Concrete Screeder (5.5 hp) 487.90 487.90
Concrete Vibrator 57.17 57.17
Concrete Saw (14", 7.5hp) 32.64 32.64
Bar Cutter (25mm) 105.47 105.47
Bar Bender 168.75 168.75
Concrete Vibrator 57.17 57.17
One Bagger Mixer 172.00 172.00
Backhoe (wheel mounted, 0.28cu.m.) 1,054.95 1,054.95
Cargo Truck (2-5MT) 1,497.02 1,497.02
Kneading Machine 187.50 187.50
Applicator Machine 93.75 93.75
Telescopic Manlift 824.75 824.75
Boom Truck, 10 mt 2,784.92 2,784.92
Asphalt Distributor, ROSCO/5 TON - 3000 USG - 100 hp 1,347.89 1,347.89
Power Broom, Towed Type with 2m Wide 6-30km/hr sweeping
capacity 130.54 130.54
Asphalt Paver (80hp), NF220BIIVDM 1,988.50 1,988.50
Pneumatic Tire Roller, 9 - WHL, 9.00X 20, 4PR 561.00 561.00
Tandem Steel Roller, HD110, 11 m.t. 2,591.94 2,591.94
CALCULATION OF CYCLE TIME FOR HAULING
DUMP TRUCK TRAVEL SPEED (km/hr)
TERRAIN CONDITION ROAD SURFACE CONDITION
LOADED EMPTY
PAVED 35 55
FLAT
UNPAVED 30 45
PAVED 30 40
ROLLING
UNPAVED 25 35
PAVED 20 30
MOUNTAINOUS
UNPAVED 15 25
LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY (min) 10% of Cycle Time

FORMULA FOR THE CALCULATION OF DUMP TRUCK TRAVEL TIME


FORMULA : T = D/R
Where
T = Time, Time of Travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)

COMPUTATION OF CYCLE TIME, T

Terrain = FLAT PAVED


Average Hauling Distance m
Loading Time = 3 min
Loaded Travel Time
First 200m @ 20 kph = 0.6 min
Succeding @ 35 kph = -0.69 min
Next 200m @ 20 kph = 0.6 min
Unload and Manuever = 2 min
Return Empty = min
First 200m @ 30 kph = 0.4 min
Succeding @ 55 kph = -0.44 min
Next 200m @ 30 kph = 0.4 min
Cycle Time, T = 5.87 min
Allowance for Delay = 0.59 min
Total Cycle Time, T = 6.46 min
0.11 hr.

Rate of Equipment per HR = 2822.47


310.47
Equipment Capacity = 9.174658 cu.m.
33.84
CALCULATION OF CYCLE TIME FOR HAULING
DUMP TRUCK TRAVEL SPEED (km/hr)
TERRAIN CONDITION ROAD SURFACE CONDITION
LOADED EMPTY
PAVED 35 55
FLAT
UNPAVED 30 45
PAVED 30 40
ROLLING
UNPAVED 25 35
PAVED 20 30
MOUNTAINOUS
UNPAVED 15 25
LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY (min) 10% of Cycle Time

FORMULA FOR THE CALCULATION OF DUMP TRUCK TRAVEL TIME


FORMULA : T = D/R
Where
T = Time, Time of Travel (h)
D = Distance, Hauling Distance (km)
R = Rate, Travel Speed (km/h)

COMPUTATION OF CYCLE TIME, T

Terrain = FLAT PAVED


Average Hauling Distance 108000 m
Loading Time = 3 min
Loaded Travel Time
First 200m @ 20 kph = 0.6 min
Succeding @ 35 kph = 184.46 min
Next 200m @ 20 kph = 0.6 min
Unload and Manuever = 2 min
Return Empty = min
First 200m @ 30 kph = 0.4 min
Succeding @ 55 kph = 117.38 min
Next 200m @ 30 kph = 0.4 min
Cycle Time, T = 308.84 min
Allowance for Delay = 30.88 min
Total Cycle Time, T = 339.72 min
5.66 hr.

Rate of Equipment per HR = 2822.47


15,975.18
Equipment Capacity = 9.174658 cu.m.
1,741.23
Department of Public Works and Highways
Contract ID:
Contract Name:
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348
Location of the Contract: Sudipen, La Union
----------------------------------------------------------------------------------------------------------------------------------------------
BILL OF QUANTITIES

Part No. Part Description:

(Columns (1), (2), (3), and (4) are (Columns (5) and (6) are
to be filled up by the Procuring Entity) to be filled up by the Bidder)

Pay Item
Description Unit Quantity Unit Price Amount
No.

(1) (2) (3) (4) (5) (6)


B. OTHER GENERAL REQUIREMENTS
In words: In figures:
One Pesos & 00/100 2.00
Project Billboard / Only
B.5 ea. 2.00
Signboard (DPWH)
In figures:
1.00
In words: In figures:
518,432.56
Five Hundred and
Eighteen Thousand
Project Billboard / Four Hundred and
B.5 ea. 1.00 Thirty Two Pesos &
Signboard (COA)
56/100 Only

In figures:
518,432.56
In words: In figures:
One Pesos & 00/100 3.80
Occupational Safety Only
B.7(1) mo. 3.80
and Health Program
In figures:
1.00
In words: In figures:
1,970,043.73
Five Hundred and
Eighteen Thousand
Four Hundred and
B.8(1) Traffic Management mo. 3.80 Thirty Two Pesos &
56/100 Only

In figures:
518,432.56
In words: In figures:
518,432.56
Five Hundred and
Eighteen Thousand
Mobilization / Four Hundred and
B.9 L.S. 1.00 Thirty Two Pesos &
Demobilization
56/100 Only

In figures:
518,432.56
In words:
Sub-Total B
Three Million Six
Thousand Nine
Hundred and Fourteen
Pesos & 65/100 Only

In figures:
3,006,914.65
C. EARTHWORK
In words: In figures:
#NAME?
Five Hundred and
Eighteen Thousand
Four Hundred and
#NAME? #NAME? #NAME? #NAME? Thirty Two Pesos &
56/100 Only

In figures:
518,432.56
In words: In figures:
Four Hundred and 480,111.32
Thirty Two Pesos &
Surplus Common
102(2) cu.m. 1,109.93 56/100 Only
Excavation
In figures:
432.56
In words: In figures:
Four Hundred and 27,904.45
Thirty Two Pesos &
Structure Excavation 56/100 Only
103(1)a cu.m. 64.51
(Common Soil)
In figures:
432.56
In words: In figures:
Four Hundred and 17,293.75
Embankment from Thirty Two Pesos &
roadway/structure 56/100 Only
104(1)a cu.m. 39.98
excavation (Common
Soil)
In figures:
432.56
In words: In figures:
Four Hundred and 12,428.31
Thirty Two Pesos &
104(7) Gravel Fill cu.m. 28.73 56/100 Only

In figures:
432.56
In words: In figures:
Four Hundred and 1,023,350.45
Thirty Two Pesos &
Subgrade Preparation
105(1)a sq.m. 2,365.80 56/100 Only
(Common Material)
In figures:
432.56
In words:
Sub-Total C #NAME?

In figures:
#NAME?
D. SUBBASE AND BASE COURSE
In words: In figures:
Four Hundred and 204,674.42
Thirty Two Pesos &
Aggregate Subbase 56/100 Only
200(1) cu.m. 473.17
Course
In figures:
432.56
In words:
Sub-Total D
Two Hundred and Four
Thousand Six Hundred
and Seventy Four Pesos
& 42/100 Only

In figures:
204,674.42
E. SURFACE COURSE
In words: In figures:
0.00
One Thousand Four
Portland Cement Hundred and Thirty
Concrete Pavement Two Pesos & 56/100
311(1)e1 sq.m. 0.00
(Unreinforced, 0.28 m Only
thick), 14 Days
In figures:
1,432.56
In words:
Sub-Total E #NAME?

In figures:
#NAME?
G. BRIDGE CONSTRUCTION
In words: In figures:
Four Hundred and 13,059,245.94
Thirty Two Pesos &
Reinforcing Steel
404(1)a kg. 30,190.60 56/100 Only
(Grade 40)
In figures:
432.56
In words: In figures:
Four Hundred and 85,344.09
Structural Concrete, Thirty Two Pesos &
405(1)a2 Class "A" (20.68 Mpa), cu.m. 197.30 56/100 Only
14 days
In figures:
432.56
In words:
Sub-Total G #NAME?

In figures:
#NAME?
H. MISCELLANEOUS STRUCTURES
In words: In figures:
36,082,906.18
Five Hundred and
Reflectorized Eighteen Thousand
Thermoplastic Four Hundred and
612(1) sq.m. 69.60 Thirty Two Pesos &
Pavement Markings
White 56/100 Only

In figures:
518,432.56
In words: In figures:
Four Hundred and 0.00
Reflectorized Thirty Two Pesos &
Thermoplastic 56/100 Only
612(2) sq.m. 0.00
Pavement Markings
Yellow
In figures:
432.56
In words: In figures:
Four Hundred and 0.00
Single Arm Solar LED Thirty Two Pesos &
624(9)a1 Roadway Lighting, 8m- ea. 0.00 56/100 Only
Pole, 60W-80W
In figures:
432.56
In words:
Sub-Total H

#NAME?

In figures:
#NAME?
In words:
Grand Total

#NAME?

In figures:
#NAME?
PART A
A.1.1 Offices and Laboratory for the Engineer
Pay Item Suffix (Subscript)
(Number)
A.1.1(1)

A.1.1(2)

A.1.1(3)

A.1.1(4)

A.1.1(5)

A.1.1(6)

A.1.1(7)

A.1.1(8)

A.1.1(9)

A.1.1(10)

A.1.1(11)

A.1.1(12)

A.1.1(13)
A.1.1(14)

A.1.1(15)

A.1.1(16)

A.1.1(17)

A.1.1(18)

A.1.2 Vehicles for the Engineer


Pay Item Suffix (Subscript)
(Number)
A.1.2(1)

A.1.2(2)

A.1.2(3)

A.1.2(4)

A.1.2(5)

A.1.2(6)

A.1.2(7)

A.1.2(8)
A.1.2(9)

A.1.3 Assistance to the Engineer


Pay Item Suffix (Subscript)
(Number)
A.1.3(1)

A.1.3(2)

A.1.3(3)

A.1.3(4)

A.1.4 Photographs
Pay Item Suffix (Subscript)
(Number)
A.1.4(1)

A.1.5 Communication Facility


Pay Item Suffix (Subscript)
(Number)
A.1.5(1)

A.1.5(2)

PART B -
Pay Item Suffix (Subscript)
(Number)
B.1

B.2

B.3
B.4(1)

B.4(2)

B.4(3)
B.4(4)
B.4(5)
B.4(6)

B.4(7)
B.4(8)

B.4(9)

B.4(10)

B.5

B.6

B.7(1)

B.7(2)

B.8(1)
B.8(2)
B.9
B.10
B.11
B.12

B.13

B.14

B.15(1)
B.15(2)
B.16

B.17

B.18(1)
B.18(2)
B.19
B.20
B.21
B.22
B.23
B.24

B.25

ITEM 100 - CLEARING AND GRUBBING


Pay Item Suffix (Subscript)
(Number)
100(1)
100(2)
100(3) a1

100(3) a2

100(3) a3

100(3) a4

100(4)

ITEM 101 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS


Pay Item Suffix (Subscript)
(Number)
101(1)

101(2)

101(3) a1

101(3) a2

101(3) a3

101(3) a4

101(3) a5

101(3) a6

101(3) a7

101(3) a8
101(3) a9

101(3) b1

101(3) b2

101(3) b3

101(3) b4

101(3) b5

101(3) b6

101(3) b7

101(3) b8

101(3) b9

101(3) c1

101(3) c2

101(3) d

101(4) a1

101(4) a2

101(4) a3

101(4) a4
101(4) a5

101(4) a6

101(4) a7

101(4) b

101(4) c

101(5) a1

101(5) a2

101(5) a3

101(5) a4

101(5) a5

101(5) a6

101(5) a7

101(5) b1

101(5) b2

101(5) b3

101(5) b4

101(5) b5
101(5) c1

101(5) c2

101(5) c3

101(5) c4

101(5) c5

101(5) c6

101(5) c7

101(6)

101(7) a

101(7) b

101(7) c

101(8)

101(9)

101(10)

ITEM 102 — EXCAVATION


Pay Item Suffix (Subscript)
(Number)
102(1)
102(2)

102(3) a

102(3) b

102(4)

ITEM 103 - STRUCTURE EXCAVATION


Pay Item Suffix (Subscript)
(Number)
103(1) a

103(1) b

103(1) c

103(2) a

103(2) b

103(2) c

103(3)
103(4)

103(5) a

103(5) b

103(6) a

103(6) b

103(6) c

ITEM 104 — EMBANKMENT


Pay Item Suffix (Subscript)
(Number)
104(1) a

104(1) b
104(1) c

104(2) a

104(2) b

104(2) c

104(2) d

104(2) e

104(3) a

104(3) b

104(4)
104(5)
104(6)

104(7)

Item 105 - SUBGRADE PREPARATION


Pay Item Suffix (Subscript)
(Number)
105(1) a

105(1) b

105(1) C

105(1) d

105(1) e

105(1)

ITEM 106 - COMPACTION EQUIPMENT AND DENSITY CONTROL STRIPS


Pay Item Suffix (Subscript)
(Number)
106(1)

*unless otherwise provided, the cost of CO

ITEM 107 - OVERHAUL


Pay Item Suffix (Subscript)
(Number)
107(1)
107(2)
107(3)

107(4)

PART D

ITEM 200 - AGGREGATE SUBBASE COURSE


Pay Item Suffix (Subscript)
(Number)
200(1)

ITEM 201 — AGGREGATE BASE COURSE


Pay Item Suffix (Subscript)
(Number)
201(1)

ITEM 202 - CRUSHED AGGREGATE BASE COURSE


Pay Item Suffix (Subscript)
(Number)
202(1)

ITEM 203 - LIME STABILIZED ROAD MIX BASE COURSE


Pay Item Suffix (Subscript)
(Number)
203(1) a

203(1) b

ITEM 204 - PORTLAND CEMENT STABILIZED ROAD MIX BASE COURSE


Pay Item Suffix (Subscript)
(Number)
204(1) a

204(1) b

Item 205— ASPHALT STABILIZED ROAD MIX BASE COURSE


Pay Item Suffix (Subscript)
(Number)
205(1) a

205(1) b

ITEM 206 - CHEMICALLY STABILIZED ROAD MIX SUB-BASE/BASE COURSE


Pay Item Suffix (Subscript)
(Number)
206(1)

ITEM 207 - PORTLAND CEMENT TREATED PLANT MIX BASE COURSE


Pay Item Suffix (Subscript)
(Number)
207(1) a

207(1) b

ITEM 208 - AGGREGATE STOCKPILE


Pay Item Suffix (Subscript)
(Number)
208(1)

ITEM 209 - ASPHALT TREATED PLANT MIX BASE COURSE


Pay Item Suffix (Subscript)
(Number)
209(1)

ITEM 210 — CRACK AND SEAT


Pay Item Suffix (Subscript)
(Number)
210(1)
P
ITEM 300 — AGGREGATE SURFACE COURSE
Pay Item Suffix (Subscript)
(Number)
300(1)
300(2)

ITEM 301 — BITUMINOUS PRIME COAT


Pay Item Suffix (Subscript)
(Number)
301(1) a

301(1) b

301(1) C

301(1) d

301(1) e

301(1) a

301(1) b

301(1) C

301(1) d

ITEM 302 - BITUMINOUS TACK COAT


Pay Item Suffix (Subscript)
(Number)
302(1) a

302(1) b

302(1) c

302(1) d

302(1)

ITEM 303 - BITUMINOUS SEAL COAT


Pay Item Suffix (Subscript)
(Number)
303(1) a
303(1) b
303(1) c

303(2) a

303(2) b

303(2) c

303(2) d

303(2) e

303(3) a

303(3) b

303(3) c

303(3) d

303(4)

ITEM 304 - BITUMINOUS SURFACE TREATMENT


Pay Item Suffix (Subscript)
(Number)
304(1)
304(2)

304(3) a

304(3) b

304(3) c

304(3) d
304(4) a

304(4) b

304(4) c

304(4) d

304(4) e

304(5)

ITEM 304A — SLURRY SYSTEM FOR ROAD SURFACE TREATMENT


Pay Item Suffix (Subscript)
(Number)
304A (1)

304A (2)
304A (3)

ITEM 305 - BITUMINOUS PENETRATION MACADAM PAVEMENT


Pay Item Suffix (Subscript)
(Number)
305(1)
305(2)
305(3) a

305(3) b

305(3) c

305(3) d

305(4)

ITEM 306 - BITUMINOUS ROAD MIX SURFACE COURSE


Pay Item Suffix (Subscript)
(Number)
306(1)

306(2)

ITEM 307 — BITUMINOUS PLANT-MIX SURFACE COURSE - GENERAL


Pay Item Suffix (Subscript)
(Number)
*The item to be paid for under this item shall be the number of square Meters (m°) of asphalt pavement pfaced

ITEM 308 - BITUMINOUS PLANT- MIX SURFACE COURSE, COLD-LAID


Pay Item Suffix (Subscript)
(Number)
308(1)

ITEM 309 — BITUMINOUS PLANT-MIX (STOCKPILE MAINTENANCE MIXTURE)


Pay Item Suffix (Subscript)
(Number)
309(1)

ITEM 310 - BITUMINOUS CONCRETS SURFACE COURSE, HOT-LAID


Pay Item Suffix (Subscript)
(Number)
310(1) a

310(1) b

310(1) c

310(2) a

310(2) b

310(2) c

310(3)
310(4) a

310(4) b

310(4) c

310(5)

310(6) a

310(6) b

310(6) c

ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT


Pay Item Suffix (Subscript)
(Number)
311(1) a

311(1) b1

311(1) b2

311(1) b3

311(1) c1

311(1) c2

311(1) c3

311(1) d1
311(1) d2

311(1) d3

311(1) e1

311(1) e2

311(1) e3

311(1) e4

311(1) f1

311(1) f2

311(1) f3

311(1) f4

311(1) g1

311(1) g2

311(1) g3

311(1) g4

311(1) h1

311(1) h2

311(1) h3
311(1) h4

311(1) i1

311(1) i2

311(1) i3

311(1) i4

311(2) a

311(2) b1

311(2) b2

311(2) b3

311(2) c1

311(2) c2

311(2) c3

311(2) d1

311(2) d2

311(2) d3

311(2) e1

311(2) e2
311(2) e3

311(2) f1

311(2) f2

311(2) f3

311(2) g1

311(2) g2

311(2) g3

311(2) h1

311(2) h2

311(2) h3

311(3) a1

311(3) a2

311(3) a3

311(3) b1

311(3) b2
311(3) b3

311(3) c1

311(3) c2

311(3) c3

311(3) d1

311(3) d2

311(3) d3

311(3) e1

311(3) e2

311(3) e3

311(3) f1

311(3) f2
311(3) f3

311(4) a1

311(4) a2

311(4) a3

311(4) a4

311(4) a5

311(4) b1

311(4) b2

311(4) b3

311(4) b4
311(4) b5

311(5) a1

311(5) a2

311(5) a3

311(5) a4

311(5) a5

311(5) b1

311(5) b2

311(5) b3

311(5) b4
311(5) b5

311(6) a1

311(6) a2

311(6) a3

311(6) a4

311(6) a5

311(6) a6

311(6) b1

311(6) b2

311(6) b3

311(6) b4

311(6) b5

311(6) b6

311(6) c1

311(6) c2

311(6) c3
311(6) c4

311(6) c5

311(6) c6

311(7) a1

311(7) a2

311(7) a3

311(7) a4

311(7) b1

311(7) b2

311(7) b3

311(7) b4
311(7) c1

311(7) c2

311(7) c3

311(7) c4

311(8) a1

311(8) a2

311(8) a3

311(8) a4

311(8) b1

311(8) b2
311(8) b3

311(8) b4

311(8) c1

311(8) c2

311(8) c3

311(8) c4

311(9) a1

311(9) a2

311(9) a3

311(9) a4

311(9) b1
311(9) b2

311(9) b3

311(9) b4

311(9) c1

311(9) c2

311(9) c3

311(9) c4

ITEM 313 - ROCK ASPHALT, HOT LAID


Pay Item Suffix (Subscript)
(Number)
313(1)

PAR
ITEM 400 — PILING
Pay Item Suffix (Subscript)
(Number)
400(1)

400(2)

400(3) a

400(3) b

400(3) c
400(3) d

400(4) a1

400(4) a2

400(5) a1

400(5) a2

400(6)

400(7)

400(8)

400(9)

400(10)
400(11)
400(12)

400(13)

400(14)

400(15)

400(16) a

400(16) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b
400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) a

400(17) b

400(17) y1

400(17) y2

400(17) z

400(18) a

400(18) b

400(19) a

400(19) b

400(20)
400(21)
400(22)
400(23) a1
400(23) a2

400(23) a3

400(23) b1

400(23) b2

400(23) b3

400(23) c1

400(23) c2

400(23) c3

400(23) d1

400(23) d2

400(23) d3

400(23) e1

400(23) e2

400(23) e3

400(23) f1

400(23) f2

400(23) f3

400(23) 91

400(23) g2

400(23) q3

400(23) h1

400(23) h2

400(23) h3

400(23) i1

400(23) i2
400(23) j1

400(23) j2

400(23) k1

400(23) k2

400(23) 11

400(23) 12

400(23) m1

400(23) m2

400(23) n1

400(23) n2

400(23) o1

400(23) o2

400(23) p1

400(23) p2

400(23) q1

400(23) q2

400(23) r1

400(23) r2

400(23) s1

400(23) s2

400(23) t1

400(23) t2

400(23) u1

400(23) u2

400(23) v1
400(23) v2

400(23) w1

400(23) w2

400(23) x1

400(23) x2

400(24)
400(25)

400(26) a

400(26) b

400(27)

400(28) a1
400(28) a2
400(28) a3
400(29) a1

400(29) a2

400(29) a3

400(30)
400(31)
400(32)

400(33)

ITEM 401 - RAILINGS


Pay Item Suffix (Subscript)
(Number)
401(1) a1

401(1) a2

401(1) b
401(2) a
401(2) b
401(2) c
401(3)
401(4)
401(5)

ITEM 402 - TIMBER STRUCTURES


Pay Item Suffix (Subscript)
(Number)
Pay Item Suffix (Subscript)
(Number)
402(1)
402(2)

ITEM 403 - METAL STRUCTURES


Pay Item Suffix (Subscript)
(Number)
403(1) a1

403(1) a2

403(2) a1

403(2) a2

403(3) a1

403(3) a2

403(4) a1

403(4) a2

403(5) a1

403(5) a2

403(6)

403(7)

403(8)
403(9)

ITEM 404 - REINFORCING STEEL


Pay Item Suffix (Subscript)
(Number)
404(1) a

404(1) b

ITEM 404A - EPOXY-COATED REINFORCING STEEL BARS


Pay Item Suffix (Subscript)
(Number)
404A(1) a
404A(1) b

ITEM 405 - STRUCTURAL CONCRETE


Pay Item Suffix (Subscript)
(Number)
405(1) a1

405(1) a2

405(1) a3

405(1) b1

405(1) b2

405(1) b3

405(1) c1

405(1) c2

405(1) c3

405(1) d1

405(1) d2

405(1) d3

405(1) e1

405(1) e2

405(1) e3

405(2) a

405(2) b

405(2) c

405(2) d

405(3) a

405(3) b
405(4) a1

405(4) a2

405(4) a3

405(4) b1

405(4) b2

405(4) b3

405(4) c1

405(4) c2

405(4) c3

405(5)
405(6)

405(7) a

405(7) b

405(8)

405(9) a

405(9) b

405(9) c

405(10) a

405(10) b

405(10) c

ITEM 406 - PRESTRESSED CONCRETE STRUCTURES


Pay Item Suffix (Subscript)
(Number)
406(1) a1

406(1) a2
406(1) a3

406(1) b1

406(1) b2

406(1) b3

406(1) b4

406(1) b5

406(1) c1

406(1) c2

406(1) c3

406(1) c4

406(1) c5

406(1) c6

406(1) c7

406(1) d1

406(1) d2

406(1) d3

406(1) d4
406(1) d5

406(1) d6

406(1) d7

406(1) d8

406(1) d9

406(1) e1

406(1) e2

406(1) e3

406(1) e4

406(1) e5

406(1) e6

406(1) e7

406(1) e8

406(1) f1

406(1) f2

406(1) f3

406(1) f4
406(1) f5

406(1) f6

406(1) f7

406(1) f8

406(1) f9

406(1) f10

406(1) f11

406(1) f12

406(1) p1

406(1) p2

406(1) p3

406(1) p4

406(1) p5

406(1) p6

406(1) p7

406(1) p8
406(1) p9

406(1) p10

406(1) p11

406(1) p12

406(1) h1

406(1) h2

406(1) h3

406(1) h4

406(1) h5

406(1) h6

406(1) h7

406(1) h8

406(1) h9

406(1) h10

406(1) h11

406(1) h12
406(1) h13

406(2) a

406(2) b

406(3)

ITEM 407- CONCRETE STRUCTURES


Pay Item Suffix (Subscript)
(Number)
407(1)

407(2)

407(3)
407(4)
407(5)

407(6)

407(7)

407(8)

*When more than one item is specified, means of identiFiCotion shall be inserted in parenthesis immediatefy otte

ITEM 408— STEEL BRIDGES


Pay Item Suffix (Subscript)
(Number)
408(1)
*The quantities, measured as prescribed above, shaff be paid for at the Contract

ITEM 409 — WELDED STRUCTURAL STEEL


Pay Item Suffix (Subscript)
(Number)
409(1)
409(2)

’Unless otherwise provided in the Special Provisions, we/ded structura/ steel structures sha// not be measured a

ITEM 410 - TREATED AND UNTREATED TIMBER


Pay Item Suffix (Subscript)
(Number)
Pay Item Suffix (Subscript)
(Number)
410(1)
410(2)

ITEM 411 - PAINT


Pay Item Suffix (Subscript)
(Number)
411(1)
411(2)
*Printing shafl not be measured and paid for separatefy, but the co

ITEM 412 – ELASTOMERIC BEARING PADS


Pay Item Suffix (Subscript)
(Number)
412(1)
412(2)

ITEM 413 - EXPANSION JOINT SYSTEMS


Pay Item Suffix (Subscript)
(Number)
413(1)

413(2)

413(3) a

413(3) b

413(4) a
413(4) b

413(4) c

413(4) d
413(4) e

413(4) f

413(5)

413(6) a

413(6) a
413(7) a1

413(7) a2

413(8)

ITEM 414 - FORMS AND FALSEWORKS


Pay Item Suffix (Subscript)
(Number)
414(1)

ITEM 415 — CABLE RESTRAINER


Pay Item Suffix (Subscript)
(Number)
415(1)
415(2)

ITEM 416 - FIBER REINFORCED POLYMER


Pay Item Suffix (Subscript)
(Number)
416(1) a
416(1) b
416(1) c
416(1) d
416(1) e
416(2)
416(3) a
416(3) b
416(3) c
416(3) d
416(4)
416(5)
416(6)

ITEM 417 - BEARING DEVICES


Pay Item Suffix (Subscript)
(Number)
417(1) a

417(1) b

417(1) c

ITEM 418 — BRIDGE STEEL DECK


Pay Item Suffix (Subscript)
(Number)
418(1)
418(2)
ITEM 419 - BRIDGE STEEL DECK
Pay Item Suffix (Subscript)
(Number)
419(1)
419(2)

PART G - DRAINA
ITEM 500 - PIPE CULVERTS AND STORM DRAIN
Pay Item Suffix (Subscript)
(Number)
500(1) a1

500(1) a2

500(1) a3

500(1) a4

500(1) a5

500(1) a6

500(1) b1

500(1) b2

500(1) b3

500(1) b4

500(1) b5

500(1) b6

500(1) b7

500(2)
500(3) a

500(3) b1

500(3) b2

500(3) c1

500(3) c2

ITEM 501- UNDERDRAINS


Pay Item Suffix (Subscript)
(Number)
501(1)
501(2)
501(3)

501(4)
501(5)

ITEM 502 - MANHOLES, INLETS ANDCATCH BASINS


Pay Item Suffix (Subscript)
(Number)
502(1) a1

502(1) a2

502(1) a3

502(1) a4

502(1) a5

502(1) a6

502(1) a7

502(1) b1

502(1) b2

502(1) b3

502(1) b4

502(1) b5

502(1) b6

502(1) b7

502(2) a1
502(2) a2
502(2) a3
502(2) a4

502(2) a5

502(2) a6

502(2) a7
502(3) a1
502(3) a2
502(3) a3
502(3) a4

502(3) a5

502(3) a6

502(3) a7

502(4) a1

502(4) a2

502(4) a3

502(4) a4

502(4) a5

502(4) a6

502(4) a7

502(5)

502(6)
502(7)
502(8)
502(9)
502(10)

502(11)

ITEM 503 - DRAINAGE STEEL GRATING WITH FRAME


Pay Item Suffix (Subscript)
(Number)
503(1)
503(2)

ITEM 504 - CLEANING AND RECONDITIONING EXISTING DRAINAGE STRUCTURES


Pay Item Suffix (Subscript)
(Number)
504(1) a

504(1) b
504(1) a

504(1) b

504(1) a

504(1) b

504(2) a

504(2) b

504(2) a

504(2) b

504(2) a

504(2) b

504(3) a

504(3) b

504(3) a

504(3) b

504(3) a

504(3) b

504(4)
504(5)

*If more than one type of drainage structure is described for on Item in the Bid SChedufe, letter suffixes shafl
*lino Pay Item from the fist above appears in the Bid Schedufe, the pipe removed

ITEM 505 - RIPRAP AND GROUTED RIPRAP


Pay Item Suffix (Subscript)
(Number)
505(1) a
505(1) b
505(1) c
505(1) d
505(2) a
505(2) b
505(2) c
505(2) d
505(3)

ITEM 506 - STONE MASONRY


Pay Item Suffix (Subscript)
(Number)
506(1)

ITEM 507 — RUBBLE CONCRETE


Pay Item Suffix (Subscript)
(Number)
507(1)

ITEM 508 - HAND-LAID ROCK EMBANKMENT


Pay Item Suffix (Subscript)
(Number)
508(1)

ITEM 509 - SHEET PILES


Pay Item Suffix (Subscript)
(Number)
509(1) a1

509(1) b1

509(1) b2

509(1) c1

509(1) c2

509(1) c3
509(1) d1

509(1) d2

ITEM 510 - CONCRETE SLOPE PROTECTION


Pay Item Suffix (Subscript)
(Number)
510(1)

510(2)

ITEM 511 — GABIONS AND MATTRESSES


Pay Item Suffix (Subscript)
(Number)
511(1) a1

511(1) a2

511(1) a3

511(1) a4

511(1) a5

511(1) a6

511(1) b1

511(1) b2

511(1) b3

511(1) b4

511(1) b5

511(1) b6

511(2) a1

511(2) a2

511(3)
511(4) a1

511(4) a2

511(4) a3

511(4) a4
511(4) b1

511(4) b2

511(4) b3

511(4) b4

511(4) b5

511(4) b6

ITEM 512 - EROSION CONTROL MATS, ROVING, AND CELLULAR CONFINEMENT SYSTEMS
Pay Item Suffix (Subscript)
(Number)
512(1) a

512(1) b

512(1) c

512(1) d

512(1) e

512(2)
512(3)

ITEM 513 — PERMANENT GROUND ANCHORS


Pay Item Suffix (Subscript)
(Number)
513(1)

ITEM 514 — SHOTCRETE (CONCRETE SPRAY)


Pay Item Suffix (Subscript)
(Number)
514(1)

514(2)

ITEM 515 - MECHANICALLY-STABILIZED EARTH (MSE) RETAINING WALLS


Pay Item Suffix (Subscript)
(Number)
515(1)

515(2)
515(3)
ITEM 516 - WET STONE MASONRY (COBBLE STONE)
Pay Item Suffix (Subscript)
(Number)
516(1)
516(2)

ITEM 517 - DRAIN PIPE


Pay Item Suffix (Subscript)
(Number)
517(1) a
517(1) b
517(2)
517(3) a

517(3) b

ITEM 520 - HYDROSEEDING


Pay Item Suffix (Subscript)
(Number)
520(1)

ITEM 522 - ROCKFALL PROTECTION SYSTEM


Pay Item Suffix (Subscript)
(Number)
522(1)
522(2)

ITEM 522A - PROTECTION SYSTEM FOR UNSTABLE SLOPE


Pay Item Suffix (Subscript)
(Number)
522A(1)
522A(2)

ITEM 520 - HYDROSEEDING


Pay Item Suffix (Subscript)
(Number)
522B(1)

PART H

ITEM 600 – CURB AND GUTTER


Pay Item Suffix (Subscript)
(Number)
600(1)

600(2)
600(3)

600(4)

600(5)
600(6)
600(7)

ITEM 601 – SIDEWALK


Pay Item Suffix (Subscript)
(Number)
601(1)

ITEM 602 – MONUMENTS, MARKERS AND GUIDE POSTS


Pay Item Suffix (Subscript)
(Number)
602(1) a

602(1) b

602(2) a

602(2) b

602(2) c

602(3) a

602(3) b
602(4) a

602(4) b1
602(4) b2

602(4) b3

602(5)

602(6)

ITEM 603 — GUARDRAIL


Pay Item Suffix (Subscript)
(Number)
603(1)

603(2)

603(3) a1

603(3) a2

603(3) b1

603(3) b2

603(4) a

603(4) b

603(4) c

603(5)
603(6) a
603(6) b

ITEM 604 — FENCING


Pay Item Suffix (Subscript)
(Number)
604(1)
604(2)

604(3)
604(4)
604(5)

604(6)

604(7)

ITEM 605 - ROAD SIGN


Pay Item Suffix (Subscript)
(Number)
605(1) a1

605(1) a2

605(1) a3

605(1) b1

605(1) b2

605(1) b3

605(1) c1
605(1) c2

605(1) c3

605(1) d1

605(1) d2

605(1) d3

605(1) e1

605(1) e2

605(1) f1

605(1) f2

605(1) g1

605(1) g2

605(1) g3

605(1) g4

605(1) h1
605(1) h2

605(1) h3

605(1) h4

605(1) i1

605(1) i2

605(1) i3

605(1) j1

605(1) j2

605(1) j3

605(1) j4

605(1) k1

605(1) k2

605(1) k3

605(1) k4
605(1) l1

605(1) l2

605(1) l3

605(1) l4

605(1) m1

605(1) m2

605(1) m3

605(1) n1

605(1) n2

605(1) n3

605(1) o1

605(1) o2
605(1) o3

605(1) p1

605(1) p2

605(1) p3

605(1) p4

605(1) q1

605(1) q2

605(1) q3

605(1) q4

605(1) r1

605(1) r2

605(1) s1

605(1) s2
605(1) s3

605(1) s4

605(1) t1

605(1) t2

605(1) t3

605(1) t4

605(1) t5

605(1) t6

605(1) u1

605(1) u2

605(1) u3

605(1) u4

605(1) u5

605(1) u6

605(1) V1

605(1) v2
605(1) v3

605(1) v4

605(1) w1

605(1) w2

605(1) w3

605(1) w4

605(1) x1

605(1) x2

605(1) y1

605(1) y2

605(1) y3

605(1) y4

605(1) z1

605(1) z2

605(1) z3

605(1) z4

605(1) aa1
605(1) aa2

605(1) aa3

605(1) ab1

605(1) ab2

605(1) ab3

605(1) ac1

605(1) ac2

605(1) ac3

605(1) ac4

605(1) ad1

605(1) ad2

605(1) ad3

605(1) ad4

605(1) ae1

605(1) ae2

605(1) ae3

605(1) af1
605(1) af2

605(1) af3

605(1) af4

605(1) af5

605(1) af6

605(1) af7

605(1) ag1

605(1) ag2

605(1) ag3

605(1) ah1

605(1) ah2

605(1) ah3

605(1) ah4

605(1) ai1
605(1) ai2

605(1) ai3

605(1) aj1

605(1) aj2

605(1) ak1

605(1) all

605(1) al2

605(1) aI3

605(1) am1

605(1) am2

605(1) an1

605(1) ao1
605(1) ao2

605(1) ao3

605(1) apt

605(1) ap2

605(1) ap3

605(1) aq1

605(1) ar1

605(1) ar2

605(1) ar3

605(1) as1

605(1) as2

605(1) as3
605(1) at1

605(1) at2

605(1) at3

605(1) au1

605(1) au2

605(1) au3

605(1) av1

605(1) av2

605(1) av3

605(1) aw1

605(1) aw2

605(1) aw3

605(1) ax1

605(1) ax2
605(1) ax3

605(1) ay1

605(1) ay2

605(1) ay3

605(1) az1

605(1) az2

605(1) az3

605(1) bat

605(1) ba2

605(1) ba3

605(1) bb1

605(1) bb2
605(1) bb3

605(1) bb4

605(1) bb5

605(1) bb6

605(1) bb7

605(2) a1

605(2) a2

605(2) a3

605(2) a4

605(2) b1

605(2) b2

605(2) b3

605(2) b4

605(2) c1

605(2) d1
605(2) d2

605(2) d3

605(2) d4

605(2) d5

605(2) d6

605(2) d7

605(2) e1

605(2) e2

605(2) e3

605(2) e4

605(2) e5

605(2) e6

605(2) e7

605(2) f1

605(2) f2

605(2) f3
605(2) f4

605(2) f5

605(2) f6

605(2)

605(2) g1

605(2) g2

605(2) g3

605(2) g4

605(2) g5

605(2) h1

605(2) h2

605(2) h3
605(2) h4

605(2) h5

605(2) h6

605(2) i1

605(2) i2

605(2) i3

605(2) i4

605(2) i5

605(2) j1

605(2) j2

605(2) j3
605(2) j4

605(2) j5

605(2) j6

605(2) j7

605(2) j8

605(2) j9

605(2) j10

605(2) j11

605(2) k1

605(2) k2

605(2) k3

605(2) k4
605(2) k5

605(2) k6

605(2) k7

605(2) k8

605(2) k9

605(2) k10

605(2) k11

605(2) 11

605(2) 12

605(2) 13

605(2) I4

605(2) 15
605(2) 16

605(2) 17

605(2) 18

605(2) 19

605(2) 110

605(2) 111

605(2) m1

605(2) m2

605(2) m3

605(2) n1

605(2) n2

605(2) n3
605(2) n4

605(2) o1

605(2) o2

605(2) o3

605(2) o4

605(2) p1

605(2) p2

605(2) p3

605(2) p4

605(2) q1

605(2) q2
605(2) q3

605(2) q4

605(2) r1

605(2) r2

605(2) r3

605(2) r4

605(2) s1

605(2) s2

605(2) s3

605(2) s4

605(2) s5

605(2) t1
605(2) t2

605(2) u1

605(2) u2

605(2) V1

605(2) v2

605(2) w1

605(2) w2

605(2) x1

605(2) x2

605(2) y1

605(2) y2

605(2) z1

605(2) z2
605(2) aa1

605(2) aa2

605(2) aa3

605(2) ab1

605(2) ab2

605(2) ab3

605(2) ac1

605(2) ac2

605(2) ac3

605(2) ac4

605(2) ad1

605(2) ae1

605(2) af1
605(2) ag1

605(2) ag2

605(2) ag3

605(2) ag4

605(2) ag5

605(2) ah1

605(2) ai1

605(2) ai2

605(2) a3

605(2) aj1

605(2) aj2

605(2) aj3

605(2) ak1

605(2) ak2
605(2) ak3

605(2) all

605(2) al2

605(2) al3

605(3) a1

605(3) a2

605(3) a3

605(3) b1

605(3) b2

605(3) c1

605(3) c2

605(3) c3

605(3) c4

605(3) d1
605(3) d2

605(3) e1

605(3) e2

605(3) e3

605(3) f1

605(3) f2

605(3) f3

605(3) f4

605(3) g1

605(3) g2

605(3) g3

605(3) g4

605(3) h1

605(3) h2

605(3) h3
605(3) h4

605(3) h5

605(3) h6

605(3) i1

605(3) i2

605(3) i3

605(3) i4

605(3) j1

605(3) j2

605(3) j3

605(3) j4

605(3) j5

605(3) j6
605(3) j7

605(3) j8

605(3) k1

605(3) k2

605(4) a1

605(4) a2

605(4) a3

605(4) b1

605(4) b2

605(4) b3

605(4) b4
605(4) b5

605(4) c1

605(4) c2

605(4) c3

605(4) d1

605(4) d2

605(4) d3

605(4) d4

605(4) e1

605(4) e2

605(4) e3

605 (4) e4
605 (4) e5

605 (4) e6

605(4) e7

605(4) e8

605(4) f1

605(4) f2

605(4) f3

605(4) f4

605 (4) g1

605 (4) g2

605(4) g3
605(4) h1

605(4) h2

605(4) h3

605(4) h4

605(4) h5

605(4) h6

605(4) h7

605(4) i1

605(4) j1
605(4) j2

605(4) k1

605(4) k2

605(4) I1

605(4) 12

605(5) a1

605(5) a2

605(5) a3

605(5) a4

605(5) a5

605(5) b1
605(5) b2

605(5) b3

605(5) b4

605(5) b5

605(5) b6

605(5) b7

605(5) b8

605(5) b9

605(5) b10

605(5) b11
605(5) b12

605(5) b13

605(5) b14

605(5) b15

605(5) b16

605(6) a

605(6) b1

605(6) c1

605(6) c2

605(6) c3
605(6) d1

605(6) d2

605(6) e1

605(6) e2

ITEM 606 - PAVEMENT MARKINGS


Pay Item Suffix (Subscript)
(Number)
606(1) a1

606(1) a2

606(1) b1

606(1) b2

ITEM 607 - REFLECTIVE PAVEMENT STUDS


Pay Item Suffix (Subscript)
(Number)
607(1) a

607(1) b

607(2) a

607(2) b
607(3)

607(3) b

ITEM 608 - TOPSOIL


Pay Item Suffix (Subscript)
(Number)
608(1)

608(2)

ITEM 609 - SPRIGGING


Pay Item Suffix (Subscript)
(Number)
609(1)
609(2)

ITEM 610 - SODDING


Pay Item Suffix (Subscript)
(Number)
610(1)

ITEM 611 — TREE PLANTING


Pay Item Suffix (Subscript)
(Number)
611(1)

611(2)

ITEM 612 - REFLECTIVE THERMOPLASTIC STRIPING MATERIAL (SOLID FORM)


Pay Item Suffix (Subscript)
(Number)
612(1)

612(2)

612(3)

ITEM 613 - CONCRETE JOINT SEALANT (HOT-POURED ELASTIC AND COLD-APPLIED TYPES)
Pay Item Suffix (Subscript)
(Number)
613(1)

613(2)

ITEM 614 - WATERSTOPS


Pay Item Suffix (Subscript)
(Number)
614(1) a
614(1) b
614(1) c
614(2)

ITEM 615 - NOISE BARRIER


Pay Item Suffix (Subscript)
(Number)
615(1)

ITEM 618 - REFLECTORIZED THERMOPLASTIC RUMBLE STRIPS


Pay Item Suffix (Subscript)
(Number)
618(1)

ITEM 622 - COCONET BIO-ENGINEERING SOLUTIONS


Pay Item Suffix (Subscript)
(Number)
622(1) a
622(1) b
622(1) c
622(2) a
622(2) b
622(2) c
622(2) d
622(2) e
622(3) a
622(3) b

ITEM 623 - TRAFFIC SIGNALIZATION PROJECTS


Pay Item Suffix (Subscript)
(Number)
623(1) a1

623(1) a2
623(1) a3

623(2)

623(3) a1

623(3) a2

623(3) a3

623(3) b1

623(3) b2

623(3) b3

623(3) b4

623(3) b5

623(3) c1

623(3) c2

623(3) c3

623(3) d1
623(3) d2

623(3) d3

623(3) d4

623(3) d5

623(4)

623(5)

623(6) a

623(6) b

623(6) C

623(6) d

623(6) e

623(7) a

623(7) b

623(7) c

623(7) d
623(7) e

623(7) f

623(7) g

623(7) h

623(8) a
623(8) b
623(9) a

623(9) b

623(10)

623(11)

623(12)

623(13) a1

623(13) a2

623(13) a3

623(13) a4

623(14) a1

623(14) a2

623(15) a1
623(15) a2

623(15) a3

623(15) b1

623(15) b2

623(15) b3

623(15) b4

623(15) b5

623(15) c1

623(15) c2

623(15) c3

623(15) d1

623(15) d2

623(15) d3

623(15) d4

623(15) d5

623(16)

623(17)
623(18) a1

623(18) a2

623(19) a1

623(19) a2

623(20) a1

623(20) a2

623(20) a3

623(20) a4

623(20) a5

623(20) a6

623(20) a7
623(20) a8

623(21) a1

623(21) a2

623(21) a3

623(21) a4

623(21) a5

623(22)

623(23)
623(24)
623(25)
623(26)
623(27)

623(28)

623(29)
623(30)
623(31)

623(33)
623(33)

623(34)

623(35) a

623(35) b

623(35) c
623(35) d
623(35) e
623(36)

623(37)
623(38)

ITEM 624 - ROADWAY LIGHTING


Pay Item Suffix (Subscript)
(Number)
624(1) a1

624(1) a2

624(1) a3

624(1) b1

624(1) b2

624(1) b3

624(1) b4

624(2) a1

624(2) a2

624(2) a3

624(2) b1

624(2) b2

624(2) b3

624(2) b4

624(3) a

624(3) b

624(4)

624(5)
624(6)

624(7)
624(8)
624(9)

624(10)
ITEM 625 - ROAD SAFETY AND TRAFFIC CONTROL DEVICES
Pay Item Suffix (Subscript)
(Number)
625(1) a1

625(1) a2

625(1) a3

625(1) a4

625(1) b1

625(1) b2

625(1) b3

625(1) b4

625(1) c1

625(1) c2
625(2) a1

625(2) a2

625(2) a3

625(2) a4

625(3) a1

625(3) a2

625(4) a

625(4) b

625(4) c

625(4) d

625(4) e

625(4) f

625(5) a1

625(5) a2

625(5) a3
625(5) a4

625(5) a5

625(5) a6

625(6) a1

625(6) a2

625(6) a3

625(6) a4

625(6) a5

625(6) a6

625(6) a7
625(6) a8

625(7) a1

625(7) a2

625(8) a1

625(8) a2

625(9) a1

625(9) a2

625(10)

625(11) a1

625(11) a2

625(11) a3

625(11) a4

625(11) a5

625(11) a6

ITEM 626 - TEMPORARY SIGNS (ROADWORKS)


Pay Item Suffix (Subscript)
(Number)
626(1) a1
626(1) a2

626(1) a3

626(1) a4

626(1) a5

626(1) a6

626(1) a7

626(1) a8

626(1) a9

626(2) a1

626(2) a2

626(2) a3

626(2) a4

626(2) a5

626(2) a6

626(2) a7

626(3) a1
626(3) a2

626(3) a3

626(3) a4

626(3) a5

626(3) a6

626(4) a1

626(4) a2

626(4) a3

626(4) a4

626(4) a5

626(4) a6

626(4) a7

626(4) a8

626(4) a9

626(4) a10
626(4) a11

626(5) a1

626(5) a2

626(5) a3

626(6) a1

626(6) a2

626(7) a1

626(7) a2

626(7) a3

626(7) a4

ITEM 627 - WEIGH-IN-MOTION (WIM) AND TRAFFIC COUNTING


Pay Item Suffix (Subscript)
(Number)
627(1) a1

627(1) a2

627(1) a3

627(1) a4
627(1) b1

627(1) b2

627(1) b3

627(1) b4

627(2) a1

627(2) a2

627(2) a3

627(2) a4

627(2) b1

627(2) b2

627(2) b3

627(2) b4

627(2) c1
627(2) c2

627(2) c3

627(2) c4

627(3)

627(4)

627(5)

627(6) a

627(6) b

627(7)

627(8)

627(9)

627(10)

627(11)
627(12) a

627(12) b

627(13)
627(14) a

627(14) b

627(14) c

627(15) a

627(15) b

627(15) c

627(16)
627(17) a
627(17) b
627(17) c
627(17) d
627(18)

627(19) a

627(19) b

627(20)
627(21)
627(22)
627(23)
627(24)
627(25)

627(26)
627(27)
627(28)

627(29)

627(30)

627(31)
627(32)

ITEM 628 - REPAIR AND RETROFITTING WORKS


Pay Item Suffix (Subscript)
(Number)
628(1) a

628(1) b

628(2)
628(3)
628(4)

628(5)
628(6)
628(7)
628(8)

628(9)
628(10)

628(11)

628(12)

628(13)

ITEM 629 - MISCELLANEOUS SLOPE PROTECTION


Pay Item Suffix (Subscript)
(Number)
629(1)

ITEM 630 - ATHLETIC OR SPORTS FIELD ITEMS


Pay Item Suffix (Subscript)
(Number)
630(1)
630(2)

ITEM 631 - CONCRETE ANCHORAGE


Pay Item Suffix (Subscript)
(Number)
631(1)
631(2)

ITEM 632 - HIGH FLOW EPOXY MORTAR FOR SUBMERGED AND WET CONCRETE STRUCTURES
Pay Item Suffix (Subscript)
(Number)
Pay Item Suffix (Subscript)
(Number)
632(1)

PA
ITEM 700 - HYDRAULIC CEMENT
Pay Item Suffix (Subscript)
(Number)
700 (1)

ITEM 701 - CONSTRUCTION LIME (HYDRATED)


Pay Item Suffix (Subscript)
(Number)
701(1)

ITEM 702 - BITUMINOUS MATERIALS


Pay Item Suffix (Subscript)
(Number)
702(1)

ITEM 703 - AGGREGATES


Pay Item Suffix (Subscript)
(Number)
703(1)

ITEM 703A - MINERAL FILLER


Pay Item Suffix (Subscript)
(Number)
703A(1)

ITEM 704 - MASONRY UNITS


Pay Item Suffix (Subscript)
(Number)
704(1)

ITEM 705 - JOINT MATERIALS


Pay Item Suffix (Subscript)
(Number)
705(1)

ITEM 706 - CONCRETE, CLAY, PLASTIC ANDFIBER PIPE


Pay Item Suffix (Subscript)
(Number)
706(1)

ITEM 707 - METAL PIPE


Pay Item Suffix (Subscript)
(Number)
707(1)

ITEM 708 - CHEMICAL ADPIIXTURES FOR CONCRETE


Pay Item Suffix (Subscript)
(Number)
708(1)

ITEM 709 - PAINTS


Pay Item Suffix (Subscript)
(Number)
709(1)

ITEM 710 - REINFORCING STEEL AND WIRE ROPE


Pay Item Suffix (Subscript)
(Number)
710(1)

ITEM 711 - FENCE AND GUARDRAIL


Pay Item Suffix (Subscript)
(Number)
711(1)

ITEM 712 - STRUCTURAL METAL


Pay Item Suffix (Subscript)
(Number)
712(1)

ITEM 713 - TREATED AND UNTREATED TIMBER


Pay Item Suffix (Subscript)
(Number)
713(1)

ITEM 714 - WATER


Pay Item Suffix (Subscript)
(Number)
714(1)

ITEM 715 - GEOTEXTILES


Pay Item Suffix (Subscript)
(Number)
715(1)
715(2)
715(3)
715(4)
715(5)
715(6)
715(7)
715(8)

ITEM 716 - DRILLING SLURRY


Pay Item Suffix (Subscript)
(Number)
716(1)

ITEM 719 - EPOXY-RESIN-BASE BONDING SYSTEMS FOR CONCRETE


Pay Item Suffix (Subscript)
(Number)
719(1)

’Epoxy-resin-base bonding system sha// not be measured and paid for separately, but the cost thereof sha// be

ITEM 726 – COAL TAR SURFACE TREATMENT


Pay Item Suffix (Subscript)
(Number)
726(1)

ITEM 727 - NON-SHRINK GROUT


Pay Item Suffix (Subscript)
(Number)
727(1)
*Non-shrink grout shall not be measured and paid for separately, but the cost thereof shall be considered as incl

ITEM 729 - PROTECTIVE COATING FOR CONCRETE


Pay Item Suffix (Subscript)
(Number)
729(1)

“Protective coating shall not be measured and paid for separately, but the cost thereof shall be considered as inc

ITEM 733 - ZINC (HOT-DIP GALVANIZED) COATINGS ON IRON ANDSTEEL PRODUCTS


Pay Item Suffix (Subscript)
(Number)
733(1)

*2'inc (Hot-dip gif anized) coating shall not be measured and paid for separately, but the cost thereof shall be c

ITEM 734 - STONE MASTIC ASPHALT (SMA)


Pay Item Suffix (Subscript)
(Number)
734(1)
ITEM 735 - POROUS ASPHALT MIXTURE
Pay Item Suffix (Subscript)
(Number)
735(1)

ITEM 737 - MECHANICAL COUPLERS FOR REINFORCING STEEL


Pay Item Suffix (Subscript)
(Number)
* Mechanical Coupler for Reinforcing Steel shaff not be measured and paid for separately, but the cost thereof s

ITEM 738 - EPOXY RESIN ADHESIVES FOR BONDING TRAFFIC MARKERS TO HARDENED PORTLAND
Pay Item Suffix (Subscript)
(Number)
*Epoxy Resin Adhesives for Binding Traffic Markers to Hardened Portland Cement and Asphalt Concrete Paveme

ITEM 715 - INTERLOCKING PRECAST CONCRETE BLOCKS


Pay Item Suffix (Subscript)
(Number)
741(1)
741(2)
PART
“Re

PART II
“Ref

PART III - CIVIL, MECHA

ITEM 800 – CLEARING AND GRUBBING


Pay Item Suffix (Subscript)
(Number)
800(1)
800(2)
800(3) a1

800(3) a2

800(3) a3

800(3) a4
800(4)

ITEM 801 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS


Pay Item Suffix (Subscript)
(Number)
801(1)

801(2)

801(3) a

801(3) b

801(3) c

801(4) a1

801(4) a2

801(4) a3

801(4) a4

801(4) a5

801(4) a6

801(4) b

801(4) c

801(5) a1

801(5) a2

801(5) a3

801(5) a4
801(5) a5

801(5) a6

801(5) a7

801(5) b1

801(5) b2

801(5) b3

801(5) b4

801(5) b5

801(5) c1

801(5) c2

801(5) c3

801(5) c4

801(5) c5

801(5) c6
801(5) c7

801(6)

801(7) a

801(7) b

801(7) c

801(8)
801(9)
801(10)

801(11)

ITEM 802 - EXCAVATION


Pay Item Suffix (Subscript)
(Number)
802(1)
802(2)

802(3) a

802(3) b

802(4)

ITEM 803 - STRUCTURE EXCAVATION


Pay Item Suffix (Subscript)
(Number)
803(1) a

803(1) b

803(1) c

803(2) a

803(2) b

803(2) c

803(3)
803(4)

803(5) a

803(5) b

803(6) a

803(6) b

803(6) c

803(7)

ITEM 804 - EMBANKMENT


Pay Item Suffix (Subscript)
(Number)
804(1) a

804(1) b

804(2) a

804(2) b

804(3)
804(4)

ITEM 805 - DREDGING


Pay Item Suffix (Subscript)
(Number)
805(1)
805(2)

ITEM 806 - RECLAMATION


Pay Item Suffix (Subscript)
(Number)
806 (1)

ITEM 807 - SITE DEVELOPMENT


Pay Item Suffix (Subscript)
(Number)
807(1)
807(2)
807(3) a
807(3) b
807(4)
807(5)
807(6) a
807(6) b
807(6) c
807(7)
807(8) a
807(8) b
807(9)
807(10)
807(11)
807(12)
807(13)
807(14)

PART B — PLAI
ITEM 900 — REINFORCED CONCRETE
Pay Item Suffix (Subscript)
(Number)
900(1) a1

900(1) a2

900(1) a3

900(1) a4

900(1) a5

900(1) a6

900(1) b1

900(1) b2

900(1) b3

900(1) b4

900(1) b5

900(1) b6
900(1) c1

900(1) c2

900(1) c3

900(1) c4

900(1) c5

900(1) c6

900(2) a

900(2) b

900(2) c

900(3) a

900(3) b

900(3) c

900(4) a

900(4) b

900(4) c

900(5)

900(6)
900(7)
900(8)

ITEM 901 - PLAIN/LEAN CONCRETE


Pay Item Suffix (Subscript)
(Number)
901(1)

ITEM 902 - REINFORCING STEEL


Pay Item Suffix (Subscript)
(Number)
902(1) a

902(1) b

902(2)

ITEM 903 - FORMWORKS AND FALSEWORKS


Pay Item Suffix (Subscript)
(Number)
903(1)
903(2)

PART C - FIN
ITEM 1000 — TERMITE CONTROL WORK
Pay Item Suffix (Subscript)
(Number)
1000(1)
1000(2)
1000(3)

ITEM 1001 — STORM DRAINAGE AND SEWERAGE SYSTEM


Pay Item Suffix (Subscript)
(Number)
1001(1) a1

1001(1) a2

1001(1) a3

1001(1) a4

1001(1) a5

1001(1) a6

1001(1) a7

1001(1) a8

1001(1) a9

1001(1) a10

1001(1) a11

1001(1) b1

1001(1) b2
1001(1) b3

1001(1) b4

1001(1) b5

1001(1) c1

1001(1) c2

1001(1) c3

1001(1) c4

1001(1) c5

1001(1) c6

1001(1) c7

1001(2)
1001(3)
1001(4)
1001(5) a
1001(5) b
1001(6)
1001(7) a
1001(7) b
1001(8)
1001(9)

1001(10)

1001(11)

1001(12)
1001(13)
1001(14)
1001(15)
1001(16) a1

1001(16) a2
1001(16) a3

1001(16) a4

1001(16) a5

ITEM 1002 - PLUMBING WORKS


Pay Item Suffix (Subscript)
(Number)
1002(1) a

1002(1) b

1002(1) c

1002(1) d

1002(1) e

1002(1) f

1002(1) g

1002(1) h

1002(1) i

1002(2) a1

1002(2) a2

1002(2) a3

1002(2) b1

1002(2) b2
1002(2) b3

1002(2) c1

1002(2) c2

1002(2) c3

1002(2) d1

1002(2) d2

1002(2) d3

1002(2) e1

1002(2) e2

1002(2) e3

1002(2) f1

1002(2) f2
1002(2) f3

1002(2) g1

1002(2) g2

1002(2) g3

1002(2) h1

1002(2) h2

1002(2) h3

1002(3) a

1002(3) b

1002(3) c

1002(3) d

1002(3) e

1002(3) f

1002(3) g

1002(3) h

1002(4)
1002(5) a

1002(5) b
1002(6)

1002(7) a

1002(7) b

1002(8)

1002(9) a

1002(9) b

1002(10)

1002(11) a

1002(11) b

1002(12)
1002(13)
1002(14) a

1002(14) b

1002(15) a

1002(15) b

1002(16) a1

1002(16) a2

1002(16) a3

1002(16) b1

1002(16) b2

1002(16) b3

1002(17)
1002(18)

1002(19)
1002(20)
1002(21)
1002(22)
1002(23) a
1002(23) b
1002(23) c
1002(24)
1002(25)
1002(26)
1002(27)

ITEM 1003 — CARPENTRY AND JOINERY WORKS


Pay Item Suffix (Subscript)
(Number)
1003(1) a1

1003(1) a2

1003(1) b1

1003(1) b2

1003(1) c1

1003(1) c2

1003(1) d1

1003(1) d2

1003(1) e1

1003(1) e2

1003(1) e3

1003(1) f

1003(1) g1
1003(1) g2
1003(1) h
1003(2) a1
1003(2) a2

1003(2) b1

1003(2) b2

1003(2) b3

1003(2) b4

1003(2) c1

1003(2) c2

1003(2) d1

1003(2) d2

1003(2) e1

1003(2) e2

1003(2) f

1003(2) g
1003(2) h
1003(3)
1003(4)
1003(5)
1003(6)
1003(7)
1003(8)
1003(9)
1003(10)
1003(11) a1

1003(11) a2

1003(12)
1003(13)
1003(14)
1003(15) a
1003(15) b
1003(15) c
1003(15) d
1003(15) e
1003(16)
1003(17)

1003(18)
1003(19)

1003(20)
1003(21)
1003(22)
1003(23)

ITEM 1004 - HARDWARE


Pay Item Suffix (Subscript)
(Number)
1004(1)
1004(2)

ITEM 1005 - STEEL WINDOWS


Pay Item Suffix (Subscript)
(Number)
1005(1)

1005(2)

1005(3)
1005(4)
1005(5)
1005(6)
1005(7)

ITEM 1006 - STEEL DOORS AND FRAMES


Pay Item Suffix (Subscript)
(Number)
1006(1)
1006(2)
1006(3)
1006(4)
1006(5)

1006(6)

ITEM 1007 - ALUMINUM FRAMED GLASS DOORS


Pay Item Suffix (Subscript)
(Number)
1007(1) a

1007(1) b

1007(2)
ITEM 1008 - ALUMINUM GLASS WINDOWS
Pay Item Suffix (Subscript)
(Number)
1008(1) a

1008(1) b

1008(1) c

1008(1) d

1008(2)

ITEM 1009 - JALOUSIE WINDOWS


Pay Item Suffix (Subscript)
(Number)
1009(1) a
1009(1) b
1009(2)

ITEM 1010 - WOODEN DOORS AND WINDOWS


Pay Item Suffix (Subscript)
(Number)
1010(1)

1010(2) a
1010(2) b
1010(2) c
1010(3)
1010(4)

ITEM 1011 — ROLL-UP DOORS


Pay Item Suffix (Subscript)
(Number)
1011(1) a
1011(1) b
1011(2)

ITEM 1012 - GLASS AND GLAZING


Pay Item Suffix (Subscript)
(Number)
1012(1)
1012(2)

1012(3) a

1012(3) b
1012(4) a

1012(4) b

1012(5) a

1012(5) b

1012(5) c

1012(6)
1012(7)

ITEM 1013 - CORRUGATED METAL ROOFING


Pay Item Suffix (Subscript)
(Number)
1013(1)

1013(2) a1

1013(2) a2

1013(2) b1

1013(2) b2

1013(2) b3

1013(2) b4

1013(3)

1013(4)

ITEM 1013A — CORRUGATED ASPHALT ROOFING


Pay Item Suffix (Subscript)
(Number)
1013A(1)

1013A(2) a1
1013A(2) a2

1013A(2) b1

1013A(2) b2

1013A(2) b3

1013A(2) b4

1013A(3)

ITEM 1014 — PREPAINTED METAL SHEETS


Pay Item Suffix (Subscript)
(Number)
1014(1) a1

1014(1) a2

1014(1) b1

1014(1) b2

ITEM 1015 — CLAY ROOF TILE


Pay Item Suffix (Subscript)
(Number)
1015 (1)

ITEM 1016 — WATERPROOFING


Pay Item Suffix (Subscript)
(Number)
1016(1) a

1016(1) b
1016(2)

ITEM 1017 — ROOF DRAINS WITH STRAINERS


Pay Item Suffix (Subscript)
(Number)
1017(1) a

1017(1) b

1017(1) c

1017(1) d

1017(2) a

1017(2) b

1017(2) c

1017(2) d

1017(3) a

1017(3) b

1017(3) c

ITEM 1018 — CERAMIC/GRANITE TILES


Pay Item Suffix (Subscript)
(Number)
1018(1)
1018(2)
1018(3)
1018(4)
1018(5)
1018(6)
1018(7)

ITEM 1019 — WOOD TILES


Pay Item Suffix (Subscript)
(Number)
1019(1) a
1019(1) b
1019(1) c
1019(1) d

ITEM 1020 — VINYL FLOOR TILES


Pay Item Suffix (Subscript)
(Number)
1020(1) a
1020(1) b
ITEM 1021 — CEMENT FLOOR FINISH
Pay Item Suffix (Subscript)
(Number)
1021(1) a
1021(1) b

1021(1) c

1021(2)
1021(3) a
1021(3) b

1021(3) c

1021(4)
1021(5)
1021(6)
1021(7)
1021(8)
1021(9)
1021(10)
1021(11)
1021(12)

ITEM 1022 - STUCCO FINISH


Pay Item Suffix (Subscript)
(Number)
1022(1)

ITEM 1023 - GRANOLITHIC MARBLE WORK


Pay Item Suffix (Subscript)
(Number)
1023(1)
1023(2)
1023(3)

ITEM 1024 - PEA GRAVEL WASHOUT FINISH


Pay Item Suffix (Subscript)
(Number)
1024 (1)

ITEM 1025 - BUSH HAMMERED FINISH


Pay Item Suffix (Subscript)
(Number)
1025(1) a
1025(1) b

ITEM 1026 - PEBBLE WASHOUT FINISH


Pay Item Suffix (Subscript)
(Number)
Pay Item Suffix (Subscript)
(Number)
1026(1)

ITEM 1027 - CEMENT PLASTER FINISH/DECORATIVE STONE


Pay Item Suffix (Subscript)
(Number)
1027(1)
1027(2)
1027(3)
1027(4)

ITEM 1028 - SYNTHETIC ADOBE


Pay Item Suffix (Subscript)
(Number)
1028(1) a

1028(1) b

1028(2)

ITEM 1029 - GRANATITE WASHOUT FINISH


Pay Item Suffix (Subscript)
(Number)
1029(1)

ITEM 1030 - ACOUSTICAL CEILING


Pay Item Suffix (Subscript)
(Number)
1030(1)

ITEM 1031 - ACOUSTICAL TREATMENT


Pay Item Suffix (Subscript)
(Number)
1031(1) a
1031(1) b
1031(1) c
1031(2)

ITEM 1032 - PAINTING, VARNISHING AND OTHER RELATED WORKS


Pay Item Suffix (Subscript)
(Number)
1032(1) a

1032(1) b
1032(1) c
1032(2)
1032(3)
1032(4)
1032(5)

ITEM 1033- METAL DECK


Pay Item Suffix (Subscript)
(Number)
1033(1)

ITEM 1034 - DAMP PROOFING


Pay Item Suffix (Subscript)
(Number)
1034(1) a
1034(1) b

1034(1) c

1034(1) d

ITEM 1035 - NON-STRUCTURAL METAL FRAMING


Pay Item Suffix (Subscript)
(Number)
1035(1)

ITEM 1036 — POLYCARBONATE SHEETS/PANELS


Pay Item Suffix (Subscript)
(Number)
1036(1) a
1036(1) b

ITEM 1037 — CONCRETE ROOF TILE


Pay Item Suffix (Subscript)
(Number)
1037(1)

ITEM 1038 — REFLECTIVE INSULATION


Pay Item Suffix (Subscript)
(Number)
1038(1)

ITEM 1039 - ALUMINUM CLADDING


Pay Item Suffix (Subscript)
(Number)
1039(1)

ITEM 1040 - METAL LATH AND ACCESSORIES


Pay Item Suffix (Subscript)
(Number)
1040(1)

ITEM 1041 — GYPSUM BOARD


Pay Item Suffix (Subscript)
(Number)
1041(1)
1041(2)

ITEM 1042 - STAINLESS STEEL DOOR AND FRAMES


Pay Item Suffix (Subscript)
(Number)
1042(1)

1042(2)

ITEM 1043 - PVC DOORS AND FRAMES


Pay Item Suffix (Subscript)
(Number)
1043(1)
1043(2)

ITEM 1044 - FOLDING DOOR/PARTITION


Pay Item Suffix (Subscript)
(Number)
1044(1)
1044(1)

1044(1)
1044(2)
1044(2)

1044(2)

ITEM 1045 — ALUMINUM PANEL


Pay Item Suffix (Subscript)
(Number)
1045(1)

ITEM 1046 — MASONRY WORKS


Pay Item Suffix (Subscript)
(Number)
1046(1) a1

1046(1) a2

1046(2) a1
1046(2) a2

1046(3)
1046(4)

ITEM 1047 — METAL STRUCTURES


Pay Item Suffix (Subscript)
(Number)
1047(1)
1047(2) a
1047(2) b
1047(2) c
1047(3) a

1047(3) b

1047(3) c

1047(3) d

1047(4)

1047(5)

1047(6)

1047(7) a

1047(7) b

1047(7) c

1047(8)

1047(9)

1047(10)

ITEM 1048 — FIBER REINFORCED POLYMER


Pay Item Suffix (Subscript)
(Number)
1048(1) a
1048(1) b
1048(1) c
1048(1) d
1048(1) e
1048(2)
1048(3) a
1048(3) b
1048(3) c
1048(3) d
1048(4)
1048(5)
1048(6)

ITEM 1049 - JET GROUTING


Pay Item Suffix (Subscript)
(Number)
1049(1) a
1049(1) b
1049(1) c

ITEM 1050 - NON-SHRINK GROUT


*Non-shrink grout shall not be measured and paid for separately, but the cost thereof shall be considered as inc

ITEM 1051 - RAILINGS


Pay Item Suffix (Subscript)
(Number)
1051(1)
1051(2) a
1051(2) b
1051(2) c
1051(3)
1051(4)
1051(5)
1051(6)
1051(7)

ITEM 1052 - PILING


Pay Item Suffix (Subscript)
(Number)
1052(1)

1052(2)

1052(3)
1052(4) a

1052(4) b

1052(5) a

1052(5) b

1052(6)

1052(7)
1052(8)

1052(9)

1052(10)
1052(11)
1052(12)

1052(13)

1052(14)

1052(15)

1052(16)

1052(17) a

1052(17) b

1052(17) c

1052(17) d

1052(17) e

1052(17) f

1052(17) g

1052(17) h

1052(17) i

1052(17) j

1052(17) k

1052(17) l

1052(17) m

1052(17) n

1052(17) o

1052(17) p

1052(17) q
1052(17) r

1052(17) s

1052(17) t

1052(17) u

1052(17) v

1052(17) w

1052(18)

1052(19)

1052(20)
1052(21)
1052(22)
1052(23) a1

1052(23) a2

1052(23) a3

1052(23) b1

1052(23) b2

1052(23) b3

1052(23) c1

1052(23) c2

1052(23) c3

1052(23) d1

1052(23) d2

1052(23) d3

1052(23) e1

1052(23) e2

1052(23) e3

1052(23) f1
1052(23) f2

1052(23) f3

1052(23) g1

1052(23) g2

1052(23) g3

1052(23) h1

1052(23) h2

1052(23) h3

1052(23) i1

1052(23) i2

1052(23) j1

1052(23) j2

1052(23) k1

1052(23) k2

1052(23) l1

1052(23) l2

1052(23) m1

1052(23) m2

1052(23) n1

1052(23) n2

1052(23) o1

1052(23) o2

1052(23) p1

1052(23) p2

1052(23) q1
1052(23) q2

1052(23) r1

1052(23) r2

1052(23) s1

1052(23) s2

1052(23) t1

1052(23) t2

1052(23) u1

1052(23) u2

1052(23) v1

1052(23) v2

1052(23) w1

1052(23) w2

1052(24)

1052(25)

1052(26) a

1052(26) b

1052(27)

1052(28) a
1052(28) b
1052(28) c
1052(29) a

1052(29) b

1052(29) c

1052(30)
1052(31)
1052(32)

1052(33)
ITEM 1053 - CARPET FLOOR TILES
Pay Item Suffix (Subscript)
(Number)
1053(1)
1053(1)

ITEM 1054 - GLASS FIBER REINFORCED CONCRETE CLADDING PANELS


Pay Item Suffix (Subscript)
(Number)
1054(1)

ITEM 1055 - INTERIOR CEMENTITIOUS FIREPROOFING


Pay Item Suffix (Subscript)
(Number)
1055(1)

ITEM 1056 - ASPHALT ROOFING SHINGLES


Pay Item Suffix (Subscript)
(Number)
1056(1)

ITEM 1100 - CONDUITS, BOXES & FITTINGS (CONDUIT WORKS/ CONDUIT ROUGH-IN)
Pay Item Suffix (Subscript)
(Number)
1100(1) a

1100(1) b

1100(1) c

1100(1) d

1100(1) e

1100(1) f

1100(1) g

1100(1) h

1100(1) i

1100(1) j

1100(1) k
1100(1) l

1100(2) a

1100(2) b

1100(2) c

1100(2) d

1100(2) e

1100(2) f

1100(2) g

1100(2) h

1100(2) i

1100(2) j

1100(3) a

1100(3) b

1100(3) c

1100(3) d

1100(3) e

1100(3) f

1100(3) g

1100(3) h

1100(3) i

1100(3) j

1100(4) a

1100(4) b

1100(4) c

1100(4) d
1100(4) e

1100(4) f

1100(4) g

1100(4) h

1100(4) i

1100(4) j

1100(5) a

1100(5) b

1100(5) c

1100(5) d

1100(5) e

1100(5) f

1100(5) g

1100(6) a

1100(6) b

1100(6) c

1100(6) d

1100(6) e

1100(6) f

1100(6) g

1100(6) h

1100(6) i
1100(6) j

1100(6) k

1100(7) a1

1100(7) a2

1100(7) a3

1100(7) a4

1100(7) a5

1100(7) a6

1100(7) a7

1100(7) a8

1100(7) a9

1100(7) a10

1100(7) a11

1100(7) a12

1100(8)
1100(9)
1100(10)

1100(11)

ITEM 1101 – WIRES AND WIRING DEVICES


Pay Item Suffix (Subscript)
(Number)
1101(1) a1

1101(1) a2

1101(1) a3

1101(1) a4

1101(1) b1

1101(1) b2

1101(1) b3

1101(1) b4

1101(1) b5

1101(1) b6

1101(1) b7

1101(1) b8

1101(1) b9

1101(1) b10

1101(1) b11

1101(1) b12

1101(1) b13

1101(1) b14

1101(1) b15

1101(1) b16
1101(1) b17

1101(1) b18

1101(1) b19

1101(1) c1

1101(1) c2

1101(1) c3

1101(1) c4

1101(1) c5

1101(1) c6

1101(1) c7

1101(1) c8

1101(1) c9

1101(1) c10

1101(1) c11

1101(1) c12

1101(1) d1

1101(1) d2

1101(1) d3

1101(1) d4

1101(1) d5

1101(1) d6

1101(1) d7

1101(1) d8

1101(1) d9

1101(1) d10
1101(1) d11

1101(1) d12

1101(1) d13

1101(1) d14

1101(1) e1

1101(1) e2

1101(1) e3

1101(1) e4

1101(1) e5

1101(1) e6

1101(1) e7

1101(1) e8

1101(1) e9

1101(1) e10

1101(1) e11

1101(1) e12

1101(1) e13

1101(1) e14

1101(1) f1

1101(1) f2

1101(1) f3

1101(1) f4

1101(1) f5

1101(1) f6

1101(1) f7
1101(1) f8

1101(1) f9

1101(1) f10

1101(1) f11

1101(1) f12

1101(1) f13

1101(1) f14

1101(2) a1

1101(2) a2

1101(2) a3

1101(2) a4

1101(2) b1

1101(2) b2

1101(2) b3

1101(2) b4

1101(2) b5

1101(2) b6

1101(2) b7

1101(2) b8

1101(2) b9

1101(2) b10

1101(2) b11

1101(2) b12
1101(2) b13

1101(2) b14

1101(2) b15

1101(2) b16

1101(2) b17

1101(2) b18

1101(2) b19

1101(2) c1

1101(2) c2

1101(2) c3

1101(2) c4

1101(2) c5

1101(2) c6

1101(2) c7

1101(2) c8

1101(2) c9

1101(2) c10

1101(2) c11

1101(2) c12

1101(2) c13

1101(2) c14

1101(2) d1

1101(2) d2

1101(2) d3

1101(2) d4
1101(2) d5

1101(2) d6

1101(2) d7

1101(2) d8

1101(2) d9

1101(2) d10

1101(2) d11

1101(2) d12

1101(2) d13

1101(2) d14

1101(2) e1

1101(2) e2

1101(2) e3

1101(2) e4

1101(2) e5

1101(2) e6

1101(2) e7

1101(2) e8

1101(2) e9

1101(2) e10

1101(2) e11

1101(2) e12

1101(2) e13

1101(2) e14

1101(2) f1
1101(2) f2

1101(2) f3

1101(2) f4

1101(2) f5

1101(2) f6

1101(2) f7

1101(2) f8

1101(2) f9

1101(2) f10

1101(2) f11

1101(2) f12

1101(3)

1101(4)

1101(5)

1101(6)
1101(7)
1101(8)
1101(9)
1101(10)
1101(11)
1101(12)
1101(13)
1101(14) a

1101(14) b

1101(15)

1101(16)

1101(17)
1101(18)

1101(19)

1101(20)

1101(21)

1101(22)

1101(23)

1101(24)

1101(25)

1101(26)

1101(27)

1101(28)
1101(29)
1101(30)
1101(30)
1101(30)
1101(30)
1101(31)
1101(32)
1101(33)
1101(34)

ITEM 1102 — POWER LOAD CENTER, SWITCHGEAR AND PANELBOARDS, AND OTHER OVERCURREN
Pay Item Suffix (Subscript)
(Number)
1102(1)

1102(2)
1102(3)

1102(4)

1102(5)

1102(6)

1102(7)

1102(8)

1102(9)

1102(10)

1102(11)

1102(12)

1102(13)
1102(14)
1102(15)
1102(16) a1

1102(16) a2

1102(17)

1102(18)

1102(19)

1102(20)
1102(21)
1102(22)
1102(23)

ITEM 1103 - LIGHTING FIXTURES AND LAMPS


Pay Item Suffix (Subscript)
(Number)
1103(1)

1103(2)

ITEM 1104 - AUXILLARY SYSTEM


Pay Item Suffix (Subscript)
(Number)
1104(1)

ITEM 1105 - NETWORK CABLING SYSTEM


Pay Item Suffix (Subscript)
(Number)
1105(1) a
1105(1) b

1105(2) a

1105(2) b

1105(3)
1105(4)
1105(5)
1105(6)
1105(7)
1105(8)
1105(9)
1105(10)
1105(11)
1105(12)
1105(13)
1105(14)

1105(15)

1105(16)

1105(17)
1105(18)

1105(19)

1105(20)
1105(21)

ITEM 1106 - CCTV SYSTEM


Pay Item Suffix (Subscript)
(Number)
1106(1)
1106(2)
1106(3)
1106(4)
1106(5)
1106(6)
1106(7)
1106(8)

1106(9)
1106(10)
1106(11)
1106(12)

ITEM 1107 - PUBLIC ADDRESS SYSTEM


Pay Item Suffix (Subscript)
(Number)
1107(1)
1107(2)

1107(3)
1107(4)
1107(5)
1107(6)
1107(7)
1107(8)
1107(9)
1107(10)
1107(11)
1107(12)
1107(13)

ITEM 1108 - DOOR ACCESS AND CARD READER SYSTEg4


Pay Item Suffix (Subscript)
(Number)
1108(1)

1108(2)
1108(3)
1108(4)
1108(5) a
1108(5) b
1108(5) c

ITEM 1109 - GROUNDING SYSTEM


Pay Item Suffix (Subscript)
(Number)
1109(1)
1109(2)
1109(3)
1109(4) a

1109(4) b

1109(4) c

1109(4) d

1109(4) e

1109(4) g

1109(4) h

1109(4) i

1109(4) j

1109(4) k

1109(4) l

1109(4) m

1109(5) a

1109(5) b

1109(5) c

1109(5) d

1109(5) e

1109(5) f

1109(5) g

1109(5) h
1109(5) i

1109(5) j

1109(5) k

1109(5) l

1109(5) m

1109(5) n

1109(5) o

1109(5) p

1109(6) a

1109(6) b

1109(6) c

1109(6) d

1109(6) e

1109(6) f

1109(6) g

ITEM 1110 - NURSE CALL SYSTEIH


Pay Item Suffix (Subscript)
(Number)
1110(1)
1110(2)
1110(3)
1110(4)
1110(5)

ITEM 1111 - MISCELLANEOUS ELECTRICAL/CIVIL WORKS


Pay Item Suffix (Subscript)
(Number)
1111(1)

1111(2)

1111(3)

1111(4)
1111(5)
1111(6)
1111(7)
1111(8)
1111(9)
1111(10)

ITEM 1200 - AIR CONDITIONING AND VENTILATING SYSTEM


Pay Item Suffix (Subscript)
(Number)
1200(1)
1200(2) a
1200(2) b
1200(2) c
1200(3)
1200(4) a

1200(4) b
1200(4) c

1200(5) a

1200(5) b

1200(5) c

1200(5) d

1200(6)
1200(7)

1200(8)

1200(9)
1200(10)
1200(11) a
1200(11) b
1200(11) c
1200(11) d
1200(11) e
1200(12)
1200(13) a

1200(13) b
1200(13) c

1200(14)

ITEM 1201 - WATER PUMPING SYSTEM


Pay Item Suffix (Subscript)
(Number)
Pay Item Suffix (Subscript)
(Number)
1201(1)
1201(2)

1201(3)

1201(4)

1201(5)

1201(6)
1201(7)
1201(8)
1201(9) a
1201(9) b

1201(9) c

1201(9) d
1201(10) a
1201(10) b

1201(11)
1201(12)
1201(13)

ITEM 1202 - FIRE PROTECTION SPRINKLER SYSTEM (AFSS)


Pay Item Suffix (Subscript)
(Number)
1202(1)

1202(2)

1202(3)

1202(4)

1202(5)
1202(6) a1

1202(6) a2

1202(6) a3

1202(6) a4
1202(6) a5

1202(7)

1202(8)

ITEM 1203 — ELECTRIC ELEVATOR


Pay Item Suffix (Subscript)
(Number)
1203(1) a

1203(1) b

1203(1) c

1203(2)

ITEM 1204 - ELECTRIC DUMBWAITER


Pay Item Suffix (Subscript)
(Number)
1204(1)
1204(2)
1204(3)

ITEM 1205 — OXYGEN, NITROUS OXIDE, VACUUM AND FUEL GAS


Pay Item Suffix (Subscript)
(Number)
1205(1)

1205(2)

ITEM 1206 — HEATING SYSTEM


Pay Item Suffix (Subscript)
(Number)
1206(1)

1206(2)
1206(3)

ITEM 1207 - BOILER


Pay Item Suffix (Subscript)
(Number)
1207(1)

1207(2)
1207(3)

ITEM 1208 - FIRE ALARM SYSTEM


Pay Item Suffix (Subscript)
(Number)
1208(1)
1208(2)
1208(3)
1208(4)
1208(5)
1208(6)
1208(7)
1208(8)

1208(9)
1208(10)
1208(11)
1208(12)

ITEIH 1300 - PILING


Pay Item Suffix (Subscript)
(Number)
1300(1)

1300(2)

1300(3)
1300(4) a

1300(4) b

1300(5) a

1300(5) b

1300(6) a

1300(6) b

1300(7)

1300(8)

1300(9)

1300(10)
1300(11)
1300(12)

1300(13)

1300(14)

1300(15)

1300(16)

1300(17) a

1300(17) b

1300(17) c

1300(17) d

1300(17) e

1300(17) f

1300(17) g

1300(17) h

1300(17) i

1300(17) j

1300(17) k

1300(17) l

1300(17) m

1300(17) n

1300(17) o

1300(17) p

1300(17) q

1300(17) r

1300(17) s

1300(17) t
1300(17) u

1300(17) v

1300(17) w

1300(18)

1300(19)

1300(20)
1300(21)
1300(22)
1300(23) a1

1300(23) a2

1300(23) a3

1300(23) b1

1300(23) b2

1300(23) b3

1300(23) c1

1300(23) c2

1300(23) c3

1300(23) d1

1300(23) d2

1300(23) d3

1300(23) e1

1300(23) e2

1300(23) e3

1300(23) f1

1300(23) f2

1300(23) f3

1300(23) g1
1300(23) g2

1300(23) g3

1300(23) h1

1300(23) h2

1300(23) h3

1300(23) i1

1300(23) i2

1300(23) j1

1300(23) j2

1300(23) k1

1300(23) k2

1300(23) l1

1300(23) l2

1300(23) m1

1300(23) m2

1300(23) n1

1300(23) n2

1300(23) o1

1300(23) o2

1300(23) p1

1300(23) p2

1300(23) q1

1300(23) q2

1300(23) r1

1300(23) r2
1300(23) s1

1300(23) s2

1300(23) t1

1300(23) t2

1300(23) u1

1300(23) u2

1300(23) v1

1300(23) v2

1300(23) w1

1300(23) w2

1300(24)

1300(25)

1300(26) a

1300(26) b

1300(27)

1300(28) a
1300(28) b
1300(28) c
1300(29) a

1300(29) b

1300(29) c

1300(30) a

1300(30) b

1300(31)

1300(32)
1300(33)
1300(34)

1300(35)
PART G — PR
ITEM 1400 - MOORING FIXTURES
Pay Item Suffix (Subscript)
(Number)
1400(1)
1400(2)
1400(3)
1400(4)
1400(5)
1400(6)
1400(7)
1400(8)

ITEM 1401 — TIMBER WALING


Pay Item Suffix (Subscript)
(Number)
1401(1)

ITEM 1402 — FENDER CLUSTERS AND DOLPHINS


Pay Item Suffix (Subscript)
(Number)
1402(1) a
1402(1) b
1402(1) c
1402(1) d
1402(1) e
1402(1) f
1402(2)
1402(3)

ITEM 1403 - RUBBER DOCK FENDERS


Pay Item Suffix (Subscript)
(Number)
1403(1)

ITEM 1404 - FILTER FABRIC


Pay Item Suffix (Subscript)
(Number)
1404(1)
1404(2)

ITEM 1405 - REINFORCING MAT


Pay Item Suffix (Subscript)
(Number)
1405(1)

ITEM 1406 - DEFLECTOR WALL, BULKHEAD CURBS, AND STAIR LANDING


Pay Item Suffix (Subscript)
(Number)
1406(1)
1406(2)
1406(3)

ITEM 1407 - PRECAST BREAKWATER STRUCTURE


Pay Item Suffix (Subscript)
(Number)
1407(1)
1407(2)
1407(3)
1407(4)
1407(5)
1407(6)

ITEM 1500 — SAND MATTRESS


Pay Item Suffix (Subscript)
(Number)
1500(1)

ITEM 1501 — ROCKWORKS


Pay Item Suffix (Subscript)
(Number)
1501(1)
1501(2)
1501(3)

ITEM 1502 — FILTER MATERIALS


Pay Item Suffix (Subscript)
(Number)
1502(2)

ITEM 1503 - EXCAVATION FOR BULKHEADS AND RECLAMATION


Pay Item Suffix (Subscript)
(Number)
1503(1)

ITEM 1600 - EXCAVATION


Pay Item Suffix (Subscript)
(Number)
1600(1)

1600(2)
1600(3)

ITEM 1601 - FILL AND BACKFILL


Pay Item Suffix (Subscript)
(Number)
Pay Item Suffix (Subscript)
(Number)
1601(1)

ITEM 1602 - INSTALLATION OF PIPELINE


Pay Item Suffix (Subscript)
(Number)
1602(1)

1602(2)
1602(3)

1602(4)
1602(5)

ITEM 1603 — INSTALLATION OF VALVES


Pay Item Suffix (Subscript)
(Number)
1603(1)

ITEM 1604 — WATER TREATMENT PLANT


Pay Item Suffix (Subscript)
(Number)
1604(1)

Part 3 —

ITEM 1700 — CLEARING AND GRUBBING


Pay Item Suffix (Subscript)
(Number)
1700(1)
1700(2)
1700(3) a1

1700(3) a2

1700(3) a3

1700(3) a4

1700(4)

ITEM 1701 - CHANNEL EXCAVATION


Pay Item Suffix (Subscript)
(Number)
Pay Item Suffix (Subscript)
(Number)
1701(1)
1701(2)

1701(3)
1701(4)

ITEM 1702 — STRUCTURE EXCAVATION


Pay Item Suffix (Subscript)
(Number)
1702(1) a

1702(1) b

1702(1) c

1702(2) a

1702(2) b

1702(2) c

1702(3)
1702(4)

1702(5) a

1702(5) b

1702(6) a

1702(6) b

1702(6) c

ITEM 1703 - DREDGING


Pay Item Suffix (Subscript)
(Number)
1703(1) a

1703(1) b

1703(2)

1703(3)
1703(4)

1703(5)

ITEM 1704 - EMBANKMENT


Pay Item Suffix (Subscript)
(Number)
1704(1) a

1704(1) b

1704(2) a

1704(2) b

1704(3)
1704(4)

ITEM 1705 - FILL AND BACKFILL


Pay Item Suffix (Subscript)
(Number)
1705(1)
1705(2)

ITEM 1706 - HAULING AND DISPOSAL/OVERHAUL


Pay Item Suffix (Subscript)
(Number)
1706(1)

1706(2)

ITEM 1707 - AGGREGATE SUBBASE COURSE


Pay Item Suffix (Subscript)
(Number)
1707(1)

ITEM 1708 - AGGREGATE BASE COURSE


Pay Item Suffix (Subscript)
(Number)
1708(1)

ITEM 1709 - CRUSHED AGGREGATE BASE COURSE


Pay Item Suffix (Subscript)
(Number)
1709(1)

PART I-B - B
ITEM 1710 - RIPRAP AND GROUTED RIPRAP
Pay Item Suffix (Subscript)
(Number)
1710(1) a
1710(1) b
1710(1) c
1710(1) d
1710(2) a
1710(2) b
1710(2) c
1710(2) d
1710(3)

ITEM 1711 - STONE MASONRY


Pay Item Suffix (Subscript)
(Number)
1711(1)

ITEM 1712 — CONCRETE SLOPE PROTECTION


Pay Item Suffix (Subscript)
(Number)
1712(1)

1712(2)

ITEM 1713 — RUBBLE CONCRETE


Pay Item Suffix (Subscript)
(Number)
1713(1)

ITEM 1714 - GABIONS AND MATTRESSES


Pay Item Suffix (Subscript)
(Number)
1714(1) a1

1714(1) a2

1714(1) a3

1714(1) a4

1714(1) a5

1714(1) a6

1714(1) b1
1714(1) b2

1714(1) b3

1714(1) b4

1714(1) b5

1714(1) b6

1714(2) a1

1714(2) a2

1714(3)
1714(4) a1

1714(4) a2

1714(4) a3

1714(4) a4

1714(4) b1

1714(4) b2

1714(4) b3

1714(4) b4

1714(4) b5

1714(4) b6

ITEM 1715 - FILTER FABRIC


Pay Item Suffix (Subscript)
(Number)
1715(1)
1715(2)

ITEM 1716 - PILING


Pay Item Suffix (Subscript)
(Number)
1716(1)

1716(2)

1716(3)
1716(4) a

1716(4) b

1716(5) a

1716(5) b

1716(6) a

1716(6) b

1716(7)

1716(8)

1716(9)

1716(10)
1716(11)
1716(12)

1716(13)

1716(14)

1716(15)

1716(16)

1716(17) a

1716(17) b

1716(17) c

1716(17) d

1716(17) e

1716(17) f

1716(17) g

1716(17) h

1716(17) i
1716(18)

1716(19)

1716(20)
1716(21)
1716(22)
1716(23) a

1716(23) b

1716(23) c

1716(23) d

1716(23) e

1716(23) f

1716(23) g

1716(23) h

1716(23) i

1716(24)
1716(25)

1716(26) a

1716(26) b

1716(27)

1716(28) a

1716(28) b

1716(29)

1716(30)
1716(31)
1716(32)

1716(33)

ITEM 1717 — SHEET PILES


Pay Item Suffix (Subscript)
(Number)
1717(1)
1717(2) a1

1717(2) a2

1717(2) a3

1717(3) a1

1717(3) a2

1717(3) a3

1717(4) a1

1717(4) a2

1717(4) b

1717(4) c

1717(4) d

1717(5) a1

1717(5) a2

1717(5) a1

1717(5) a2

1717(5) a3

1717(6)

1717(7)
1717(8) a1

1718(8) a2

PA
ITEM 1718 - PILE CULVERTS AND STORM DRAINS
Pay Item Suffix (Subscript)
(Number)
1718(1)
1718(2)
ITEM 1719 - UNDERDRAINS
Pay Item Suffix (Subscript)
(Number)
1719(1)
1719(2)
1719(3)

1719(4) a1

1719(4) a2

1719(4) b

1719(5) a1

1719(5) a2

1719(5) a3

1719(6) a1

1719(6) a2

ITEM 1720 - MANHOLES, INLETS AND CATCH BASINS


Pay Item Suffix (Subscript)
(Number)
1720(1) a1

1720(1) a2

1720(1) a3

1720(1) a4

1720(1) a5

1720(1) a6

1720(1) a7

1720(1) b1
1720(1) b2

1720(1) b3

1720(1) b4

1720(1) b5

1720(1) b6

1720(1) b7

1720(2) a1
1720(2) a2
1720(2) a3
1720(2) a4

1720(2) a5

1720(2) a6

1720(3) a1

1720(3) a2

1720(3) a3

1720(3) a4

1720(3) a5

1720(3) a6

1720(4) a1

1720(4) a2

1720(4) a3

1720(4) a4

1720(4) a5

1720(4) a6

1720(5)

1720(6)
1720(7)
1720(8)
ITEM 1721 - CLEANING AND RECONDITIONING EXISTING DRAINAGE STRUCTURES
Pay Item Suffix (Subscript)
(Number)
1721(1)

1721(2)

1721(3)

1721(4)

ITEM 1722 - FENCE AND RAILINGS


Pay Item Suffix (Subscript)
(Number)
1722(1) a
1722(1) b
1722(1) c

1722(1) d
1722(1) e
1722(2)

ITEM 1724 - MAIN PUMPING STATION


Pay Item Suffix (Subscript)
(Number)
1724(1)

1724(2)

1724(3)

1724(4)

1724(5)

1724(6)
1724(7)

1724(8) a

1724(8) b

1724(9)

1724(10)
1724(11)

1724(12)

1724(13)

1724(14)

1724(15) a1

1724(15) a2

1724(15) a3

1724(15) a4

1724(15) a5

1724(16)

ITEM 1725 — INTERMEDIATE PUMPING STATION


Pay Item Suffix (Subscript)
(Number)
1725(1)

1725(2)

1725(3)

1725(4)

1725(5)

1725(6)
1725(7)

1725(8) a
1725(8) b

1725(9)
1725(10)

1725(11) a1

1725(11) a2

1725(11) a3

1725(11) a4

1725(11) a5

ITEM 1726 - ELECTRO MECHANICAL FOR PUMPING STATION


Pay Item Suffix (Subscript)
(Number)
1726(1)

1726(2)
1726(3)

ITEM 1727 - AUXILIARY AND FACILITY EQUIPMENT


Pay Item Suffix (Subscript)
(Number)
1727(1)
1727(2) a
1727(2) b
1727(2) c
1727(3) a
1727(3) b
1727(3) c
1727(4) a

1727(4) b

1727(5)

1727(6)

1727(7)
PART A - FACILITIES FOR THE ENGINEER
for the Engineer
Description

Construction of Combined Field Office, Laboratory and Living Quarters Building for the Engineer

Construction of Combined Field Office and Laboratory


Buildinq for the Enqineer

Construction of Field Office for the Engineer

Construction of Field Laboratory for the Engineer

Construction of Living Quarters for the Engineer

Provision of Combined Field Office, Laboratory and


Living Quarters Building for the Engineer (Rental Basis)

Provision of Combined Field Office and Laboratory Building for the Engineer (Rental Basis)

Provision of Field Office for the Engineer (Rental Basis)

Provision of Laboratory for the Engineer (Rental Basis)

Provision of Living Quarters for the Engineer (Rental Basis)

Provision of Furnitures/Fixtures, Equipment &


Appliances for the Field Office for the Enqineer

Provision of Furnitures/Fixtures, Equipment & Appliances for Laboratory Building for the Engineer

Provision of Furnitures/Fixtures & Appliances for the Living Quarters for the Enqineer
Provision of Laboratory Testing Equipment, Apparatus and Publications for the Enqineer

Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the
Engineer

Operation & Maintenance of Field Office for the Engineer

Operation & Maintenance of Laboratory Building for the Engineer

Operation & Maintenance of Living Quarters for the Engineer

Description

Provision of 4x4 Pick Up Type Service Vehicle for the Engineer

Provision of 4x4 Pick Up Type Service Vehicle for the Engineer on Bare Rental Basis

Provision of 4x2 Pick Up Type Service Vehicle for the Engineer

Provision of 4x2 Pick Up Type Service Vehicle for the Engineer on Bare Rental Basis

Operation and Maintenance of 4x4 Pick Up Type Service Vehicle for the Engineer

Operation and Maintenance of 4x2 Pick Up Type Service Vehicle for the Engineer

Provision of 4x4 Van Type Service Vehicle (12-seater)

Provision of 4x4 Van Type Service Vehicle on Rental Basis (12 Seater)
Operation and Maintenance of 4x4 Van Type Service Vehicle (12-seater)

Description

Provision of Field Office Staff for the Assistance to the Engineer

Provision of Survey Equipment for the Assistance to the Engineer

Provision of Survey Personnel for the Assistance to the Engineer

Provision of Laboratory Personnel for the Assistance to the Engineer

Description

Provision of Progress Photographs

Description

Provision of Communication Facility for the Engineer

Operation and Maintenance of Communication Facility for the Enqineer

PART B - OTHER GENERAL REQUIREMENTS


Description

Offices, Shops, Stores and Workmens Accommodation for Contractor

Medical Room and First Aid Facilities

Permits and Clearances


Construction survey and staking

Slope, reference, and clearing and grubbing stakes

Centerline reestablishment
Culvert survey and staking
Bridge survey and staking
Retaining wall survey and staking

Grade finishing stakes


Permanent monuments and markers

Miscellaneous survey and staking

PlisceIIaneous survey and staking

Project Billboard / Signboard

Installation of ODA Recognition Plate

Occupational Safety and Health Proqram

Occupational Safety and Health Program

Traffic Management
Traffic Management
Mobilization/Demobilization
Dayworks
Provisional Sum
Removal and Relocation of Utilities

Additional Geotechnical Investigation

Environmental Management and Monitoring

Detour/Access Road
Detour/Access Road
Recognition Plate/Project Narker

Temporary Diversion of Waterway

Craneway
Craneway
Geotechnical Exploration
Temporary Fence
Temporary Bridge
Support Equipment
Staging Area
General Scaffolding and Shoring

Detailed Engineering and Architectural Design

PART C - EARTHWORK
RUBBING
Description

Clearing and Grubbing


Clearing and Grubbing
Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees

RUCTURES AND OBSTRUCTIONS


Description

Removal of Structures and Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/obstruction

Removal of Actual Structures/obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/obstruction


Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/obstruction

Removal of Actual Structures/obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures*

Removal of Actual Structures

Removal of Actual Structures*

Removal of Actual Structures*

Removal of Actual Structures

Removal of Actual Structures*

Removal of Actual Structures*

Removal of Actual Structures*


Removal of Actual Structures*

Removal of Actual Structures*

Removal of Actual Structures*

Removal of Actual Structures

Removal of Actual Structures/Obstruction

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts


Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Structures and Obstruction

Removal of Structures and Obstruction

Removal of Structures and Obstruction

Removal of Structures and Obstruction

Removal of Existing Guardrails

Removal of Existing Guardrail Posts

Removal of Existing Road Signs

Description
Unsuitable Excavation
Surplus Common Excavation

Surplus Rock Excavation

Surplus Rock Excavation

Surplus Unclassified Excavation

AVATION
Description

Structure Excavation

Structure Excavation

Structure Excavation

Bridge Excavation

Bridge Excavation

Bridge Excavation

Foundation Fill
Excavation ordered below Plan elevation

Shoring, cribbing and related works

Shoring, cribbing and related works

Pipe culverts and drain excavation

Pipe culverts and drain excavation

Pipe culverts and drain excavation

Description

Embankment from roadway excavation

Embankment from roadway excavation


Embankment from roadway excavation

Embankment from borrow

Embankment from borrow

Embankment from borrow

Embankment from borrow

Embankment from borrow

Selected Borrow for topping

Selected Borrow for topping

Earth Berm
Boulder Fill
Preload, relocated, and compacted

Embankment from structure excavation

ARATION
Description

Subgrade Preparation

Subgrade Preparation

Subgrade Preparation

Subgrade Preparation

Subgrade Preparation

Subgrade Preparation

UIPMENT AND DENSITY CONTROL STRIPS


Description

Compaction Equipment and Density Controls Strips

the cost of COf75tructingthe controf strip will be considered incidentaf to the cost of the work item for which a COntrol st
Description

Overhaul
Overhaul
Overhaul of Borrow

Overhaul of Borrow

PART D — SUBBASE AND BASE COURSE

BASE COURSE
Description

Aggregate Subbase Course

E COURSE
Description

Aggregate Base Course

EGATE BASE COURSE


Description

Crushed Appregate Base Course

D ROAD MIX BASE COURSE


Description

Lime Stabilized Road Mix Base Course

Lime Stabilized Road Mix Base Course

NT STABILIZED ROAD MIX BASE COURSE


Description

Portland Cement Stabilized Road Mix Base Course

Portland Cement Stabilized Road dlix Base Course

IZED ROAD MIX BASE COURSE


Description
Asphalt Stabilized Road Mix Base Course

Asphalt Stabilized Road I‘flix Base Course

ABILIZED ROAD MIX SUB-BASE/BASE COURSE


Description

Polymer-Based Chemical Soil Additive

NT TREATED PLANT MIX BASE COURSE


Description

Portland Cement treated Plant dlix Course

Portland Cement treated Plant Mix Course

CKPILE
Description

Aggregate Stockpile

ED PLANT MIX BASE COURSE


Description

Asphalt Treated Plant Mix Base Course

T
Description

Crack and Seat


PART E - SURFACE COURSE
RFACE COURSE
Description

Gravel Surface Course


Crushed Appregate Surface Course

IME COAT
Description
Bituminous Prime Coat - MC— Cut-back Asphalt

Bituminous Prime Coat - MC— Cut-back Asphalt

Bituminous Prime Coat - MC— Cut-back Asphalt

Bituminous Prime Coat - MC— Cut-back Asphalt

Bituminous Prime Coat - MC— Cut-back Asphalt

Bituminous Prime Coat - RC — Cut-back Asphalt

Bituminous Prime Coat - RC — Cut-back Asphalt

Bituminous Prime Coat - RC — Cut-back Asphalt

Bituminous Prime Coat - RC — Cut-back Asphalt

CK COAT
Description

Bituminous Tack Coat - RC — Cut-back Asphalt

Bituminous Tack Coat - RC — Cut-back Asphalt

Bituminous Tack Coat - RC — Cut-back Asphalt

Bituminous Tack Coat - RC — Cut-back Asphalt

Emulsified Asphalt

AL COAT
Description

Cover Agprepate
Cover Agprepate
Cover Aggregate

Bituminous Seal Coat - MC-Cut-back Asphalt

Bituminous Seal Coat - MC-Cut-back Asphalt

Bituminous Seal Coat - MC-Cut-back Asphalt

Bituminous Seal Coat - MC-Cut-back Asphalt

Bituminous Seal Coat - MC-Cut-back Asphalt

Bituminous Seal Coat - RC-Cut-back Asphalt

Bituminous Seal Coat - RC-Cut-back Asphalt

Bituminous Seal Coat - RC-Cut-back Asphalt

Bituminous Seal Coat - RC-Cut-back Asphalt

Asphalt Cement Penetration Grade

URFACE TREATMENT
Description

Aggregate Grading
Asphalt Cement Penetration Grade

Bituminous Surface Treatment - RC-Cut-back Asphalt

Bituminous Surface Treatment - RC-Cut-back Asphalt

Bituminous Surface Treatment - RC-Cut-back Asphalt

Bituminous Surface Treatment - RC-Cut-back Asphalt


Bituminous Surface Treatment - MC-Cut-back Asphalt

Bituminous Surface Treatment - MC-Cut-back Asphalt

Bituminous Surface Treatment - MC-Cut-back Asphalt

Bituminous Surface Treatment - MC-Cut-back Asphalt

Bituminous Surface Treatment - MC-Cut-back Asphalt

Emulsified Asphalt

M FOR ROAD SURFACE TREATMENT


Description

Slurry Surface Treatment (SST)

Slurry Seal
Micro-surfacing

NETRATION MACADAM PAVEMENT


Description

Aggregates
Asphalt Cement
Bituminous Penetration Macadam Pavement - RC-Cut-back Asphalt

Bituminous Penetration Macadam Pavement - RC-Cut-back Asphalt

Bituminous Penetration Macadam Pavement - RC-Cut-back Asphalt

Bituminous Penetration Macadam Pavement - RC-Cut-back Asphalt

Emulsified Asphalt

AD MIX SURFACE COURSE


Description
Aggregate for Bituminous Road Mix Surface Course

Bituminous Material for Bituminous Road Mix Surface Course

LANT-MIX SURFACE COURSE - GENERAL


Description

his item shall be the number of square Meters (m°) of asphalt pavement pfaced, compacted and aCcepted based on the Th

ANT- MIX SURFACE COURSE, COLD-LAID


Description

Bituminous Plant-Mix Surface Course, Cold-Laid

ANT-MIX (STOCKPILE MAINTENANCE MIXTURE)


Description

Bituminous Plant-Mix (Stockpile Maintenance Mixture)

NCRETS SURFACE COURSE, HOT-LAID


Description

Bituminous Concrete Surface Wearing Course, Hot-Laid

Bituminous Concrete Surface Wearing Course, Hot-Laid

Bituminous Concrete Surface Wearing Course, Hot-Laid

Bituminous Concrète Surface Binder Course, Hot-Laid

Bituminous Concrète Surface Binder Course, Hot-Laid

Bituminous Concrete Surface Binder Course, Hot-Laid

Asphaltic Concrete With Lahar as Fine Aggregate Replacement


Bituminous Concrete Surface Wearing Course, Stone Mastic

Bituminous Concrete Surface Wearing Course, Stone Mastic

Bituminous Concrete Surface Wearing Course, Stone Mastic

Bituminous Concrete Surface Binder Course, Stone Mastic

Bituminous Concrete Surface Wearing Course, PMB

Bituminous Concrete Surface Wearing Course, PMB

Bituminous Concrete Surface Wearing Course, PMB

NT CONCRETE PAVEMENT
Description

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)


Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)


Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Unreinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)


Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)


Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement (Reinforced with Wire Mesh)


Portland Cement Concrete Pavement (Reinforced with Wire Mesh)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)
Portland Cement Concrete Pavement with Coralline Materials as Coarse Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Reinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Reinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Reinforced)

Portland Cement Concrete Pavement with Dolomites as Aggregates (Reinforced)


Portland Cement Concrete Pavement with Dolomites as Aggregates (Reinforced)

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement


Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Roller Compacted Concrete Pavement

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)


Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Unreinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)


Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Elasto Barchip-Synthetic Fibers (Reinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)


Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

Portland Cement Concrete Pavement with Forta-Ferro Fibers (Unreinforced)

HOT LAID
Description

Rock Asphalt

PART F - BRIDGE CONSTRUCTION

Description

Untreated Timber Piles, furnished

Treated Timber Piles, preservative, furnished

Steel H-Piles, furnished

Steel H-Piles, furnished

Steel H-Piles, furnished


Steel H-Piles, furnished

Precast Concrete Piles, furnished

Precast Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Structural Steel Sheet Piles, furnished

Precast Concrete Sheet Piles, furnished

Untreated Timber Piles, driven

Treated Timber Piles, driven

Steel H-Piles, driven


Steel Pipes Piles
Structural Steel Sheet Piles, driven

Precast Concrete Sheet Piles, driven

Precast Concrete Piles, driven

Precast, Prestresssed Concrete Piles, driven

Test Piles, furnished and driven

Test Piles, furnished and driven

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes


Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Steel Shells

Concrete Piles cast in Steel Shells

Concrete Piles cast in Steel Pipes

Concrete Piles cast in Steel Pipes

Pile Shoes
Splices
Load Tests
Permanent Casinp
Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casing

Permanent Casinp

Permanent Casinp

Permanent Casinq

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casing

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp

Permanent Casinp
Permanent Casinp

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casinq

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing
Permanent Casinq

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing
Splicing of R.C. Piles with Epoxy

Pile Integrity Testing

Pile Integrity Testing

High Strain Dynamic Testinq (P.D.A)

Sand Compaction Pile


Sand Compaction Pile
Sand Compaction Pile
Gravel Compaction Pile

Gravel Compaction Pile

Gravel Compaction Pile

Rammed Aggregate Piers


Vibro Stone Columns
Modulus or Uplift Load Tests

Steel Casinp

Description

Metal Railing

Metal Railing

Metal Railing
Concrete Railing
Concrete Railing
Concrete Railing
Wooden Railing
Stone and Brick Railing
Pedestrian Railing

URES
Description
Description

Timber Structure
Timber Structure

URES
Description

Structural Steel, furnished

Structural Steel, furnished

Structural Steel, fabricated

Structural Steel, fabricated

Structural Steel, erected

Structural Steel, erected

Structural Steel, furnished, and fabricated

Structural Steel, furnished, and fabricated

Structural Steel, furnished, fabricated, and erected

Structural Steel, furnished, fabricated, and erected

Structural Steel, painting works

Bolts with Nuts and Washers

Rivets
Removal and Replacement of Rivets

TEEL
Description

Reinforcing Steel

Reinforcing Steel

REINFORCING STEEL BARS


Description

Epoxy-Coated Reinforcing Steel Bars


Epoxy-Coated Reinforcing Steel Bars

ONCRETE
Description

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

StructuralConcrete

StructuralConcrete

StructuralConcrete

StructuralConcrete

StructuralConcrete

StructuralConcrete

StructuralConcrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete
Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Seal Concrete
Structural Concrete, painting works

Structural Concrete (Box Girder)

Structural Concrete (Segmental Box Girder)

Protective Mortar (using PCM w/ Lithium)

Structural Precast Concrete

Structural Precast Concrete

Structural Precast Concrete

Structural Precast Concrete

Structural Precast Concrete

Structural Precast Concrete

ONCRETE STRUCTURES
Description

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members


Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members


Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Plembers

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Plembers

Prestressed Structural Concrete Nlembers

Prestressed Structural Concrete Nlembers

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Plembers

Prestressed Structural Concrete Nlembers


Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members


Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Plembers

Prestressed Structural Concrete Plembers

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members

Prestressed Structural Concrete Members


Prestressed Structural Concrete Plembers

Prestressed Concrete

Prestressed Concrete

Installation, Tensioning and Grouting of Prestressing Steel

TURES
Description

Concrete (Refer to Item 405)

Concrete Post/Baluster Railings (Refer to Item 401)

Parapet Walls
Piling (Refer to Item 400)
Structure Excavation (Refer to Item 103)

Sidewalk Concrete (Refer to Item 601)

Reinforcing Steel Bars (Refer to Item 404)

Lean Concrete (Refer to Item 901)

ecified, means of identiFiCotion shall be inserted in parenthesis immediatefy otter the Pop Item end fetter suti'ixes shaff be

Description

Steel Bridges
rescribed above, shaff be paid for at the Contract vot// priCe for the several Pay Items which price and payments shaff be

TURAL STEEL
Description

Welded Structural Steel


Tightening/Retightening of High Tension Bolt

Special Provisions, we/ded structura/ steel structures sha// not be measured and paid for separate/y, but the cost thereo

NTREATED TIMBER
Description
Description

Timber
Treated Timber

Description

Paint
Paint
*Printing shafl not be measured and paid for separatefy, but the cost thereofshal/ be considered as incftided in

EARING PADS
Description

Elastomeric Bearing Pads


Disk Rubber Bearing Shoe

T SYSTEMS
Description

Preformed Sponge Rubber Joint Expansion

Preformed Cork 3oint Expansion

Premolded Expansion Joint Filler with Sealant

Premolded Expansion Joint Filler with Sealant

Expansion Joint
Expansion Joint

Expansion Joint

Expansion Joint
Expansion Joint

Expansion Joint

Elastomeric, Hot-Applied Expansion Joint Sealant


(with Single-Sized Aggregates)

Asphaltic Plug Joints (APJ) for Bridges

Asphaltic Plug Joints (APJ) for Bridges


Expansion Dam for Bridges

Expansion Dam for Bridges

Expansion Joint

EWORKS
Description

Forms and Falsework

NER
Description

Cable Restrainer
Cable Restrainer

CED POLYMER
Description

Carbon Fiber
Carbon Fiber
Carbon Fiber
Carbon Fiber
Carbon Fiber
Carbon Fiber
Aramid Fiber
Aramid Fiber
Aramid Fiber
Aramid Fiber
Aramid Fiber
Glass Fiber
Glass Fiber

ES
Description

Bearing Devices

Bearing Devices

Bearing Devices

ECK
Description

Bridqe Steel deck


Bridoe Steel deck
ECK
Description

Corruqated Steel Plate


Corrugated Steel Plate

PART G - DRAINAGE AND SLOPE PROTECTION STRUCTU


ND STORM DRAIN
Description

Pipe Culverts

Pipe Culverts

Pipe Culverts

Pipe Culverts

Pipe Culverts

Pioe Culverts

Pipe Culverts

Pipe Culverts

Pipe Culverts

Pipe Culverts

Pipe Culverts

Pipe Culverts

Pipe Culverts

Storm Drain
Lined Canal

Lined Canal

Lined Canal

Lined Canal

Lined Canal
Description

Underdrain
Blind drain
Granular backfill filter material for underdrains

Underdrain
Blind drain

ETS ANDCATCH BASINS


Description

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

manholes

Manholes

Manholes

Inlets, type
Inlets, type
Inlets, type
Inlets, type

Inlets, type

Inlets, type

Inlets, type
Catch basins
Catch basins
Catch basins
Catch basins

Catch basins

Catch basins

Catch basins

Concrete covers

Concrete covers

Concrete covers

Concrete covers

Concrete covers

Concrete covers

Concrete covers

Metal frames and gratings, type

Metal frames and covers


Adjusting manholes
Adjusting catch basin
Berm Ditch Gutter
U-Type Vertical Slope Ditch

Splash Pad

EL GRATING WITH FRAME


Description

PletaI frames and grating


Metal frames and grating

ECONDITIONING EXISTING DRAINAGE STRUCTURES


Description

Removing, cleaning, stockpiling salvaged culvert pipe

Removing, cleaning, stockpiling salvaged culvert pipe


Removing, cleaning, stockpiling salvaged culvert pipe

Removing, cleaning, stockpiling salvaged culvert pipe

Removing, cleaning, stockpiling salvaged culvert pipe

Removing, cleaning, stockpiling salvaged culvert pipe

Removing, cleaning, and relaying salvaged culvert


pipe

Removing, cleaning, and relaying salvaged culvert


pipe

Removing, cleaning, and relaying salvaged culvert


pipe

Removing, cleaning, and relaying salvaged culvert


pipe

Removing, cleaning, and relaying salvaged culvert


pipe

Removing, cleaning, and relaying salvaged culvert


pipe

Cleaning culvert pipe in place

Cleaning culvert pipe in place

Cleaning culvert pipe in place

Cleaning culvert pipe in place

Cleaning culvert pipe in place

Cleaning culvert pipe in place

Reconditioninq drainaqe structures


Cleaning/Reconditioninp of drainage structures

ge structure is described for on Item in the Bid SChedufe, letter suffixes shafl be added to the item Number to diiTerentiat
ve appears in the Bid Schedufe, the pipe removed rriffbe considered as incfuded in the work Item 101, Remo of of Structu

UTED RIPRAP
Description

Riprap
Riprap
Riprap
Riprap
Grouted Riprap
Grouted Riprap
Grouted Riprap
Grouted Riprap
Filter layer of granular material

Y
Description

Stone Masonry

ETE
Description

Rubble Concrete

K EMBANKMENT
Description

Hand-Laid Rock Embankment

Description

Sheet Piles

Sheet Piles

Sheet Piles

Sheet Piles

Sheet Piles

Sheet Piles
Sheet Piles

Sheet Piles

E PROTECTION
Description

Bed Course Granular Material Concrete

Concrete

ATTRESSES
Description

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Mattresses

Mattresses

Filter Cloth
Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion


Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

OL MATS, ROVING, AND CELLULAR CONFINEMENT SYSTEMS


Description

Erosion Control Mat

Erosion Control Mat

Erosion Control Mat

Erosion Control Mat

Erosion Control Mat

Rovinp
Cellular Confinement Systems

OUND ANCHORS
Description

Permanent Ground Anchor

NCRETE SPRAY)
Description

Shotcrete with reinforcing steel

Shotcrete with reinforcing fibers

STABILIZED EARTH (MSE) RETAINING WALLS


Description

Mechanically-Stabilized Earth (MSE) Retaining Walls

Select Granular Backfill


Structural Backfill
ONRY (COBBLE STONE)
Description

Wet Stone Masonry


Wet Stone Masonry

Description

Drain Pipe
Drain Pipe
Replacement of Drain Pipe
Deck Drain

Deck Drain

Description

Hydroseeding

CTION SYSTEM
Description

Rockfall Netting
Rockfall Barrier

STEM FOR UNSTABLE SLOPE


Description

Active Protection System


Passive/Rockfall Barrier

Description

Landslide Protection System

PART H – MISCELLANEOUS STRUCTURES

ER
Description

Concrete Curb

Asphalt Curb
Concrete Gutter

Curb and Gutter

Concrete Curb
Concrete Gutter
Curb and Gutter

Description

Sidewalk

ARKERS AND GUIDE POSTS


Description

Right-of-Way monuments

Right-of-Way monuments

Maintenance marker posts

Maintenance marker posts

Maintenance marker posts

Kilometer posts

Kilometer posts
Guide Posts

Guide Posts
Guide Posts

Guide Posts

Precast Guide posts

Cast-in-place Guide posts

Description

Guardrail (Wire rope or Wire cable)

Cable Guardrail (Chain Link Fabric)

Metal Guardrail (Metal Beam) Including Post

Metal Guardrail (Metal Beam) Including Post

Metal Guardrail (Metal Beam) Including Post

Metal Guardrail (Metal Beam) Including Post

Metal Beam End Piece

Metal Beam End Piece

Metal Beam End Piece

Guardrail (Timber)
Installation of Metal Guardrail (Metal Beam) Including Post
Installation of Metal Guardrail (Metal Beam) Including Post

Description

Fencing Barbed wire


Fencing Chain Link Fence Fabric

Fencing Posts
Fencing Gates
Concrete Fence including Post

Precast Concrete Fencing including Post

Precast Concrete Fencing including Post

Description

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs
Warning Signs

Warning Signs

Warning Signs

Warning Signs

Warning Signs

Regulatory Sipns

Regulatory Sipns

Regulatory Sipns

Regulatory Sipns

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs
Regulatory Signs

Regulatory Signs

Regulatory Signs

Regulatory Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs


Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Siqns

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs


Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs


Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Guide or Information Signs

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways
Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways
Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways
Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways
Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Signs on Expressways

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs


Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs


Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs


Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

Traffic Instruction Signs

KINGS
Description

Pavement markings

Pavement markings

Pavement markings

Pavement markings

EMENT STUDS
Description

Reflectorized Pavement Studs Flush Type

Reflectorized Pavement Studs Flush Type

Reflectorized Pavement Studs Raised Profile Type

Reflectorized Pavement Studs Raised Profile Type


Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type

Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type

Description

Furnishing and Placing Topsoil

Placing Topsoil

Description

Sprigging
Sprigging

Description

Sodding

Description

Trees Furnishing and Transplanting

Trees Transplanting

RMOPLASTIC STRIPING MATERIAL (SOLID FORM)


Description

Reflectorized Thermoplastic Pavement Markings, White

Reflectorized Thermoplastic Pavement Markings, Yellow

Removal of Existing Reflectorized Thermoplastic Pavement Markings

SEALANT (HOT-POURED ELASTIC AND COLD-APPLIED TYPES)


Description
Concrete Joint Sealant (Hot-Poured Elastic Type)

Concrete Joint Sealant (Cold-Applied Type)

Description

Waterstop
Waterstop
Waterstop
Waterstop

Description

Noise Barrier

THERMOPLASTIC RUMBLE STRIPS


Description

Reflectorized Thermoplastic Rumble Strips

NGINEERING SOLUTIONS
Description

Coco-net
Coco-net
Coco-net
Coco-logs/Fascine
Coco-logs/Fascine
Coco-logs/Fascine
Coco-logs/Fascine
Coco-logs/Fascine
Vegetation
Vegetation

IZATION PROJECTS
Description

Supply & Install Local Controller Microprocessor type

Supply & Install Local Controller Microprocessor type


Supply & Install Local Controller Microprocessor type

Supply & Install Traffic Signal Flasher Controller

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type


Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply & Install Traffic Signal Head, LED-type

Supply and Install Pedestrian Signal Head, LED-type

Supply and Install Pedestrian Pushbutton Assembly

Supply & Install Traffic Signal Pole

Supply & Install Traffic Signal Pole

Supply & Install Traffic Signal Pole

Supply & Install Traffic Signal Pole

Supply & Install Traffic Signal Pole

Trenching - Double Barrel

Trenching - Single Barrel

Trenching - Double Barrel

Trenching - Single Barrel


Trenching - Double Barrel

Trenching - Single Barrel

Trenching - Double Barrel

Trenching - Single Barrel

Handhole
Handhole
Supply and Install Vehicle Detector

Supply and Install Vehicle Detector

Installation of Local Controller inc. Testing & Commissioning

Complete Installation of Local Wiring & Connection to Local Controller

Customization of Local Controller

Local Controller Microprocessor type

Local Controller Microprocessor type

Local Controller Microprocessor type

Traffic Signal Flasher Controller

Detector Card/Board

Detector Card/Board

Traffic Signal Head, LED-type


Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Traffic Signal Head, LED-type

Pedestrian Signal Head, LED-type

Pedestrian Pushbutton Assembly


Mounting Bracket

Mounting Bracket

Arrow Mask

Arrow Mask

Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head

Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head

Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head

Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head

Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head

Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head

Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head
Target Board Polycarbonate or Powder-coated, Aluminum Substrate for Traffic Signal Head

Traffic Signal Control Cable

Traffic Signal Control Cable

Traffic Signal Control Cable

Traffic Signal Control Cable

Traffic Signal Control Cable

Loop Detector Cable

Loop Feeder Cable


Loop Sealant
Splicing Kit
Grounding Cable
Electricity/Power Supply Cable

Main Circuit Breaker

Mounting Strap
Plounting Buckle
Terminal Board (20P)

Terminal Lugs
Grounding Rod & Connector

Local Controller Footing

Footing

Footing

Footing
Footing
Footing
Loop Detector Installation

Concrete Bollard
Protection Cape for Local Controller

ING
Description
Single Arm Post, with Street Light

Single Arm Post, with Street Light

Single Arm Post, with Street Light

Single Arm Post, with Street Light

Single Arm Post, with Street Light

Single Arm Post, with Street Light

Single Arm Post, with Street Light

Double Arm Post, with Street Light

Double Arm Post, with Street Light

Double Arm Post, with Street Light

Double Arm Post, with Street Light

Double Arm Post, with Street Light

Double Arm Post, with Street Light

Double Arm Post, with Street Light

Undercarriage Luminaire

Undercarriage Luminaire

Warning Light, Complete with Conduits

Lighting Control Panel


Main Feeder Distribution System

Photoelectric Cells
Solar LED Street Light
Underground Electrical Works

Roadway Lighting
D TRAFFIC CONTROL DEVICES
Description

Delineators

Delineators

Delineators

Delineators

Delineators

Delineators

Delineators

Delineators

Delineators

Delineators
Linear Delineation System

Linear Delineation System

Linear Delineation System

Linear Delineation System

Tubular Markers

Tubular Markers

Road Safety Barrier System

Road Safety Barrier System

Road Safety Barrier System

Road Safety Barrier System

Road Safety Barrier System

Road Safety Barrier System

Impact Attenuator/Crash Cushion

Impact Attenuator/Crash Cushion

Impact Attenuator/Crash Cushion


Impact Attenuator/Crash Cushion

Impact Attenuator/Crash Cushion

Impact Attenuator/Crash Cushion

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices


Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

Traffic Control Devices

NS (ROADWORKS)
Description

Advance Warning Sipns


Advance Warning Sipns

Advance Warning Signs

Advance Warning Sipns

Advance Warning Sipns

Advance Warning Sipns

Advance Warning Signs

Advance Warning Sipns

Advance Warning Sipns

Regulatory Control Signs

Regulatory Control Signs

Regulatory Control Signs

Regulatory Control Signs

Regulatory Control Signs

Regulatory Control Signs

Regulatory Control Signs

Detour Signs
Detour Signs

Detour Signs

Detour Signs

Detour Signs

Detour Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs

Road Conditions and Hazard Signs


Road Conditions and Hazard Signs

Lane and Road Closure Signs

Lane and Road Closure Signs

Lane and Road Closure Signs

Blasting Signs

Blasting Signs

Pedestrian Control Signs

Pedestrian Control Signs

Pedestrian Control Signs

Pedestrian Control Signs

ON (WIM) AND TRAFFIC COUNTING


Description

Supply and Install Road Sensors

Supply and Install Road Sensors

Supply and Install Road Sensors

Supply and Install Road Sensors


Supply and Install Road Sensors

Supply and Install Road Sensors

Supply and Install Road Sensors

Supply and Install Road Sensors

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)


Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Supply and Install Automatic Traffic Counter/Classifier (ATC)

Complete Installation of Local Wiring and Connection to ATC including Testing & Commissioning

Supply and Install ATC Software

Supply and Install Solar Panel

Supply and Install Permanent Type Weigh-in-Motion


Axle Scale

Supply and Install Permanent Type Weigh-in-Motion


Axle Scale

Supply of Portable Weigh-in-Motion Axle Scale

Supply and Install WIM CPU/Console

Supply and Install LED Display

Complete Installation of Local Wiring and Connection to CPU/Console including Testing & Commissioning

Supply and Install WIM Software


Automatic traffic counter/classifier (ATC)

Automatic traffic counter/classifier (ATC)

Pneumatic road tubes


Road tube cable grip

Road tube cable grip

Road tube cable grip

Road tube anchor

Road tube anchor

Road tube anchor

Replacement road case


Battery pack
Battery pack
Battery pack
Battery pack
Inductive loop detector cable

Piezoelectric axle sensor

Piezoelectric axle sensor

Remote access hardware


Solar panel
WIM strip scale
Weighing scale indicator
Load cell
External axle weight/ticket printer

Roll-up ramp/levelling pad


Conductor cable with shield
Concrete bollard/protection post

Roadside Cabinet or Protection Cage with


Identification Plate

Portable Weigh-In Motion Axle Scale (PWIM)

Weigh-In-Motion (WIM) Systems


Automatic Traffic Counter/Classifier (ATC) Equipment

ROFITTING WORKS
Description

Waterproofing on Deck Slab

Waterproofing on Deck Slab

Epoxy Coating on Crack


Epoxy Injection on Crack
Replacement of Expansion Joint

Waterproof Expansion Joint


Caulkinp
Patching
Partial Deck Slab Replacement

Special Anti-Corrosion Paint


Dismantling and Reinstallation of Existing Signs

Structural Concrete Injection and Crack Repair

Protective Coating for Concrete Structures

Bridge Seat Extension

SLOPE PROTECTION
Description

Bamboo Cribbing

ORTS FIELD ITEMS


Description

Rubberized Playing Field


Artificial Turf

ORAGE
Description

Drill and Bond Dowels


Drilling of Anchor Bolts

XY MORTAR FOR SUBMERGED AND WET CONCRETE STRUCTURES


Description
Description

High Flow Epoxy Mortar for Submerged and Wet Concrete Structures

PART I - MATERIALS DETAILS


ENT
Description

Portland Cement and Masonry Cement

LIME (HYDRATED)
Description

Construction Lime (Hydrated)

TERIALS
Description

Bituminous Naterials

Description

Aggregates

R
Description

Mineral Filler

Description

Masonry Units

S
Description

Joint Materials

PLASTIC ANDFIBER PIPE


Description

Concrete, Clay, Plastic and Fiber Pipe


Description

Metal Pipe

XTURES FOR CONCRETE


Description

Chemical Admixtures for Concrete

Description

Paints

TEEL AND WIRE ROPE


Description

Reinforcing Steel and Wire Rope

RDRAIL
Description

Fence and Guardrail

TAL
Description

Structural Metal

TREATED TIMBER
Description

Treated and Untreated Timber

Description

Water

Description

Geotextile
Separation Geotextile
Drainage Geotextile
Pavinp Fabric
Hydraulic Filter
Silt Fence
Remaining Sediment
Geotextile Bag

Y
Description

Drilling Slurry

ASE BONDING SYSTEMS FOR CONCRETE


Description

Epoxy-Resin-Base Bonding Systems for Concrete

m sha// not be measured and paid for separately, but the cost thereof sha// be considered as included in the contract unit p

CE TREATMENT
Description

Coal Tar Surface Treatment

OUT
Description

Non-Shrink Grout
easured and paid for separately, but the cost thereof shall be considered as included in the contract unit price of the items w

TING FOR CONCRETE


Description

Protective Coating for Concrete

measured and paid for separately, but the cost thereof shall be considered as included in the contract unit price of the items

ALVANIZED) COATINGS ON IRON ANDSTEEL PRODUCTS


Description

Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel


Products

g shall not be measured and paid for separately, but the cost thereof shall be considered as included in the contract unit pr

SPHALT (SMA)
Description

Stone Mastic Asphalt with Cellulose Fiber Surface Course, Hot-Laid


T MIXTURE
Description

Porous Asphalt Pavement with Polymer Modified Bitumen

UPLERS FOR REINFORCING STEEL


Description

cing Steel shaff not be measured and paid for separately, but the cost thereof shall be considered as included in the contra

HESIVES FOR BONDING TRAFFIC MARKERS TO HARDENED PORTLAND CEMENT AND ASPHALT CONCRETE PA
Description

ng Traffic Markers to Hardened Portland Cement and Asphalt Concrete Pavement shall not be measured and paid for separ

RECAST CONCRETE BLOCKS


Description

Concrete Paving Blocks


Articulated Concrete Blocks
PART I - FACILITIES FORTHE ENGINEER
“Refer to Blue Book Volume/J, PaztA

PART II - OTHER GENERAL REQUIREMENTS


“Refer to Blue Book Volume XE, PartB

PART III - CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMB

PART A - EARTHWORK
GRUBBING
Description

Clearing and Grubbing


Clearing and Grubbing
Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees


Individual Removal of Trees

RUCTURES AND OBSTRUCTIONS


Description

Removal of Structures and Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Actual Structures/Obstruction

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts


Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts

Removal of Pipes other than Pipe Culverts


Removal of Pipes other than Pipe Culverts

Removal of Structures and Obstruction

Removal of Structures and Obstruction

Removal of Structures and Obstruction

Removal of Structures and Obstruction

Relocation of Utilities
Relocation of Structures
Removal of Structures and Obstruction (Offshore)

Removal of Structures and Obstruction (Offshore)

Description

Unsuitable Excavation
Surplus Common Excavation

Surplus Rock Excavation

Surplus Rock Excavation

Surplus Unclassified Excavation

AVATION
Description

Structure Excavation

Structure Excavation

Structure Excavation

Bridge Excavation

Bridge Excavation

Bridge Excavation

Foundation Fill
Excavation ordered below Plan elevation

Shoring, cribbing and drain excavation

Shoring, cribbing and drain excavation

Pipe culverts and drain excavation

Pipe culverts and drain excavation

Pipe culverts and drain excavation

Trimming Works

Description

Embankment

Embankment

Selected Borrow for topping

Selected Borrow for topping

Earth Berm
Gravel fill

Description

Dredging - soils
Dredging - coral material

Description

Reclamation

NT
Description

Site Development
Softscape
Softscape
Softscape
Softscape
Hardscape
Hardscape
Hardscape
Hardscape
Garden Soil
Aquatic
Aquatic
Paver Blocks
Curbs
Column Guards
Wheel Guards
Fence
Gate

PART B — PLAIN AND REINFORCED CONCRETE WOR


NCRETE
Description

Structural Concrete

Structural Concrete (Footings and Slab on Fill)

Structural Concrete (Footing Tie Beams)

Structural Concrete (Columns)

Structural Concrete (Suspended Slab)

Structural Concrete (Beams/Girders)

Structural Concrete

Structural Concrete (Footings and Slab on Fill)

Structural Concrete (Footing Tie Beams)

Structural Concrete (Columns)

Structural Concrete (Suspended Slab)

Structural Concrete (Beams/Girders)


Structural Concrete

Structural Concrete (Footings and Slab on Fill)

Structural Concrete (Footing Tie Beams)

Structural Concrete (Columns)

Structural Concrete (Suspended Slab)

Structural Concrete (Beams/Girders)

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Structural Concrete

Seal Concrete
Reinforced Concrete
Structural Concrete

NCRETE
Description

Lean Concrete

TEEL
Description
Reinforcing Steel (Deformed)

Reinforcing Steel (Deformed)

Reinforcing Steel (Plain/Round)

D FALSEWORKS
Description

Formworks and Falseworks


Formworks and Falseworks

PART C - FINISHINGS AND OTHER CIVIL WORKS


ROL WORK
Description

Soil Poisoning
Wood Preservative
Powder Termicide

AGE AND SEWERAGE SYSTEM


Description

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings


Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Pipes and Fittings

Concrete Gutter
Concrete Canal
Wrought Iron Grating
Catch Basin
Catch Basin
Catch Basin
Junction Box
Junction Box
Sewer Line Works
Storm Drainage and Downspout

Pipes with Fittings Connection

Septic Vault

Septic Tank
Septic Tank
Manhole
Manhole
Inlets

Inlets
Inlets

Inlets

Inlets

RKS
Description

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Galvanized Iron Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings


Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings


Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

Polyprophylene Random Copolymer (PPR-C) Pipes with Fittings

PVC Pipes (blue) with Fittings

PVC Pipes (blue) with Fittings

PVC Pipes (blue) with Fittings

PVC Pipes (blue) with Fittings

PVC Pipes (blue) with Fittings

PVC Pipes (blue) with Fittings

PVC Pipes (blue) with Fittings

PVC Pipes (blue) with Fittings

Plumbing Fixtures
Water Closet, Elongated, Complete

Water Closet, Elongated, Complete


Water Closet, Elongated, Automatic Flush Valve, Complete

Water Closet, Round Front, Complete

Water Closet, Round Front, Complete

Water Closet, Round Front, Automatic Flush Valve, Complete

Urinal, Flush Valve, Complete

Urinal, Flush Valve, Complete

Urinal, Automatic Flush Valve, Complete

Kitchen Sink, Complete

Kitchen Sink, Complete

Scrub Up Sink, Complete


Slop Sink, Complete
Lavatory, Wall Hung, Complete

Lavatory, Wall Hung, Complete

Lavatory, Counter Top/Under Counter, Complete

Lavatory, Counter Top/Under Counter, Complete

Floor Drain Plates

Floor Drain Plates

Floor Drain Plates

Floor Drain Plates

Floor Drain Plates

Floor Drain Plates

Bidet
Stainless Steel Grab Bar, 40mm dia.

Shower Head/Shower Valve


Facial Mirror
Faucet
Hose Bibb
Water Meter
Water Meter
Water Meter
Cold Water Lines
Hot Water Lines
Cistern
Plumbing Works

ND JOINERY WORKS
Description

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling

Ceiling
Ceiling
Ceiling
Wall
Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall
Wall
Cabinets
Cabinets
Roof Frame
Roof Frame
Flooring
Flooring
Wall Frame
Wall Frame
Fascia Board

Fascia Board

Fascia Board
Phenolic Board
Phenolic Board
Moulding
Moulding
Moulding
Moulding
Moulding
Pressurized Laminated Wood Particles
Carpentry and Joinery Works

Lawanit
Wooden Post

Coco Lumber
Moulding
Modular Partition
Modular Partition

Description

Rough Hardware
Finishing Hardware

S
Description

Residential Casement (Steel)

Heavy Duty Side-hinged Ventilator

Projected Ventilator
Awning Ventilator
Steel Window
Window Accessory
Louver Window

ND FRAMES
Description

Hollow Steel Door


Flush Door
Grille Door
Steel Louver Door
Fire Rated Fire Exit Steel Door

Steel Doors and Frames

MED GLASS DOORS


Description

Aluminum Framed Glass Door

Aluminum Framed Glass Door

Aluminum Framed Glass Door


ASS WINDOWS
Description

Aluminum Glass Windows

Aluminum Glass Windows

Aluminum Glass Windows

Aluminum Glass Windows

Aluminum Glass Windows

DOWS
Description

Jalousie Windows
Jalousie Windows
Jalousie Windows

S AND WINDOWS
Description

Frames

Doors
Doors
Doors
Window Sashes
Wooden Doors and Windows

S
Description

Roll-Up Door
Roll-Up Door
Roll-Up Doors

ZING
Description

Float Glass
Ordinary window & Sheet Glass

Tempered Glass Doors

Tempered Glass Doors


Tempered Glass Windows

Tempered Glass Windows

Tempered Glass Walls/Barriers, etc.

Tempered Glass Walls/Barriers, etc.

Tempered Glass Walls/Barriers, etc.

Glass and Glazing


Facial Mirror

METAL ROOFING
Description

Corrugated Metal Roofing

Fabricated Metal Roofing Accessory

Fabricated Metal Roofing Accessory

Fabricated Metal Roofing Accessory

Fabricated Metal Roofing Accessory

Fabricated Metal Roofing Accessory

Fabricated Metal Roofing Accessory

Fabricated Metal Roofing Accessory

Roof Ventilators

ASPHALT ROOFING
Description

Corrugated Asphalt Roofing

Fabricated Asphalt Roofing Accessory


Fabricated Asphalt Roofing Accessory

Fabricated Asphalt Roofing Accessory

Fabricated Asphalt Roofing Accessory

Fabricated Asphalt Roofing Accessory

Fabricated Asphalt Roofing Accessory

Roof Ventilators

ETAL SHEETS
Description

Prepainted Metal Sheets

Prepainted Metal Sheets

Prepainted Metal Sheets

Prepainted Metal Sheets

E
Description

Clay Roof Tile

NG
Description

Waterproofing

Waterproofing
Built-up and Preformed Membrane

WITH STRAINERS
Description

Roof Drain with Strainer

Roof Drain with Strainer

Roof Drain with Strainer

Roof Drain with Strainer

Canopy Drain with Strainer

Canopy Drain with Strainer

Canopy Drain with Strainer

Canopy Drain with Strainer

Gutter Drain with Strainer

Gutter Drain with Strainer

Gutter Drain with Strainer

NITE TILES
Description

Glazed Tiles and Trims


Unglazed Tiles
Granite Tiles
Synthetic Granite Tiles
Glazed Tiles
Textured Glazed Tiles
Textured Unglazed Tiles

Description

Wood Tile
Wood Tile
Wood Tile
Wood Tile

ILES
Description

Vinyl Floor Tile


Vinyl Floor Tile
R FINISH
Description

Cement Floor Finish


Cement Floor Finish

Cement Floor Finish

Stamped Concrete
Floor Topping
Floor Topping

Floor Topping

Straight to Finish
Cement Broom Finish
Nonslip Finish
Scratched Finish
Floated Finish
Exposed Aggregate Finish
Gloss-imparting Waxes
Evaporation Reducers
Floor Finishes

Description

Stucco Finish

MARBLE WORK
Description

Corridors and Stair Landings


Treads and Risers, etc.
Rooms and others

SHOUT FINISH
Description

Pea Gravel Washout Finish

D FINISH
Description

Hammered Finish
Hammered Finish

UT FINISH
Description
Description

Pebble Washout

R FINISH/DECORATIVE STONE
Description

Cement Plaster Finish


Simulated Red Bricks
Decorative Stone
Cement Plaster Finish

BE
Description

Synthetic Adobe Finish

Synthetic Adobe Finish

Synthetic Finish

SHOUT FINISH
Description

Granatite Washout Finish

EILING
Description

Acoustical Ceiling Panel

REATMENT
Description

Acoustical
Acoustical
Acoustical
Sprayed-on acoustical material

NISHING AND OTHER RELATED WORKS


Description

Painting Works

Painting Works
Painting Works
Varnishing
Sea-mist Finish
Ducco Finish
Textured Finish

Description

Metal Deck Panel

G
Description

Damp proofing
Damp proofing

Damp proofing

Damp proofing

AL METAL FRAMING
Description

Furring Channel

TE SHEETS/PANELS
Description

Polycarbonate
Polycarbonate

OF TILE
Description

Concrete Roof Tile

SULATION
Description

Reflective Insulation

DDING
Description

Aluminum Cladding

D ACCESSORIES
Description

Metal Lath and Accessories

D
Description

Gypsum Board for Walls


Gypsum Board for Ceilings

EL DOOR AND FRAMES


Description

Stainless Steel Door and Frames

Stainless Steel Door and Frames

D FRAMES
Description

PVC Doors and Frames


PVC Doors and Frames

/PARTITION
Description

Folding Door
Folding Door

Folding Door
Folding Partition
Folding Partition

Folding Partition

NEL
Description

Perforated Ceiling Panels

RKS
Description

CHB Load Bearing (including Reinforcing Steel)

CHB Load Bearing (including Reinforcing Steel)

CHB Non-Load Bearing (including Reinforcing Steel)


CHB Non-Load Bearing (including Reinforcing Steel)

Louver Blocks
AutoClaved Aerated Concrete Blocks

TURES
Description

Structural Steel
Structural Steel
Structural Steel
Structural Steel
Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Metal Structure Accessories

Structural Steel

Stainless Steel Pipe

Metal Structure Accessories

RCED POLYMER
Description

Carbon Fiber
Carbon Fiber
Carbon Fiber
Carbon Fiber
Carbon Fiber
Carbon Fiber
Aramid Fiber
Aramid Fiber
Aramid Fiber
Aramid Fiber
Aramid Fiber
Glass Fiber
Glass Fiber

Description

Jet Grouting
Jet Grouting
Jet Grouting

ROUT
easured and paid for separately, but the cost thereof shall be considered as included in the contract unit price of the items

Description

Railing
Concrete Railing
Concrete Railing
Concrete Railing
Wooden Railing
Stone and Brick Railing
Metal Railing
Railing
Glass Railing

Description

Untreated Timber Piles, furnished

Treated Timber Piles, preservative, furnished

Steel H-Piles, furnished


Precast Concrete Piles, furnished

Precast Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Structural Steel Sheet Piles, furnished

Precast Concrete Sheet Piles, furnished


Untreated Timber Piles, driven

Treated Timber Piles, driven

Steel H-Piles, driven


Steel Pipes Piles
Structural Steel Sheet Piles, driven

Precast Concrete Sheet Piles, driven

Precast Concrete Piles, driven

Precast, Prestresssed Concrete Piles, driven

Test Piles, furnished and driven

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes


Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Steel Shells

Concrete Piles cast in Steel Pipes

Pile Shoes
Splices
Load Tests
Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing
Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing
Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Splicing of R.C. Piles with Epoxy

Splicing of R.C. Piles with Epoxy

Pile Integrity Testing

Pile Integrity Testing

High Strain Dynamic Testing (P.D.A)

Micro Piles
Micro Piles
Micro Piles
Permanent Casing (Micro Piles)

Permanent Casing (Micro Piles)

Permanent Casing (Micro Piles)

Rammed Aggregate Piers


Vibro Stone Columns
Modulus or Uplift Load Tests

Steel Casing
TILES
Description

Carpet Floor Tiles


Carpet Floor Tiles

INFORCED CONCRETE CLADDING PANELS


Description

Glass Fiber Reinforced Concrete (GFRC) Cladding Panels

NTITIOUS FIREPROOFING
Description

Sprayed Cementitious Fireproofing

NG SHINGLES
Description

Asphalt Roofing Shingles

PART D - ELECTRICAL
ES & FITTINGS (CONDUIT WORKS/ CONDUIT ROUGH-IN)
Description

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)

Rigid Steel Conduit (RSC)


Rigid Steel Conduit (RSC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Intermediate Metal Conduit (IMC)

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Flexible Metal Conduit

Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)


Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)

Electrical Metallic Tubing (EMT)

Rigid Type Flexible Non-Metallic Conduit

Rigid Type Flexible Non-Metallic Conduit

Rigid Type Flexible Non-Metallic Conduit

Rigid Type Flexible Non-Metallic Conduit

Rigid Type Flexible Non-Metallic Conduit

Rigid Type Flexible Non-Metallic Conduit

Rigid Type Flexible Non-Metallic Conduit

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)


Polyvinyl Chloride Pipes (PVC/uPVC)

Polyvinyl Chloride Pipes (PVC/uPVC)

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Weatherhead Condulet

Boxes/Wire Gutter
Fittings and Accessories
Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in)

Repair/Replacement of Conduits/Pipes, Boxes, Fittings (Conduit Works/Rough-in)

RING DEVICES
Description

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire
Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire
Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire
Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire
Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire
Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire
Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Electric Wire

Single Pole Wall Switch on one switch plate

Duplex (2 Single Pole Wall Switches on one switch plate)

Triplex (3 Single Pole Wall Switches on one switch plate)

Three-way Switch
Four-way Switch
Double Pole Switch
Three Pole Switch
Dimmer Switch
Master Selector Switch
Automatic Door Switch
Switch Bank
Passive Infra-Red (Presence) Detector/Switch

Passive Infra-Red (Presence) Detector/Switch

Single Convenience Outlet/Receptacle, Grounding Type (GT)

Duplex Convenience Outlets/Receptacles (GT)

Heavy Duty Convenience Outlet/Receptacles (GT)


Weatherproof Single Convenience Outlet/Receptacle (GT)

Weatherproof Single Convenience Outlet/Receptacle (GT)

Special Purpose Outlet/Receptacle, (GT) for ACU, WH, etc.

Pop-up type/Floor Single Convenience Outlet/Receptacle (GT)

Pop-up type/Floor Duplex Convenience Outlet/Receptacle (GT)

Pop-up type/Floor Triplex Convenience Outlet/Receptacle (GT)

Explosion Proof type Single Convenience Outlet/Receptacle (GT)

Explosion Proof type Duplex Convenience Outlet/Receptacle (GT)

Single Convenience Outlet with Ground Fault Circuit Interrupter (GFCI)

Duplex Convenience Outlet with GFCI

PVC Tape
Rubber Tape/ Friction Tape
Mica Tubing
Mica Tubing
Mica Tubing
Mica Tubing
Messenger Wire
Guy Wire
Wires and Wiring Devices
Repair/Replacement of Wires and Wiring Devices

ENTER, SWITCHGEAR AND PANELBOARDS, AND OTHER OVERCURRENT PROTECTION DEVICES


Description

Panelboard with Main & Branch Breakers

Motor Control Center with Main, Branch Breakers and Motor Starters/controllers
Cupper Bus Bar NEMA I Enclosure

Manual Transfer Switch with renewable Fuse

Manual Transfer Switch, Breaker Type

Automatic Transfer Switch, Breaker Type

Automatic Transfer Switch, Breaker Type

Pad Mounted Distrbution Transformer (OISC) with Complete Accessories

Pad Mounted Power Transformer (OISC) with Complete Accessories

Pole Mounted Distribution Transformer (OISC) with Complete Accessories

Pole Mounted Power Transformer (OISC) with Complete Accessories

Dry Type Transformer

Current Transformer
Potential Transformer
Isolation Transformer
Generator

Generator

Synchronizing Panel for Generators

Solar Panel with inverter, battery and other devices

Apitong or Approved Equal Creosoted Wood Pole

Anchor Rod
Anchor Log
Powerload Studs with Nuts
Repair/Replacement of Power Load Center, Switchgear and Panelboards, and other Overcurrent Protection
Devices

URES AND LAMPS


Description

Lighting Fixtures and Lamps

Repair/Replacement of Lighting Fixtures and Lamps

TEM
Description

Auxillary System

LING SYSTEM
Description

Data Cabinet
Data Cabinet

Distribution Frame Panel

Distribution Frame Panel

Terminal Block
UTP patch Panel
Fiber Management Panel
UTP CAT5 Cable
UTP CAT6 Cable
Fiber Optic Cable
Fiber Connector
Patch Cord CAT5
Patch Cord CAT6
Fiber Patch Cord
Modular Jack
Wall Plate Single (Voice/Data Outlet)

Wall Plate 2 port (Voice/Data Outlet)

Wall Plate 3 port (Voice/Data Outlet)

Floor Mounted 2 port (Voice/Data Outlet)


Floor Mounted 3 port (Voice/Data Outlet)

Network Equipment (Servers, Fire Wall, Repeaters, etc.)

Network Cabling
UTP CAT5e Cable

Description

CCTV System
IP - Fixed Dome Camera
IP - Pinhole Type Camera
Movable Camera
Weather Proof Camera
Data Digital Video Recorder
Network Video Recorder
Centralized Power Supply with UPS

LCD, LED Monitor


CCTV Console
RG59 Coaxial Cable
Digital Disc Recorder

SS SYSTEM
Description

Public Address System


Management System Amplifier

Power Amplifier
Voice Announcement Board
Remote Microphone
Ceiling Speaker
Wall Mount Speaker
CD/DVD Player
AM/FM Tuner
Fabricated Rack
Booster Transformer
Horn
Wires/Cables

AND CARD READER SYSTEg4


Description

Door Access and Card Reader System

Security Cabinet
Magnetic Card
Magnetic Door Contact
Biometric Scanner
Biometric Scanner
Biometric Scanner

YSTEM
Description

Grounding System
Exothermic Weld Connector
Air Terminal
Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Bare Copper Wire

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires


Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Clamps for Electric Wires

Grounding Rod Copper Clad

Grounding Rod Copper Clad

Grounding Rod Copper Clad

Grounding Rod Copper Clad

Grounding Rod Copper Clad

Grounding Rod Copper Clad

Grounding Rod Copper Clad

STEIH
Description

Nurse Call System


Area Control Unit
Nurse Call Console
Patient Bed Station
Corridor Lights and Zone Lights

S ELECTRICAL/CIVIL WORKS
Description

Reinforced Concrete Pedestal / Pole

Reinforced Concrete Envelop/encasement

Concrete Envelop/encasement

Handhole
Manhole
Cable Tray
Wire Trench
2 Spool Insulator Wire Rack
3 Spool Insulator Wire Rack
4 Spool Insulator Wire Rack

PART E - MECHANICAL
ING AND VENTILATING SYSTEM
Description

Ventilating Equipment
Oscillating
Oscillating
Oscillating
Stand Fan, Industrial Type
Propeller

Propeller
Propeller

Exhaust fan

Exhaust fan

Exhaust fan

Exhaust Fan

Supply fan, ceiling cassette


Centrifugal Cabinet in line Ducted type (CCI)

Centrifugal Backward Incline

Kitchen Hood
Induced Jet Fan
Freon (Gas)
Freon (Gas)
Freon (Gas)
Freon (Gas)
Freon (Gas)
Sand Trap Louver
Airconditioning

Airconditioning
Airconditioning

Ventilation

NG SYSTEM
Description
Description

Water Pumping System


Centrifugal Pump with control

Submersible Multi-Stage Deepwell Pump with control

Submersible Sump Pump with control

Submersible Sewage Ejector Pump with control

Booster Pump with control


Jet Pump with control
Water Tank
Overhead Tank
Overhead Tank

Overhead Tank

Overhead Tank
Pneumatic
Pneumatic

Air Compressor
Valves and Pipe Fittings
Electrode

ON SPRINKLER SYSTEM (AFSS)


Description

Automatic Fire Sprinkler System (AFSS)

Fire Pump complete with control and standard accessories

Jockey Pump complete with control and standard accessories

Fire hose valve siames 150mm dia x 2w x 65mm dia with cap

Fire hose cabinet assembly


Fire Extinguisher

Fire Extinguisher

Fire Extinguisher

Fire Extinguisher
Fire Extinguisher

Fire Department connections 100 x 65 x 65 mm for Dry Type system

Fire Hydrant

VATOR
Description

Electric Elevator

Electric Elevator

Electric Elevator

Lift Elevator

BWAITER
Description

Electric Dumbwaiter
Electric Wires and Conduits
Electric Wires and Conduits

OUS OXIDE, VACUUM AND FUEL GAS


Description

Oxygen, Nitrous Oxide, Gas Manifold and Duplex Vacuum Pump

Humidifier, Vacuum Trap Bottle, Outlets, Valves

EM
Description

Boilers, Fuel Pump, Storage Tank and Fuel Day Tank including Foundation

Pipes
Valves and Fittings

Description

Steam Boilers, Air Compressor, Heat Exchanger & Fuel Pump

Pipes with Insulation


Valves and Fittings

STEM
Description

Fire Alarm System


Smoke Detector with base
Heat Detector with base
Fire Alarm Bell
Fire Alarm Control Panel
Manual Pull Station Switch
Back-up Battery Pack
Automatic Voltage Regulator

Extended Power Supply


Loop Expander Module
Loop Control Module
Annunciator Addressable Module

PART F - PILING

Description

Untreated Timber Piles, furnished

Treated Timber Piles, preservative, furnished

Steel H-Piles, furnished


Precast Concrete Piles, furnished

Precast Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Structural Steel Sheet Piles, furnished

Structural Steel Sheet Piles, furnished

Precast Concrete Sheet Piles, furnished

Untreated Timber Piles, driven

Treated Timber Piles, driven

Steel H-Piles, driven


Steel Pipes Piles
Structural Steel Sheet Piles, driven

Precast Concrete Sheet Piles, driven

Precast Concrete Piles, driven

Precast, Prestresssed Concrete Piles, driven

Test Piles, furnished and driven

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes


Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Steel Shells

Concrete Piles cast in Steel Pipes

Pile Shoes
Splices
Load Tests
Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing
Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing
Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Splicing of R.C. Piles with Epoxy

Splicing of R.C. Piles with Epoxy

Pile Integrity Testing

Pile Integrity Testing

High Strain Dynamic Testing (P.D.A)

Micro Piles
Micro Piles
Micro Piles
Permanent Casing (Micro Piles)

Permanent Casing (Micro Piles)

Permanent Casing (Micro Piles)

Painting Works

Painting Works

Structural Steel Sheet Piles, extracted

Rammed Aggregate Piers


Vibro Stone Columns
Modulus or Uplift Load Tests

Steel Casing
PART G — PROTECTIVE WORKS AND ACCESSORIES
TURES
Description

Cleat
Post
Bitt
Bollard
Cleat
Post
Bitt
Bollard

NG
Description

Timber Waling

TERS AND DOLPHINS


Description

Pile Cluster
Pile Cluster
Pile Cluster
Pile Cluster
Pile Cluster
Pile Cluster
Concrete Dolphin
Tubular Steel Dolphin

FENDERS
Description

Installation of Rubber Dock Fenders

Description

Filter Fabric Material


Filter Aggregate Material

MAT
Description

Reinforcing Mat

ALL, BULKHEAD CURBS, AND STAIR LANDING


Description
Deflector Wall
Bulkhead Curbs
Stair Landing

KWATER STRUCTURE
Description

Tetrapod
Tetrapod
Hexapod
Hexapod
Tria Blocks
Tria Blocks

PART H — BULKHEADS
SS
Description

Sand Mattress

Description

Rock Works
Rock Works
Rock Works

IALS
Description

Filter Material

OR BULKHEADS AND RECLAMATION


Description

Excavation for Bulkheads and Reclamation

PART I — WATER SUPPLY

Description

Excavation Beneath Proposed Structures

Pipeline Trench Excavation


Dewatering

FILL
Description
Description

Fill and Backfill

OF PIPELINE
Description

Mortar Lined and Coated Steel Pipe

Cast Iron Water Pipe


Asbestos-Cement Water Pipe

PVC Polyvinyl Chloride Pipe


Polyethylene (PE) Plastic Pipe

N OF VALVES
Description

Valve

MENT PLANT
Description

Water Treatment Plant

Part 3 — FLOOD CONTROL AND DRAINAGE


Part I-A — EARTHWORK
GRUBBING
Description

Clearing and Grubbing


Clearing and Grubbing
Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees

Individual Removal of Trees

VATION
Description
Description

Unsuitable Excavation
Surplus Common Excavation

Surplus Rock
Surplus Unclassified Excavation

CAVATION
Description

Structure Excavation

Structure Excavation

Structure Excavation

Bridge Excavation

Bridge Excavation

Bridge Excavation

Foundation Fill
Excavation ordered below Plan elevation

Shoring, cribbing and related works

Shoring, cribbing and related works

Pipe culverts and drain excavation

Pipe culverts and drain excavation

Pipe culverts and drain excavation

Description

Dredging using cutter suction

Dredging using cutter suction

Dredging using amphibious excavator

Dredging using backhoe on barge


Dredging using backhoe on bank

Dredging using clampshell

Description

Embankment

Embankment

Selected Borrow for topping

Selected Borrow for topping

Earth Berm
Boulder Fill

FILL
Description

Fill and Backfill


Backfill

DISPOSAL/OVERHAUL
Description

Overhaul

Overhaul of Borrow Case 1

BBASE COURSE
Description

Aggregate Subbase Course

SE COURSE
Description

Aggregate Base Course

EGATE BASE COURSE


Description

Crushed Aggregate Base Course

PART I-B - BANK AND SLOPE PROTECTION WORKS


ROUTED RIPRAP
Description

Riprap
Riprap
Riprap
Riprap
Grouted Riprap
Grouted Riprap
Grouted Riprap
Grouted Riprap
Filter layer of granular material

Y
Description

Stone Masonry

PE PROTECTION
Description

Bed Course Granular Material

Concrete

RETE
Description

Rubble Concrete

MATTRESSES
Description

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions

Gabions
Gabions

Gabions

Gabions

Gabions

Gabions

Mattresses

Mattresses

Filter Cloth
Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Polyester Net Gabion

Description

Filter Material
Filter Fabric with Aluminum Frame

Description

Untreated Timber Piles, furnished

Treated Timber Piles, preservative, furnished

Steel H-Piles, furnished


Precast Concrete Piles, furnished

Precast Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Precast, Prestresssed Concrete Piles, furnished

Structural Steel Sheet Piles, furnished

Structural Steel Sheet Piles, furnished

Precast Concrete Sheet Piles, furnished

Untreated Timber Piles, driven

Treated Timber Piles, driven

Steel H-Piles, driven


Steel Pipes Piles
Structural Steel Sheet Piles, driven

Precast Concrete Sheet Piles, driven

Precast Concrete Piles, driven

Precast, Prestresssed Concrete Piles, driven

Test Piles, furnished and driven

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes

Concrete Piles cast in Drilled Holes


Concrete Piles cast in Steel Shells

Concrete Piles cast in Steel Pipes

Pile Shoes
Splices
Load Tests
Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing

Permanent Casing
Splicing of R.C. Piles with Epoxy

Pile Integrity Testing

Pile Integrity Testing

High Strain Dynamic Testing (P.D.A)

Painting Works

Painting Works

Structural Steel Sheet Piles, extracted

Rammed Aggregate Piers


Vibro Stone Columns
Modulus or Uplift Load Tests

Steel Casing

Description

Sheet Piles Timber


Sheet Piles

Sheet Piles

Sheet Piles

Sheet Piles

Sheet Piles

Sheet Piles

Furnishing of Steel Sheet Pile

Furnishing of Steel Sheet Pile

Furnishing of Steel Sheet Pile

Furnishing of Steel Sheet Pile

Furnishing of Steel Sheet Pile

Furnished and Driven of Steel Sheet Pile

Furnished and Driven of Steel Sheet Pile

Furnished and Driven of Steel Sheet Pile

Furnished and Driven of Steel Sheet Pile

Furnished and Driven of Steel Sheet Pile

Steel Sheet Pile Flexible Joint

End Connection
Sheet Piles

Sheet Piles

PART I-C - DRAINAGE WORKS


AND STORM DRAINS
Description

Pipe Culverts
Storm Drain
Description

Underdrain
Blind Drain
Granular Backfill Filter Material for underdrains

Fiber Reinforced Plastic Mortar (FRPM)

Fiber Reinforced Plastic Mortar (FRPM)

Fiber Reinforced Plastic Mortar (FRPM)

Fiber Reinforced Plastic Flap Gate

Fiber Reinforced Plastic Flap Gate

Fiber Reinforced Plastic Flap Gate

Rectangular Aluminum Flap Gate

Rectangular Aluminum Flap Gate

LETS AND CATCH BASINS


Description

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Manholes
Manholes

Manholes

Manholes

Manholes

Manholes

Manholes

Inlets, type
Inlets, type
Inlets, type
Inlets, type

Inlets, type

Inlets, type

Catch Basins

Catch Basins

Catch Basins

Catch Basins

Catch Basins

Catch Basins

Concrete Covers

Concrete Covers

Concrete Covers

Concrete Covers

Concrete Covers

Concrete Covers

Metal Frames and Gratings, type

Metal Frames and Covers


Adjusting Manholes Each
Adjusting Catch Basin
RECONDITIONING EXISTING DRAINAGE STRUCTURES
Description

Removing, Cleaning, Stockpiling Salvaged Culvert Pipe

Removing, Cleaning, and Relaying Salvaged Culvert Pipe

Cleaning Culvert Pipe in place

Reconditioning Drainage Structures

LINGS
Description

Fence
Fence
Fence

Fence
Fence
Railings

STATION
Description

Submersible Axial and Mixed Flow Pump

Submersible Vertical Axial Flow Pump

Horizontal Axial Flow Pump

Suction Column Pipe set with Flanges and Bolt & Nuts

Discharge Column Pipe set with Flanges and Bolt & Nuts

Flapper Valve
Butterfly Valve

Water Elevation Indicator

Water Elevation Indicator

Bulk Fuel Storage Tank

Fuel Day Tank


Fuel Transfer Pump

Overhead Water Tank with Pump

Water Supply Centrifugal Pump

Portable Submersible Pump

Rectangular Flap Gate

Rectangular Flap Gate

Rectangular Flap Gate

Rectangular Flap Gate

Rectangular Flap Gate

Pump House and Accessories

PUMPING STATION
Description

Submersible Axial and Mixed Flow Sewage Pump

Submersible Vertical Axial Flow Sewage Pump

Suction Column Pipe Set with Flanges and Bolts and Nuts

Discharge Column Pipe Set with Flanges and Bolts and Nuts

Flapper Valve (Carbon Steel)

Fuel Transfer Pump


Fuel Storage Tank

Fuel Day Tank


Fuel Day Tank

Steel Grating
Meter Stick

Gantry Crane

Gantry Crane

Gantry Crane

Gantry Crane

Gantry Crane

ANICAL FOR PUMPING STATION


Description

Motor Control Center (for main pumps and facilities)

Generator Set
Local Panel Control Center (for Auxiliary Equipment)

D FACILITY EQUIPMENT
Description

Hoist Crane
Overhead Crane
Overhead crane
Overhead crane
Gantry Crane
Gantry Crane
Gantry Crane
Automatic trash rake complete with accessories ready for service

Trash rake complete with accessories ready for service

Flood gate complete with accessories ready for service

Horizontal conveyor complete with accessories ready for service

Inclined conveyor with hooper complete with accessories ready for service
GINEER

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Month

Month

Month

Month

Month

Lump Sum

Lump Sum

Lump Sum
Lump Sum

Month

Month

Month

Month

Valid Values Unit of Measure


Thickness/Sizes Class Others
Each

Month

Each

Month

Month

Month

Each

Month
Month

Valid Values Unit of Measure


Thickness/Sizes Class Others
Month

Lump Sum

Month

Month

Valid Values Unit of Measure


Thickness/Sizes Class Others
Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Each

Each

EMENTS
Valid Values Unit of Measure
Thickness/Sizes Class Others
Lump Sum

Lump Sum

Lump Sum
Kilometer

Kilometer

Kilometer
Each
Lump Sum
Lump Sum

Kilometer
Each

Hour

Lump Sum

Each

Lump Sum

Month

Lump Sum

Month
Lump Sum
Lump Sum
PS
PS
Lump Sum

Lump Sum

Month

Lump Sum
Linear Meter
Each

Lump Sum

Lump Sum
Linear Meter
Linear Meter
Lump sum
Lump sum
Lump sum
Lump sum
Lump sum

Lump sum
Valid Values Unit of Measure
Thickness/Sizes Class Others
Hectare
Lump Sum
150 - 300 mm dia. Small Each

301 - 500 mm.dia Small Each

501 - 750 mm.dia Small Each

751 - 900 mm.dia Small Each

above 900mm dia. Large Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Each

0.15 m thick PCCP Square Meter

0.20 m thick PCCP Square Meter

0.23 m thick PCCP Square Meter

0.25 m thick PCCP Square Meter

0.28 m thick PCCP Square Meter

0.30 m thick PCCP Square Meter

0.33 m thick PCCP Square Meter

0.35 m thick PCCP Square Meter


0.38 m thick PCCP Square Meter

0.15 m thick PCCP Square Meter

0.20 m thick PCCP Square Meter

0.23 m thick PCCP Square Meter

0.25 m thick PCCP Square Meter

0.28 m thick PCCP Square Meter

0.30 m thick PCCP Square Meter

0.33 m thick PCCP Square Meter

0.35 m thick PCCP Square Meter

0.38 m thick PCCP (Unreinforced) Square Meter

0.05 m thick ACP Square Meter

0.10 m thick ACP Square Meter

0.10 m thick Sidewalk Square Meter

610 mm dia. RCPC Linear Meter

760 mm dia. RCPC Linear Meter

910 mm dia. RCPC Linear Meter

1070 mm dia. RCPC Linear Meter


1220 mm dia. RCPC Linear Meter

1520 mm dia. RCPC Linear Meter

1830 mm dia. RCPC Linear Meter

Curb Linear Meter

Curb and Gutter Linear Meter

50 mm dia. PVC Linear Meter

75 mm dia. PVC Linear Meter

100 mm dia. PVC Linear Meter

150 mm dia. PVC Linear Meter

200 mm dia. PVC Linear Meter

250 mm dia. PVC Linear Meter

300 mm dia. PVC Linear Meter

150 mm dia. Concrete Linear Meter

200 mm dia. Concrete Linear Meter

250 mm dia. Concrete Linear Meter

300 mm dia. Concrete Linear Meter

350 mm dia. Concrete Linear Meter


50 mm dia. High Density Linear Meter
Polyethylene
HDPE

75 mm dia. High Density Linear Meter


Polyethylene
HDPE

100 mm dia. High Density Linear Meter


Polyethylene
HDPE

150 mm dia. High Density Linear Meter


Polyethylene HDPE

200 mm dia. High Density Linear Meter


Polyethylene
HDPE

250 mm dia. High Density Linear Meter


Polyethylene
HDPE

300 mm dia. High Density Linear Meter


Polyethylene HDPE

Concrete Cubic Meter

Steel Kilogram

Steel H-Piles Kilogram

RSB Kilogram

Linear Meter

Each

Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter
Cubic Meter

Soft Cubic Meter

Hard Cubic Meter

Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Cubic Meter
Cubic Meter

Shoring Lump sum

Cribbing/ Cofferdamming Lump sum

Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Common Soil Cubic Meter

Soft Rock Cubic Meter


Hard Rock Cubic Meter

Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Granular Coarse Cubic Meter


Material

Granular Fine Material Cubic Meter

Case 1 Cubic Meter

Case 2 Cubic Meter

Cubic Meter
Cubic Meter
Common Borrow Cubic Meter

Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Common Material Square Meter

Existing Pavement Square Meter

Unsuitable Material Square Meter

Hard Rock Material Square Meter

Soft Rock Material Square Meter

Unclassified Material Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Common Material Square Meter

ch a COntrol strip is required. Payment for the work item shall be deemed to incfude compensation for
Valid Values Unit of Measure
Thickness/Sizes Class Others
Cubic Meter
Kilometer
Case 1 Cubic Meter

Case 1 Kilometer

OURSE

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
New Soil Aggregate Cubic Meter

Salvaged Soil Cubic Meter


Aqqreqate

Valid Values Unit of Measure


Thickness/Sizes Class Others
New Soil Aggregate Cubic Meter

Salvaged Soil Cubic Meter


Aqqreqate

Valid Values Unit of Measure


Thickness/Sizes Class Others
New Soil Aggregate Cubic Meter

Salvaged Soil Cubic Meter


Aqqreqate

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter

Valid Values Unit of Measure


Thickness/Sizes Class Others
New Soil Aggregate Cubic Meter

Salvaged Soil Cubic Meter


Aqqreqate

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
E

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Grade 30 Square Meter

Grade 70 Square Meter

Grade 250 Square Meter

Grade 800 Square Meter

Grade 3000 Square Meter

Grade 70 Square Meter

Grade 250 Square Meter

Grade 800 Square Meter

Grade 3000 Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Grade 70 Square Meter

Grade 250 Square Meter

Grade 800 Square Meter

Grade 3000 Square Meter

Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Type 2 Tonne
Type 3A Tonne
Type 3B Tonne

Grade 30 Tonne

Grade 70 Tonne

Grade 250 Tonne

Grade 800 Tonne

Grade 3000 Tonne

Grade 70 Tonne

Grade 250 Tonne

Grade 800 Tonne

Grade 3000 Tonne

Tonne

Valid Values Unit of Measure


Thickness/Sizes Class Others
Tonne
Tonne

Grade 70 Tonne

Grade 250 Tonne

Grade 800 Tonne

Grade 3000 Tonne


Grade 30 Tonne

Grade 70 Tonne

Grade 250 Tonne

Grade 800 Tonne

Grade 3000 Tonne

Tonne

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Tonne
Tonne
Grade 70 Tonne

Grade 250 Tonne

Grade 800 Tonne

Grade 3000 Tonne

Tonne

Valid Values Unit of Measure


Thickness/Sizes Class Others
Tonne

Tonne

Valid Values Unit of Measure


Thickness/Sizes Class Others
ased on the ThiCkness/Sizes and densities of the cores taken.

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
30 mm Square Meter

40 mm Square Meter

50 mm Square Meter

30 mm Square Meter

40 mm Square Meter

50 mm Square Meter

Square Meter
30 mm Square Meter

40 mm Square Meter

50 mm Square Meter

50 mm Square Meter

30 mm Square Meter

40 mm Square Meter

50 mm Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
0.15 m thick 14 days Square Meter

0.20 m thick 14 days Square Meter

0.20 m thick 7 days Square Meter

0.20 m thick 3 days Square Meter

0.23 m thick 14 days Square Meter

0.23 m thick 7 days Square Meter

0.23 m thick 3 days Square Meter

0.25 m thick 14 days Square Meter


0.25 m thick 7 days Square Meter

0.25 m thick 3 days Square Meter

0.28 m thick 14 days Square Meter

0.28 m thick 7 days Square Meter

0.28 m thick 3 days Square Meter

0.28 m thick 1 day Square Meter

0.30 m thick 14 days Square Meter

0.30 m thick 7 days Square Meter

0.30 m thick 3 days Square Meter

0.30 m thick 1 day Square Meter

0.33 m thick 14 days Square Meter

0.33 m thick 7 days Square Meter

0.33 m thick 3 days Square Meter

0.33 m thick 1 day Square Meter

0.35 m thick 14 days Square Meter

0.35 m thick 7 days Square Meter

0.35 m thick 3 days Square Meter


0.35 m thick 1 day Square Meter

0.38 m thick 14 days Square Meter

0.38 m thick 7 days Square Meter

0.38 m thick 3 days Square Meter

0.38 m thick 1 day Square Meter

0.15 m thick 14 days Square Meter

0.20 m thick 14 days Square Meter

0.20 m thick 7 days Square Meter

0.20 m thick 3 days Square Meter

0.23 m thick 14 days Square Meter

0.23 m thick 7 days Square Meter

0.23 m thick 3 days Square Meter

0.25 m thick 14 days Square Meter

0.25 m thick 7 days Square Meter

0.25 m thick 3 days Square Meter

0.28 m thick 14 days Square Meter

0.28 m thick 7 days Square Meter


0.28 m thick 3 days Square Meter

0.30 m thick 14 days Square Meter

0.30 m thick 7 days Square Meter

0.30 m thick 3 days Square Meter

0.33 m thick 14 days Square Meter

0.33 m thick 7 days Square Meter

0.33 m thick 3 days Square Meter

0.35 m thick 14 days Square Meter

0.35 m thick 7 days Square Meter

0.35 m thick 3 days Square Meter

0.23 m thick 14 days Square Meter

0.23 m thick 7 days Square Meter

0.23 m thick 3 days Square Meter

0.25 m thick 14 days Square Meter

0.25 m thick 7 days Square Meter


0.25 m thick 3 days Square Meter

0.28 m thick 14 days Square Meter

0.28 m thick 7 days Square Meter

0.28 m thick 3 days Square Meter

0.30 m thick 14 days Square Meter

0.30 m thick 7 days Square Meter

0.30 m thick 3 days Square Meter

0.33 m thick 14 days Square Meter

0.33 m thick 7 days Square Meter

0.33 m thick 3 days Square Meter

0.35 m thick 14 days Square Meter

0.35 m thick 7 days Square Meter


0.35 m thick 3 days Square Meter

0.15 m thick 14 days Square Meter

0.20 m thick 14 days Square Meter

0.23 m thick 14 days Square Meter

0.25 m thick 14 days Square Meter

0.28 m thick 14 days Square Meter

0.15 m thick 14 days Square Meter

0.20 m thick 14 days Square Meter

0.23 m thick 14 days Square Meter

0.25 m thick 14 days Square Meter


0.28 m thick 14 days Square Meter

0.15 m thick 14 days Square Meter

0.20 m thick 14 days Square Meter

0.23 thick 14 days Square Meter

0.25 m thick 14 days Square Meter

0.›8 thick 14 days Square Meter

0.15 m thick 14 days Square Meter

0.20 m thick 14 days Square Meter

0.23 m thick 14 days Square Meter

0.25 m thick 14 days Square Meter


0.28 m thick 14 days Square Meter

0.15 m thick 14 days Square Meter

0.20 m thick 14 days Square Meter

0.23 m thick 14 days Square Meter

0.25 m thick 14 days Square Meter

0.28 m thick 14 days Square Meter

0.30 m thick 14 days Square Meter

0.15 m thick 7 days Square Meter

0.20 m thick 7 days Square Meter

0.23 m thick 7 days Square Meter

0.25 m thick 7 days Square Meter

0.28 m thick 7 days Square Meter

0.30 m thick 7 days Square Meter

0.15 m thick 3 days Square Meter

0.20 m thick 3 days Square Meter

0.23 m thick 3 days Square Meter


0.25 m thick 3 days Square Meter

0.28 m thick 3 days Square Meter

0.30 m thick 3 days Square Meter

0.20 m thick 14 days Square Meter

0.23 m thick 14 days Square Meter

0.25 m thick 14 days Square Meter

0.28 m thick 14 days Square Meter

0.20 m thick 7 days Square Meter

0.23 m thick 7 days Square Meter

0.25 m thick 7 days Square Meter

0.28 m thick 7 days Square Meter


0.20 m thick 3 days Square Meter

0.23 m thick 3 days Square Meter

0.25 m thick 3 days Square Meter

0.28 m thick 3 days Square Meter

0.20 m thick 14 days Square Meter

0.23 m thick 14 days Square Meter

0.25 m thick 14 days Square Meter

0.28 m thick 14 days Square Meter

0.20 m thick 7 days Square Meter

0.23 m thick 7 days Square Meter


0.25 m thick 7 days Square Meter

0.28 m thick 7 days Square Meter

0.20 m thick 3 days Square Meter

0.23 m thick 3 days Square Meter

0.25 m thick 3 days Square Meter

0.28 m thick 3 days Square Meter

0.20 m thick 14 days Square Meter

0.23 think 14 days Square Meter

0.25 thick 14 days Square Meter

.28 thick 14 days Square Meter

0.20 think 7 days Square Meter


0.23 m thick 7 days Square Meter

0.25 thick 7 days Square Meter

.›8 thick 7 days Square Meter

0.20 m thick 3 days Square Meter

0.23 thick 3 days Square Meter

0.25 thick 3 days Square Meter

0.›8 thick 3 days Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

ION

Valid Values Unit of Measure


Thickness/Sizes Class Others
Meter

Meter

305mmx305mm 79 kg/m Meter

305mmx305mm 94 kg/m Meter

305mmx305mm 110 kg/m Meter


305mmx305mm 125 kg/m Meter

400x400 mm Meter

450x450 mm Meter

400x400 mm Meter

450x450 mm Meter

Meter

Meter

Meter

Meter

Meter
Meter
Meter

Meter

Meter

Meter

400x400 mm Meter

450x450 mm Meter

0.80 Meter

0.90 Meter

1.00 Meter

1.10 Meter

1.20 Meter

1.30 Meter

1.40 Meter

1.50 Meter
1.60 Meter

1.70 Meter

1.80 Meter

1.90 Meter

2.00 Meter

2.10 Meter

2.20 Meter

2.30 Meter

2.40 Meter

2.50 Meter

2.60 Meter

2.70 Meter

2.80 Meter

2.90 Meter

3.00 Meter

3.50 Meter

3.0 x 6.5 Oval Meter

3.0 x 7.0 Oval Meter

Rectanqular Meter

400mm dia. Meter

500mm dia. Meter

400mm dia. Meter

500mm dia. Meter

Each
Splice Can Each
Each
0.80 10mm thick Meter
0.80 12mm thick Meter

0.80 16mm thick Meter

0.90 10mm thick Meter

0.90 12mm thick Meter

0.90 16mm thick Meter

1.00 10mm thick Meter

1.00 12mm thick Meter

1.00 16mm thick Meter

1.10 10mm thick Meter

1.10 12mm thick Meter

1.10 16mm thick Meter

1.20 10mm thick Meter

1.20 12mm thick Meter

1.20 16mm thick Meter

1.30 10mm thick Meter

1.30 12mm thick Meter

1.30 16mm thick Meter

1.40 10mm thick Meter

1.40 12mm thick Meter

1.40 16mm thick Meter

1.50 10mm thick Meter

1.50 12mm thick Meter

1.50 16mm thick Meter

1.60 12mm thick Meter

1.60 16mm thick Meter


1.70 12mm thick Meter

1.70 16mm thick Meter

1.80 12mm thick Meter

1.80 16mm thick Meter

1.90 12mm thick Meter

1.90 16mm thick Meter

2.00 12mm thick Meter

2.00 16mm thick Meter

2.10 12mm thick Meter

2.10 16mm thick Meter

2.20 12mm thick Meter

2.20 16mm thick Meter

2.30 12mm thick Meter

2.30 16mm thick Meter

2.40 12mm thick Meter

2.40 16mm thick Meter

2.50 16mm thick Meter

2.50 20mm thick Meter

2.60 16mm thick Meter

2.60 20mm thick Meter

2.70 16mm thick Meter

2.70 20mm thick Meter

2.80 16mm thick Meter

2.80 20mm thick Meter

2.90 16mm thick Meter


2.90 20mm thick Meter

3.00 16mm thick Meter

3.00 20mm thick Meter

3.50 16mm thick Meter

3.50 20mm thick Meter

Kilogram
Each

Crosshole-Sonic Each

Low Strain Each

Each

0.60 Meter
0.70 Meter
0.80 Meter
0.60 Meter

0.70 Meter

0.80 Meter

Cubic Meter
Cubic Meter
Each

Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Grade 36 Steel Meter

Grade 50 Steel Meter

Aluminum Meter
Standard Meter
Balluster Meter
Parapet Meter
Meter
Meter
Lump Sum

Valid Values Unit of Measure


Unit of Measure
Thickness/Sizes Class Others
Span
Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Grade 36 Kilogram

Grade 50 Kilogram

Grade 36 Kilogram

Grade 50 Kilogram

Grade36 Kilogram

Grade 50 Kilogram

Grade 36 Kilogram

Grade 50 Kilogram

Grade 36 Kilogram

Grade 50 Kilogram

Square Meter

Lump Sum

Lump Sum
Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Grade 40 Kilogram

Grade 60 Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
Grade 40 Kilogram
Grade 60 Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
20.68Mpa A 7 days Cubic Meter

20.68Mpa A 14 days Cubic Meter

20.68Mpa A 28 days Cubic Meter

27.58Mpa A 7 days Cubic Meter

27.58Mpa A 14 days Cubic Meter

27.58Mpa A 28 days Cubic Meter

30.0Mpa A 7 days Cubic Meter

30.0Mpa A I4 days Cubic Meter

30.0Mpa A 28 days Cubic Meter

36.0Mpa A 7 days Cubic Meter

36.0Mpa A I4 days Cubic Meter

36.0Mpa A 28 days Cubic Meter

41.0Mpa (Non-shrink) 7 days Cubic Meter

41.0Mpa (Non-shrink) 14 days Cubic Meter

41.0Mpa Cubic Meter

20.68MPa B Cubic Meter

27.58 Mpa B Cubic Meter

18.00 Mpa B Cubic Meter

16.50 Mpa B Cubic Meter

20.68MPa C Cubic Meter

27.58 Mpa C Cubic Meter


34.47 Mpa P 7 days Cubic Meter

34.47 Mpa P 14 days Cubic Meter

34.47 Mpa P 28 days Cubic Meter

41.37 Mpa P 7 days Cubic Meter

41.37 Mpa P 14 days Cubic Meter

41.37 Mpa P 28 days Cubic Meter

38.0 Mpa P 7 days Cubic Meter

38.0 Mpa P 14 days Cubic Meter

38.0 Mpa P 28 days Cubic Meter

Cubic Meter
Square Meter

42.0 Mpa Y Cubic Meter

55.0 Mpa Y Cubic Meter

Square Meter

7 days Square Meter

14 days Square Meter

28 days Square Meter

7 days Cubic Meter

14 days Cubic Meter

28 days Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
9.00 m. Type I I-Girders Each

10.00 m. Type I I-Girders Each


11.00 m. Type I I-Girders Each

11.00 m. Type II I-Girders Each

12.00 m. Type II I-Girders Each

13.00 m. Type II I-Girders Each

14.00 m. Type II I-Girders Each

15.00 m. Type II I-Girders Each

15.00 m. Type III I-Girders Each

16.00 m. Type III I-Girders Each

17.00 m. Type III I-Girders Each

18.00 m. Type III I-Girders Each

19.00 m. Type III I-Girders Each

20.00 m. Type III I-Girders Each

21.00 m. Type III I-Girders Each

19.00 m. Type IV I-Girders Each

20.00 m. Type IV I-Girders Each

21.00 m. Type IV I-Girders Each

22.00 m. Type IV I-Girders Each


23.00 m. Type IV I-Girders Each

24.00 m. Type IV I-Girders Each

25.00 m. Type IV I-Girders Each

26.00 m. Type IV I-Girders Each

27.00 m. Type IV I-Girders Each

23.00 m. Type IV-A I-Girders Each

24.00 m. Type IV-A I-Girders Each

25.00 m. Type IV-A I-Girders Each

26.00 m. Type IV-A I-Girders Each

27.00 m. Type IV-A I-Girders Each

28.00 m. Type IV-A I-Girders Each

29.00 m. Type IV-A I-Girders Each

30.00 m. Type IV-A I-Girders Each

23.00 m. Type IV-B I-Girders Each

24.00 m. Type IV-B I-Girders Each

25.00 m. Type IV-B I-Girders Each

26.00 m. Type IV-B I-Girders Each


27.00 m. Type IV-B I-Girders Each

28.00 m. Type IV-B I-Girders Each

29.00 m. Type IV-B I-Girders Each

30.00 m. Type IV-B I-Girders Each

31.00 m. Type IV-B I-Girders Each

32.00 m. Type IV-B I-Girders Each

33.00 m. Type IV-B I-Girders Each

34.00 m. Type IV-B I-Girders Each

26.00 m. Type V I-Girders Each

27.00 m. Type V I-Girders Each

28.00 m. Type V I-Girders Each

29.00 m. Type V I-Girders Each

30.00 m. Type V I-Girders Each

31.00 m. Type V I-Girders Each

32.00m. Type V I-Girders Each

33.00m. Type V I-Girders Each


34.00m. Type V I-Girders Each

35.00m. Type V I-Girders Each

36.00m. Type V I-Girders Each

37.00 m. Type V I-Girders Each

33.00 m. Type VI I-Girders Each

34.00 m. Type VI I-Girders Each

35.00 m. Type VI I-Girders Each

36.00 m. Type VI I-Girders Each

37.00 m. Type VI I-Girders Each

38.00 m. Type VI I-Girders Each

39.00 m. Type VI I-Girders Each

40.00 m. Type VI I-Girders Each

41.00 m. Type VI I-Girders Each

42.00 m. Type VI I-Girders Each

43.00 m. Type VI I-Girders Each

44.00 m. Type VI I-Girders Each


45.00 m. Type VI I-Girders Each

T-Girder Cubic Neter

Box Girder Cubic Meter

Box Girder Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
A Cubic Meter

Each

Cubic Neter
Linear Meter
Cubic Meter

Cubic Meter

Grade 40 Kilogram

Class B (16.5 Mpa) Cubic Meter

ti'ixes shaff be inCfuded within the parenthesis of the Pay Item Number.

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
ments shaff be full compensation for furnishing, preparing, fabricating, transporting, pfacing and erecting

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Kilogram

he cost thereofsha// be considered as inc/uded in the contract price for other items.

Valid Values Unit of Measure


Unit of Measure
Thickness/Sizes Class Others
Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Square Meter
as incftided in the contract unit price of the Items where calfed for.

Valid Values Unit of Measure


Thickness/Sizes Class Others
Each
Steel Box Girder Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Cubic Meter

12 mm Cubic Meter

50 mm Cubic Meter

Linear Meter
Steel Finger Type Linear Meter

Aluminum Cast Linear Meter

Strip Seal Linear Meter


Compression Seal Linear Meter

Rubber (Multiplex) Linear Meter


Expansion Joints

Modular Expansion Linear Meter


Device

Each

Each
Steel Transverse Set

Steel Longitudinal Set

Steel Finger Type Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
1 Layer Square Meter
2 Layers Square Meter
3 Layers Square Meter
4 Layers Square Meter
Plate Square Meter
Lump Sum
1 Layer Square Meter
2 Layers Square Meter
3 Layers Square Meter
4 Layers Square Meter
Lump Sum
Sheet Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Steel Bearing Each

Rubber Bearing Each

High Damping Rubber Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Kilogram
Valid Values Unit of Measure
Thickness/Sizes Class Others
Kilogram
Square Meter

ON STRUCTURES

Valid Values Unit of Measure


Thickness/Sizes Class Others
610 mm dia. Class II RCPC Linear Meter

760 mm dia. Class II RCPC Linear Meter

910 mm dia. Class II RCPC Linear Meter

1070 mm dia. Class II RCPC Linear Meter

1220 mm dia. Class II RCPC Linear Meter

1520 mm dia. Class II RCPC Linear Meter

610 mm dia. Class IV RCPC Linear Meter

760 mm dia. Class IV RCPC Linear Meter

910 mm dia. Class IV RCPC Linear Meter

1070 mm dia. Class IV RCPC Linear Meter

1220 mm dia. Class IV RCPC Linear Meter

1520 mm dia. Class IV RCPC Linear Meter

1830 mm dia. Class IV RCPC Linear Meter

Linear Meter
Rectangular CHB Linear Meter

Rectanqular Concrete Linear Meter

V-Shape Concrete Linear Meter

Rectangular Masonry Linear Meter

V-Shape Masonry Linear Meter


Valid Values Unit of Measure
Thickness/Sizes Class Others
150 mm dia. Linear Meter
Linear Meter
Cubic Meter

Lump Sum
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
610 mm dia. Concrete Each

760 mm dia. Concrete Each

910 mm dia. Concrete Each

1070 mm dia. Concrete Each

1220 mm dia. Concrete Each

1520 mm dia. Concrete Each

1830 mm dia. Concrete Each

610 mm dia. CHB Each

760 mm dia. CHB Each

910 mm dia. CHB Each

1070 mm dia. CHB Each

1220 mm dia. CHB Each

1520 mm dia. CHB Each

1830 mm dia. CHB Each

610 mm dia. Each


760 mm dia. Each
910 mm dia. Each
1070 mm dia. Each

1220 mm dia. Each

1520 mm dia. Each

1830 mm dia. Each


610 mm dia. Each
760 mm dia. Each
910 mm dia. Each
1070 mm dia. Each

1220 mm dia. Each

1520 mm dia. Each

1830 mm dia. Each

610 mm dia. Each

760 mm dia. Each

910 mm dia. Each

1070 mm dia. Each

1220 mm dia. Each

1520 mm dia. Each

1830 mm dia. Each

Pair

Pair
Each
Each
Linear Meter
Precast Linear Meter

Precast Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Set
Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
610 mm dia. Linear Meter

760 mm dia. Linear Meter


910 mm dia. Linear Meter

1070 mm dia. Linear Meter

1220 mm dia. Linear Meter

1520 mm dia. Linear Meter

610 mm dia. Linear Meter

760 mm dia. Linear Meter

910 mm dia. Linear Meter

1070 mm dia. Linear Meter

1220 mm dia. Linear Meter

1520 mm dia. Linear Meter

610 mm dia., half- Linear Meter


silted

760 mm dia., half- Linear Meter


silted

910 mm dia., half- Linear Meter


silted

1070 mm dia., half- Linear Meter


silted

1220 mm dia., half- Linear Meter


silted

1520 mm dia., half- Linear Meter


silted

Each
Lump Sum

to diiTerentiate be tween such struCtures.


o of of Structures and Obstructions.

Valid Values Unit of Measure


Thickness/Sizes Class Others
A Cubic Meter
B Cubic Meter
C Cubic Meter
Cubic Meter
A Cubic Meter
B Cubic Meter
c Cubic Meter
D Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Timber Furnished and Driven Linear Meter

Steel Slope Protection Linear Meter

Steel Cofferdamming Linear Meter

Concrete Furnished Linear Meter

Concrete Driven Linear Meter

Concrete Furnished and Driven Linear Meter


PVC Furnished Linear Meter

PVC Driven Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Slope Protection Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
0.5m x Inn x 3m Metallic Coated Cubic Meter

0.5m x Inn x 4m Metallic Coated Cubic Meter

1m x 1m x 2m Metallic Coated Cubic Meter

1m x 1m x 3m Metallic Coated Cubic Meter

1m x 1m x 4m Metallic Coated Cubic Meter

0.5m x Inn x 2m Metallic Coated Cubic Meter

0.5m x Inn x 3m PVC Coated Cubic Meter

0.5m x Inn x 4m PVC Coated Cubic Meter

1m x 1m x 2m PVC Coated Cubic Meter

1m x 1m x 3m PVC Coated Cubic Meter

1m x 1m x 4m PVC Coated Cubic Meter

0.5m x Inn x 2m PVC Coated Cubic Meter

0.3m x 2m x 6m Metallic Coated Cubic Meter

0.3m x 2m x 6m PVC Coated Cubic Meter

Square Meter
1 tonne Type I Each

2 tonnes Type I Each

3 tonnes Type I Each

4 tonnes Type I Each


1 tonne Type II Each

2 tonnes Type II Each

3 tonnes Type II Each

4 tonnes Type II Each

5 tonnes Type II Each

6 tonnes Type II Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Type 1 Square Meter

Type 2 Square Meter

Type 3 Square Meter

Type 4 Square Meter

Type 5 Square Meter

Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Cubic Meter
Cubic Meter
Valid Values Unit of Measure
Thickness/Sizes Class Others
Linear Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Galvanized Linear Meter
PVC Linear Meter
Lump Sum
Type-1 Cast Iron Each

Type-2 Cast Iron Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

CTURES

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cast in place Linear Meter

Cast in place Linear Meter


Cast in place Linear Meter

Cast in place Linear Meter

Precast Piece
Precast Piece
Precast Piece

Valid Values Unit of Measure


Thickness/Sizes Class Others
100mm thick Cast in place Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Timber Each

Concrete Each

Cast-in-place Each

Precast Each

Timber Each

Cast-in-place Each

Precast Each
1000±50 high, Timber with 3" dia. (75mm) Each
100mm±5 wide, reflector
50mm±5 thick,
500mm depth (min)

1000±50 high, Flexible Non-timber with 3" dia. Each


100mm±5 wide, (75mm) reflector
50mm±5 thick,
350mm depth (min)
1000±50 high, Semi-flexible Non-timber with 3" dia. Each
100mm±5 wide, (75mm) reflector
50mm±5 thick,
350mm depth (min)

1000±50 high, Rigid Non-timber with 3" dia. Each


100mm±5 wide, (75mm) reflector
50mm±5 thick,
500mm depth (min)

Rectangular Each

Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

Linear Meter

Single W-Beam Linear Meter

Single Thrie-Beam Linear Meter

Double W-Beam Linear Meter

Double Thrie-Beam Linear Meter

Fish Tail Each

Bull Nose Each

Eccentric Loader Each


Breakaway Cable Terminal
(ELTJ

Linear Meter
W-Beam Linear Meter
Thrie-Beam Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter
Linear Meter

Each
Each
Square Meter

Square Meter

Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
600 mm W1-1A Horizontal Alignment Sharp Each
Turn L or R

750 mm W1-1B Horizontal Alignment Sharp Each


Turn L or R

900 mm W1-1C Horizontal Alignment Sharp Each


Turn L or R

600 mm W1-2A Horizontal Alignment Each


Reverse Turn L or R

750 mm W1-2B Horizontal Alignment Each


Reverse Turn L or R

900 mm W1-2C Horizontal Alignment Each


Reverse Turn L or R

600 mm W1-3A Horizontal Alignment Curve Each


L or R
750 mm W1—3B Horizontal Alignment Curve Each
L or R

900 mm W1-3C Horizontal Alignment Curve Each


L or R

600 mm W1-4A Horizontal Alignment Each


Reverse Curve L or R

750 mm W1-4B Horizontal Alignment Each


Reverse Curve L or R

900 mm W1-4C Horizontal Alignment Each


Reverse Curve L or R

600 mm W1-5A Horizontal Alignment Each


Winding Road L or R

750 mm W1-5B Horizontal Alignment Each


Winding Road L or R

600 mm W1-6A Horizontal Alignment Each


Hairpin Bend L or R

750 mm W1-6B Horizontal Alignment Each


Hairpin Bend L or R

450 mm W2-1A Intersection and Junction Each


Signs Cross Road

600 mm W2-1B Intersection and Junction Each


Signs Cross Road

750 mm W2-1C Intersection and Junction Each


Signs Cross Road

900 mm W2-1D Intersection and Junction Each


Signs Cross Road

450 mm W2-2A Intersection and function Each


Signs Staggered Side Road
Junction L or R
600 mm W2-2B Intersection and function Each
Signs Staggered Side Road
Junction L or R

750 mm W2-2C Intersection and function Each


Signs Staggered Side Road
Junction L or R

900 mm W2-2D Intersection and function Each


Signs Staggered Side Road
Junction L or R

600 mm W2-3A Intersection and Junction Each


Signs Skewed Intersection

750 mm W2-3B Intersection and Junction Each


Signs Skewed Intersection

900 mm W2-3C Intersection and Junction Each


Signs Skewed Intersection

450 mm W2-4A Intersection and Junction Each


Signs T- Junction

600 mm W2-4B Intersection and function Each


Signs T-Junction

750 mm W2-4C Intersection and function Each


Signs T-Junction

900 mm W2-4D Intersection and function Each


Signs T-Junction

450 mm W2-5A Intersection and function Each


Signs Y-Junction

600 mm W2-5B Intersection and function Each


Signs Y-Junction

750 mm W2-5C Intersection and function Each


Signs Y-Junction

900 mm W2-5D Intersection and function Each


Signs Y-Junction
450 mm W2-6A Intersection and Junction Each
Signs Side Road Junction L
or R

600 mm W2-6B Intersection and Junction Each


Signs Side Road Junction L
or R

750 mm W2-6C Intersection and Junction Each


Signs Side Road Junction L
or R

900 mm W2-6D Intersection and Junction Each


Signs Side Road Junction L
or R

450 mm W2-7A Intersection and Junction Each


Signs Runabout Ahead

600 mm W2-7B Intersection and Junction Each


Signs Runabout Ahead

750 mm W2-7C Intersection and Junction Each


Signs Runabout Ahead

600 mm W2-8B Intersection and Junction Each


Signs Priority Junction

750 mm W2-8C Intersection and Junction Each


Signs Priority Junction

900 mm W2-8D Intersection and Junction Each


Signs Priority Junction

600 mm W2-9B Intersection and Junction Each


Signs Priority Merging

750 mm W2-9C Intersection and Junction Each


Signs Priority Merging
900 mm W2-9D Intersection and Junction Each
Signs Priority Merging

450 mm W2-10A Intersection and Junction Each


Signs Priority Cross

600 mm W2-10B Intersection and Junction Each


Signs Priority Cross

750 mm W2-10C Intersection and Junction Each


Signs Priority Cross

900 mm W2-10D Intersection and Junction Each


Signs Priority Cross

600 mm W3-1A Advance Warning of Traffic Each


Control Device Signs Signals
Ahead

750 mm W3-1B Advance Warning of Traffic Each


Control Device Signs Signals
Ahead

900 mm W3-1C Advance Warning of Traffic Each


Control Device Signs Signals
Ahead

1200 mm W3-1D Advance Warning of Traffic Each


Control Device Signs Signals
Ahead

450 mm W3-2A Advance Warning of Traffic Each


Control Device Signs Stop
Sign Ahead

600 mm W3-2B Advance Warning of Traffic Each


Control Device Signs Stop
Sign Ahead

750 mm W3-2C Advance Warning of Traffic Each


Control Device Signs Stop
Sign Ahead

450 mm W3-3A Advance Warning of Traffic Each


Control Device Signs Give
Way Sign Ahead
600 mm W3-3B Advance Warning of Traffic Each
Control Device Signs Give
Way Sign Ahead

750 mm W3-3C Advance Warning of Traffic Each


Control Device Signs Give
Way Sign Ahead

450 mm W4-1A Road Width Sign Narrow Each


Bridge

600 mm W4-1B Road Width Sign Narrow Each


Bridge

750 mm W4-1C Road Width Sign Narrow Each


Bridge

450 x 700 mm W4-IPA Road Width Sign Narrow Each


Bridge

600 x 900 mm W4-1PB Road Width Sign Narrow Each


Bridge

750 x 1200 mm W4-IPC Road Width Sign Narrow Each


Bridge

450 mm W4-2A Road Width Sign Road Each


Narrows

600 mm W4-2B Road Width Sign Road Each


Narrows

750 mm W4-2C Road Width Sign Road Each


Narrows

450x700 mm W4-2PA Road Width Sign Road Each


Narrows

600 x 900 mm W4-2PB Road Width Sign Road Each


Narrows

750 x 1200 mm W4-2PC Road Width Sign Road Each


Narrows

450 mm W4-3A Road Width Sign Divided Each


Road

600 mm W4-3B Road Width Sign Divided Each


Road
750 mm W4-3C Road Width Sign Divided Each
Road

900 mm W4-3D Road Width Sign Divided Each


Road

450 mm W4-4A Road Width Sign End Each


Divided Road

600 mm W4-4B Road Width Sign End Each


Divided Road

750 mm W4-4C Road Width Sign End Each


Divided Road

900 mm W4-4D Road Width Sign End Each


Divided Road

600 mm W5-1B Road Obstacle Signs Each


Opening Bridge

750 mm W5-1C Road Obstacle Signs Each


Opening Bridge

450 mm W5-2A Road Obstacle Signs Each


Uneven Road

600 mm W5-2B Road Obstacle Signs Each


Uneven Road

750 mm W5-2C Road Obstacle Signs Each


Uneven Road

900 mm W5-2D Road Obstacle Signs Each


Uneven Road

450 mm W5-3A Road Obstacle Signs Hump Each

600 mm W5—3B Road Obstacle Signs Hump Each

750 mm W5-3C Road Obstacle Signs Hump Each

900 mm W5-3D Road Obstacle Signs Hump Each

600 mm W5-4B Road Obstacle Signs Steep Each


Descent
750 mm W5-4C Road Obstacle Signs Steep Each
Descent

900 mm W5-4D Road Obstacle Signs Steep Each


Descent

450 mm W5-5A Road Obstacle Signs Steep Each


Climb

600 mm W5-5B Road Obstacle Signs Steep Each


Climb

750 mm W5-5C Road Obstacle Signs Steep Each


Climb

450 mm W5-6A Road Obstacle Signs Spill Each


Way

600 mm W5-6B Road Obstacle Signs Spill Each


Way

750 mm W5-6C Road Obstacle Signs Spill Each


Way

900 mm W5-6D Road Obstacle Signs Spill Each


Way

450 mm W5-7A Road Obstacle Signs Flood Each

600 mm W5-7B Road Obstacle Signs Flood Each

750 mm W5-7C Road Obstacle Signs Flood Each

900 mm W5-7D Road Obstacle Signs Flood Each

600 mm W5-8B Road Obstacle Signs Falling Each


Rocks L or R

750 mm W5-8C Road Obstacle Signs Falling Each


Rocks L or R

900 mm W5-8D Road Obstacle Signs Falling Each


Rocks L or R

450 mm W5-9A Road Obstacle Signs Each


Slippery Road
600 mm W5-9B Road Obstacle Signs Each
Slippery Road

750 mm W5-9C Road Obstacle Signs Each


Slippery Road

900 mm W5-9D Road Obstacle Signs Each


Slippery Road

450mm X 700 mm W5-9PA Road Obstacle Signs Each


Slippery Road

600mm X 900 mm W5-9PB Road Obstacle Signs Each


Slippery Road

750mm X 1200 mm W5-9PC Road Obstacle Signs Each


Slippery Road

600 mm W5-10B Road Obstacle Signs Animal Each


Crossing

750 mm W5-10C Road Obstacle Signs Animal Each


Crossing

900 mm W5-10D Road Obstacle Signs Animal Each


Crossing

450 mm W5-11A Road Obstacle Signs Aircraft Each

600 mm W5-1 1B Road Obstacle Signs Aircraft Each

750 mm W5-11C Road Obstacle Signs Aircraft Each

900 mm W5-11D Road Obstacle Signs Aircraft Each

600mm X 600 mm W6-1B Pedestrian and School Signs Each


Pedestrian Crossing Ahead
750mm X 750 mm W6-IC Pedestrian and School Signs Each
Pedestrian Crossing Ahead

450mm X 750 mm W6-IP Pedestrian and School Signs Each


Slow Down Pedestrian
Crossing Ahead

600mm X 600 mm W6-2B Pedestrian and School Signs Each


Children Crossing

750mm X 750 mm W6-2C Pedestrian and School Signs Each


Children Crossing

300mm X 450 mm W6-3 Pedestrian and School Signs Each


Cross Only At Ped Xing

450mm X 450 mm W6-4A Pedestrian and School Signs Each


Wheel Chair Crossing

600mm X 600 mm W6-4B Pedestrian and School Signs Each


Wheel Chair Crossing

750mmX 750 mm W6-4C Pedestrian and School Signs Each


Wheel Chair Crossing

400mm X 900 mm W6-5A Pedestrian and School Signs Each


Bike Lane Ahead

600mm X 900 mm W6-5B Pedestrian and School Signs Each


Bike Lane Ahead

Railroad Cross Position W7-1 Railway Level Crossing Each


Signs Railroad Crossing
Position

600 mm W7-2B Railway Level Crossing Each


Signs Railway Crossing
without signal
750 mm W7-2C Railway Level Crossing Each
Signs Railway Crossing
without signal

900 mm W7-2D Railway Level Crossing Each


Signs Railway Crossing
without signal

600 mm W7-3B Railway Level Crossing Each


Signs Railway Crossing with
signal

750 mm W7—3C Railway Level Crossing Each


Signs Railway Crossing with
signal

900 mm W7-3D Railway Level Crossing Each


Signs Railway Crossing with
signal

700mm X 900 mm W7-4 Railway Level Crossing Each


Signs Alternative Railway
Crossing Position

600mm X 400 mm W8-1A Supplementary Signs Each


Advisory Speed

750mm X 500 mm W8-1B Supplementary Signs Each


Advisory Speed

900mm X 600 mm W8-IC Supplementary Signs Each


Advisory Speed

600mm X 400 mm W8-2A Supplementary Signs On Each


Side Road

750mm X 500 mm W8-2B Supplementary Signs On Each


Side Road

900mm X 600 mm W8-2C Supplementary Signs On Each


Side Road
600mm X 200 mm W8-3A Supplementary Signs Each
Distance ... m

750mm X 250 mm W8-3B Supplementary Signs Each


Distance ... m

900mm X 300 mm W8-3C Supplementary Signs Each


Distance ... m

600mm X 200 mm W8-4A Supplementary Signs Each


Distance ... km

750mm X 250 mm W8-4B Supplementary Signs Each


Distance ... km

900mm X 300 mm W8-4C Supplementary Signs Each


Distance ... km

600mm X 400 mm W8-5A Supplementary Signs When Each


Wet

750mm X 500 mm W8-5B Supplementary Signs When Each


Wet

900mm X 600 mm W8-5C Supplementary Signs When Each


Wet

600mm X 200 mm W8-6A Supplementary Signs Blind Each

750mm X 250 mm W8-6B Supplementary Signs Blind Each

900mm X 300 mm W8-6C Supplementary Signs Blind Each

600mm X 200 mm W8-7A Supplementary Signs Aged Each

750mm X 250 mm W8-7B Supplementary Signs Aged Each


900mm X 300 mm W8-7C Supplementary Signs Aged Each

600mm X 400 mm W8-8A Supplementary Signs Each


Playground

750mm X 500 mm W8-8B Supplementary Signs Each


Playground

900mm X 600 mm W8-8C Supplementary Signs Each


Playground

600mm X 200 mm W8-9A Supplementary Signs School Each

750mm X 250 mm W8-9B Supplementary Signs School Each

900mm X 300 mm W8-9C Supplementary Signs School Each

600mm X 200 mm W8-10A Supplementary Signs Each


Disabled

750mm X 250 mm W8-10B Supplementary Signs Each


Disabled

900mm X 300 mm W8-10C Supplementary Signs Each


Disabled

1500mm X 600 mm W9-1A Other Warning Signs Each


Vertical Clearance;
CLEARANCE

1950mm X 600 mm W9-1B Other Warning Signs Each


Vertical Clearance; LOW
CLEARANCE
1060mm X 600 mm W9-2A Other Warning Signs Slow Each
Down Accident Prone Area

1060mm X 600 mm W9-2B Other Warning Signs Each


Bumagal Madalas Ang
Aksidente Dito

1060mm X 600 mm W9-3 Other Warning Signs Slow Each


Down Merging Traffic
Ahead

950mm X 600 mm W9-4 Other Warning Signs Lane Each


Ends - Merge Left

1060mm X 600 mm W9-5 Other Warning Signs Slow Each


Down Weighbridge Ahead

450 x 450 mm R1-1A Priority Signs Stop Each

600 x 600 mm R1-1B Priority Signs Stop Each

750 x 750 mm R1-1C Priority Signs Stop Each

900 x 900 mm R1-1D Priority Signs Stop Each

600 mm R1-2A Priority Signs Give Way Each

750 mm R1-2B Priority Signs Give Way Each

900 mm R1-2C Priority Signs Give Way Each

640 x 900 mm R1-2P Priority Signs Give Way Each

500 x 750 mm R1-3 Priority Signs Left Turner Each


Must Give Way

450 mm R2-1A Direction Signs NO TURNS; Each


Disc Type
450 mm R2-2A Direction Signs ONE WAY; Each
Disc Type

450 mm R2-3A Direction Signs KEEP Each


RIGHT; Disc Type

450 mm R2-4A Direction Signs LANE SPLIT; Each


Disc Type

450 mm R2-5A Direction Signs ALL Each


TRAFFIC; Disc Type

450 mm R2-6A Direction Signs MERGING Each


TRAFFIC; Disc Type

450 mm R2-7A Direction Signs TWO WAY; Each


Disc Type

600 mm R2-1B Direction Signs NO TURNS; Each


Disc Type

600 mm R2-2B Direction Signs ONE WAY; Each


Disc Type

600 mm R2-3B Direction Signs KEEP Each


RIGHT; Disc Type

600 mm R2-4B Direction Signs LANE SPLIT; Each


Disc Type

600 mm R2-5B Direction Signs ALL Each


TRAFFIC; Disc Type

600 mm R2-6B Direction Signs MERGING Each


TRAFFIC; Disc Type

600 mm R2-7B Direction Signs TWO WAY; Each


Disc Type

750 mm R2-1C Direction Signs NO TURNS; Each


Disc Type

750 mm R2-2C Direction Signs ONE WAY; Each


Disc Type

750 mm R2-3C Direction Signs KEEP Each


RIGHT; Disc Type
750 mm R2-4C Direction Signs LANE SPLIT; Each
Disc Type

750 mm R2-5C Direction Signs ALL Each


TRAFFIC; Disc Type

750 mm R2-6C Direction Signs MERGING Each


TRAFFIC; Disc Type

750 mm R2-7C Direction Signs TWO WAY; Each


Disc Type

Disc Size 400 mm R2-IPA Direction Signs NO TURNS; Each


Plate Type; 450 x 750 mm

Disc Size 400 mm R2-2PA Direction Signs ONE WAY; Each


Plate Type; 450 x 750 mm

Disc Size 400 mm R2-3PA Direction Signs KEEP Each


RIGHT; Plate Type; 450 x
750 mm

Disc Size 400 mm R2-5PA Direction Signs ALL Each


TRAFFIC; Plate Type; 450 x
750 mm

Disc Size 400 mm R2-6PA Direction Signs MERGING Each


TRAFFIC; Plate Type; 450 x
750 mm

450 x 750 mm R2-7PA Other Directional Signs Each


TWO WAY

900 x 700 mm R2-7S Other Directional Signs Each


SALUBONG NA TRAPIKO

450 X 750 mm R2-8A (R) Other Directional Signs Each


RIGHT LANE MUST TURN
RIGHT
450 X 750 mm R2-8A (L) Other Directional Signs Each
LEFT LANE MUST TURN
LEFT

600 X 1000 mm R2-8B (R) Other Directional Signs Each


RIGHT LANE MUST TURN
RIGHT

600 X 1000 mm R2-8B (L) Other Directional Signs Each


LEFT LANE MUST TURN
LEFT

600 mm R3—1A Prohibitive or Restrictive Each


Signs No Entry for All
Vehicles

750 mm R3-1B Prohibitive or Restrictive Each


Signs No Entry for All
Vehicles

400 x 600 mm R3-IPA Prohibitive or Restrictive Each


Signs No Entry for All
Vehicles

600 x 900 mm R3-1PB Prohibitive or Restrictive Each


Signs No Entry for All
Vehicles

800 x 1200 mm R3-IPC Prohibitive or Restrictive Each


Signs No Entry for All
Vehicles

450 mm R3-2A Prohibitive or Restrictive Each


Signs No Entry for Cars

450 mm R3-3A Prohibitive or Restrictive Each


Signs No Entry for Jeepneys

450 mm R3—4A Prohibitive or Restrictive Each


Signs No Entry for Bicycles
450 mm R3-5A Prohibitive or Restrictive Each
Signs No Entry for
Motorcycles

450 mm R3-6A Prohibitive or Restrictive Each


Signs No Entry for Tricycles

450 mm R3—7A Prohibitive or Restrictive Each


Signs No Entrv for Buses

450 mm R3-8A Prohibitive or Restrictive Each


Signs No
Entry for Trucks

450 mm R3-9A Prohibitive or Restrictive Each


Signs No Entry for Trucks
with Trailer

450 mm R3-10A Prohibitive or Restrictive Each


Signs No Entry for
Pedestrians

450 mm R3-11A Prohibitive or Restrictive Each


Signs No Entry for Animal
Drawn Vehicle

450 mm R3-12A Prohibitive or Restrictive Each


Signs No Entry for
Pushcarts

600 mm R3-2B Prohibitive or Restrictive Each


Signs No Entry for Cars

600 mm R3-3B Prohibitive or Restrictive Each


Signs No Entry for Jeepneys

600 mm R3-4B Prohibitive or Restrictive Each


Signs No Entry for Bicycles

600 mm R3-5B Prohibitive or Restrictive Each


Signs No Entry for
Motorcycles
600 mm R3-6B Prohibitive or Restrictive Each
Signs No Entry for Tricycles

600 mm R3-7B Prohibitive or Restrictive Each


Signs No Entry for Buses

600 mm R3-8B Prohibitive or Restrictive Each


Signs No Entry for Trucks

600 mm R3-9B Prohibitive or Restrictive Each


Signs No Entry for Trucks
with Trailer

600 mm R3-10B Prohibitive or Restrictive Each


Signs No Entry for
Pedestrians

600 mm R3-11B Prohibitive or Restrictive Each


Signs No Entry for Animal
Drawn Vehicle

600 mm R3-12B Prohibitive or Restrictive Each


Signs No Entry for
Pushcarts

750 mm R3-2C Prohibitive or Restrictive Each


Signs No Entry for Cars

750 mm R3-3C Prohibitive or Restrictive Each


Signs No Entry for Jeepneys

750 mm R3—4C Prohibitive or Restrictive Each


Signs No Entry for Bicycles

750 mm R3-5C Prohibitive or Restrictive Each


Signs No Entry for
Motorcycles

750 mm R3-6C Prohibitive or Restrictive Each


Signs No Entry for Tricycles
750 mm R3-7C Prohibitive or Restrictive Each
Signs No Entry for Buses

750 mm R3-8C Prohibitive or Restrictive Each


Signs No Entry for Trucks

750 mm R3-9C Prohibitive or Restrictive Each


Signs No Entry for Trucks
with Trailer

750 mm R3-10C Prohibitive or Restrictive Each


Signs No Entry for
Pedestrians

750 mm R3-11C Prohibitive or Restrictive Each


Signs No Entry for Animal
Drawn Vehicle

750 mm R3-12C Prohibitive or Restrictive Each


Signs No Entry for
Pushcarts

450 x 600 mm R3-10P1 Prohibitive or Restrictive Each


Signs Use Overpass

450 X 600 mm R3-10P2 Prohibitive or Restrictive Each


Signs Use Ped Xing

300 X 350 mm R3-10P3 Prohibitive or Restrictive Each


Signs Bawal tumawid
gamitin ang Overpass

600 mm R3-13A Prohibitive or Restrictive Each


Signs Turning Prohibition;
No Right Turn

900 mm R3-13B Prohibitive or Restrictive Each


Signs Turning Prohibition;
No Right Turn

450 x 750 mm R3-13 PA Prohibitive or Restrictive Each


Signs Turning Prohibition;
No Right Turn
600 x 1000 mm R3-13 PB Prohibitive or Restrictive Each
Signs Turning Prohibition;
No Right Turn

600 mm R3-14A Prohibitive or Restrictive Each


Signs Turning Prohibition;
No Left Turn

900 mm R3-14B Prohibitive or Restrictive Each


Signs Turning Prohibition;
No Left Turn

450x750 mm R3-14 PA Prohibitive or Restrictive Each


Signs Turning Prohibition;
No Left Turn

600 x 1000 mm R3-14 PB Prohibitive or Restrictive Each


Signs Turning Prohibition;
No Left Turn

600 mm R3-15A Prohibitive or Restrictive Each


Signs Turning Prohibition;
No U Turn

900 mm R3-15B Prohibitive or Restrictive Each


Signs Turning Prohibition;
No U Turn

450x750 mm R3-15 PA Prohibitive or Restrictive Each


Signs Turning Prohibition;
No U Turn

600 x 1000 mm R3-15 PB Prohibitive or Restrictive Each


Signs Turning Prohibition;
No U Turn

600 mm R3-16A Prohibitive or Restrictive Each


Signs Prohibition of
Overtaking

900 mm R3-16B Prohibitive or Restrictive Each


Signs Prohibition of
Overtaking
600 x 900 mm R3-16 PA Prohibitive or Restrictive Each
Signs Prohibition of
Overtaking; Bawal Lumusot

750 x 1000 mm R3-16 PB Prohibitive or Restrictive Each


Signs Prohibition of
Overtaking; Bawal Lumusot

450 mm R4-1A Speed Signs Speed Each


Restriction (Maximum )

600 mm R4-1B Speed Signs Speed Each


Restriction (Maximum )

900 mm R4-1C Speed Signs Speed Each


Restriction (Maximum )

450 x 450 mm R4-2A Speed Signs Speed Each


Restriction (Minimum)

600 x 600 mm R4-2B Speed Signs Speed Each


Restriction Signs

450x750 mm R4-2PA Speed Signs Speed Each


Restriction Signs

600 x 1000 mm R4-2PB Speed Signs Speed Each


Restriction Signs

800 x 1334 mm R4-2PC Speed Signs Speed Each


Restriction Signs

900 mm R4-3A Speed Signs Speed Each


Restriction Signs

450 mm R5-1SA Parking Signs No Parking Each


(Disc)
600 mm R5-1SB Parking Signs No Parking Each
(Disc)

450 x 750 mm R5-IPA Parking Signs No Parking Each


(Filipino Worded) (Plate)

600 x 1000 mm R5-IPC Parking Signs No Parking Each


(Filipino Worded) (Plate)

450 x 750 mm R5-2PA Parking Signs No Parking - Each


Loading Only (Plate)

600 x 1000 mm R5-2PB Parking Signs No Parking - Each


Loading Only (Plate)

450 x 750 mm R5-3PA Parking Signs No Parking - Each


Anytime (Plate)

600 x 1000 mm R5-3PB Parking Signs No Parking - Each


Anytime (Plate)

450 x 750 mm R5-3CA Parking Signs No Parking - Each


Tow Away (Plate)

600 x 1000 mm R5-3CB Parking Signs No Parking - Each


Tow Away (Plate)

450 x 750 mm R5-4 Parking Signs Restricted Each


Parking; Meter Parking

450 x 750 mm R5-4A Parking Signs Restricted Each


Parking; 2 Hour Parking

450 x 750 mm R5-4B Parking Signs Loading Each


Signs; Loading Zone

450x750 mm R5-4C Parking Signs Loading Each


Signs; Loading and
Unloading Zone
450 x 750 mm R5-5 Parking Signs No Waiting Each
Signs

450x750 mm R5-5A Parking Signs No Waiting Each


Signs

450 x 750 mm R5-5B Parking Signs No Waiting Each


Signs

450 x 750 mm R5-6 Parking Signs No Loading Each


and Unloading Signs

450x750 mm R5-6A Parking Signs No Loading Each


and Unloading Signs

450 x 750 mm R5-7 Parking Signs No Each


Loading/Unloading Within
Red-Painted Curb

450 x 750 mm R5-8 Parking Signs No Stopping Each


Anytime

400 x 900 mm R5-9A Parking Signs No Parking Each


or Stopping Signs: BUS
Stop

400 x 900 mm R5-9B Parking Signs No Parking or Each


Stopping Signs; PUJ Stop

400 x 900 mm R5-9C Parking Signs No Parking Each


or Stopping Signs: Bus-PUJ
Stop

400 x 600 mm R5-10 Parking Signs Do Not Each


Block Intersection

450 x 600 mm R5-11 Parking Signs Right Turners Each


Cross at Broken White Lines

600 mm R6-1 Miscellaneous Signs Each


Prohibition on Use of
Audible Warning Device
600 mm R6-2 Miscellaneous Signs Load Each
and Dimension Restriction
Signs

600 mm R6-3 Miscellaneous Signs Load Each


and Dimension Restriction
Signs

600 mm R6-4 Miscellaneous Signs Load Each


and Dimension Restriction
Signs

600 mm R6-5 Miscellaneous Signs Load Each


and Dimension Restriction
Signs

600 mm R6-6 Miscellaneous Signs Load Each


and Dimension Restriction
Signs

450 x 675 mm R6-7 Miscellaneous Signs Use Each


Seat Belt Sign

450 mm R6-8A Miscellaneous Signs Each


Pedestrian Crossing

600 mm R6-8B Miscellaneous Signs Each


Pedestrian Crossing

750 mm R6-8C Miscellaneous Signs Each


Pedestrian Crossing

450 mm R6-9A Miscellaneous Signs School Each


Children Crossing

600 mm R6-9B Miscellaneous Signs School Each


Children Crossing

750 mm R6-9C Miscellaneous Signs School Each


Children Crossing

450 mm R6-10A Miscellaneous Signs Bike Each


Lane Signs

600 mm R6-10B Miscellaneous Signs Bike Each


Lane Signs
750 mm R6-10C Miscellaneous Signs Bike Each
Lane Signs

450 mm R6-11A Miscellaneous Signs Wheel Each


Chair Crossing Signs

600 mm R6-11B Miscellaneous Signs Wheel Each


Chair Crossing Signs

750 mm R6-11C Miscellaneous Signs Wheel Each


Chair Crossing Signs

G1-1 Advance Direction Signs Each


Stack Signs

G1-2 Advance Direction Signs Each


Stack Signs

G1-3 Advance Direction Signs Each


Stack Signs

G1-4 Advance Direction Signs Each


Diagrammatic Direction
Signs

G1-5 Advance Direction Signs Each


Diagrammatic Direction
Signs

G2-1 Intersection Direction Signs Each

G2-2 Intersection Direction Signs Each

G2-3 Intersection Direction Signs Each

G2-4 Intersection Direction Signs Each

G3-1 Reassurance Direction Each


Signs
G3-2 Reassurance Direction Each
Signs

G4-1 Finger Board Direction Each


Signs

G4-2 Finger Board Direction Each


Signs

G4-3 Finger Board Direction Each


Signs

G5-1 Street Name Signs Each

G5-2A Street Name Signs Each

G5-2B Street Name Signs Each

G5-3 Street Name Signs Each

G6-1 Town Name and Each


Geographical Feature Signs
Town Name

G6-2 Town Name and Each


Geographical Feature Signs
Province Name

G6-3 Town Name and Each


Geographical Feature Signs
Geographic Feature

G6-4 Town Name and Each


Geographical Feature Signs
Local Government Boundary

G7-1 Service Signs Service Center Each


2km

G7-2 Service Signs Weighbridge Each


Station

G7-3 Service Signs Parking and Each


Restrooms
G7-3A Service Signs Gasoline Each
Station and Restaurant or
Cafes

G7-4 Service Signs Rest Area and Each


Truck Parking Turn Left
300m

G7-5 Service Signs Shopping Each


Center

G8-1 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs
G8-2 Tourist Information and Each
Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

G8-2 Tourist Information and Each


Tourist Destination Signs

GE2-2 Expressway Information Each


Signs Toll Charges
(Advance Information)

GE2-2 Expressway Information Each


Signs Toll Charges
(Advance Information)

GE2-2 Expressway Information Each


Signs Toll Charges
(Advance Information)

GE2-2 Expressway Information Each


Signs Toll Charges
(Advance Information)

GE2-2 Expressway Information Each


Signs Toll Charges
(Advance Information)

GE2-2 Expressway Information Each


Signs Toll Charges
(Advance Information)

GE2-2 Expressway Information Each


Signs Toll Charges
(Advance Information)
GE2-3 Expressway Information Each
Signs Lane Direction Sions

GE3-1 Advance Exit Signs Advance Each


Exit with distance

GE3-2 Advance Exit Signs Advance Each


Exit with Distance plus
RIGHT LANE

GE3-3 Advance Exit Signs Each


Supplementary Advance
(NEXT EXIT)

GE4-1 Expressway Exit Direction Each


Signs Exit signs with
Destination

GE4-2 Expressway Exit Direction Each


Signs NEXT EXIT. KM

GE4-3 Expressway Exit Direction Each


Signs EXIT

GE4-3A Expressway Exit Direction Each


Signs Numbered exit

2800mm X 1500 mm GE5-1 Expressway Service Signs Each


Rest Area Right Lane 2km

2800mm X 1500 mm GE5-1A Expressway Service Signs Each


Rest Area Right Lane 2km

2500mm X 1100 mm GE5-2 Expressway Service Signs Each


Rest Area 2km

1500mm X 1800 mm GE5-3 Expressway Service Signs Each


Rest Area
2800mm X 1500 mm GE5-4 Expressway Service Signs Each
Service Center 2km

2240mm X 1800 mm GE5-5 Expressway Service Signs Each


Truck Parking 2km

3240mm X 1800 mm GE5-6 Expressway Service Signs Each


Restaurant Next Exit

2800mm X 1800 mm GE5-7 Expressway Service Signs Each


Truck Parking exit

2300mm X 1500 mm GE6-1 End of Expressway END Each


EXPRWAY 1 Km

1200mm X 600 mm GE6-1A End of Expressway END Each


EXPRWAY 2 Km

900mm X 450 mm GE6-2 End of Expressway START Each


EXPRWAY

900mm X 450 mm GE6-3 End of Expressway END Each


EXPRWAY

2600mm X 1600 mm GE7-1 Toll Signs Toll Plaza Each


Ahead

1600mm X 1900 mm GE7-2 Toll Signs Stop At Toll Gates Each

2400mm X 1200 mm GE7-3 Toll Signs Pay Toll Ahead Each


2300mm X 1470 mm GE8-1 Expressway Traffic Each
Instruction and Regulatory
Signs Wrong Way - Go
Back

1600mm X 1700 mm GE8-2 Expressway Traffic Each


Instruction and Regulatory
Signs Right Lane Ends m

2700mm X 1700 mm GE8-3 Expressway Traffic Each


Instruction and Regulatory
Signs Right Lanes Ends
Merge Left

2700mm X 1400 mm GE8-4 Expressway Traffic Each


Instruction and Regulatory
Signs Lane Ends Merge Left

1750mm X 1500 mm GE8-5 Expressway Traffic Each


Instruction and Regulatory
Signs Merge Left

2400mm X 2950 mm GE8-6 Expressway Traffic Each


Instruction and Regulatory
Signs Slow Vehicle Use
Right Lane

2000mm X 1100 mm GE8-7 Expressway Traffic Each


Instruction and Regulatory
Signs Check Brakes

2600mm X 2000 mm S1-4E Expressway Traffic Each


Instruction and Regulatory
Signs Reduced Speed Now

900 Disc R4-1C (XXX) Expressway Traffic Each


Instruction and Regulatory
Signs Speed Limit Sign
1200 Disc R4-1D (XXX) Expressway Traffic Each
Instruction and Regulatory
Signs Speed Limit Sign

900 Disc R4-3A (XX) Expressway Traffic Each


Instruction and Regulatory
Signs Minimum Speed Limit

1200 Disc R4-3B (XX) Expressway Traffic Each


Instruction and Regulatory
Signs Minimum Speed Limit

900 Disc R4-2C Expressway Traffic Each


Instruction and Regulatory
Signs Speed Restrictions

1200 Disc R4-2D Expressway Traffic Each


Instruction and Regulatory
Signs Speed Restrictions

600mm X 300 mm S1-1 Supplementary Signs USE Each


OVERPASS

600mm X 450 mm S1-2 Supplementary Signs USE Each


PEDESTRIAN CROSSING

800mm X 600 mm S1-3A Supplementary Signs Each


TRUCK USE LOW GEAR

1000mm X 750 mm S1-3B Supplementary Signs Each


TRUCK USE LOW GEAR

620mm X 420 mm S1-4 Supplementary Signs Each


CHECK BRAKES

1500mm X 750 mm S2-1 Movement Instruction Signs Each


REDUCE SPEED
450mm X 750 mm S2-2 Movement Instruction Signs Each
STOP HERE ON RED
SIGNAL

400mm X 600 mm S2-3L Movement Instruction Signs Each


TURN LEFT WITH CARE

750mm X 500 mm S2-3R Movement Instruction Signs Each


TURN RIGHT ANYTIME
WITH CARE

1300mm X 350 mm S2-4A Movement Instruction Signs Each


DETOUR FOR HIGH
VEHICLES (L or R)

1400mm X 350 mm S2-4A(L)(R) Movement Instruction Signs Each


DETOUR FOR HEAW
VEHICLES (L or R)

900mm X 600 mm S2-5 Movement Instruction Signs Each


GIVEWAY TO PEDESTRIANS

500mm X 800 mm S2-6 Movement Instruction Signs Each


NO RIGHT TURN ON RED
SIGNAL

950mm X 1100 mm S2-7 Plovement Instruction Signs Each


SLOW VEHICLES USE
RIGHT LANE

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
S2-7A Movement Instruction Signs Each
MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
S2-7A Movement Instruction Signs Each
MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

S2-7A Movement Instruction Signs Each


MABAGAL NA SASAKYAN
MAMALAGI SA KANAN

Valid Values Unit of Measure


Thickness/Sizes Class Others
Premixed White Square Meter
Reflectorized

Premixed Yellow Square Meter


Reflectorized

Reflectorized White Square Meter


Thermoplastic

Reflectorized Yellow Square Meter


ThermoPlastic

Valid Values Unit of Measure


Thickness/Sizes Class Others
Mono-Directional Each

Bi-Directional Each

Mono-Directional Each

Bi-Directional Each
Mono-Directional Each

Bi-Directional Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
100 Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Each

Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Square Meter

Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Kilogram

Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
100 mm. Meter
150 mm. Meter
200 mm. Meter
Lump sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
CN 400 Square Meter
CN 700 Square Meter
CN 900 Square Meter
CN 100 Linear Meter
CN 200 Linear Meter
CN 300 Linear Meter
CN 400 Linear Meter
CN 500 Linear Meter
Grass-Cover Square Meter
Vetiver Grass System Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
TS1 8 Signal Group Lump Sum

TS2 16 Signal Group Lump Sum


TS3 32 Signal Group Lump Sum

TS4 Lump Sum

200mm 1 Aspect TS5 Amber Lens Lump Sum

200mm 1 Aspect TS6 Red Lens Lump Sum

200mm 1 Aspect TS7 Green Lens Lump Sum

200mm 2 Aspect TS8 Lump Sum

200mm 3 Aspect TS9 Lump Sum

200mm 4 Aspect TS10 Lump Sum

200mm 5 Aspect TS11 Lump Sum

200mm 6 Aspect TS12 Lump Sum

300mm 1 Aspect TS13 Amber Lens Lump Sum

300mm 1 Aspect TS14 Red Lens Lump Sum

300mm 1 Aspect TS15 Green Lens Lump Sum

300mm 2 Aspect TS16 Lump Sum


300mm 3 Aspect TS17 Lump Sum

300mm 4 Aspect TS18 Lump Sum

300mm 5 Aspect TS19 Lump Sum

300mm 6 Aspect TS20 Lump Sum

300mm 2 Aspect TS21 Lump Sum

TS22 Lump Sum

TS23 Type A Nlast Arm 4m Lump Sum


outreach with concrete
pedestal

TS25 Type B Lump Sum

TS26 Type C Lump Sum

TS27 Type D Lump Sum

TS24 Type A Nlast Arm 4m Lump Sum


outreach with concrete
pedestal

100mm dia. TS28 P.E Pipe Concrete Linear Meter


Pavement

100mm dia. TS29 P.E Pipe Concrete Linear Meter


Pavement

100mm dia. TS30 P.E. Pipe on Asphalt Linear Meter


Pavement

100mm dia. TS31 P.E. Pipe on Asphalt Linear Meter


Pavement
100mm dia. TS32 P.E. Pipe on Concrete Linear Meter
Sidewalk

100mm dia. TS33 P.E. Pipe on Concrete Linear Meter


Sidewalk

100mm dia. TS34 P.E. Pipe on Earth Linear Meter


Surface

100mm dia. TS35 P.E. Pipe on Earth Linear Meter


Surface

TS36 Type B Each


TS37 Type A Each
TS38 Inductive Loop Type Lump Sum

TS39 Video Camera Type Lump Sum

TS40 Lump Sum

TS41 Site

TS42 Each

TSP1 8 Signal Group Each

TSP2 16 Signal Group Each

TSP3 32 Signal Group Each

TSP4 Each

TSP5 8 Channel Each

TSP6 16 Channel Each

200mm 1 Aspect TSP7 Amber Lens Set


200mm 1 Aspect TSP8 Red Lens Set

200mm 1 Aspect TSP9 Green Lens Set

200mm 2 Aspect TSP10 Set

200mm 3 Aspect TSP11 Set

200mm 4 Aspect TSP12 Set

200mm 5 Aspect TSP13 Set

200mm 6 Aspect TSP14 Set

300mm 1 Aspect TSP15 Amber Lens Set

300mm 1 Aspect TSP16 Red Lens Set

300mm 1 Aspect TSP17 Green Lens Set

300mm 2 Aspect TSP18 Set

300mm 3 Aspect TSP19 Set

300mm 4 Aspect TSP20 Set

300mm 5 Aspect TSP21 Set

300mm 6 Aspect TSP22 Set

300mm 2 Aspect TSP23 Set

TSP24 Set
200mm TSP25 Set

300mm TSP26 Set

200mm TSP27 Each

300mm TSP28 Each

200mm 3 Aspect TSP29 Each

200mm 4 Aspect TSP30 Each

200mm 5 Aspect TSP31 Each

200mm 6 Aspect TSP32 Each

300mm 3 Aspect TSP33 Each

300mm 4 Aspect TSP34 Each

300mm 5 Aspect TSP35 Each


300mm 6 Aspect TSP36 Each

4 Core TSP37 Meter

8 Core TSP38 Meter

12 Core TSP39 Meter

19 Core TSP40 Meter

29 Core TSP41 Meter

TSP42 Meter

TSP43 Meter
TSP44 Pail
TSP45 Each
TSP46 Meter
TSP47 Meter

TSP48 Each

TSP49 Roll
TSP50 Box
TSP51 Each

TSP52 Each
TSP53 Set

TSC1 Each

TSC2 Type A (w/pedestal) Each

TSC3 Type A (w/o pedestal) Each

TSC4 Type B Each


TSC5 Type C Each
TSC6 Type D Each
TSC7 Slot

TSC8 Each
TSC9 Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
8m LED 130W Each

9m LED 175W Each

10m LED 175W Each

8m HPS 150W-250W Each

9m HPS 250W Each

10m HPS 400W Each

12m HPS 400W Each

8m LED 130W Each

9m LED 175W Each

10m LED 175W Each

8m HPS 150W-250W Each

9m HPS 250W Each

10m HPS 400W Each

12m HPS 400W Each

LED 75W Each

HPS 150W Each

Each

Each
Lump Sum

Each
Each
Lump Sum

Lump Sum
Valid Values Unit of Measure
Thickness/Sizes Class Others
200mm X 100mm X Button type Zinc anneal plate with glass Each
3mm thick plate with reflector of prismatic lenses
3" dia. (75mm)
reflector

200mm X 100mm X Button type G.I. plate with glass Each


3mm thick plate with 3" dia. reflector of prismatic
(75mm) reflector lenses

200mm X 100mm X Button type Zinc anneal plate with Each


3mm thick plate with 3" dia. retrorflective sheeting
(75mm) retroflective
sheeting

200mm X 100mm X Button type G.I. plate with retrorflective Each


3mm thick plate with 3" dia. sheeting
(75mm) retroflective
sheeting

4"X4" Aluminum Panel Type - Retroflective Each


Sheeting

4" X 4" GI Panel Type - Retroflective Each


Sheeting

10" X 10" Aluminum Panel Type - Retroflective Each


Sheeting

10" X 10" GI Panel Type - Retroflective Each


Sheeting

2"X 4" Aluminum Panel type (L Shaped) Each


Retroflective Sheeting

2"X 4" GI Panel type (L-Shaped) Each


Retroflective Sheeting
34"X 4" Aluminum Rib Type Each

34"X 4" GI Rib Type Each

34"X 6" Aluminum Rib Type Each

34"X 6" GI Rib Type Each

1000mm (40") X Surface Mounted Collapsible Bollards Each


75mm (3") dia.

1000mm (40") X In-ground Collapsible Bollards Each


75mm (3") dia. Plounted

Semi-rigid Box-Beam Steel Each

Rigid Concrete Safety Shape Each


(F-Shape/Jersey Type)

Rigid Concrete Single Slope Each

Plastic Jersey Type - Each


Waterfilled

Steel Guard Fence Each

Concrete Cast-in-place Each

Stationary Gatinp - Waterfilled Each

Stationary Gating - Sand Filled Each


Barrels

Stationary Non-gating - Independent Each


coIIaOsibIe bays
Stationary Non-gating - High Each
Molecular Weight/High
Density Polyethylene
(HNIW/HDPE) side panels

Stationary Non-gating - Shock Each


Absorbing Cable
Mechanism

Stationary Truck-Mounted- Each


Attenuator (TMA1

36" x 3" dia. Plastic, Rubber, Temporary Bollard - Each


Synthetic Rubber Surface Mounted

1000 mm (40") x 75 Plastic, Rubber, Temporary Bollard - Each


mm (3") dia. Synthetic Rubber Surface Mounted

28" high Plastic, Rubber, Reflective Striped Traffic Each


Synthetic Rubber Cone

36" high Plastic, Rubber, Reflective Striped Traffic Each


Synthetic Rubber Cone

1500 x 450 mm T5-4 Temporary Hazard Each


Markers

600 x 600 mm T5-5 Temporary Hazard Each


Markers

(2.5m - 4 m) x (150 Timber Barrier Boards Each


mm - 200 mm)
(2.5m - 4 m) x (150 Plastic Barrier Boards Each
mm - 200 mml

100mm wide Tapes Containment Fences Meter

1 m high Mesh Fencing Containment Fences Meter

Expanded Antiglare Screen Set


Polystyrene (EPS)
Foam

Double Reverse Antiglare Screen Set


Corrugated (DRC)
Galvanized Steel
Fabric
High Impact Antiglare Screen Each
Polymer

Flashing Lamps Each

Concrete Temporary Curb Linear Meter

Interlocking Temporary Curb Each


Blocks

HNIW/HDPE Temporary Curb Each


Plastic

Rotating Lights Vehicle Mounted Each


Equipment

Flashing Arrow Vehicle Mounted Each


Board Equipment

Variable Message Signs Each

Portable Traffic Signals Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
1800 x 600 mm T1 - 1 Roadwork Ahead Each
1800 x 600 mm T1 - 2 Bridgework Ahead Each

1200 x 600 mm T1 - 3 Road Machinery Ahead Each

900 x 600 mm T1 - 4 Grader Ahead Each

900 x 600 mm T1 - 5 Workmen Ahead Each

1800 x 600 mm T1 - 24 Roadwork Next km Each

1800 x 600 mm T1 - 25 Roadwork On Side Each


Road

600 x 600 mm T1 - 28 Next 2 km Each

1800 x 600 mm T2 - 16 End Roadwork Each

450 mm diameter T7-2 Stop Hand Held Sign Each

450 mm diameter T7 - 1 Slow Hand Held Sign Each

900 x 600 mm T1 - 18 Prepare To Stop Each

600 x 800 mm (size B) R4 - 1 (T) Speed Restriction Each

600 x 400 mm (size B) R4 - 3 (T) Road Work Each

600 x 1000 mm (size B) R4 - 2P End Speed Restriction Each

600 x 800 mm (size B) R4 -2 (T) De - Restriction Each

1200 x 600 mm T1 - 6 Detour Ahead Each


1200 x 300 mm T5 - 1 Detour (Right) Each

1200 x 300 mm T5 - 1 Detour (Left) Each

450 x 450 mm T5 - 6A Detour Marker Each

900 x 600 mm G9 - 40 -2 Local Traffic Only Each

1200 x 600 mm T2 - 23 End Detour Each

900 x 600 mm T3 - 1 Wet Tar Each

900 x 600 mm T3 - 3 Slippery Each

900 x 600 mm T3 -6 Soft Edges Each

900 x 600 mm T3 — 7 Rough Surface Each

900 x 600 mm T3 - 9 Loose Stones Each

900 x 600 mm T3 -13 Gravel Road Each

900 x 600 mm T3 - 14 Loose Surface Each

1500 x 900 mm T3 - 12 No Lines Do Not Overtake Each


Unless Safe

1200 x 900 mm T1 - 10 Traffic Hazard Ahead Each

900 x 600 mm T2 - 25 Trucks Entering Each


1800 x 900 mm T4- 5 Power Line Works in Each
Proqress

1800 x 300 mm T2 - 4 Road Closed Each

1200 x 900 mm T2 -6 -1 Lane Status Each

1800 x 900 mm T2 - 6 -2 Lane Status Each

1200 x 600 mm T4-2 Blasting Area Switch Off Each


Radio Transmitters

1200 x 450 mm T4 - 3 End Blasting Area Each

900 x 600 mm T8 - 1 Pedestrians Watch Each


Your Step

1200 x 300 mm T8 -2 Pedestrians (Ripht) Each

1200 x 300 mm T8 -2 Pedestrians (Left) Each

900 x 600 mm T8 - 3 Use Other Path Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
2 lanes Loop-piezo-loop Lump Sum

4 lanes Loop-oiezo-loop Lump Sum

6 lanes Loop-piezo-loop Lump Sum

> 6 lanes Loop-piezo-loop Lump Sum


2 lanes Dual piezo Lump Sum

4 lanes Dual piezo Lump Sum

6 lanes Dual piezo Lump Sum

> 6 lanes Dual piezo Lump Sum

2 lanes ATC without solar Lump Sum

4 lanes ATC without solar Lump Sum

6 lanes ATC without solar Lump Sum

> 6 lanes ATC without solar Lump Sum

2 lanes ATC with solar Lump Sum

4 lanes ATC with solar Lump Sum

6 lanes ATC with solar Lump Sum

> 6 lanes ATC with solar Lump Sum

2 lanes with Remote Access Lump Sum


Unit
4 lanes with Remote Access Lump Sum
Unit

6 lanes with Remote Access Lump Sum


Unit

> 6 lanes with Remote Access Lump Sum


Unit

Lump Sum

Lump Sum

Lump Sum

High-speed WIM, Lump Sum


sensor-based

Low-speed WIM, load Lump Sum


cell-based

Lump Sum

Lump Sum

Lump Sum

Lump Sum

Lump Sum
In-ground survey Each
type

On-ground survey Each


type

Roll
Figure 8 Each

Woven cable Each

End C-clamp Each

Center plate clamp Each

Center lane flap Each

Bitumen tape Roll

Each
6 V 4.5Ah Each
6 V 12Ah Each
Welded 6 V Each
36 Ah Each
Roll

Type I Set

Type II Set

Set
Set
Each
Each
Each
Each

Set
Set
Each

Each

Piece

Lump Sum
Piece

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Rubber compound Square Meter


Membrane Type

Linear Meter
Linear Meter
Linear Meter

Linear Meter
Meter
Square Meter
Cubic Meter

Square Meter
Each

Lump Sum

Square Meter

Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter
Linear Meter

Valid Values Unit of Measure


Unit of Measure
Thickness/Sizes Class Others
Cubic Meter

LS

Valid Values Unit of Measure


Thickness/Sizes Class Others
Bag

Valid Values Unit of Measure


Thickness/Sizes Class Others
Bag

Valid Values Unit of Measure


Thickness/Sizes Class Others
Metric Ton

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter
Valid Values Unit of Measure
Thickness/Sizes Class Others
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
Board Foot

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter
Linear Meter
Cubic Meter
Piece

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

contract unit price of the items where ca//ed for.

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Kilogram
e of the items where called for.

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter

e of the items where called for.

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter

ontract unit price of the Items where called for.

Valid Values Unit of Measure


Thickness/Sizes Class Others
0.05 m thick Square Meter
Valid Values Unit of Measure
Thickness/Sizes Class Others
0.05 m thick Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
d in the contract unit price of the items where called for.

CONCRETE PAVEMENT
Valid Values Unit of Measure
Thickness/Sizes Class Others
paid for separately, but the cost thereof shall be considered as included in the contract unit price of the items

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Square Meter
INEER
ztA

EMENTS
artB

NITARY/PLUMBING WORKS

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Lump Sum
150 - 300mm dia Small Each

301 - 500 mm.dia Small Each

501 - 750 mm.dia Small Each

751 - 900 mm.dia Small Each


above 900mm dia. Large Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Each

Square Meter

Square Meter

Square Meter

610 mm dia. Linear Meter

760 mm dia. Linear Meter

910 mm dia. Linear Meter

1070 mm dia. Linear Meter

1220 mm dia. Linear Meter

1520 mm dia. Linear Meter

Linear Meter

Linear Meter

50 mm dia. PVC Linear Meter

75 mm dia. PVC Linear Meter

100 mm dia. PVC Linear Meter

150 mm dia. PVC Linear Meter


200 mm dia. PVC Linear Meter

250 mm dia. PVC Linear Meter

300 mm dia. PVC Linear Meter

150 mm dia. Concrete Linear Meter

200 mm dia. Concrete Linear Meter

250 mm dia. Concrete Linear Meter

300 mm dia. Concrete Linear Meter

350 mm dia. Concrete Linear Meter

50 mm dia. High Density Linear Meter


Polyethylene HDPE

75 mm dia. High Density Linear Meter


Polyethylene HDPE

100 mm dia. High Density Linear Meter


Polyethylene HDPE

150 mm dia. High Density Linear Meter


Polyethylene HDPE

200 mm dia. High Density Linear Meter


Polyethylene HDPE

250 mm dia. High Density Linear Meter


Polyethylene HDPE
300 mm dia. High Density Linear Meter
Polyethylene HDPE

Concrete Cubic Meter

Steel Kilogram

Steel H-Piles Kilogram

RSB Kilogram

Lump Sum
Lump Sum
Steel Kilogram

Concrete Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter
Cubic Meter

Soft Cubic Meter

Hard Cubic Meter

Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Common Soil Cubic Meter

Soft Rock Cubic Meter

Solid Rock Cubic Meter

Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Cubic Meter
Cubic Meter

Shoring Lump Sum

Cribbing/Cofferdamming Lump Sum

Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
From structure excavation Cubic Meter

From borrow Cubic Meter

Case 1 Cubic Meter

Case 2 Cubic Meter

Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Lump Sum
Trees Each
Shrubs Each
Grass Square Meter
Lump Sum
Fountains Each
Benches Each
Gazebos Each
Cubic Meter
Plants Each
Animals Each
Square Meter
Linear Meter
Each
Each
CHB Square Meter
Lump Sum

NCRETE WORK

Valid Values Unit of Measure


Thickness/Sizes Class Others
Class "A" 7 days Cubic Meter

Class "A" 7 days Cubic Meter

Class "A" 7 days Cubic Meter

Class "A" 7 days Cubic Meter

Class "A" 7 days Cubic Meter

Class "A" 7 days Cubic Meter

Class "A" 14 days Cubic Meter

Class "A" 14 days Cubic Meter

Class "A" 14 days Cubic Meter

Class "A" 14 days Cubic Meter

Class "A" 14 days Cubic Meter

Class "A" 14 days Cubic Meter


Class "A" 28 days Cubic Meter

Class "A" 28 days Cubic Meter

Class "A" 28 days Cubic Meter

Class "A" 28 days Cubic Meter

Class "A" 28 days Cubic Meter

Class "A" 28 days Cubic Meter

Class "B" 7 days Cubic Meter

Class "B" 14 days Cubic Meter

Class "B" 28 days Cubic Meter

Class "C" 7 days Cubic Meter

Class "C" 14 days Cubic Meter

Class "C" 28 days Cubic Meter

Class "P" 7 days Cubic Meter

Class "P" 14 days Cubic Meter

Class "P" 28 days Cubic Meter

Class "AA" Cubic Meter

Cubic Meter
Cubic Meter
27.58 Mpa 28 days Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Grade 40 Kilogram

Grade 60 Kilogram

Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Square Meter

VIL WORKS

Valid Values Unit of Measure


Thickness/Sizes Class Others
Liter
Liter
Kilogram

Valid Values Unit of Measure


Thickness/Sizes Class Others
50 mm dia. PVC Meter

75 mm dia. PVC Meter

100 mm dia. PVC Meter

150 mm dia. PVC Meter

50 mm dia. PVC Meter

75 mm dia. PVC Meter

100 mm dia. PVC Meter

150 mm dia. PVC Meter

200 mm dia. PVC Meter

250 mm dia. PVC Meter

300 mm dia. PVC Meter

150 mm dia. Concrete Meter

200 mm dia. Concrete Meter


250 mm dia. Concrete Meter

300 mm dia. Concrete Meter

350 mm dia. Concrete Meter

50 mm dia. High Density Meter


Polyethylene HDPE

75 mm dia. High Density Meter


Polyethylene HDPE

100 mm dia. High Density Meter


Polyethylene HDPE

150 mm dia. High Density Meter


Polyethylene HDPE

200 mm dia. High Density Meter


Polyethylene HDPE

250 mm dia. High Density Meter


Polyethylene HDPE

300 mm dia. High Density Meter


Polyethylene HDPE

Meter
Meter
Square Meter
Concrete Each
CHB Each
Lump Sum
Concrete Each
CHB Each
Lump Sum
Lump Sum

Lump Sum

Concrete/CHB Lump Sum

PVC Lump Sum


PVC Each
Concrete/CHB Lump Sum
Concrete/CHB Each
150 mm dia. Concrete Inlet Meter

200 mm dia. Concrete Inlet Meter


250 mm dia. Concrete Inlet Meter

300 mm dia. Concrete Inlet Meter

350 mm dia. Concrete Inlet Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
13 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter

40 mm dia. Meter

50 mm dia. Meter

65 mm dia. Meter

75 mm dia. Meter

100 mm dia. Meter

150 mm dia. Meter

20 mm dia. PN 10 Meter

20 mm dia. PN 16 Meter

20 mm dia. PN 20 Meter

25 mm dia. PN 10 Meter

25 mm dia. PN 16 Meter
25 mm dia. PN 20 Meter

32 mm dia. PN 10 Meter

32 mm dia. PN 16 Meter

32 mm dia. PN 20 Meter

40 mm dia. PN 10 Meter

40 mm dia. PN 16 Meter

40 mm dia. PN 20 Meter

50 mm dia. PN 10 Meter

50 mm dia. PN 16 Meter

50 mm dia. PN 20 Meter

63 mm dia. PN 10 Meter

63 mm dia. PN 16 Meter
63 mm dia. PN 20 Meter

75 mm dia. PN 10 Meter

75 mm dia. PN 16 Meter

75 mm dia. PN 20 Meter

100 mm dia. PN 10 Meter

100 mm dia. PN 16 Meter

100 mm dia. PN 20 Meter

13 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter

40 mm dia. Meter

50 mm dia. Meter

65 mm dia. Meter

75 mm dia. Meter

100 mm dia. Meter

Lump Sum
Tank Type Set

Flush Type Set


Sensor Type Set

Tank Type Set

Flush Type Set

Sensor Type Set

Push Button Type Set

Lever Arm Type Set

Sensor Type Set

Stainless Set

Aluminum Set

Set
Set
Manually Operated Set

Sensor Type Set

Manually Operated Set

Sensor Type Set

50 mm dia. Stainless Set

75 mm dia. Stainless Set

100 mm dia. Stainless Set

50 mm dia. Brass Set

75 mm dia. Brass Set

100 mm dia. Brass Set

Piece
Linear Meter

Set
Square Meter
Piece
Piece
20 mm dia. Piece
25 mm dia. Piece
32 mm dia. Piece
Lump Sum
Lump Sum
Lump Sum
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
4.5 mm Metal Frame Fiber Cement Board Square Meter

4.5 mm Wood Frame Fiber Cement Board Square Meter

4.5 mm Metal Frame Marine Plywood Square Meter

4.5 mm Wood Frame Marine Plywood Square Meter

6 mm Metal Frame Marine Plywood Square Meter

6 mm Wood Frame Marine Plywood Square Meter

6 mm Metal Frame Ordinary Plywood Square Meter

6 mm Wood Frame Ordinary Plywood Square Meter

Metal Frame Gypsum Board Square Meter

Metal Frame Prepainted Metal Panel Square Meter

Metal Frame Aluminum Metal Cladding Square Meter

Wood Frame Wood Square Meter

Wood Frame PVC Square Meter


Metal Frame PVC Square Meter
Lump Sum
4.5 mm Metal Frame Fiber Cement Board Square Meter
4.5 mm Wood Frame Fiber Cement Board Square Meter

6 mm Metal Frame Fiber Cement Board Square Meter

10 mm Metal Frame Fiber Cement Board Square Meter

12 mm Metal Frame Fiber Cement Board Square Meter

6 mm Wood Frame Fiber Cement Board Square Meter

4.5 mm Metal Frame Marine Plywood Square Meter

4.5 mm Wood Frame Marine Plywood Square Meter

6 mm Metal Frame Marine Plywood Square Meter

6 mm Wood Frame Marine Plywood Square Meter

6 mm Metal Frame Ordinary Plywood Square Meter

6 mm Wood Frame Ordinary Plywood Square Meter

Aluminum Metal Cladding Square Meter

Concrete Cladding Lump Sum


Lump Sum
Square Meter
Each
Wood Board Foot
Wood Board Foot
Wood Square Meter
Wood Board Foot
Wood Each
Wood Meter
19 mm Fiber Cement Board Meter

25 mm Lumber Meter

Metal Kilogram
Each
Square Meter
Wood Meter
Concrete Meter
Precast Meter
PVC Meter
Steel Meter
Square Meter
Lump Sum

Square Meter
Good Lumber Board Foot

Board Foot
Lump Sum
Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Square Meter

Square Meter
Square Meter
Lump Sum
Lump Sum
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter

Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Sliding Type Square Meter

Swing Type Square Meter

Lump Sum
Valid Values Unit of Measure
Thickness/Sizes Class Others
Sliding Type Square Meter

Casement Type Square Meter

Awning Type Square Meter

Fixed Type Square Meter

Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Glass Square Meter
Wood Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Jambs, Sills, Head, Set
Transoms and Mullions

Flush Square Meter


Wood Panel Square Meter
Glass Panel Square Meter
Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Steel Set
Aluminum Set
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
5.6mm Square Meter
5.6mm Square Meter

10mm Square Meter

12mm Square Meter


8mm Square Meter

10mm Square Meter

6mm Square Meter

8mm Square Meter

10mm Square Meter

Lump Sum
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
gauge 26 Square Meter

gauge 26 Ridge/Hip Rolls Linear Meter

gauge 26 Flashings Linear Meter

gauge 24 Gutters Linear Meter

gauge 24 Downspouts Linear Meter

gauge 24 Valley Rolls/Gutter Linear Meter

gauge 24 Counter Flashing Gutter Linear Meter

gauge 26 Plain GI Sheet Each

Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
gauge 26 Square Meter

gauge 26 Ridge/Hip Rolls Linear Meter


gauge 26 Flashings Linear Meter

gauge 24 Gutters Linear Meter

gauge 24 Downspouts Linear Meter

gauge 24 Valley Rolls/Gutter Linear Meter

gauge 24 Counter Flashing Gutter Linear Meter

Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
below 0.427 mm Corrugated Type Short Span Square Meter

below 0.427 mm Rib Type Short Span Square Meter

above 0.427 mm Corrugated Type Long Span Square Meter

above 0.427 mm Rib Type Long Span Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cement-base Square Meter

Liquid Square Meter


Square Meter
Valid Values Unit of Measure
Thickness/Sizes Class Others
50 mm dia. Set

75 mm dia. Set

100 mm dia. Set

150 mm dia. Set

50 mm dia. Set

75 mm dia. Set

100 mm dia. Set

150 mm dia. Set

50 mm dia. Set

75 mm dia. Set

100 mm dia. Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Narra Square Meter
Tanguile Square Meter
Others Square Meter
Laminated Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Lump Sum
Valid Values Unit of Measure
Thickness/Sizes Class Others
Plain Square Meter
Colored Square Meter

with Floor Hardener Square Meter

Square Meter
Plain Square Meter
Trowelled Finish Square Meter

Dry-Shake Finish Square Meter

Square Meter
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter
Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Linear Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Bush Square Meter
Fluted Bush Square Meter

Valid Values Unit of Measure


Unit of Measure
Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Square Meter
Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Bush Hammered Square Meter

Fluted Bush Hammered Square Meter

Piqueta Tool Finish Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Tile Square Meter
Board Square Meter
Panel Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Masonry/Concrete Square Meter

Wood Square Meter


Steel Square Meter
Square Meter
Square Meter
Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Asphalt Square Meter
Polyethylene Sheet Square Meter

Coal-tar pitch Square Meter

Emulsified Asphalt Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Sheets Linear Meter
Panel Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Valid Values Unit of Measure
Thickness/Sizes Class Others
Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Wooden Square Meter
Steel/Aluminum Square Meter

Plastic Square Meter


Wooden Square Meter
Steel/Aluminum Square Meter

Plastic Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
100 mm Square Meter

150 mm Square Meter

100 mm Square Meter


150 mm Square Meter

Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Trusses Kilogram
Purlins Kilogram
Cladding Kilogram
Bolts Each

Sagrods Each

Turnbuckle Each

Cross Bracing Each

Cross Bracing Kilogram

Steel Plates Each

Steel Plates Kilogram

Bolts Kilogram

Sagrods Kilogram

Turnbuckle Kilogram

Roof Framing Lump Sum

Flagpole Post Kilogram

Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
1 Layer Square Meter
2 Layers Square Meter
3 Layers Square Meter
4 Layers Square Meter
Plate Square Meter
Lump Sum
1 Layer Square Meter
2 Layers Square Meter
3 Layers Square Meter
4 Layers Square Meter
Lump Sum
Sheet Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
0.80 Meter
1.00 Meter
1.20 Meter

e of the items where called for.

Valid Values Unit of Measure


Thickness/Sizes Class Others
Meter
Standard Meter
Balluster Meter
Parapet Meter
Meter
Meter
Meter
Lump Sum
Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Meter

Meter

Meter
400x400 mm Meter

450x450 mm Meter

400x400 mm Meter

450x450 mm Meter

Meter

Meter
Meter

Meter

Meter
Meter
Meter

Meter

Meter

Meter

Meter

0.80 Meter

0.90 Meter

1.00 Meter

1.10 Meter

1.20 Meter

1.30 Meter

1.40 Meter

1.50 Meter

1.60 Meter

1.70 Meter

1.80 Meter

1.90 Meter

2.00 Meter

2.10 Meter

2.20 Meter

2.30 Meter

2.40 Meter
2.50 Meter

2.60 Meter

2.70 Meter

2.80 Meter

2.90 Meter

3.00 Meter

400-500 mm dia. Meter

400-500 mm dia. Meter

Meter
Meter
Meter
0.80 10mm thick Meter

0.80 12mm thick Meter

0.80 16mm thick Meter

0.90 10mm thick Meter

0.90 12mm thick Meter

0.90 16mm thick Meter

1.00 10mm thick Meter

1.00 12mm thick Meter

1.00 16mm thick Meter

1.10 10mm thick Meter

1.10 12mm thick Meter

1.10 16mm thick Meter

1.20 10mm thick Meter

1.20 12mm thick Meter

1.20 16mm thick Meter

1.30 10mm thick Meter


1.30 12mm thick Meter

1.30 16mm thick Meter

1.40 10mm thick Meter

1.40 12mm thick Meter

1.40 16mm thick Meter

1.50 10mm thick Meter

1.50 12mm thick Meter

1.50 16mm thick Meter

1.60 12mm thick Meter

1.60 16mm thick Meter

1.70 12mm thick Meter

1.70 16mm thick Meter

1.80 12mm thick Meter

1.80 16mm thick Meter

1.90 12mm thick Meter

1.90 16mm thick Meter

2.00 12mm thick Meter

2.00 16mm thick Meter

2.10 12mm thick Meter

2.10 16mm thick Meter

2.20 12mm thick Meter

2.20 16mm thick Meter

2.30 12mm thick Meter

2.30 16mm thick Meter

2.40 12mm thick Meter


2.40 16mm thick Meter

2.50 16mm thick Meter

2.50 20mm thick Meter

2.60 16mm thick Meter

2.60 20mm thick Meter

2.70 16mm thick Meter

2.70 20mm thick Meter

2.80 16mm thick Meter

2.80 20mm thick Meter

2.90 16mm thick Meter

2.90 20mm thick Meter

3.00 16mm thick Meter

3.00 20mm thick Meter

Kilogram

Each

Crosshole-Sonic Each

Low Strain Each

Each

0.20 Meter
0.25 Meter
0.30 Meter
0.20 Kilogram

0.25 Kilogram

0.30 Kilogram

Cubic Meter
Cubic Meter
Each

Linear Meter
Valid Values Unit of Measure
Thickness/Sizes Class Others
Square Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
15 mm dia. Meter

20 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter

40 mm dia. Meter

50 mm dia. Meter

65 mm dia. Meter

80 mm dia. Meter

90 mm dia. Meter

100 mm dia. Meter

125 mm dia. Meter


150 mm dia. Meter

15 mm dia. Meter

20 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter

40 mm dia. Meter

50 mm dia. Meter

65 mm dia. Meter

80 mm dia. Meter

90 mm dia. Meter

100 mm dia. Meter

15 mm dia. Meter

20 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter

40 mm dia. Meter

50 mm dia. Meter

65 mm dia. Meter

80 mm dia. Meter

90 mm dia. Meter

100 mm dia. Meter

15 mm dia. Meter

20 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter
40 mm dia. Meter

50 mm dia. Meter

65 mm dia. Meter

80 mm dia. Meter

90 mm dia. Meter

100 mm dia. Meter

10 mm dia. Meter

15 mm dia. Meter

20 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter

40 mm dia. Meter

50 mm dia. Meter

20 mm dia. Meter

25 mm dia. Meter

32 mm dia. Meter

40 mm dia. Meter

50 mm dia. Meter

65 mm dia. Meter

80 mm dia. Meter

90 mm dia. Meter

100 mm dia. Meter


110 mm dia. Meter

160 mm dia. Meter

15 mm dia. Rigid Steel, Hot Piece


Dipped

20 mm dia. Rigid Steel, Hot Piece


Dipped

25 mm dia. Rigid Steel, Hot Piece


Dipped

32 mm dia. Rigid Steel, Hot Piece


Dipped

40 mm dia. Rigid Steel, Hot Piece


Dipped

50 mm dia. Rigid Steel, Hot Piece


Dipped

65 mm dia. Rigid Steel, Hot Piece


Dipped

80 mm dia. Rigid Steel, Hot Piece


Dipped

90 mm dia. Rigid Steel, Hot Piece


Dipped

100 mm dia. Rigid Steel, Hot Piece


Dipped

125 mm dia. Rigid Steel, Hot Piece


Dipped

150 mm dia. Rigid Steel, Hot Piece


Dipped

Lump Sum
Lump Sum
Lump Sum

Lump Sum
Valid Values Unit of Measure
Thickness/Sizes Class Others
1.6 mm2 dia. Solid Roll
TW/THHN/THWN2

2.0 mm2 dia. Solid Roll


TW/THHN/THWN2

2.6 mm2 dia. Solid Roll


TW/THHN/THWN2

3.2 mm2 dia. Solid Roll


TW/THHN/THWN2

2.0 mm2 dia. Roll


TW/THHN/THWN2
3.5 mm2 dia. Roll
TW/THHN/THWN2
5.5 mm2 dia. Roll
TW/THHN/THWN2
8.0 mm2 dia. Roll
TW/THHN/THWN2
14 mm2 dia. Roll
TW/THHN/THWN2
22 mm2 dia. Roll
TW/THHN/THWN2
30 mm2 dia. Roll
TW/THHN/THWN2
38 mm2 dia. Roll
TW/THHN/THWN2
50 mm2 dia. Roll
TW/THHN/THWN2
60 mm2 dia. Roll
TW/THHN/THWN2
80 mm2 dia. Roll
TW/THHN/THWN2
100 mm2 dia. Roll
TW/THHN/THWN2
125 mm2 dia. Roll
TW/THHN/THWN2
150 mm2 dia. Roll
TW/THHN/THWN2
200 mm2 dia. Roll
TW/THHN/THWN2
250 mm2 dia. Roll
TW/THHN/THWN2
325 mm2 dia. Roll
TW/THHN/THWN2
400 mm2 dia. Roll
TW/THHN/THWN2
500 mm2 dia. Roll
TW/THHN/THWN2
14 mm2 ACSR Roll

22 mm2 ACSR Roll

30 mm2 ACSR Roll

38 mm2 ACSR Roll

50 mm2 ACSR Roll

60 mm2 ACSR Roll

80 mm2 ACSR Roll

100 mm2 ACSR Roll

125 mm2 ACSR Roll

150 mm2 ACSR Roll

200 mm2 ACSR Roll

250 mm2 ACSR Roll

1C X 4 XLPE Roll

1C X 6 XLPE Roll

1C X 10 XLPE Roll

1C X 25 XLPE Roll

1C X 35 XLPE Roll

1C X 50 XLPE Roll

1C X 70 XLPE Roll

1C X 95 XLPE Roll

1C X 120 XLPE Roll

1C X 185 XLPE Roll


1C X 240 XLPE Roll

1C X 300 XLPE Roll

1C X 400 XLPE Roll

1C X 500 XLPE Roll

2C X 4 XLPE Roll

2C X 6 XLPE Roll

2C X 10 XLPE Roll

2C X 25 XLPE Roll

2C X 35 XLPE Roll

2C X 50 XLPE Roll

2C X 70 XLPE Roll

2C X 95 XLPE Roll

2C X 120 XLPE Roll

2C X 185 XLPE Roll

2C X 240 XLPE Roll

2C X 300 XLPE Roll

2C X 400 XLPE Roll

2C X 500 XLPE Roll

3C X 4 XLPE Roll

3C X 6 XLPE Roll

3C X 10 XLPE Roll

3C X 25 XLPE Roll

3C X 35 XLPE Roll

3C X 50 XLPE Roll

3C X 70 XLPE Roll
3C X 95 XLPE Roll

3C X 120 XLPE Roll

3C X 185 XLPE Roll

3C X 240 XLPE Roll

3C X 300 XLPE Roll

3C X 400 XLPE Roll

3C X 500 XLPE Roll

1.6 mm2 dia. Meter


TW/THHN/THWN2
2.0 mm2 dia. Meter
TW/THHN/THWN2
2.6 mm2 dia. Meter
TW/THHN/THWN2
3.2 mm2 dia. Meter
TW/THHN/THWN2
2.0 mm2 dia. Meter
TW/THHN/THWN2
3.5 mm2 dia. Meter
TW/THHN/THWN2
5.5 mm2 dia. Meter
TW/THHN/THWN2
8.0 mm2 dia. Meter
TW/THHN/THWN2
14 mm2 dia. Meter
TW/THHN/THWN2
22 mm2 dia. Meter
TW/THHN/THWN2
30 mm2 dia. Meter
TW/THHN/THWN2
38 mm2 dia. Meter
TW/THHN/THWN2
50 mm2 dia. Meter
TW/THHN/THWN2
60 mm2 dia. Meter
TW/THHN/THWN2
80 mm2 dia. Meter
TW/THHN/THWN2
100 mm2 dia. Meter
TW/THHN/THWN2
125 mm2 dia. Meter
TW/THHN/THWN2
150 mm2 dia. Meter
TW/THHN/THWN2
200 mm2 dia. Meter
TW/THHN/THWN2
250 mm2 dia. Meter
TW/THHN/THWN2
325 mm2 dia. Meter
TW/THHN/THWN2
400 mm2 dia. Meter
TW/THHN/THWN2
500 mm2 dia. Meter
TW/THHN/THWN2
14 mm2 ACSR Meter

22 mm2 ACSR Meter

30 mm2 ACSR Meter

38 mm2 ACSR Meter

50 mm2 ACSR Meter

60 mm2 ACSR Meter

80 mm2 ACSR Meter

100 mm2 ACSR Meter

125 mm2 ACSR Meter

150 mm2 ACSR Meter

200 mm2 ACSR Meter

250 mm2 ACSR Meter

1C X 4 XLPE Meter

1C X 6 XLPE Meter

1C X 10 XLPE Meter

1C X 25 XLPE Meter

1C X 35 XLPE Meter

1C X 50 XLPE Meter
1C X 70 XLPE Meter

1C X 95 XLPE Meter

1C X 120 XLPE Meter

1C X 185 XLPE Meter

1C X 240 XLPE Meter

1C X 300 XLPE Meter

1C X 400 XLPE Meter

1C X 500 XLPE Meter

2C X 4 XLPE Meter

2C X 6 XLPE Meter

2C X 10 XLPE Meter

2C X 25 XLPE Meter

2C X 35 XLPE Meter

2C X 50 XLPE Meter

2C X 70 XLPE Meter

2C X 95 XLPE Meter

2C X 120 XLPE Meter

2C X 185 XLPE Meter

2C X 240 XLPE Meter

2C X 300 XLPE Meter

2C X 400 XLPE Meter

2C X 500 XLPE Meter

3C X 4 XLPE Meter

3C X 6 XLPE Meter

3C X 10 XLPE Meter
3C X 25 XLPE Meter

3C X 35 XLPE Meter

3C X 50 XLPE Meter

3C X 70 XLPE Meter

3C X 95 XLPE Meter

3C X 120 XLPE Meter

3C X 185 XLPE Meter

3C X 240 XLPE Meter

3C X 300 XLPE Meter

3C X 400 XLPE Meter

3C X 500 XLPE Meter

Set

Set

Set

Set
Set
Set
Set
Set
Set
Set
Set
Surface Mounted Set

Recessed Set

Set

Set

Set
Set

Set

Set

Set

Set

Set

Set

Set

Set

Set

Roll
Roll
Meter
Meter
Meter
Meter
Meter
Lump Sum
Lump Sum
Lump Sum

S
Valid Values Unit of Measure
Thickness/Sizes Class Others
Lump Sum

NEMA 1 Flushed Type Set


Surface Mounted Set

Flushed Type Set

Free Standing Set

Flushed Type Set

Free Standing Set

Free Standing Lump Sum

single or three phase Free Standing Lump Sum

Pole type Lump Sum

single or three phase Pole type or Flatform Lump Sum

single or three phase Free Standing or Flatform Lump Sum

Lump Sum
Lump Sum
Lump Sum
single or three phase Stand-by Lump Sum

single or three phase Continuous Lump Sum

Lump Sum

Lump Sum

Piece

Piece
Piece
Piece
Piece

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Wall type Set
Free standing Set

Sub Set

Main Set

Set
Set
Set
Roll
Roll
Roll
Set
Set
Set
Set
Set
Set

Set

Set

Set
Set

Set

Lump Sum
Roll

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Set
Set
Set
Set
Set
Set
Set

Set
Set
Meter
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Set

Set
Set
Set
Set
Set
Unit
Unit
Set
Set
Set
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Unit
Piece
Set
Face Set
Finger Set
Face/Finger Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Piece
Set
2.0 mm2 Meter

3.4 mm2 Meter

5.5 mm2 Meter

8.0 mm2 Meter

14 mm2 Meter

22 mm2 Meter

30 mm2 Meter

38 mm2 Meter

50 mm2 Meter

60 mm2 Meter

80 mm2 Meter

100 mm2 Meter

2.0 mm2 Piece

3.4 mm2 Piece

5.5 mm2 Piece

8.0 mm2 Piece

14 mm2 Piece

22 mm2 Piece

30 mm2 Piece

38 mm2 Piece
50 mm2 Piece

60 mm2 Piece

80 mm2 Piece

100 mm2 Piece

125 mm2 Piece

200 mm2 Piece

250 mm2 Piece

400 mm2 Piece

14.2mm dia x 3m Length

16mm dia x 3m Length

17.2mm dia x 3m Length

18mm dia x 3m Length

20mm dia x 3m Length

22mm dia x 3m Length

25mm dia x 3m Length

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Set
Set
Set
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Lump Sum

Lump Sum

Lump Sum
Lump Sum
Lump Sum
Lump Sum
Set
Set
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Stand Fan Set
Wall Fan Set
Ceiling Fan Set
Set
Wall Mounted Fan Set

Ceiling Fan Set


Tube Axial Roof Mounted Set

Ceiling Cassette Set

Wall Mounted Set

Wall Mounted, Industrial Set


Type
Tubular In Line Set

Set
Set

Set

Set
Set
23 Kilogram
134a Kilogram
134b Kilogram
410a Kilogram
410b Kilogram
Square Meter
Package/Split type Lump Sum

VRF/VRV Lump Sum


Centralized Air- Lump Sum
Condition Ducting
Lump Sum

Valid Values Unit of Measure


Unit of Measure
Thickness/Sizes Class Others
Lump Sum
Set

Set

Set

Set

Set
Set
Set
Stainless Set
Galvanized Iron Set

Polyethylene Set

Concrete Set
Stainless Set
Galvanized Iron Set

Set
Lump Sum
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

250 - 1000gpm Set

Set

150 mm dia. Set

Set
10 lbs ABC with bracket Set

20 lbs ABC with bracket Set

10 lbs CO2/HCFC123 with bracket Set

20 lbs CO2/HCFC123 with bracket Set


50 lbs CO2/HCFC123 with bracket Set

Set

Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
up to 500 kgs Lump Sum

501 - 1000 kgs Lump Sum

above 1000 kgs Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Length
Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Set

Piece

Valid Values Unit of Measure


Thickness/Sizes Class Others
Set

Meter
Piece

Valid Values Unit of Measure


Thickness/Sizes Class Others
Set

Meter
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum
Set
Set
Set
Set
Set
Set
Set

Set
Set
Set
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Meter

Meter

Meter
400x400 mm Meter

450x450 mm Meter

400x400 mm Meter

450x450 mm Meter

New Meter

Rental Meter

Meter

Meter

Meter

Meter
Meter
Meter

Meter

Meter

Meter

Meter

0.80 Meter

0.90 Meter

1.00 Meter

1.10 Meter

1.20 Meter

1.30 Meter

1.40 Meter

1.50 Meter

1.60 Meter

1.70 Meter

1.80 Meter

1.90 Meter

2.00 Meter

2.10 Meter

2.20 Meter

2.30 Meter

2.40 Meter

2.50 Meter

2.60 Meter

2.70 Meter
2.80 Meter

2.90 Meter

3.00 Meter

400-500 mm dia. Meter

400-500 mm dia. Meter

Meter
Meter
Meter
0.80 10mm thick Meter

0.80 12mm thick Meter

0.80 16mm thick Meter

0.90 10mm thick Meter

0.90 12mm thick Meter

0.90 16mm thick Meter

1.00 10mm thick Meter

1.00 12mm thick Meter

1.00 16mm thick Meter

1.10 10mm thick Meter

1.10 12mm thick Meter

1.10 16mm thick Meter

1.20 10mm thick Meter

1.20 12mm thick Meter

1.20 16mm thick Meter

1.30 10mm thick Meter

1.30 12mm thick Meter

1.30 16mm thick Meter

1.40 10mm thick Meter


1.40 12mm thick Meter

1.40 16mm thick Meter

1.50 10mm thick Meter

1.50 12mm thick Meter

1.50 16mm thick Meter

1.60 12mm thick Meter

1.60 16mm thick Meter

1.70 12mm thick Meter

1.70 16mm thick Meter

1.80 12mm thick Meter

1.80 16mm thick Meter

1.90 12mm thick Meter

1.90 16mm thick Meter

2.00 12mm thick Meter

2.00 16mm thick Meter

2.10 12mm thick Meter

2.10 16mm thick Meter

2.20 12mm thick Meter

2.20 16mm thick Meter

2.30 12mm thick Meter

2.30 16mm thick Meter

2.40 12mm thick Meter

2.40 16mm thick Meter

2.50 16mm thick Meter

2.50 20mm thick Meter


2.60 16mm thick Meter

2.60 20mm thick Meter

2.70 16mm thick Meter

2.70 20mm thick Meter

2.80 16mm thick Meter

2.80 20mm thick Meter

2.90 16mm thick Meter

2.90 20mm thick Meter

3.00 16mm thick Meter

3.00 20mm thick Meter

Kilogram

Each

Crosshole-Sonic Each

Low Strain Each

Each

0.20 Meter
0.25 Meter
0.30 Meter
0.20 Kilogram

0.25 Kilogram

0.30 Kilogram

Concrete Structures Square Meter

Steel Structures Square Meter

Meter

Cubic Meter
Cubic Meter
Each

Linear Meter
CCESSORIES

Valid Values Unit of Measure


Thickness/Sizes Class Others
with Accessories Set
with Accessories Set
with Accessories Set
with Accessories Set
Replacement Each
Replacement Each
Replacement Each
Replacement Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
3 Set
4 Set
5 Set
7 Set
9 Set
12 Set
Set
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Set

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter
Linear Meter
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Piece
Cubic Meter
Piece
Cubic Meter
Piece
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Class I Rock Tonne
Class II Rock Tonne
Class III Rock Tonne

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Cubic Meter
Lump Sum

Valid Values Unit of Measure


Unit of Measure
Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Lump Sum
Lump Sum

Lump Sum
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

AINAGE

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Lump Sum
150-300 mm dia. Small Each

301-500 mm dia. Small Each

501-750 mm dia. Small Each

751-900 mm dia. Small Each

above 900mm dia. Large Each

Valid Values Unit of Measure


Unit of Measure
Thickness/Sizes Class Others
Cubic Meter
Cubic Meter

Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Cubic Meter
Cubic Meter

Shoring Lump sum

Cribbing/ Cofferdamming Lump sum

Common Soil Cubic Meter

Soft Rock Cubic Meter

Hard Rock Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
up to 300mm dia. Cubic Meter

above 300mm dia. Cubic Meter

Cubic Meter

Cubic Meter
Cubic Meter

Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
From roadway/structure Cubic Meter
excavation

From borrow Cubic Meter

Case 1 Cubic Meter

Case 2 Cubic Meter

Cubic Meter
Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter
Sand Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter-
Kilometer
Sand Cubic Meter-
Kilometer

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

ION WORKS
Valid Values Unit of Measure
Thickness/Sizes Class Others
Class A Cubic Meter
Class B Cubic Meter
Class C Cubic Meter
Class D Cubic Meter
Class A Cubic Meter
Class B Cubic Meter
Class C Cubic Meter
Class D Cubic Meter
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic meter in-place

Slope Protection Cubic meter in-place

Valid Values Unit of Measure


Thickness/Sizes Class Others
Cubic Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
0.5m x 1m x 3m Metallic Coated Cubic Meter

0.5m x 1m x 4m Metallic Coated Cubic Meter

1m x 1m x 2m Metallic Coated Cubic Meter

1m x 1m x 3m Metallic Coated Cubic Meter

1m x 1m x 4m Metallic Coated Cubic Meter

0.5 x 1m x 2m Metallic Coated Cubic Meter

0.5m x 1m x 3m PVC Coated Cubic Meter


0.5m x 1m x 4m PVC Coated Cubic Meter

1m x 1m x 2m PVC Coated Cubic Meter

1m x 1m x 3m PVC Coated Cubic Meter

1m x 1m x 4m PVC Coated Cubic Meter

0.5m x 1m x 2m PVC Coated Cubic Meter

0.3m x 2m x 6m Metallic Coated Cubic Meter

0.3m x 2m x 6m PVC Coated Cubic Meter

Square Meter
1 tonne Type I Each

2 tonnes Type I Each

3 tonnes Type I Each

4 tonnes Type I Each

1 tonne Type II Each

2 tonnes Type II Each

3 tonnes Type II Each

4 tonnes Type II Each

5 tonnes Type II Each

6 tonnes Type II Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
Square Meter
Square Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Meter

Meter

Meter
400x400 mm Meter

450x450 mm Meter

400x400 mm Meter

450x450 mm Meter

New Meter

Rental Meter

Meter

Meter

Meter

Meter
Meter
Meter

Meter

Meter

Meter

Meter

0.80 Meter

0.90 Meter

1.00 Meter

1.10 Meter

1.20 Meter

1.30 Meter

1.40 Meter

1.50 Meter

1.60 Meter
400-500 mm dia. Meter

400-500 mm dia. Meter

Meter
Meter
Meter
0.80 10mm thick Meter

0.90 10mm thick Meter

1.00 10mm thick Meter

1.10 10mm thick Meter

1.20 10mm thick Meter

1.30 10mm thick Meter

1.40 10mm thick Meter

1.50 10mm thick Meter

1.60 12mm thick Meter

Kilogram
Each

Crosshole-Sonic Each

Low Strain Each

Each

Concrete Structures Square Meter

Steel Structures Square Meter

Meter

Cubic Meter
Cubic Meter
Each

Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
Meter
Steel Slope Protection Meter

Steel Cofferdamming Meter

Steel Extraction Meter

Concrete Furnished Meter

Concrete Driven Meter

Concrete Furnished and Driven Meter

U-Type Grade 40 Kilogram

U-Type Grade 50 Kilogram

Z-Type Grade 50 Kilogram

Hat Type Grade 50 Kilogram

Pipe Type Grade 50 Kilogram

U-Type Grade 40 Meter

U-Type Grade 50 Meter

Z-Type Grade 50 Meter

Hat Type Grade 50 Meter

Pipe Type Grade 50 Meter

Type 2 Meter

Type 1 Piece
PVC Furnished Linear Meter

PVC Driven Linear Meter

KS

Valid Values Unit of Measure


Thickness/Sizes Class Others
Linear Meter
Linear Meter
Valid Values Unit of Measure
Thickness/Sizes Class Others
Linear Meter
Linear Meter
Cubic Meter

300mm dia. FRPM Pipe Meter

200mm dia. FRPM Pipe Meter

300mm dia. FRPM Perforated Pipe Meter

300mm dia. FRP Flap Gate Each

750mm dia. FRP Flap Gate Each

900mm dia. FRP Flap Gate Each

2000 x 2000mm Aluminum Flap Gate Each

1700 x 1700mm Aluminum Flap Gate Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
610 mm dia. Concrete Each

760 mm dia. Concrete Each

910 mm dia. Concrete Each

1070 mm dia. Concrete Each

1220 mm dia. Concrete Each

1520 mm dia. Concrete Each

1830 mm dia. Concrete Each

610 mm dia. CHB Each


760 mm dia. CHB Each

910 mm dia. CHB Each

1070 mm dia. CHB Each

1220 mm dia. CHB Each

1520 mm dia. CHB Each

1830 mm dia. CHB Each

610 mm dia. Each


760 mm dia. Each
910 mm dia. Each
1070 mm dia. Each

1220 mm dia. Each

1520 mm dia. Each

610 mm dia. Each

760 mm dia. Each

910 mm dia. Each

1070 mm dia. Each

1220 mm dia. Each

1520 mm dia. Each

610 mm dia. Each

760 mm dia. Each

910 mm dia. Each

1070 mm dia. Each

1220 mm dia. Each

1520 mm dia. Each

Pair

Pair
Each
Each
Valid Values Unit of Measure
Thickness/Sizes Class Others
Linear Meter

Linear Meter

Linear Meter

Each

Valid Values Unit of Measure


Thickness/Sizes Class Others
CHB Square Meter
Precast Square Meter
Cyclone/Welded Wire Square Meter

Galvanized Square Meter


Precast Plant Box Linear Meter
Linear Meter

Valid Values Unit of Measure


Thickness/Sizes Class Others
above 1.0 m3/s cap Set

above 1.0 m3/s cap Set

above 1.0 m3/s cap Set

6 -10mmt carbon steel 1500mmØ and below Set

6 -10mmt carbon steel 1500mmØ and below Set

12mmt carbon steel 1500mmØ and below Set


12mmt carbon steel 1500mmØ and below Set

Meter Stick Set

Electronic Sensor Set

20,000 ltrs. Set

1500 ltrs. Set


0.187-0.75kW Set

stainless 2-5cu.meter Set

0.75 - 2.24kW Set

0.75 -3.73kW Set

610mm dia. Cast Iron Each

910mm dia. Cast Iron Each

1070mm dia. Cast Iron Each

1220mm dia. Cast Iron Each

1524mm dia. Cast Iron Each

Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
1.0 m /s cap and below
3
Set

1.0 m3/s cap and below Set

700mmФ below Set

700mmФ below Set

700mmФ below Set

0.187-0.75 KW Set
5,000 lts. Set

1,000 lts. Set


above 1000 - 15000 lts. Set

Set
1m/3ft Metric / English (0.5 ton cap chain host with Set
Aluminum meter stick trolley)

LDY type Metallurgy, single (0.5 ton cap chain host with Set
overhead crance trolley)

LDY type Metallurgy, single (0.5 ton cap chain host with Set
overhead crance trolley)

LDY type Metallurgy, single (0.5 ton cap chain host with Set
overhead crance trolley)

LDY type Metallurgy, single (0.5 ton cap chain host with Set
overhead crance trolley)

LDY type Metallurgy, single (0.5 ton cap chain host with Set
overhead crance trolley)

Valid Values Unit of Measure


Thickness/Sizes Class Others
Lump Sum

Lump Sum
Lump Sum

Valid Values Unit of Measure


Thickness/Sizes Class Others
Set
Set
Set
Set
Set
Set
Set
Set

Set

Set

Set

Set
PART I - FACILITIES FO
PART A - PART A
PART II - OTHER GENER
PART B
PART C
A.1.1(1) Construction of Combined
Field Office, Laboratory and
Living Quarters Building for
the Engineer L.S. PART D
A.1.1(2) Construction of Combined
Field Office and Laboratory
Buildinq for the Enqineer L.S. PART E
A.1.1(3) Construction of Field Office for
the Engineer L.S. PART F
A.1.1(4) Construction of Field
Laboratory for the Engineer
L.S. PART G
A.1.1(5) Construction of Living
Quarters for the Engineer L.S. PART H
A.1.1(6) Provision of Combined Field
Office, Laboratory and
Living Quarters Building for
the Engineer (Rental Basis)
mo. PART I
A.1.1(7) Provision of Combined Field
Office and Laboratory Building
for the Engineer (Rental Basis)
mo. PART III - CIVIL, MECHA
A.1.1(8) Provision of Field Office for the
Engineer (Rental Basis) mo. PART A
A.1.1(9) Provision of Laboratory for
the Engineer (Rental Basis)
mo. PART B
A.1.1(10) Provision of Living Quarters
for the Engineer (Rental Basis)
mo. PART C
A.1.1(11) Provision of
Furnitures/Fixtures, Equipment
&
Appliances for the Field Office
for the Enqineer L.S. PART D
A.1.1(12) Provision of
Furnitures/Fixtures, Equipment
& Appliances for Laboratory
Building for the Engineer
L.S. PART E
A.1.1(13) Provision of
Furnitures/Fixtures &
Appliances for the Living
Quarters for the Enqineer L.S. PART F
A.1.1(14) Provision of Laboratory
Testing Equipment, Apparatus
and Publications for the
Enqineer L.S. PART G
A.1.1(15) Operation & Maintenance of
Temporary Field Office,
Laboratory and Living
Quarters Building for the
Engineer mo. PART H
A.1.1(16) Operation & Maintenance of
Field Office for the Engineer
mo. PART I
A.1.1(17) Operation & Maintenance of
Laboratory Building for the
Engineer mo. Part 3
A.1.1(18) Operation & Maintenance of
Living Quarters for the
Engineer mo.

A.1.2(1) Provision of 4x4 Pick Up Type


Service Vehicle for the
Engineer ea.
A.1.2(2) Provision of 4x4 Pick Up Type
Service Vehicle for the
Engineer on Bare Rental Basis
mo.
A.1.2(3) Provision of 4x2 Pick Up Type
Service Vehicle for the
Engineer ea.
A.1.2(4) Provision of 4x2 Pick Up Type
Service Vehicle for the
Engineer on Bare Rental Basis
mo.
A.1.2(5) Operation and Maintenance of
4x4 Pick Up Type Service
Vehicle for the Engineer
mo.
A.1.2(6) Operation and Maintenance
of 4x2 Pick Up Type Service
Vehicle for the Engineer
mo.
A.1.2(7) Provision of 4x4 Van Type
Service Vehicle (12-seater) ea.
A.1.2(8) Provision of 4x4 Van Type
Service Vehicle on Rental
Basis (12 Seater) mo.
A.1.2(9) Operation and Maintenance
of 4x4 Van Type Service
Vehicle (12-seater) mo.

A.1.3(1) Provision of Field Office Staff


for the Assistance to the
Engineer mo.
A.1.3(2) Provision of Survey Equipment
for the Assistance to the
Engineer L.S.
A.1.3(3) Provision of Survey Personnel
for the Assistance to the
Engineer mo.
A.1.3(4) Provision of Laboratory
Personnel for the Assistance to
the Engineer mo.

A.1.4(1) Provision of Progress


Photographs ea.

A.1.5(1) Provision of Communication


Facility for the Engineer ea.
A.1.5(2) Operation and Maintenance of
Communication Facility for the
Enqineer ea.

PART B - OTHER GENERAL REQUIR

B.1 Offices, Shops, Stores and


Workmens Accommodation for
Contractor L.S.
B.2 Medical Room and First Aid
Facilities L.S.
B.3 Permits and Clearances L.S.
B.4(1) Construction survey and
staking kms.
B.4(2) Slope, reference, and clearing
and grubbing stakes
kms.
B.4(3) Centerline reestablishment kms.
B.4(4) Culvert survey and staking ea.
B.4(5) Bridge survey and staking L.S.
B.4(6) Retaining wall survey and
staking L.S.
B.4(7) Grade finishing stakes kms.
B.4(8) Permanent monuments and
markers ea.
B.4(9) Miscellaneous survey and
staking hrs.
B.4(10) PlisceIIaneous survey and
staking L.S.
B.5 Project Billboard / Signboard
ea.
B.6 Installation of ODA
Recognition Plate L.S.
B.7(1) Occupational Safety and
Health Proqram mo.
B.7(2) Occupational Safety and
Health Program L.S.
B.8(1) Traffic Management mo.
B.8(2) Traffic Management L.S.
B.9 Mobilization/Demobilization L.S.
B.10 Dayworks PS
B.11 Provisional Sum PS
B.12 Removal and Relocation of
Utilities L.S.
B.13 Additional Geotechnical
Investigation L.S.
B.14 Environmental Management
and Monitoring
mo.
B.15(1) Detour/Access Road L.S.
B.15(2) Detour/Access Road l.m.
B.16 Recognition Plate/Project
Narker ea.
B.17 Temporary Diversion of
Waterway L.S.
B.18(1) Craneway L.S.
B.18(2) Craneway l.m.
B.19 Geotechnical Exploration l.m.
B.20 Temporary Fence L.S.
B.21 Temporary Bridge L.S.
B.22 Support Equipment L.S.
B.23 Staging Area L.S.
B.24 General Scaffolding and
Shoring L.S.
B.25 Detailed Engineering and
Architectural Design L.S.

PART C - EARTHWORK
100(1) Clearing and Grubbing ha.
100(2) Clearing and Grubbing L.S.
100(3)a1 Individual Removal of Trees -
150 - 300 mm dia. - Small
ea.
100(3)a2 Individual Removal of Trees -
301 - 500 mm.dia - Small
ea.
100(3)a3 Individual Removal of Trees -
501 - 750 mm.dia - Small
ea.
100(3)a4 Individual Removal of Trees -
751 - 900 mm.dia - Small
ea.
100(4) Individual Removal of Trees -
above 900mm dia. - Large
ea.

101(1) Removal of Structures and


Obstruction L.S.
101(2) Removal of Actual
Structures/Obstruction ea.
101(3)a1 Removal of Actual
Structures/Obstruction - 0.15
m thick - PCCP sq.m.
101(3)a2 Removal of Actual
Structures/Obstruction - 0.20
m thick - PCCP sq.m.
101(3)a3 Removal of Actual
Structures/Obstruction - 0.23
m thick - PCCP sq.m.
101(3)a4 Removal of Actual
Structures/Obstruction - 0.25
m thick - PCCP sq.m.
101(3)a5 Removal of Actual
Structures/obstruction - 0.28
m thick - PCCP sq.m.
101(3)a6 Removal of Actual
Structures/obstruction - 0.30
m thick - PCCP sq.m.
101(3)a7 Removal of Actual
Structures/Obstruction - 0.33
m thick - PCCP sq.m.
101(3)a8 Removal of Actual
Structures/obstruction - 0.35
m thick - PCCP sq.m.
101(3)a9 Removal of Actual
Structures/Obstruction - 0.38
m thick - PCCP sq.m.
101(3)b1 Removal of Actual
Structures/Obstruction - 0.15
m thick - PCCP sq.m.
101(3)b2 Removal of Actual
Structures/Obstruction - 0.20
m thick - PCCP sq.m.
101(3)b3 Removal of Actual
Structures/obstruction - 0.23
m thick - PCCP sq.m.
101(3)b4 Removal of Actual
Structures/obstruction - 0.25
m thick - PCCP sq.m.
101(3)b5 Removal of Actual
Structures/Obstruction - 0.28
m thick - PCCP sq.m.
101(3)b6 Removal of Actual
Structures/Obstruction - 0.30
m thick - PCCP sq.m.
101(3)b7 Removal of Actual
Structures/Obstruction - 0.33
m thick - PCCP sq.m.
101(3)b8 Removal of Actual
Structures/Obstruction - 0.35
m thick - PCCP sq.m.
101(3)b9 Removal of Actual Structures*
- 0.38 m thick - PCCP
(Unreinforced) sq.m.
101(3)c1 Removal of Actual Structures -
0.05 m thick - ACP
sq.m.
101(3)c2 Removal of Actual Structures*
- 0.10 m thick - ACP
sq.m.
101(3)d Removal of Actual Structures*
- 0.10 m thick - Sidewalk
sq.m.
101(4)a1 Removal of Actual Structures -
610 mm dia. - RCPC
l.m.
101(4)a2 Removal of Actual Structures*
- 760 mm dia. - RCPC
l.m.
101(4)a3 Removal of Actual Structures*
- 910 mm dia. - RCPC
l.m.
101(4)a4 Removal of Actual Structures*
- 1070 mm dia. - RCPC
l.m.
101(4)a5 Removal of Actual Structures*
- 1220 mm dia. - RCPC
l.m.
101(4)a6 Removal of Actual Structures*
- 1520 mm dia. - RCPC
l.m.
101(4)a7 Removal of Actual Structures*
- 1830 mm dia. - RCPC
l.m.
101(4)b Removal of Actual Structures -
Curb l.m.
101(4)c Removal of Actual
Structures/Obstruction - Curb
and Gutter l.m.
101(5)a1 Removal of Pipes other than
Pipe Culverts - 50 mm dia. -
PVC l.m.
101(5)a2 Removal of Pipes other than
Pipe Culverts - 75 mm dia. -
PVC l.m.
101(5)a3 Removal of Pipes other than
Pipe Culverts - 100 mm dia. -
PVC l.m.
101(5)a4 Removal of Pipes other than
Pipe Culverts - 150 mm dia. -
PVC l.m.
101(5)a5 Removal of Pipes other than
Pipe Culverts - 200 mm dia. -
PVC l.m.
101(5)a6 Removal of Pipes other than
Pipe Culverts - 250 mm dia. -
PVC l.m.
101(5)a7 Removal of Pipes other than
Pipe Culverts - 300 mm dia. -
PVC l.m.
101(5)b1 Removal of Pipes other than
Pipe Culverts - 150 mm dia. -
Concrete l.m.
101(5)b2 Removal of Pipes other than
Pipe Culverts - 200 mm dia. -
Concrete l.m.
101(5)b3 Removal of Pipes other than
Pipe Culverts - 250 mm dia. -
Concrete l.m.
101(5)b4 Removal of Pipes other than
Pipe Culverts - 300 mm dia. -
Concrete l.m.
101(5)b5 Removal of Pipes other than
Pipe Culverts - 350 mm dia. -
Concrete l.m.
101(5)c1 Removal of Pipes other than
Pipe Culverts - 50 mm dia. -
High Density
Polyethylene
HDPE l.m.
101(5)c2 Removal of Pipes other than
Pipe Culverts - 75 mm dia. -
High Density
Polyethylene
HDPE l.m.
101(5)c3 Removal of Pipes other than
Pipe Culverts - 100 mm dia. -
High Density
Polyethylene
HDPE l.m.
101(5)c4 Removal of Pipes other than
Pipe Culverts - 150 mm dia. -
High Density
Polyethylene HDPE l.m.
101(5)c5 Removal of Pipes other than
Pipe Culverts - 200 mm dia. -
High Density
Polyethylene
HDPE l.m.
101(5)c6 Removal of Pipes other than
Pipe Culverts - 250 mm dia. -
High Density
Polyethylene
HDPE l.m.
101(5)c7 Removal of Pipes other than
Pipe Culverts - 300 mm dia. -
High Density
Polyethylene HDPE l.m.
101(6) Removal of Structures and
Obstruction - Concrete cu.m.
101(7)a Removal of Structures and
Obstruction - Steel kgs.
101(7)b Removal of Structures and
Obstruction - Steel H-Piles kgs.
101(7)c Removal of Structures and
Obstruction - RSB kgs.
101(8) Removal of Existing
Guardrails l.m.
101(9) Removal of Existing Guardrail
Posts ea.
101(10) Removal of Existing Road
Signs ea.
102(1) Unsuitable Excavation cu.m.
102(2) Surplus Common Excavation
cu.m.
102(3)a Surplus Rock Excavation - Soft
cu.m.
102(3)b Surplus Rock Excavation -
Hard cu.m.
102(4) Surplus Unclassified
Excavation cu.m.

103(1)a Structure Excavation -


Common Soil cu.m.
103(1)b Structure Excavation - Soft
Rock cu.m.
103(1)c Structure Excavation - Hard
Rock cu.m.
103(2)a Bridge Excavation - Common
Soil cu.m.
103(2)b Bridge Excavation - Soft Rock
cu.m.
103(2)c Bridge Excavation - Hard Rock
cu.m.
103(3) Foundation Fill cu.m.
103(4) Excavation ordered below Plan
elevation cu.m.
103(5)a Shoring, cribbing and related
works - Shoring L.S.
103(5)b Shoring, cribbing and related
works - Cribbing/
Cofferdamming L.S.
103(6)a Pipe culverts and drain
excavation - Common Soil cu.m.
103(6)b Pipe culverts and drain
excavation - Soft Rock cu.m.
103(6)c Pipe culverts and drain
excavation - Hard Rock cu.m.

104(1)a Embankment from roadway


excavation - Common Soil
cu.m.
104(1)b Embankment from roadway
excavation - Soft Rock
cu.m.
104(1)c Embankment from roadway
excavation - Hard Rock
cu.m.
104(2)a Embankment from borrow -
Common Soil cu.m.
104(2)b Embankment from borrow -
Soft Rock cu.m.
104(2)c Embankment from borrow -
Hard Rock cu.m.
104(2)d Embankment from borrow -
Granular Coarse
Material cu.m.
104(2)e Embankment from borrow -
Granular Fine Material cu.m.
104(3)a Selected Borrow for topping -
Case 1 cu.m.
104(3)b Selected Borrow for topping -
Case 2 cu.m.
104(4) Earth Berm cu.m.
104(5) Boulder Fill cu.m.
104(6) Preload, relocated, and
compacted - Common Borrow
cu.m.
104(7) Embankment from structure
excavation cu.m.

105(1)a Subgrade Preparation -


Common Material sq.m.
105(1)b Subgrade Preparation -
Existing Pavement sq.m.
105(1)C Subgrade Preparation -
Unsuitable Material sq.m.
105(1)d Subgrade Preparation - Hard
Rock Material sq.m.
105(1)e Subgrade Preparation - Soft
Rock Material sq.m.
105(1) Subgrade Preparation -
Unclassified Material sq.m.

106(1) Compaction Equipment and


Density Controls Strips -
Common Material sq.m.
107(1) Overhaul cu.m.
107(2) Overhaul kms.
107(3) Overhaul of Borrow - Case 1
cu.m.
107(4) Overhaul of Borrow - Case 1
kms.
PART D — SUBBASE AND BASE CO

200(1) Aggregate Subbase Course cu.m.

201(1) Aggregate Base Course cu.m.

202(1) Crushed Appregate Base


Course cu.m.

203(1)a Lime Stabilized Road Mix Base


Course - New Soil Aggregate
cu.m.
203(1)b Lime Stabilized Road Mix Base
Course - Salvaged Soil
Aqqreqate cu.m.

204(1)a Portland Cement Stabilized


Road Mix Base Course - New
Soil Aggregate cu.m.
204(1)b Portland Cement Stabilized
Road dlix Base Course -
Salvaged Soil
Aqqreqate cu.m.
205(1)a Asphalt Stabilized Road Mix
Base Course - New Soil
Aggregate cu.m.
205(1)b Asphalt Stabilized Road I‘flix
Base Course - Salvaged Soil
Aqqreqate cu.m.

206(1) Polymer-Based Chemical Soil


Additive l

207(1)a Portland Cement treated Plant


dlix Course - New Soil
Aggregate cu.m.
207(1)b Portland Cement treated Plant
Mix Course - Salvaged Soil
Aqqreqate
cu.m.

208(1) Aggregate Stockpile cu.m.

209(1) Asphalt Treated Plant Mix


Base Course cu.m.

210(1) Crack and Seat sq.m.


PART E - SURFACE COURSE PART E - SURFACE COURSE

300(1) Gravel Surface Course cu.m.


300(2) Crushed Appregate Surface
Course cu.m.
301(1)a Bituminous Prime Coat - MC—
Cut-back Asphalt - Grade 30
sq.m.
301(1)b Bituminous Prime Coat - MC—
Cut-back Asphalt - Grade 70
sq.m.
301(1)C Bituminous Prime Coat - MC—
Cut-back Asphalt - Grade 250
sq.m.
301(1)d Bituminous Prime Coat - MC—
Cut-back Asphalt - Grade 800
sq.m.
301(1)e Bituminous Prime Coat - MC—
Cut-back Asphalt - Grade
3000 sq.m.
301(1)a Bituminous Prime Coat - RC —
Cut-back Asphalt - Grade 70
sq.m.
301(1)b Bituminous Prime Coat - RC —
Cut-back Asphalt - Grade 250
sq.m.
301(1)C Bituminous Prime Coat - RC —
Cut-back Asphalt - Grade 800
sq.m.
301(1)d Bituminous Prime Coat - RC —
Cut-back Asphalt - Grade
3000 sq.m.

302(1)a Bituminous Tack Coat - RC —


Cut-back Asphalt - Grade 70
sq.m.
302(1)b Bituminous Tack Coat - RC —
Cut-back Asphalt - Grade 250
sq.m.
302(1)c Bituminous Tack Coat - RC —
Cut-back Asphalt - Grade 800
sq.m.
302(1)d Bituminous Tack Coat - RC —
Cut-back Asphalt - Grade
3000 sq.m.
302(1) Emulsified Asphalt sq.m.

303(1)a Cover Agprepate - Type 2 tonnes


303(1)b Cover Agprepate - Type 3A
tonnes
303(1)c Cover Aggregate - Type 3B
tonnes
303(2)a Bituminous Seal Coat - MC-
Cut-back Asphalt - Grade 30
tonnes
303(2)b Bituminous Seal Coat - MC-
Cut-back Asphalt - Grade 70
tonnes
303(2)c Bituminous Seal Coat - MC-
Cut-back Asphalt - Grade 250
tonnes
303(2)d Bituminous Seal Coat - MC-
Cut-back Asphalt - Grade 800
tonnes
303(2)e Bituminous Seal Coat - MC-
Cut-back Asphalt - Grade
3000 tonnes
303(3)a Bituminous Seal Coat - RC-
Cut-back Asphalt - Grade 70
tonnes
303(3)b Bituminous Seal Coat - RC-
Cut-back Asphalt - Grade 250
tonnes
303(3)c Bituminous Seal Coat - RC-
Cut-back Asphalt - Grade 800
tonnes
303(3)d Bituminous Seal Coat - RC-
Cut-back Asphalt - Grade
3000 tonnes
303(4) Asphalt Cement Penetration
Grade tonnes

304(1) Aggregate Grading tonnes


304(2) Asphalt Cement Penetration
Grade tonnes
304(3)a Bituminous Surface Treatment
- RC-Cut-back Asphalt - Grade
70 tonnes
304(3)b Bituminous Surface Treatment
- RC-Cut-back Asphalt - Grade
250 tonnes
304(3)c Bituminous Surface Treatment
- RC-Cut-back Asphalt - Grade
800 tonnes
304(3)d Bituminous Surface Treatment
- RC-Cut-back Asphalt - Grade
3000 tonnes
304(4)a Bituminous Surface Treatment
- MC-Cut-back Asphalt - Grade
30 tonnes
304(4)b Bituminous Surface Treatment
- MC-Cut-back Asphalt - Grade
70 tonnes
304(4)c Bituminous Surface Treatment
- MC-Cut-back Asphalt - Grade
250 tonnes
304(4)d Bituminous Surface Treatment
- MC-Cut-back Asphalt - Grade
800 tonnes
304(4)e Bituminous Surface Treatment
- MC-Cut-back Asphalt - Grade
3000 tonnes
304(5) Emulsified Asphalt tonnes

304A(1) Slurry Surface Treatment


(SST) sq.m.
304A(2) Slurry Seal sq.m.
304A(3) Micro-surfacing sq.m.

305(1) Aggregates tonnes


305(2) Asphalt Cement tonnes
305(3)a Bituminous Penetration
Macadam Pavement - RC-Cut-
back Asphalt - Grade 70
tonnes
305(3)b Bituminous Penetration
Macadam Pavement - RC-Cut-
back Asphalt - Grade 250
tonnes
305(3)c Bituminous Penetration
Macadam Pavement - RC-Cut-
back Asphalt - Grade 800
tonnes
305(3)d Bituminous Penetration
Macadam Pavement - RC-Cut-
back Asphalt - Grade 3000
tonnes
305(4) Emulsified Asphalt tonnes
306(1) Aggregate for Bituminous
Road Mix Surface Course tonnes
306(2) Bituminous Material for
Bituminous Road Mix Surface
Course tonnes

308(1) Bituminous Plant-Mix Surface


Course, Cold-Laid sq.m.

309(1) Bituminous Plant-Mix


(Stockpile Maintenance
Mixture) cu.m.

310(1)a Bituminous Concrete Surface


Wearing Course, Hot-Laid - 30
mm sq.m.
310(1)b Bituminous Concrete Surface
Wearing Course, Hot-Laid - 40
mm sq.m.
310(1)c Bituminous Concrete Surface
Wearing Course, Hot-Laid - 50
mm sq.m.
310(2)a Bituminous Concrète Surface
Binder Course, Hot-Laid - 30
mm sq.m.
310(2)b Bituminous Concrète Surface
Binder Course, Hot-Laid - 40
mm sq.m.
310(2)c Bituminous Concrete Surface
Binder Course, Hot-Laid - 50
mm sq.m.
310(3) Asphaltic Concrete With Lahar
as Fine Aggregate
Replacement sq.m.
310(4)a Bituminous Concrete Surface
Wearing Course, Stone Mastic
- 30 mm sq.m.
310(4)b Bituminous Concrete Surface
Wearing Course, Stone Mastic
- 40 mm sq.m.
310(4)c Bituminous Concrete Surface
Wearing Course, Stone Mastic
- 50 mm sq.m.
310(5) Bituminous Concrete Surface
Binder Course, Stone Mastic -
50 mm sq.m.
310(6)a Bituminous Concrete Surface
Wearing Course, PMB - 30 mm
sq.m.
310(6)b Bituminous Concrete Surface
Wearing Course, PMB - 40 mm
sq.m.
310(6)c Bituminous Concrete Surface
Wearing Course, PMB - 50 mm
sq.m.

311(1)a Portland Cement Concrete


Pavement (Unreinforced) -
0.15 m thick - 14 days sq.m.
311(1)b1 Portland Cement Concrete
Pavement (Unreinforced) -
0.20 m thick - 14 days sq.m.
311(1)b2 Portland Cement Concrete
Pavement (Unreinforced) -
0.20 m thick - 7 days sq.m.
311(1)b3 Portland Cement Concrete
Pavement (Unreinforced) -
0.20 m thick - 3 days sq.m.
311(1)c1 Portland Cement Concrete
Pavement (Unreinforced) -
0.23 m thick - 14 days sq.m.
311(1)c2 Portland Cement Concrete
Pavement (Unreinforced) -
0.23 m thick - 7 days sq.m.
311(1)c3 Portland Cement Concrete
Pavement (Unreinforced) -
0.23 m thick - 3 days sq.m.
311(1)d1 Portland Cement Concrete
Pavement (Unreinforced) -
0.25 m thick - 14 days sq.m.
311(1)d2 Portland Cement Concrete
Pavement (Unreinforced) -
0.25 m thick - 7 days sq.m.
311(1)d3 Portland Cement Concrete
Pavement (Unreinforced) -
0.25 m thick - 3 days sq.m.
311(1)e1 Portland Cement Concrete
Pavement (Unreinforced) -
0.28 m thick - 14 days sq.m.
311(1)e2 Portland Cement Concrete
Pavement (Unreinforced) -
0.28 m thick - 7 days sq.m.
311(1)e3 Portland Cement Concrete
Pavement (Unreinforced) -
0.28 m thick - 3 days sq.m.
311(1)e4 Portland Cement Concrete
Pavement (Unreinforced) -
0.28 m thick - 1 day sq.m.
311(1)f1 Portland Cement Concrete
Pavement (Unreinforced) -
0.30 m thick - 14 days sq.m.
311(1)f2 Portland Cement Concrete
Pavement (Unreinforced) -
0.30 m thick - 7 days sq.m.
311(1)f3 Portland Cement Concrete
Pavement (Unreinforced) -
0.30 m thick - 3 days sq.m.
311(1)f4 Portland Cement Concrete
Pavement (Unreinforced) -
0.30 m thick - 1 day sq.m.
311(1)g1 Portland Cement Concrete
Pavement (Unreinforced) -
0.33 m thick - 14 days sq.m.
311(1)g2 Portland Cement Concrete
Pavement (Unreinforced) -
0.33 m thick - 7 days sq.m.
311(1)g3 Portland Cement Concrete
Pavement (Unreinforced) -
0.33 m thick - 3 days sq.m.
311(1)g4 Portland Cement Concrete
Pavement (Unreinforced) -
0.33 m thick - 1 day sq.m.
311(1)h1 Portland Cement Concrete
Pavement (Unreinforced) -
0.35 m thick - 14 days sq.m.
311(1)h2 Portland Cement Concrete
Pavement (Unreinforced) -
0.35 m thick - 7 days sq.m.
311(1)h3 Portland Cement Concrete
Pavement (Unreinforced) -
0.35 m thick - 3 days sq.m.
311(1)h4 Portland Cement Concrete
Pavement (Unreinforced) -
0.35 m thick - 1 day sq.m.
311(1)i1 Portland Cement Concrete
Pavement (Unreinforced) -
0.38 m thick - 14 days sq.m.
311(1)i2 Portland Cement Concrete
Pavement (Unreinforced) -
0.38 m thick - 7 days sq.m.
311(1)i3 Portland Cement Concrete
Pavement (Unreinforced) -
0.38 m thick - 3 days sq.m.
311(1)i4 Portland Cement Concrete
Pavement (Unreinforced) -
0.38 m thick - 1 day sq.m.
311(2)a Portland Cement Concrete
Pavement (Reinforced) - 0.15
m thick - 14 days sq.m.
311(2)b1 Portland Cement Concrete
Pavement (Reinforced) - 0.20
m thick - 14 days sq.m.
311(2)b2 Portland Cement Concrete
Pavement (Reinforced) - 0.20
m thick - 7 days sq.m.
311(2)b3 Portland Cement Concrete
Pavement (Reinforced) - 0.20
m thick - 3 days sq.m.
311(2)c1 Portland Cement Concrete
Pavement (Reinforced) - 0.23
m thick - 14 days sq.m.
311(2)c2 Portland Cement Concrete
Pavement (Reinforced) - 0.23
m thick - 7 days sq.m.
311(2)c3 Portland Cement Concrete
Pavement (Reinforced) - 0.23
m thick - 3 days sq.m.
311(2)d1 Portland Cement Concrete
Pavement (Reinforced) - 0.25
m thick - 14 days sq.m.
311(2)d2 Portland Cement Concrete
Pavement (Reinforced) - 0.25
m thick - 7 days sq.m.
311(2)d3 Portland Cement Concrete
Pavement (Reinforced) - 0.25
m thick - 3 days sq.m.
311(2)e1 Portland Cement Concrete
Pavement (Reinforced) - 0.28
m thick - 14 days sq.m.
311(2)e2 Portland Cement Concrete
Pavement (Reinforced) - 0.28
m thick - 7 days sq.m.
311(2)e3 Portland Cement Concrete
Pavement (Reinforced) - 0.28
m thick - 3 days sq.m.
311(2)f1 Portland Cement Concrete
Pavement (Reinforced) - 0.30
m thick - 14 days sq.m.
311(2)f2 Portland Cement Concrete
Pavement (Reinforced) - 0.30
m thick - 7 days sq.m.
311(2)f3 Portland Cement Concrete
Pavement (Reinforced) - 0.30
m thick - 3 days sq.m.
311(2)g1 Portland Cement Concrete
Pavement (Reinforced) - 0.33
m thick - 14 days sq.m.
311(2)g2 Portland Cement Concrete
Pavement (Reinforced) - 0.33
m thick - 7 days sq.m.
311(2)g3 Portland Cement Concrete
Pavement (Reinforced) - 0.33
m thick - 3 days sq.m.
311(2)h1 Portland Cement Concrete
Pavement (Reinforced) - 0.35
m thick - 14 days sq.m.
311(2)h2 Portland Cement Concrete
Pavement (Reinforced) - 0.35
m thick - 7 days sq.m.
311(2)h3 Portland Cement Concrete
Pavement (Reinforced) - 0.35
m thick - 3 days sq.m.
311(3)a1 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.23 m thick - 14
days sq.m.
311(3)a2 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.23 m thick - 7
days sq.m.
311(3)a3 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.23 m thick - 3
days sq.m.
311(3)b1 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.25 m thick - 14
days sq.m.
311(3)b2 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.25 m thick - 7
days sq.m.
311(3)b3 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.25 m thick - 3
days sq.m.
311(3)c1 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.28 m thick - 14
days sq.m.
311(3)c2 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.28 m thick - 7
days sq.m.
311(3)c3 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.28 m thick - 3
days sq.m.
311(3)d1 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.30 m thick - 14
days sq.m.
311(3)d2 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.30 m thick - 7
days sq.m.
311(3)d3 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.30 m thick - 3
days sq.m.
311(3)e1 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.33 m thick - 14
days sq.m.
311(3)e2 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.33 m thick - 7
days sq.m.
311(3)e3 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.33 m thick - 3
days sq.m.
311(3)f1 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.35 m thick - 14
days sq.m.
311(3)f2 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.35 m thick - 7
days sq.m.
311(3)f3 Portland Cement Concrete
Pavement (Reinforced with
Wire Mesh) - 0.35 m thick - 3
days sq.m.
311(4)a1 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.15 m thick - 14 days sq.m.
311(4)a2 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.20 m thick - 14 days sq.m.
311(4)a3 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.23 m thick - 14 days sq.m.
311(4)a4 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.25 m thick - 14 days sq.m.
311(4)a5 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.28 m thick - 14 days sq.m.
311(4)b1 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.15 m thick - 14 days sq.m.
311(4)b2 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.20 m thick - 14 days sq.m.
311(4)b3 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.23 m thick - 14 days sq.m.
311(4)b4 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.25 m thick - 14 days sq.m.
311(4)b5 Portland Cement Concrete
Pavement with Coralline
Materials as Coarse
Aggregates (Unreinforced) -
0.28 m thick - 14 days sq.m.
311(5)a1 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Unreinforced) -
0.15 m thick - 14 days
sq.m.
311(5)a2 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Unreinforced) -
0.20 m thick - 14 days
sq.m.
311(5)a3 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Unreinforced) -
0.23 thick - 14 days
sq.m.
311(5)a4 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Unreinforced) -
0.25 m thick - 14 days
sq.m.
311(5)a5 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Unreinforced) -
0.›8 thick - 14 days
sq.m.
311(5)b1 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Reinforced) -
0.15 m thick - 14 days
sq.m.
311(5)b2 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Reinforced) -
0.20 m thick - 14 days
sq.m.
311(5)b3 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Reinforced) -
0.23 m thick - 14 days
sq.m.
311(5)b4 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Reinforced) -
0.25 m thick - 14 days
sq.m.
311(5)b5 Portland Cement Concrete
Pavement with Dolomites as
Aggregates (Reinforced) -
0.28 m thick - 14 days
sq.m.
311(6)a1 Roller Compacted Concrete
Pavement - 0.15 m thick - 14
days sq.m.
311(6)a2 Roller Compacted Concrete
Pavement - 0.20 m thick - 14
days sq.m.
311(6)a3 Roller Compacted Concrete
Pavement - 0.23 m thick - 14
days sq.m.
311(6)a4 Roller Compacted Concrete
Pavement - 0.25 m thick - 14
days sq.m.
311(6)a5 Roller Compacted Concrete
Pavement - 0.28 m thick - 14
days sq.m.
311(6)a6 Roller Compacted Concrete
Pavement - 0.30 m thick - 14
days sq.m.
311(6)b1 Roller Compacted Concrete
Pavement - 0.15 m thick - 7
days sq.m.
311(6)b2 Roller Compacted Concrete
Pavement - 0.20 m thick - 7
days sq.m.
311(6)b3 Roller Compacted Concrete
Pavement - 0.23 m thick - 7
days sq.m.
311(6)b4 Roller Compacted Concrete
Pavement - 0.25 m thick - 7
days sq.m.
311(6)b5 Roller Compacted Concrete
Pavement - 0.28 m thick - 7
days sq.m.
311(6)b6 Roller Compacted Concrete
Pavement - 0.30 m thick - 7
days sq.m.
311(6)c1 Roller Compacted Concrete
Pavement - 0.15 m thick - 3
days sq.m.
311(6)c2 Roller Compacted Concrete
Pavement - 0.20 m thick - 3
days sq.m.
311(6)c3 Roller Compacted Concrete
Pavement - 0.23 m thick - 3
days sq.m.
311(6)c4 Roller Compacted Concrete
Pavement - 0.25 m thick - 3
days sq.m.
311(6)c5 Roller Compacted Concrete
Pavement - 0.28 m thick - 3
days sq.m.
311(6)c6 Roller Compacted Concrete
Pavement - 0.30 m thick - 3
days sq.m.
311(7)a1 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.20 m thick -
14 days sq.m.
311(7)a2 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.23 m thick -
14 days sq.m.
311(7)a3 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.25 m thick -
14 days sq.m.
311(7)a4 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.28 m thick -
14 days sq.m.
311(7)b1 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.20 m thick -
7 days sq.m.
311(7)b2 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.23 m thick -
7 days sq.m.
311(7)b3 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.25 m thick -
7 days sq.m.
311(7)b4 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.28 m thick -
7 days sq.m.
311(7)c1 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.20 m thick -
3 days sq.m.
311(7)c2 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.23 m thick -
3 days sq.m.
311(7)c3 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.25 m thick -
3 days sq.m.
311(7)c4 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers
(Unreinforced) - 0.28 m thick -
3 days sq.m.
311(8)a1 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.20 m thick - 14 days
sq.m.
311(8)a2 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.23 m thick - 14 days
sq.m.
311(8)a3 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.25 m thick - 14 days
sq.m.
311(8)a4 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.28 m thick - 14 days
sq.m.
311(8)b1 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.20 m thick - 7 days
sq.m.
311(8)b2 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.23 m thick - 7 days
sq.m.
311(8)b3 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.25 m thick - 7 days
sq.m.
311(8)b4 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.28 m thick - 7 days
sq.m.
311(8)c1 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.20 m thick - 3 days
sq.m.
311(8)c2 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.23 m thick - 3 days
sq.m.
311(8)c3 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.25 m thick - 3 days
sq.m.
311(8)c4 Portland Cement Concrete
Pavement with Elasto Barchip-
Synthetic Fibers (Reinforced) -
0.28 m thick - 3 days
sq.m.
311(9)a1 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.20 m
thick - 14 days sq.m.
311(9)a2 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.23
think - 14 days sq.m.
311(9)a3 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.25
thick - 14 days sq.m.
311(9)a4 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - .28
thick - 14 days sq.m.
311(9)b1 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.20
think - 7 days sq.m.
311(9)b2 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.23 m
thick - 7 days sq.m.
311(9)b3 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.25
thick - 7 days sq.m.
311(9)b4 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - .›8
thick - 7 days sq.m.
311(9)c1 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.20 m
thick - 3 days sq.m.
311(9)c2 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.23
thick - 3 days sq.m.
311(9)c3 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.25
thick - 3 days sq.m.
311(9)c4 Portland Cement Concrete
Pavement with Forta-Ferro
Fibers (Unreinforced) - 0.›8
thick - 3 days sq.m.

313(1) Rock Asphalt sq.m.

PART F - BRIDGE CONSTRUCTION

400(1) Untreated Timber Piles,


furnished m.
400(2) Treated Timber Piles,
preservative, furnished m.
400(3)a Steel H-Piles, furnished -
305mmx305mm - 79 kg/m m.
400(3)b Steel H-Piles, furnished -
305mmx305mm - 94 kg/m m.
400(3)c Steel H-Piles, furnished -
305mmx305mm - 110 kg/m
m.
400(3)d Steel H-Piles, furnished -
305mmx305mm - 125 kg/m
m.
400(4)a1 Precast Concrete Piles,
furnished - 400x400 mm m.
400(4)a2 Precast Concrete Piles,
furnished - 450x450 mm m.
400(5)a1 Precast, Prestresssed Concrete
Piles, furnished - 400x400
mm m.
400(5)a2 Precast, Prestresssed Concrete
Piles, furnished - 450x450
mm m.
400(6) Structural Steel Sheet Piles,
furnished m.
400(7) Precast Concrete Sheet Piles,
furnished m.
400(8) Untreated Timber Piles,
driven m.
400(9) Treated Timber Piles, driven
m.
400(10) Steel H-Piles, driven m.
400(11) Steel Pipes Piles m.
400(12) Structural Steel Sheet Piles,
driven m.
400(13) Precast Concrete Sheet Piles,
driven m.
400(14) Precast Concrete Piles, driven
m.
400(15) Precast, Prestresssed Concrete
Piles, driven m.
400(16)a Test Piles, furnished and
driven - 400x400 mm m.
400(16)b Test Piles, furnished and
driven - 450x450 mm m.
400(17)a Concrete Piles cast in Drilled
Holes - 0.8 m.
400(17)b Concrete Piles cast in Drilled
Holes - 0.9 m.
400(17)a Concrete Piles cast in Drilled
Holes - 1 m.
400(17)b Concrete Piles cast in Drilled
Holes - 1.1 m.
400(17)a Concrete Piles cast in Drilled
Holes - 1.2 m.
400(17)b Concrete Piles cast in Drilled
Holes - 1.3 m.
400(17)a Concrete Piles cast in Drilled
Holes - 1.4 m.
400(17)b Concrete Piles cast in Drilled
Holes - 1.5 m.
400(17)a Concrete Piles cast in Drilled
Holes - 1.6 m.
400(17)b Concrete Piles cast in Drilled
Holes - 1.7 m.
400(17)a Concrete Piles cast in Drilled
Holes - 1.8 m.
400(17)b Concrete Piles cast in Drilled
Holes - 1.9 m.
400(17)a Concrete Piles cast in Drilled
Holes - 2 m.
400(17)b Concrete Piles cast in Drilled
Holes - 2.1 m.
400(17)a Concrete Piles cast in Drilled
Holes - 2.2 m.
400(17)b Concrete Piles cast in Drilled
Holes - 2.3 m.
400(17)a Concrete Piles cast in Drilled
Holes - 2.4 m.
400(17)b Concrete Piles cast in Drilled
Holes - 2.5 m.
400(17)a Concrete Piles cast in Drilled
Holes - 2.6 m.
400(17)b Concrete Piles cast in Drilled
Holes - 2.7 m.
400(17)a Concrete Piles cast in Drilled
Holes - 2.8 m.
400(17)b Concrete Piles cast in Drilled
Holes - 2.9 m.
400(17)a Concrete Piles cast in Drilled
Holes - 3 m.
400(17)b Concrete Piles cast in Drilled
Holes - 3.5 m.
400(17)y1 Concrete Piles cast in Drilled
Holes - 3.0 x 6.5 - Oval m.
400(17)y2 Concrete Piles cast in Drilled
Holes - 3.0 x 7.0 - Oval m.
400(17)z Concrete Piles cast in Drilled
Holes - Rectanqular m.
400(18)a Concrete Piles cast in Steel
Shells - 400mm dia. m.
400(18)b Concrete Piles cast in Steel
Shells - 500mm dia. m.
400(19)a Concrete Piles cast in Steel
Pipes - 400mm dia. m.
400(19)b Concrete Piles cast in Steel
Pipes - 500mm dia. m.
400(20) Pile Shoes ea.
400(21) Splices - Splice Can ea.
400(22) Load Tests ea.
400(23)a1 Permanent Casinp - 0.8 -
10mm thick m.
400(23)a2 Permanent Casinp - 0.8 -
12mm thick m.
400(23)a3 Permanent Casinp - 0.8 -
16mm thick m.
400(23)b1 Permanent Casinp - 0.9 -
10mm thick m.
400(23)b2 Permanent Casinp - 0.9 -
12mm thick m.
400(23)b3 Permanent Casinp - 0.9 -
16mm thick m.
400(23)c1 Permanent Casinp - 1 - 10mm
thick m.
400(23)c2 Permanent Casinp - 1 - 12mm
thick m.
400(23)c3 Permanent Casing - 1 - 16mm
thick m.
400(23)d1 Permanent Casinp - 1.1 -
10mm thick m.
400(23)d2 Permanent Casinp - 1.1 -
12mm thick m.
400(23)d3 Permanent Casinq - 1.1 -
16mm thick m.
400(23)e1 Permanent Casinp - 1.2 -
10mm thick m.
400(23)e2 Permanent Casinp - 1.2 -
12mm thick m.
400(23)e3 Permanent Casinp - 1.2 -
16mm thick m.
400(23)f1 Permanent Casinp - 1.3 -
10mm thick m.
400(23)f2 Permanent Casinp - 1.3 -
12mm thick m.
400(23)f3 Permanent Casinp - 1.3 -
16mm thick m.
400(23)91 Permanent Casinp - 1.4 -
10mm thick m.
400(23)g2 Permanent Casinp - 1.4 -
12mm thick m.
400(23)q3 Permanent Casing - 1.4 -
16mm thick m.
400(23)h1 Permanent Casinp - 1.5 -
10mm thick m.
400(23)h2 Permanent Casinp - 1.5 -
12mm thick m.
400(23)h3 Permanent Casinp - 1.5 -
16mm thick m.
400(23)i1 Permanent Casinp - 1.6 -
12mm thick m.
400(23)i2 Permanent Casinp - 1.6 -
16mm thick m.
400(23)j1 Permanent Casinp - 1.7 -
12mm thick m.
400(23)j2 Permanent Casing - 1.7 -
16mm thick m.
400(23)k1 Permanent Casing - 1.8 -
12mm thick m.
400(23)k2 Permanent Casing - 1.8 -
16mm thick m.
400(23)11 Permanent Casing - 1.9 -
12mm thick m.
400(23)12 Permanent Casing - 1.9 -
16mm thick m.
400(23)m1 Permanent Casing - 2 - 12mm
thick m.
400(23)m2 Permanent Casing - 2 - 16mm
thick m.
400(23)n1 Permanent Casing - 2.1 -
12mm thick m.
400(23)n2 Permanent Casing - 2.1 -
16mm thick m.
400(23)o1 Permanent Casing - 2.2 -
12mm thick m.
400(23)o2 Permanent Casing - 2.2 -
16mm thick m.
400(23)p1 Permanent Casing - 2.3 -
12mm thick m.
400(23)p2 Permanent Casing - 2.3 -
16mm thick m.
400(23)q1 Permanent Casing - 2.4 -
12mm thick m.
400(23)q2 Permanent Casing - 2.4 -
16mm thick m.
400(23)r1 Permanent Casing - 2.5 -
16mm thick m.
400(23)r2 Permanent Casing - 2.5 -
20mm thick m.
400(23)s1 Permanent Casing - 2.6 -
16mm thick m.
400(23)s2 Permanent Casinq - 2.6 -
20mm thick m.
400(23)t1 Permanent Casing - 2.7 -
16mm thick m.
400(23)t2 Permanent Casing - 2.7 -
20mm thick m.
400(23)u1 Permanent Casing - 2.8 -
16mm thick m.
400(23)u2 Permanent Casing - 2.8 -
20mm thick m.
400(23)v1 Permanent Casing - 2.9 -
16mm thick m.
400(23)v2 Permanent Casinq - 2.9 -
20mm thick m.
400(23)w1 Permanent Casing - 3 - 16mm
thick m.
400(23)w2 Permanent Casing - 3 - 20mm
thick m.
400(23)x1 Permanent Casing - 3.5 -
16mm thick m.
400(23)x2 Permanent Casing - 3.5 -
20mm thick m.
400(24) Permanent Casing kgs.
400(25) Splicing of R.C. Piles with
Epoxy ea.
400(26)a Pile Integrity Testing -
Crosshole-Sonic ea.
400(26)b Pile Integrity Testing - Low
Strain ea.
400(27) High Strain Dynamic Testinq
(P.D.A) ea.
400(28)a1 Sand Compaction Pile - 0.6 m.
400(28)a2 Sand Compaction Pile - 0.7 m.
400(28)a3 Sand Compaction Pile - 0.8 m.
400(29)a1 Gravel Compaction Pile - 0.6
m.
400(29)a2 Gravel Compaction Pile - 0.7
m.
400(29)a3 Gravel Compaction Pile - 0.8
m.
400(30) Rammed Aggregate Piers cu.m.
400(31) Vibro Stone Columns cu.m.
400(32) Modulus or Uplift Load Tests
ea.
400(33) Steel Casinp l.m.

401(1)a1 Metal Railing - Grade 36 -


Steel m.
401(1)a2 Metal Railing - Grade 50 -
Steel m.
401(1)b Metal Railing - Aluminum m.
401(2)a Concrete Railing - Standard m.
401(2)b Concrete Railing - Balluster m.
401(2)c Concrete Railing - Parapet m.
401(3) Wooden Railing m.
401(4) Stone and Brick Railing m.
401(5) Pedestrian Railing L.S.
402(1) Timber Structure span
402(2) Timber Structure m.

403(1)a1 Structural Steel, furnished -


Grade 36 kgs.
403(1)a2 Structural Steel, furnished -
Grade 50 kgs.
403(2)a1 Structural Steel, fabricated -
Grade 36 kgs.
403(2)a2 Structural Steel, fabricated -
Grade 50 kgs.
403(3)a1 Structural Steel, erected -
Grade36 kgs.
403(3)a2 Structural Steel, erected -
Grade 50 kgs.
403(4)a1 Structural Steel, furnished,
and fabricated - Grade 36 kgs.
403(4)a2 Structural Steel, furnished,
and fabricated - Grade 50 kgs.
403(5)a1 Structural Steel, furnished,
fabricated, and erected -
Grade 36 kgs.
403(5)a2 Structural Steel, furnished,
fabricated, and erected -
Grade 50 kgs.
403(6) Structural Steel, painting
works sq.m.
403(7) Bolts with Nuts and Washers
L.S.
403(8) Rivets L.S.
403(9) Removal and Replacement of
Rivets ea.

404(1)a Reinforcing Steel - Grade 40


kgs.
404(1)b Reinforcing Steel - Grade 60
kgs.

404A(1)a Epoxy-Coated Reinforcing


Steel Bars - Grade 40 kgs.
404A(1)b Epoxy-Coated Reinforcing
Steel Bars - Grade 60 kgs.

405(1)a1 Structural Concrete -


20.68Mpa - A - 7 days cu.m.
405(1)a2 Structural Concrete -
20.68Mpa - A - 14 days cu.m.
405(1)a3 Structural Concrete -
20.68Mpa - A - 28 days cu.m.
405(1)b1 Structural Concrete -
27.58Mpa - A - 7 days cu.m.
405(1)b2 Structural Concrete -
27.58Mpa - A - 14 days cu.m.
405(1)b3 Structural Concrete -
27.58Mpa - A - 28 days cu.m.
405(1)c1 StructuralConcrete - 30.0Mpa -
A - 7 days cu.m.
405(1)c2 StructuralConcrete - 30.0Mpa -
A - I4 days cu.m.
405(1)c3 StructuralConcrete - 30.0Mpa -
A - 28 days cu.m.
405(1)d1 StructuralConcrete - 36.0Mpa -
A - 7 days cu.m.
405(1)d2 StructuralConcrete - 36.0Mpa -
A - I4 days cu.m.
405(1)d3 StructuralConcrete - 36.0Mpa -
A - 28 days cu.m.
405(1)e1 StructuralConcrete - 41.0Mpa -
(Non-shrink) 7 days
cu.m.
405(1)e2 Structural Concrete - 41.0Mpa
- (Non-shrink) 14 days
cu.m.
405(1)e3 Structural Concrete - 41.0Mpa
cu.m.
405(2)a Structural Concrete -
20.68MPa - B cu.m.
405(2)b Structural Concrete - 27.58
Mpa - B cu.m.
405(2)c Structural Concrete - 18.00
Mpa - B cu.m.
405(2)d Structural Concrete - 16.50
Mpa - B cu.m.
405(3)a Structural Concrete -
20.68MPa - C cu.m.
405(3)b Structural Concrete - 27.58
Mpa - C cu.m.
405(4)a1 Structural Concrete - 34.47
Mpa - P - 7 days cu.m.
405(4)a2 Structural Concrete - 34.47
Mpa - P - 14 days cu.m.
405(4)a3 Structural Concrete - 34.47
Mpa - P - 28 days cu.m.
405(4)b1 Structural Concrete - 41.37
Mpa - P - 7 days cu.m.
405(4)b2 Structural Concrete - 41.37
Mpa - P - 14 days cu.m.
405(4)b3 Structural Concrete - 41.37
Mpa - P - 28 days cu.m.
405(4)c1 Structural Concrete - 38.0 Mpa
- P - 7 days cu.m.
405(4)c2 Structural Concrete - 38.0 Mpa
- P - 14 days cu.m.
405(4)c3 Structural Concrete - 38.0 Mpa
- P - 28 days cu.m.
405(5) Seal Concrete cu.m.
405(6) Structural Concrete, painting
works sq.m.
405(7)a Structural Concrete (Box
Girder) - 42.0 Mpa - Y cu.m.
405(7)b Structural Concrete
(Segmental Box Girder) - 55.0
Mpa - Y cu.m.
405(8) Protective Mortar (using PCM
w/ Lithium) sq.m.
405(9)a Structural Precast Concrete - 7
days sq.m.
405(9)b Structural Precast Concrete -
14 days sq.m.
405(9)c Structural Precast Concrete -
28 days sq.m.
405(10)a Structural Precast Concrete - 7
days cu.m.
405(10)b Structural Precast Concrete -
14 days cu.m.
405(10)c Structural Precast Concrete -
28 days cu.m.

406(1)a1 Prestressed Structural


Concrete Members - 9.00 m. -
Type I - I-Girders ea.
406(1)a2 Prestressed Structural
Concrete Members - 10.00 m.
- Type I - I-Girders ea.
406(1)a3 Prestressed Structural
Concrete Members - 11.00 m.
- Type I - I-Girders ea.
406(1)b1 Prestressed Structural
Concrete Members - 11.00 m.
- Type II - I-Girders ea.
406(1)b2 Prestressed Structural
Concrete Members - 12.00 m.
- Type II - I-Girders ea.
406(1)b3 Prestressed Structural
Concrete Members - 13.00 m.
- Type II - I-Girders ea.
406(1)b4 Prestressed Structural
Concrete Members - 14.00 m.
- Type II - I-Girders ea.
406(1)b5 Prestressed Structural
Concrete Members - 15.00 m.
- Type II - I-Girders ea.
406(1)c1 Prestressed Structural
Concrete Members - 15.00 m.
- Type III - I-Girders ea.
406(1)c2 Prestressed Structural
Concrete Members - 16.00 m.
- Type III - I-Girders ea.
406(1)c3 Prestressed Structural
Concrete Members - 17.00 m.
- Type III - I-Girders ea.
406(1)c4 Prestressed Structural
Concrete Members - 18.00 m.
- Type III - I-Girders ea.
406(1)c5 Prestressed Structural
Concrete Members - 19.00 m.
- Type III - I-Girders ea.
406(1)c6 Prestressed Structural
Concrete Members - 20.00 m.
- Type III - I-Girders ea.
406(1)c7 Prestressed Structural
Concrete Members - 21.00 m.
- Type III - I-Girders ea.
406(1)d1 Prestressed Structural
Concrete Members - 19.00 m.
- Type IV - I-Girders ea.
406(1)d2 Prestressed Structural
Concrete Members - 20.00 m.
- Type IV - I-Girders ea.
406(1)d3 Prestressed Structural
Concrete Members - 21.00 m.
- Type IV - I-Girders ea.
406(1)d4 Prestressed Structural
Concrete Members - 22.00 m.
- Type IV - I-Girders ea.
406(1)d5 Prestressed Structural
Concrete Members - 23.00 m.
- Type IV - I-Girders ea.
406(1)d6 Prestressed Structural
Concrete Members - 24.00 m.
- Type IV - I-Girders ea.
406(1)d7 Prestressed Structural
Concrete Plembers - 25.00 m.
- Type IV - I-Girders ea.
406(1)d8 Prestressed Structural
Concrete Members - 26.00 m.
- Type IV - I-Girders ea.
406(1)d9 Prestressed Structural
Concrete Members - 27.00 m.
- Type IV - I-Girders ea.
406(1)e1 Prestressed Structural
Concrete Members - 23.00 m.
- Type IV-A - I-Girders ea.
406(1)e2 Prestressed Structural
Concrete Members - 24.00 m.
- Type IV-A - I-Girders ea.
406(1)e3 Prestressed Structural
Concrete Members - 25.00 m.
- Type IV-A - I-Girders ea.
406(1)e4 Prestressed Structural
Concrete Plembers - 26.00 m.
- Type IV-A - I-Girders ea.
406(1)e5 Prestressed Structural
Concrete Nlembers - 27.00 m.
- Type IV-A - I-Girders ea.
406(1)e6 Prestressed Structural
Concrete Nlembers - 28.00 m.
- Type IV-A - I-Girders ea.
406(1)e7 Prestressed Structural
Concrete Members - 29.00 m.
- Type IV-A - I-Girders ea.
406(1)e8 Prestressed Structural
Concrete Members - 30.00 m.
- Type IV-A - I-Girders ea.
406(1)f1 Prestressed Structural
Concrete Members - 23.00 m.
- Type IV-B - I-Girders ea.
406(1)f2 Prestressed Structural
Concrete Members - 24.00 m.
- Type IV-B - I-Girders ea.
406(1)f3 Prestressed Structural
Concrete Plembers - 25.00 m.
- Type IV-B - I-Girders ea.
406(1)f4 Prestressed Structural
Concrete Nlembers - 26.00 m.
- Type IV-B - I-Girders ea.
406(1)f5 Prestressed Structural
Concrete Members - 27.00 m.
- Type IV-B - I-Girders ea.
406(1)f6 Prestressed Structural
Concrete Members - 28.00 m.
- Type IV-B - I-Girders ea.
406(1)f7 Prestressed Structural
Concrete Members - 29.00 m.
- Type IV-B - I-Girders ea.
406(1)f8 Prestressed Structural
Concrete Members - 30.00 m.
- Type IV-B - I-Girders ea.
406(1)f9 Prestressed Structural
Concrete Members - 31.00 m.
- Type IV-B - I-Girders ea.
406(1)f10 Prestressed Structural
Concrete Members - 32.00 m.
- Type IV-B - I-Girders ea.
406(1)f11 Prestressed Structural
Concrete Members - 33.00 m.
- Type IV-B - I-Girders ea.
406(1)f12 Prestressed Structural
Concrete Members - 34.00 m.
- Type IV-B - I-Girders ea.
406(1)p1 Prestressed Structural
Concrete Members - 26.00 m.
- Type V - I-Girders ea.
406(1)p2 Prestressed Structural
Concrete Members - 27.00 m.
- Type V - I-Girders ea.
406(1)p3 Prestressed Structural
Concrete Members - 28.00 m.
- Type V - I-Girders ea.
406(1)p4 Prestressed Structural
Concrete Members - 29.00 m.
- Type V - I-Girders ea.
406(1)p5 Prestressed Structural
Concrete Members - 30.00 m.
- Type V - I-Girders ea.
406(1)p6 Prestressed Structural
Concrete Members - 31.00 m.
- Type V - I-Girders ea.
406(1)p7 Prestressed Structural
Concrete Members - 32.00m. -
Type V - I-Girders
ea.
406(1)p8 Prestressed Structural
Concrete Members - 33.00m. -
Type V - I-Girders
ea.
406(1)p9 Prestressed Structural
Concrete Members - 34.00m. -
Type V - I-Girders
ea.
406(1)p10 Prestressed Structural
Concrete Members - 35.00m. -
Type V - I-Girders
ea.
406(1)p11 Prestressed Structural
Concrete Members - 36.00m. -
Type V - I-Girders
ea.
406(1)p12 Prestressed Structural
Concrete Members - 37.00 m.
- Type V - I-Girders ea.
406(1)h1 Prestressed Structural
Concrete Members - 33.00 m.
- Type VI - I-Girders ea.
406(1)h2 Prestressed Structural
Concrete Members - 34.00 m.
- Type VI - I-Girders ea.
406(1)h3 Prestressed Structural
Concrete Members - 35.00 m.
- Type VI - I-Girders ea.
406(1)h4 Prestressed Structural
Concrete Members - 36.00 m.
- Type VI - I-Girders ea.
406(1)h5 Prestressed Structural
Concrete Members - 37.00 m.
- Type VI - I-Girders ea.
406(1)h6 Prestressed Structural
Concrete Members - 38.00 m.
- Type VI - I-Girders ea.
406(1)h7 Prestressed Structural
Concrete Plembers - 39.00 m.
- Type VI - I-Girders ea.
406(1)h8 Prestressed Structural
Concrete Plembers - 40.00 m.
- Type VI - I-Girders ea.
406(1)h9 Prestressed Structural
Concrete Members - 41.00 m.
- Type VI - I-Girders ea.
406(1)h10 Prestressed Structural
Concrete Members - 42.00 m.
- Type VI - I-Girders ea.
406(1)h11 Prestressed Structural
Concrete Members - 43.00 m.
- Type VI - I-Girders ea.
406(1)h12 Prestressed Structural
Concrete Members - 44.00 m.
- Type VI - I-Girders ea.
406(1)h13 Prestressed Structural
Concrete Plembers - 45.00 m.
- Type VI - I-Girders ea.
406(2)a Prestressed Concrete - T-
Girder #N/A
406(2)b Prestressed Concrete - Box
Girder cu.m.
406(3) Installation, Tensioning and
Grouting of Prestressing Steel
- Box Girder
ea.

407(1) Concrete (Refer to Item 405) -


A cu.m.
407(2) Concrete Post/Baluster
Railings (Refer to Item 401)
ea.
407(3) Parapet Walls #N/A
407(4) Piling (Refer to Item 400) l.m.
407(5) Structure Excavation (Refer to
Item 103) cu.m.
407(6) Sidewalk Concrete (Refer to
Item 601) cu.m.
407(7) Reinforcing Steel Bars (Refer
to Item 404) - Grade 40
kgs.
407(8) Lean Concrete (Refer to Item
901) - Class B (16.5 Mpa)
cu.m.
*When more than

408(1) Steel Bridges L.S.

409(1) Welded Structural Steel L.S.


409(2) Tightening/Retightening of
High Tension Bolt kgs.
410(1) Timber cu.m.
410(2) Treated Timber cu.m.

411(1) Paint L.S.


411(2) Paint sq.m.

412(1) Elastomeric Bearing Pads ea.


412(2) Disk Rubber Bearing Shoe -
Steel Box Girder ea.

413(1) Preformed Sponge Rubber


Joint Expansion cu.m.
413(2) Preformed Cork 3oint
Expansion cu.m.
413(3)a Premolded Expansion Joint
Filler with Sealant - 12 mm cu.m.
413(3)b Premolded Expansion Joint
Filler with Sealant - 50 mm cu.m.
413(4)a Expansion Joint l.m.
413(4)b Expansion Joint - Steel Finger
Type l.m.
413(4)c Expansion Joint - Aluminum
Cast l.m.
413(4)d Expansion Joint - Strip Seal l.m.
413(4)e Expansion Joint - Compression
Seal l.m.
413(4)f Expansion Joint - Rubber
(Multiplex)
Expansion Joints l.m.
413(5) Elastomeric, Hot-Applied
Expansion Joint Sealant
(with Single-Sized Aggregates)
- Modular Expansion Device
l.m.
413(6)a Asphaltic Plug Joints (APJ) for
Bridges ea.
413(6)a Asphaltic Plug Joints (APJ) for
Bridges ea.
413(7)a1 Expansion Dam for Bridges -
Steel - Transverse sets
413(7)a2 Expansion Dam for Bridges -
Steel - Longitudinal sets
413(8) Expansion Joint - Steel Finger
Type kgs.

414(1) Forms and Falsework L.S.

415(1) Cable Restrainer L.S.


415(2) Cable Restrainer ea.

416(1)a Carbon Fiber - 1 Layer sq.m.


416(1)b Carbon Fiber - 2 Layers sq.m.
416(1)c Carbon Fiber - 3 Layers sq.m.
416(1)d Carbon Fiber - 4 Layers sq.m.
416(1)e Carbon Fiber - Plate sq.m.
416(2) Carbon Fiber L.S.
416(3)a Aramid Fiber - 1 Layer sq.m.
416(3)b Aramid Fiber - 2 Layers sq.m.
416(3)c Aramid Fiber - 3 Layers sq.m.
416(3)d Aramid Fiber - 4 Layers sq.m.
416(4) Aramid Fiber L.S.
416(5) Glass Fiber - Sheet sq.m.
416(6) Glass Fiber L.S.

417(1)a Bearing Devices - Steel


Bearing ea.
417(1)b Bearing Devices - Rubber
Bearing ea.
417(1)c Bearing Devices - High
Damping Rubber ea.

418(1) Bridqe Steel deck sq.m.


418(2) Bridoe Steel deck kgs.
419(1) Corruqated Steel Plate kgs.
419(2) Corrugated Steel Plate sq.m.

PART G - DRAINAGE AND SLOPE P

500(1)a1 Pipe Culverts - 610 mm dia. -


Class II - RCPC l.m.
500(1)a2 Pipe Culverts - 760 mm dia. -
Class II - RCPC l.m.
500(1)a3 Pipe Culverts - 910 mm dia. -
Class II - RCPC l.m.
500(1)a4 Pipe Culverts - 1070 mm dia. -
Class II - RCPC l.m.
500(1)a5 Pipe Culverts - 1220 mm dia. -
Class II - RCPC l.m.
500(1)a6 Pioe Culverts - 1520 mm dia. -
Class II - RCPC l.m.
500(1)b1 Pipe Culverts - 610 mm dia. -
Class IV - RCPC l.m.
500(1)b2 Pipe Culverts - 760 mm dia. -
Class IV - RCPC l.m.
500(1)b3 Pipe Culverts - 910 mm dia. -
Class IV - RCPC l.m.
500(1)b4 Pipe Culverts - 1070 mm dia. -
Class IV - RCPC l.m.
500(1)b5 Pipe Culverts - 1220 mm dia. -
Class IV - RCPC l.m.
500(1)b6 Pipe Culverts - 1520 mm dia. -
Class IV - RCPC l.m.
500(1)b7 Pipe Culverts - 1830 mm dia. -
Class IV - RCPC l.m.
500(2) Storm Drain l.m.
500(3)a Lined Canal - Rectangular -
CHB l.m.
500(3)b1 Lined Canal - Rectanqular -
Concrete l.m.
500(3)b2 Lined Canal - V-Shape -
Concrete l.m.
500(3)c1 Lined Canal - Rectangular -
Masonry l.m.
500(3)c2 Lined Canal - V-Shape -
Masonry l.m.
501(1) Underdrain - 150 mm dia. l.m.
501(2) Blind drain l.m.
501(3) Granular backfill filter material
for underdrains cu.m.
501(4) Underdrain L.S.
501(5) Blind drain L.S.

502(1)a1 Manholes - 610 mm dia. -


Concrete ea.
502(1)a2 Manholes - 760 mm dia. -
Concrete ea.
502(1)a3 Manholes - 910 mm dia. -
Concrete ea.
502(1)a4 Manholes - 1070 mm dia. -
Concrete ea.
502(1)a5 Manholes - 1220 mm dia. -
Concrete ea.
502(1)a6 Manholes - 1520 mm dia. -
Concrete ea.
502(1)a7 Manholes - 1830 mm dia. -
Concrete ea.
502(1)b1 Manholes - 610 mm dia. - CHB
ea.
502(1)b2 Manholes - 760 mm dia. - CHB
ea.
502(1)b3 Manholes - 910 mm dia. - CHB
ea.
502(1)b4 Manholes - 1070 mm dia. -
CHB ea.
502(1)b5 manholes - 1220 mm dia. -
CHB ea.
502(1)b6 Manholes - 1520 mm dia. -
CHB ea.
502(1)b7 Manholes - 1830 mm dia. -
CHB ea.
502(2)a1 Inlets, type - 610 mm dia. ea.
502(2)a2 Inlets, type - 760 mm dia. ea.
502(2)a3 Inlets, type - 910 mm dia. ea.
502(2)a4 Inlets, type - 1070 mm dia.
ea.
502(2)a5 Inlets, type - 1220 mm dia.
ea.
502(2)a6 Inlets, type - 1520 mm dia.
ea.
502(2)a7 Inlets, type - 1830 mm dia.
ea.
502(3)a1 Catch basins - 610 mm dia. ea.
502(3)a2 Catch basins - 760 mm dia. ea.
502(3)a3 Catch basins - 910 mm dia. ea.
502(3)a4 Catch basins - 1070 mm dia.
ea.
502(3)a5 Catch basins - 1220 mm dia.
ea.
502(3)a6 Catch basins - 1520 mm dia.
ea.
502(3)a7 Catch basins - 1830 mm dia.
ea.
502(4)a1 Concrete covers - 610 mm dia.
ea.
502(4)a2 Concrete covers - 760 mm dia.
ea.
502(4)a3 Concrete covers - 910 mm dia.
ea.
502(4)a4 Concrete covers - 1070 mm
dia. ea.
502(4)a5 Concrete covers - 1220 mm
dia. ea.
502(4)a6 Concrete covers - 1520 mm
dia. ea.
502(4)a7 Concrete covers - 1830 mm
dia. ea.
502(5) Metal frames and gratings,
type pairs
502(6) Metal frames and covers pairs
502(7) Adjusting manholes ea.
502(8) Adjusting catch basin ea.
502(9) Berm Ditch Gutter l.m.
502(10) U-Type Vertical Slope Ditch -
Precast l.m.
502(11) Splash Pad - Precast ea.

503(1) PletaI frames and grating sets


503(2) Metal frames and grating kgs.

504(1)a Removing, cleaning,


stockpiling salvaged culvert
pipe - 610 mm dia. l.m.
504(1)b Removing, cleaning,
stockpiling salvaged culvert
pipe - 760 mm dia. l.m.
504(1)a Removing, cleaning,
stockpiling salvaged culvert
pipe - 910 mm dia. l.m.
504(1)b Removing, cleaning,
stockpiling salvaged culvert
pipe - 1070 mm dia. l.m.
504(1)a Removing, cleaning,
stockpiling salvaged culvert
pipe - 1220 mm dia. l.m.
504(1)b Removing, cleaning,
stockpiling salvaged culvert
pipe - 1520 mm dia. l.m.
504(2)a Removing, cleaning, and
relaying salvaged culvert
pipe - 610 mm dia. l.m.
504(2)b Removing, cleaning, and
relaying salvaged culvert
pipe - 760 mm dia. l.m.
504(2)a Removing, cleaning, and
relaying salvaged culvert
pipe - 910 mm dia. l.m.
504(2)b Removing, cleaning, and
relaying salvaged culvert
pipe - 1070 mm dia. l.m.
504(2)a Removing, cleaning, and
relaying salvaged culvert
pipe - 1220 mm dia. l.m.
504(2)b Removing, cleaning, and
relaying salvaged culvert
pipe - 1520 mm dia. l.m.
504(3)a Cleaning culvert pipe in place -
610 mm dia., half-
silted l.m.
504(3)b Cleaning culvert pipe in place -
760 mm dia., half-
silted l.m.
504(3)a Cleaning culvert pipe in place -
910 mm dia., half-
silted l.m.
504(3)b Cleaning culvert pipe in place -
1070 mm dia., half-
silted l.m.
504(3)a Cleaning culvert pipe in place -
1220 mm dia., half-
silted l.m.
504(3)b Cleaning culvert pipe in place -
1520 mm dia., half-
silted l.m.
504(4) Reconditioninq drainaqe
structures ea.
504(5) Cleaning/Reconditioninp of
drainage structures L.S.

505(1)a Riprap - A cu.m.


505(1)b Riprap - B cu.m.
505(1)c Riprap - C cu.m.
505(1)d Riprap cu.m.
505(2)a Grouted Riprap - A cu.m.
505(2)b Grouted Riprap - B cu.m.
505(2)c Grouted Riprap - c cu.m.
505(2)d Grouted Riprap - D cu.m.
505(3) Filter layer of granular
material cu.m.

506(1) Stone Masonry cu.m.

507(1) Rubble Concrete cu.m.

508(1) Hand-Laid Rock Embankment


cu.m.

509(1)a1 Sheet Piles - Timber -


Furnished and Driven l.m.
509(1)b1 Sheet Piles - Steel - Slope
Protection l.m.
509(1)b2 Sheet Piles - Steel -
Cofferdamming l.m.
509(1)c1 Sheet Piles - Concrete -
Furnished l.m.
509(1)c2 Sheet Piles - Concrete - Driven
l.m.
509(1)c3 Sheet Piles - Concrete -
Furnished and Driven l.m.
509(1)d1 Sheet Piles - PVC - Furnished
l.m.
509(1)d2 Sheet Piles - PVC - Driven l.m.

510(1) Bed Course Granular Material


Concrete cu.m.
510(2) Concrete - Slope Protection cu.m.

511(1)a1 Gabions - 0.5m x Inn x 3m -


Metallic Coated cu.m.
511(1)a2 Gabions - 0.5m x Inn x 4m -
Metallic Coated cu.m.
511(1)a3 Gabions - 1m x 1m x 2m -
Metallic Coated cu.m.
511(1)a4 Gabions - 1m x 1m x 3m -
Metallic Coated cu.m.
511(1)a5 Gabions - 1m x 1m x 4m -
Metallic Coated cu.m.
511(1)a6 Gabions - 0.5m x Inn x 2m -
Metallic Coated cu.m.
511(1)b1 Gabions - 0.5m x Inn x 3m -
PVC Coated cu.m.
511(1)b2 Gabions - 0.5m x Inn x 4m -
PVC Coated cu.m.
511(1)b3 Gabions - 1m x 1m x 2m - PVC
Coated cu.m.
511(1)b4 Gabions - 1m x 1m x 3m - PVC
Coated cu.m.
511(1)b5 Gabions - 1m x 1m x 4m - PVC
Coated cu.m.
511(1)b6 Gabions - 0.5m x Inn x 2m -
PVC Coated cu.m.
511(2)a1 Mattresses - 0.3m x 2m x 6m -
Metallic Coated cu.m.
511(2)a2 Mattresses - 0.3m x 2m x 6m
- PVC Coated cu.m.
511(3) Filter Cloth sq.m.
511(4)a1 Polyester Net Gabion - 1 tonne
- Type I ea.
511(4)a2 Polyester Net Gabion - 2
tonnes - Type I ea.
511(4)a3 Polyester Net Gabion - 3
tonnes - Type I ea.
511(4)a4 Polyester Net Gabion - 4
tonnes - Type I ea.
511(4)b1 Polyester Net Gabion - 1 tonne
- Type II ea.
511(4)b2 Polyester Net Gabion -2
tonnes - Type II ea.
511(4)b3 Polyester Net Gabion -3
tonnes - Type II ea.
511(4)b4 Polyester Net Gabion -4
tonnes - Type II ea.
511(4)b5 Polyester Net Gabion -5
tonnes - Type II ea.
511(4)b6 Polyester Net Gabion -6
tonnes - Type II ea.

512(1)a Erosion Control Mat - Type 1


sq.m.
512(1)b Erosion Control Mat - Type 2
sq.m.
512(1)c Erosion Control Mat - Type 3
sq.m.
512(1)d Erosion Control Mat - Type 4
sq.m.
512(1)e Erosion Control Mat - Type 5
sq.m.
512(2) Rovinp sq.m.
512(3) Cellular Confinement Systems
sq.m.

513(1) Permanent Ground Anchor l.m.

514(1) Shotcrete with reinforcing


steel sq.m.
514(2) Shotcrete with reinforcing
fibers sq.m.

515(1) Mechanically-Stabilized Earth


(MSE) Retaining Walls sq.m.
515(2) Select Granular Backfill cu.m.
515(3) Structural Backfill cu.m.
516(1) Wet Stone Masonry l.m.
516(2) Wet Stone Masonry cu.m.

517(1)a Drain Pipe - Galvanized l.m.


517(1)b Drain Pipe - PVC l.m.
517(2) Replacement of Drain Pipe L.S.
517(3)a Deck Drain - Type-1 - Cast
Iron ea.
517(3)b Deck Drain - Type-2 - Cast
Iron ea.

520(1) Hydroseeding sq.m.

522(1) Rockfall Netting sq.m.


522(2) Rockfall Barrier l.m.

522A(1) Active Protection System sq.m.


522A(2) Passive/Rockfall Barrier l.m.

522B(1) Landslide Protection System


sq.m.

PART H – MISCELLANEOUS STRUC

600(1) Concrete Curb - Cast in place


l.m.
600(2) Asphalt Curb - Cast in place l.m.
600(3) Concrete Gutter - Cast in place
l.m.
600(4) Curb and Gutter - Cast in
place l.m.
600(5) Concrete Curb - Precast pcs.
600(6) Concrete Gutter - Precast pcs.
600(7) Curb and Gutter - Precast pcs.

601(1) Sidewalk - 100mm thick - Cast


in place sq.m.

602(1)a Right-of-Way monuments -


Timber ea.
602(1)b Right-of-Way monuments -
Concrete ea.
602(2)a Maintenance marker posts -
Cast-in-place ea.
602(2)b Maintenance marker posts -
Precast ea.
602(2)c Maintenance marker posts -
Timber ea.
602(3)a Kilometer posts - Cast-in-place
ea.
602(3)b Kilometer posts - Precast ea.
602(4)a Guide Posts - 1000±50 high,
100mm±5 wide,
50mm±5 thick,
500mm depth (min) - Timber
with 3" dia. (75mm) reflector

ea.
602(4)b1 Guide Posts - 1000±50 high,
100mm±5 wide,
50mm±5 thick,
350mm depth (min) - Flexible
- Non-timber with 3" dia.
(75mm) reflector

ea.
602(4)b2 Guide Posts - 1000±50 high,
100mm±5 wide,
50mm±5 thick,
350mm depth (min) - Semi-
flexible - Non-timber with 3"
dia.
(75mm) reflector
ea.
602(4)b3 Guide Posts - 1000±50 high,
100mm±5 wide,
50mm±5 thick,
500mm depth (min) - Rigid -
Non-timber with 3" dia.
(75mm) reflector
ea.
602(5) Precast Guide posts -
Rectangular ea.
602(6) Cast-in-place Guide posts ea.

603(1) Guardrail (Wire rope or Wire


cable) l.m.
603(2) Cable Guardrail (Chain Link
Fabric) l.m.
603(3)a1 Metal Guardrail (Metal Beam)
Including Post - Single - W-
Beam l.m.
603(3)a2 Metal Guardrail (Metal Beam)
Including Post - Single - Thrie-
Beam l.m.
603(3)b1 Metal Guardrail (Metal Beam)
Including Post - Double - W-
Beam l.m.
603(3)b2 Metal Guardrail (Metal Beam)
Including Post - Double -
Thrie-Beam l.m.
603(4)a Metal Beam End Piece - Fish
Tail ea.
603(4)b Metal Beam End Piece - Bull
Nose ea.
603(4)c Metal Beam End Piece -
Eccentric Loader
Breakaway Cable Terminal
(ELTJ ea.
603(5) Guardrail (Timber) l.m.
603(6)a Installation of Metal Guardrail
(Metal Beam) Including Post -
W-Beam l.m.
603(6)b Installation of Metal Guardrail
(Metal Beam) Including Post -
Thrie-Beam
l.m.

604(1) Fencing Barbed wire l.m.


604(2) Fencing Chain Link Fence
Fabric l.m.
604(3) Fencing Posts ea.
604(4) Fencing Gates ea.
604(5) Concrete Fence including Post
sq.m.
604(6) Precast Concrete Fencing
including Post sq.m.
604(7) Precast Concrete Fencing
including Post ea.

605(1)a1 Warning Signs - 600 mm -


W1-1A - Horizontal Alignment
Sharp Turn L or R
ea.
605(1)a2 Warning Signs - 750 mm -
W1-1B - Horizontal Alignment
Sharp Turn L or R
ea.
605(1)a3 Warning Signs - 900 mm -
W1-1C - Horizontal Alignment
Sharp Turn L or R
ea.
605(1)b1 Warning Signs - 600 mm -
W1-2A - Horizontal Alignment
Reverse Turn L or R
ea.
605(1)b2 Warning Signs - 750 mm -
W1-2B - Horizontal Alignment
Reverse Turn L or R
ea.
605(1)b3 Warning Signs - 900 mm -
W1-2C - Horizontal Alignment
Reverse Turn L or R
ea.
605(1)c1 Warning Signs - 600 mm -
W1-3A - Horizontal Alignment
Curve L or R ea.
605(1)c2 Warning Signs - 750 mm -
W1—3B - Horizontal Alignment
Curve L or R ea.
605(1)c3 Warning Signs - 900 mm -
W1-3C - Horizontal Alignment
Curve L or R ea.
605(1)d1 Warning Signs - 600 mm -
W1-4A - Horizontal Alignment
Reverse Curve L or R
ea.
605(1)d2 Warning Signs - 750 mm -
W1-4B - Horizontal Alignment
Reverse Curve L or R
ea.
605(1)d3 Warning Signs - 900 mm -
W1-4C - Horizontal Alignment
Reverse Curve L or R
ea.
605(1)e1 Warning Signs - 600 mm -
W1-5A - Horizontal Alignment
Winding Road L or R
ea.
605(1)e2 Warning Signs - 750 mm -
W1-5B - Horizontal Alignment
Winding Road L or R
ea.
605(1)f1 Warning Signs - 600 mm -
W1-6A - Horizontal Alignment
Hairpin Bend L or R
ea.
605(1)f2 Warning Signs - 750 mm -
W1-6B - Horizontal Alignment
Hairpin Bend L or R
ea.
605(1)g1 Warning Signs - 450 mm -
W2-1A - Intersection and
Junction Signs Cross Road ea.
605(1)g2 Warning Signs - 600 mm -
W2-1B - Intersection and
Junction Signs Cross Road ea.
605(1)g3 Warning Signs - 750 mm -
W2-1C - Intersection and
Junction Signs Cross Road ea.
605(1)g4 Warning Signs - 900 mm -
W2-1D - Intersection and
Junction Signs Cross Road ea.
605(1)h1 Warning Signs - 450 mm -
W2-2A - Intersection and
function Signs Staggered Side
Road Junction L or R ea.
605(1)h2 Warning Signs - 600 mm -
W2-2B - Intersection and
function Signs Staggered Side
Road Junction L or R ea.
605(1)h3 Warning Signs - 750 mm -
W2-2C - Intersection and
function Signs Staggered Side
Road Junction L or R ea.
605(1)h4 Warning Signs - 900 mm -
W2-2D - Intersection and
function Signs Staggered Side
Road Junction L or R ea.
605(1)i1 Warning Signs - 600 mm -
W2-3A - Intersection and
Junction Signs Skewed
Intersection ea.
605(1)i2 Warning Signs - 750 mm -
W2-3B - Intersection and
Junction Signs Skewed
Intersection ea.
605(1)i3 Warning Signs - 900 mm -
W2-3C - Intersection and
Junction Signs Skewed
Intersection ea.
605(1)j1 Warning Signs - 450 mm -
W2-4A - Intersection and
Junction Signs T- Junction ea.
605(1)j2 Warning Signs - 600 mm -
W2-4B - Intersection and
function Signs T-Junction ea.
605(1)j3 Warning Signs - 750 mm -
W2-4C - Intersection and
function Signs T-Junction ea.
605(1)j4 Warning Signs - 900 mm -
W2-4D - Intersection and
function Signs T-Junction ea.
605(1)k1 Warning Signs - 450 mm -
W2-5A - Intersection and
function Signs Y-Junction ea.
605(1)k2 Warning Signs - 600 mm -
W2-5B - Intersection and
function Signs Y-Junction ea.
605(1)k3 Warning Signs - 750 mm -
W2-5C - Intersection and
function Signs Y-Junction ea.
605(1)k4 Warning Signs - 900 mm -
W2-5D - Intersection and
function Signs Y-Junction ea.
605(1)l1 Warning Signs - 450 mm -
W2-6A - Intersection and
Junction Signs Side Road
Junction L or R ea.
605(1)l2 Warning Signs - 600 mm -
W2-6B - Intersection and
Junction Signs Side Road
Junction L or R ea.
605(1)l3 Warning Signs - 750 mm -
W2-6C - Intersection and
Junction Signs Side Road
Junction L or R ea.
605(1)l4 Warning Signs - 900 mm -
W2-6D - Intersection and
Junction Signs Side Road
Junction L or R ea.
605(1)m1 Warning Signs - 450 mm -
W2-7A - Intersection and
Junction Signs Runabout
Ahead ea.
605(1)m2 Warning Signs - 600 mm -
W2-7B - Intersection and
Junction Signs Runabout
Ahead ea.
605(1)m3 Warning Signs - 750 mm -
W2-7C - Intersection and
Junction Signs Runabout
Ahead ea.
605(1)n1 Warning Signs - 600 mm -
W2-8B - Intersection and
Junction Signs Priority
Junction ea.
605(1)n2 Warning Signs - 750 mm -
W2-8C - Intersection and
Junction Signs Priority
Junction ea.
605(1)n3 Warning Signs - 900 mm -
W2-8D - Intersection and
Junction Signs Priority
Junction ea.
605(1)o1 Warning Signs - 600 mm -
W2-9B - Intersection and
Junction Signs Priority Merging
ea.
605(1)o2 Warning Signs - 750 mm -
W2-9C - Intersection and
Junction Signs Priority Merging
ea.
605(1)o3 Warning Signs - 900 mm -
W2-9D - Intersection and
Junction Signs Priority Merging
ea.
605(1)p1 Warning Signs - 450 mm -
W2-10A - Intersection and
Junction Signs Priority Cross ea.
605(1)p2 Warning Signs - 600 mm -
W2-10B - Intersection and
Junction Signs Priority Cross ea.
605(1)p3 Warning Signs - 750 mm -
W2-10C - Intersection and
Junction Signs Priority Cross ea.
605(1)p4 Warning Signs - 900 mm -
W2-10D - Intersection and
Junction Signs Priority Cross ea.
605(1)q1 Warning Signs - 600 mm -
W3-1A - Advance Warning of
Traffic Control Device Signs
Signals Ahead ea.
605(1)q2 Warning Signs - 750 mm -
W3-1B - Advance Warning of
Traffic Control Device Signs
Signals Ahead ea.
605(1)q3 Warning Signs - 900 mm -
W3-1C - Advance Warning of
Traffic Control Device Signs
Signals Ahead ea.
605(1)q4 Warning Signs - 1200 mm -
W3-1D - Advance Warning of
Traffic Control Device Signs
Signals Ahead ea.
605(1)r1 Warning Signs - 450 mm -
W3-2A - Advance Warning of
Traffic Control Device Signs
Stop Sign Ahead ea.
605(1)r2 Warning Signs - 600 mm -
W3-2B - Advance Warning of
Traffic Control Device Signs
Stop Sign Ahead ea.
605(1)s1 Warning Signs - 750 mm -
W3-2C - Advance Warning of
Traffic Control Device Signs
Stop Sign Ahead ea.
605(1)s2 Warning Signs - 450 mm -
W3-3A - Advance Warning of
Traffic Control Device Signs
Give Way Sign Ahead ea.
605(1)s3 Warning Signs - 600 mm -
W3-3B - Advance Warning of
Traffic Control Device Signs
Give Way Sign Ahead ea.
605(1)s4 Warning Signs - 750 mm -
W3-3C - Advance Warning of
Traffic Control Device Signs
Give Way Sign Ahead ea.
605(1)t1 Warning Signs - 450 mm -
W4-1A - Road Width Sign
Narrow Bridge ea.
605(1)t2 Warning Signs - 600 mm -
W4-1B - Road Width Sign
Narrow Bridge ea.
605(1)t3 Warning Signs - 750 mm -
W4-1C - Road Width Sign
Narrow Bridge ea.
605(1)t4 Warning Signs - 450 x 700
mm - W4-IPA - Road Width
Sign Narrow Bridge ea.
605(1)t5 Warning Signs - 600 x 900
mm - W4-1PB - Road Width
Sign Narrow Bridge ea.
605(1)t6 Warning Signs - 750 x 1200
mm - W4-IPC - Road Width
Sign Narrow Bridge ea.
605(1)u1 Warning Signs - 450 mm -
W4-2A - Road Width Sign
Road Narrows ea.
605(1)u2 Warning Signs - 600 mm -
W4-2B - Road Width Sign
Road Narrows ea.
605(1)u3 Warning Signs - 750 mm -
W4-2C - Road Width Sign
Road Narrows ea.
605(1)u4 Warning Signs - 450x700 mm
- W4-2PA - Road Width Sign
Road Narrows ea.
605(1)u5 Warning Signs - 600 x 900
mm - W4-2PB - Road Width
Sign Road Narrows ea.
605(1)u6 Warning Signs - 750 x 1200
mm - W4-2PC - Road Width
Sign Road Narrows ea.
605(1)V1 Warning Signs - 450 mm -
W4-3A - Road Width Sign
Divided Road ea.
605(1)v2 Warning Signs - 600 mm -
W4-3B - Road Width Sign
Divided Road ea.
605(1)v3 Warning Signs - 750 mm -
W4-3C - Road Width Sign
Divided Road ea.
605(1)v4 Warning Signs - 900 mm -
W4-3D - Road Width Sign
Divided Road ea.
605(1)w1 Warning Signs - 450 mm -
W4-4A - Road Width Sign End
Divided Road ea.
605(1)w2 Warning Signs - 600 mm -
W4-4B - Road Width Sign End
Divided Road ea.
605(1)w3 Warning Signs - 750 mm -
W4-4C - Road Width Sign End
Divided Road ea.
605(1)w4 Warning Signs - 900 mm -
W4-4D - Road Width Sign End
Divided Road ea.
605(1)x1 Warning Signs - 600 mm -
W5-1B - Road Obstacle Signs
Opening Bridge ea.
605(1)x2 Warning Signs - 750 mm -
W5-1C - Road Obstacle Signs
Opening Bridge ea.
605(1)y1 Warning Signs - 450 mm -
W5-2A - Road Obstacle Signs
Uneven Road ea.
605(1)y2 Warning Signs - 600 mm -
W5-2B - Road Obstacle Signs
Uneven Road ea.
605(1)y3 Warning Signs - 750 mm -
W5-2C - Road Obstacle Signs
Uneven Road ea.
605(1)y4 Warning Signs - 900 mm -
W5-2D - Road Obstacle Signs
Uneven Road ea.
605(1)z1 Warning Signs - 450 mm -
W5-3A - Road Obstacle Signs
Hump ea.
605(1)z2 Warning Signs - 600 mm -
W5—3B - Road Obstacle Signs
Hump ea.
605(1)z3 Warning Signs - 750 mm -
W5-3C - Road Obstacle Signs
Hump ea.
605(1)z4 Warning Signs - 900 mm -
W5-3D - Road Obstacle Signs
Hump ea.
605(1)aa1 Warning Signs - 600 mm -
W5-4B - Road Obstacle Signs
Steep Descent ea.
605(1)aa2 Warning Signs - 750 mm -
W5-4C - Road Obstacle Signs
Steep Descent ea.
605(1)aa3 Warning Signs - 900 mm -
W5-4D - Road Obstacle Signs
Steep Descent ea.
605(1)ab1 Warning Signs - 450 mm -
W5-5A - Road Obstacle Signs
Steep Climb ea.
605(1)ab2 Warning Signs - 600 mm -
W5-5B - Road Obstacle Signs
Steep Climb ea.
605(1)ab3 Warning Signs - 750 mm -
W5-5C - Road Obstacle Signs
Steep Climb ea.
605(1)ac1 Warning Signs - 450 mm -
W5-6A - Road Obstacle Signs
Spill Way ea.
605(1)ac2 Warning Signs - 600 mm -
W5-6B - Road Obstacle Signs
Spill Way ea.
605(1)ac3 Warning Signs - 750 mm -
W5-6C - Road Obstacle Signs
Spill Way ea.
605(1)ac4 Warning Signs - 900 mm -
W5-6D - Road Obstacle Signs
Spill Way ea.
605(1)ad1 Warning Signs - 450 mm -
W5-7A - Road Obstacle Signs
Flood ea.
605(1)ad2 Warning Signs - 600 mm -
W5-7B - Road Obstacle Signs
Flood ea.
605(1)ad3 Warning Signs - 750 mm -
W5-7C - Road Obstacle Signs
Flood ea.
605(1)ad4 Warning Signs - 900 mm -
W5-7D - Road Obstacle Signs
Flood ea.
605(1)ae1 Warning Signs - 600 mm -
W5-8B - Road Obstacle Signs
Falling Rocks L or R ea.
605(1)ae2 Warning Signs - 750 mm -
W5-8C - Road Obstacle Signs
Falling Rocks L or R ea.
605(1)ae3 Warning Signs - 900 mm -
W5-8D - Road Obstacle Signs
Falling Rocks L or R ea.
605(1)af1 Warning Signs - 450 mm -
W5-9A - Road Obstacle Signs
Slippery Road ea.
605(1)af2 Warning Signs - 600 mm -
W5-9B - Road Obstacle Signs
Slippery Road
ea.
605(1)af3 Warning Signs - 750 mm -
W5-9C - Road Obstacle Signs
Slippery Road
ea.
605(1)af4 Warning Signs - 900 mm -
W5-9D - Road Obstacle Signs
Slippery Road
ea.
605(1)af5 Warning Signs - 450mm X
700 mm - W5-9PA - Road
Obstacle Signs
Slippery Road ea.
605(1)af6 Warning Signs - 600mm X
900 mm - W5-9PB - Road
Obstacle Signs
Slippery Road ea.
605(1)af7 Warning Signs - 750mm X
1200 mm - W5-9PC - Road
Obstacle Signs
Slippery Road ea.
605(1)ag1 Warning Signs - 600 mm -
W5-10B - Road Obstacle Signs
Animal Crossing ea.
605(1)ag2 Warning Signs - 750 mm -
W5-10C - Road Obstacle Signs
Animal Crossing ea.
605(1)ag3 Warning Signs - 900 mm -
W5-10D - Road Obstacle Signs
Animal Crossing ea.
605(1)ah1 Warning Signs - 450 mm -
W5-11A - Road Obstacle Signs
Aircraft ea.
605(1)ah2 Warning Signs - 600 mm -
W5-1 1B - Road Obstacle
Signs Aircraft ea.
605(1)ah3 Warning Signs - 750 mm -
W5-11C - Road Obstacle Signs
Aircraft ea.
605(1)ah4 Warning Signs - 900 mm -
W5-11D - Road Obstacle Signs
Aircraft ea.
605(1)ai1 Warning Signs - 600mm X 600
mm - W6-1B - Pedestrian and
School Signs Pedestrian
Crossing Ahead ea.
605(1)ai2 Warning Signs - 750mm X 750
mm - W6-IC - Pedestrian and
School Signs Pedestrian
Crossing Ahead ea.
605(1)ai3 Warning Signs - 450mm X 750
mm - W6-IP - Pedestrian and
School Signs Slow Down
Pedestrian Crossing Ahead
ea.
605(1)aj1 Warning Signs - 600mm X 600
mm - W6-2B - Pedestrian and
School Signs Children Crossing
ea.
605(1)aj2 Warning Signs - 750mm X 750
mm - W6-2C - Pedestrian and
School Signs Children Crossing
ea.
605(1)ak1 Warning Signs - 300mm X
450 mm - W6-3 - Pedestrian
and School Signs Cross Only
At Ped Xing ea.
605(1)all Warning Signs - 450mm X 450
mm - W6-4A - Pedestrian and
School Signs Wheel Chair
Crossing ea.
605(1)al2 Warning Signs - 600mm X 600
mm - W6-4B - Pedestrian and
School Signs Wheel Chair
Crossing ea.
605(1)aI3 Warning Signs - 750mmX 750
mm - W6-4C - Pedestrian and
School Signs Wheel Chair
Crossing ea.
605(1)am1 Warning Signs - 400mm X 900
mm - W6-5A - Pedestrian and
School Signs Bike Lane Ahead
ea.
605(1)am2 Warning Signs - 600mm X 900
mm - W6-5B - Pedestrian and
School Signs Bike Lane Ahead
ea.
605(1)an1 Warning Signs - Railroad
Cross Position - W7-1 -
Railway Level Crossing Signs
Railroad Crossing Position
ea.
605(1)ao1 Warning Signs - 600 mm -
W7-2B - Railway Level
Crossing Signs Railway
Crossing without signal ea.
605(1)ao2 Warning Signs - 750 mm -
W7-2C - Railway Level
Crossing Signs Railway
Crossing without signal ea.
605(1)ao3 Warning Signs - 900 mm -
W7-2D - Railway Level
Crossing Signs Railway
Crossing without signal ea.
605(1)apt Warning Signs - 600 mm -
W7-3B - Railway Level
Crossing Signs Railway
Crossing with signal ea.
605(1)ap2 Warning Signs - 750 mm -
W7—3C - Railway Level
Crossing Signs Railway
Crossing with signal ea.
605(1)ap3 Warning Signs - 900 mm -
W7-3D - Railway Level
Crossing Signs Railway
Crossing with signal ea.
605(1)aq1 Warning Signs - 700mm X
900 mm - W7-4 - Railway
Level Crossing Signs
Alternative Railway Crossing
Position ea.
605(1)ar1 Warning Signs - 600mm X
400 mm - W8-1A -
Supplementary Signs Advisory
Speed ea.
605(1)ar2 Warning Signs - 750mm X
500 mm - W8-1B -
Supplementary Signs Advisory
Speed ea.
605(1)ar3 Warning Signs - 900mm X
600 mm - W8-IC -
Supplementary Signs Advisory
Speed ea.
605(1)as1 Warning Signs - 600mm X
400 mm - W8-2A -
Supplementary Signs On Side
Road ea.
605(1)as2 Warning Signs - 750mm X
500 mm - W8-2B -
Supplementary Signs On Side
Road ea.
605(1)as3 Warning Signs - 900mm X
600 mm - W8-2C -
Supplementary Signs On Side
Road ea.
605(1)at1 Warning Signs - 600mm X
200 mm - W8-3A -
Supplementary Signs
Distance ... m ea.
605(1)at2 Warning Signs - 750mm X
250 mm - W8-3B -
Supplementary Signs
Distance ... m ea.
605(1)at3 Warning Signs - 900mm X
300 mm - W8-3C -
Supplementary Signs
Distance ... m ea.
605(1)au1 Warning Signs - 600mm X
200 mm - W8-4A -
Supplementary Signs
Distance ... km ea.
605(1)au2 Warning Signs - 750mm X
250 mm - W8-4B -
Supplementary Signs
Distance ... km ea.
605(1)au3 Warning Signs - 900mm X
300 mm - W8-4C -
Supplementary Signs
Distance ... km ea.
605(1)av1 Warning Signs - 600mm X
400 mm - W8-5A -
Supplementary Signs When
Wet ea.
605(1)av2 Warning Signs - 750mm X
500 mm - W8-5B -
Supplementary Signs When
Wet ea.
605(1)av3 Warning Signs - 900mm X
600 mm - W8-5C -
Supplementary Signs When
Wet ea.
605(1)aw1 Warning Signs - 600mm X
200 mm - W8-6A -
Supplementary Signs Blind ea.
605(1)aw2 Warning Signs - 750mm X
250 mm - W8-6B -
Supplementary Signs Blind ea.
605(1)aw3 Warning Signs - 900mm X
300 mm - W8-6C -
Supplementary Signs Blind ea.
605(1)ax1 Warning Signs - 600mm X
200 mm - W8-7A -
Supplementary Signs Aged ea.
605(1)ax2 Warning Signs - 750mm X
250 mm - W8-7B -
Supplementary Signs Aged ea.
605(1)ax3 Warning Signs - 900mm X
300 mm - W8-7C -
Supplementary Signs Aged ea.
605(1)ay1 Warning Signs - 600mm X
400 mm - W8-8A -
Supplementary Signs
Playground ea.
605(1)ay2 Warning Signs - 750mm X
500 mm - W8-8B -
Supplementary Signs
Playground ea.
605(1)ay3 Warning Signs - 900mm X
600 mm - W8-8C -
Supplementary Signs
Playground ea.
605(1)az1 Warning Signs - 600mm X
200 mm - W8-9A -
Supplementary Signs School
ea.
605(1)az2 Warning Signs - 750mm X
250 mm - W8-9B -
Supplementary Signs School
ea.
605(1)az3 Warning Signs - 900mm X
300 mm - W8-9C -
Supplementary Signs School
ea.
605(1)bat Warning Signs - 600mm X
200 mm - W8-10A -
Supplementary Signs Disabled
ea.
605(1)ba2 Warning Signs - 750mm X
250 mm - W8-10B -
Supplementary Signs Disabled
ea.
605(1)ba3 Warning Signs - 900mm X
300 mm - W8-10C -
Supplementary Signs Disabled
ea.
605(1)bb1 Warning Signs - 1500mm X
600 mm - W9-1A - Other
Warning Signs Vertical
Clearance; CLEARANCE ea.
605(1)bb2 Warning Signs - 1950mm X
600 mm - W9-1B - Other
Warning Signs Vertical
Clearance; LOW CLEARANCE
ea.
605(1)bb3 Warning Signs - 1060mm X
600 mm - W9-2A - Other
Warning Signs Slow Down
Accident Prone Area ea.
605(1)bb4 Warning Signs - 1060mm X
600 mm - W9-2B - Other
Warning Signs Bumagal
Madalas Ang Aksidente Dito ea.
605(1)bb5 Warning Signs - 1060mm X
600 mm - W9-3 - Other
Warning Signs Slow Down
Merging Traffic Ahead ea.
605(1)bb6 Warning Signs - 950mm X
600 mm - W9-4 - Other
Warning Signs Lane Ends -
Merge Left ea.
605(1)bb7 Warning Signs - 1060mm X
600 mm - W9-5 - Other
Warning Signs Slow Down
Weighbridge Ahead ea.
605(2)a1 Regulatory Sipns - 450 x 450
mm - R1-1A - Priority Signs
Stop ea.
605(2)a2 Regulatory Sipns - 600 x 600
mm - R1-1B - Priority Signs
Stop ea.
605(2)a3 Regulatory Sipns - 750 x 750
mm - R1-1C - Priority Signs
Stop ea.
605(2)a4 Regulatory Sipns - 900 x 900
mm - R1-1D - Priority Signs
Stop ea.
605(2)b1 Regulatory Signs - 600 mm -
R1-2A - Priority Signs Give
Way ea.
605(2)b2 Regulatory Signs - 750 mm -
R1-2B - Priority Signs Give
Way ea.
605(2)b3 Regulatory Signs - 900 mm -
R1-2C - Priority Signs Give
Way ea.
605(2)b4 Regulatory Signs - 640 x 900
mm - R1-2P - Priority Signs
Give Way ea.
605(2)c1 Regulatory Signs - 500 x 750
mm - R1-3 - Priority Signs Left
Turner Must Give Way
ea.
605(2)d1 Regulatory Signs - 450 mm -
R2-1A - Direction Signs NO
TURNS; Disc Type ea.
605(2)d2 Regulatory Signs - 450 mm -
R2-2A - Direction Signs ONE
WAY; Disc Type ea.
605(2)d3 Regulatory Signs - 450 mm -
R2-3A - Direction Signs KEEP
RIGHT; Disc Type ea.
605(2)d4 Regulatory Signs - 450 mm -
R2-4A - Direction Signs LANE
SPLIT; Disc Type ea.
605(2)d5 Regulatory Signs - 450 mm -
R2-5A - Direction Signs ALL
TRAFFIC; Disc Type ea.
605(2)d6 Regulatory Signs - 450 mm -
R2-6A - Direction Signs
MERGING TRAFFIC; Disc Type
ea.
605(2)d7 Regulatory Signs - 450 mm -
R2-7A - Direction Signs TWO
WAY; Disc Type ea.
605(2)e1 Regulatory Signs - 600 mm -
R2-1B - Direction Signs NO
TURNS; Disc Type ea.
605(2)e2 Regulatory Signs - 600 mm -
R2-2B - Direction Signs ONE
WAY; Disc Type ea.
605(2)e3 Regulatory Signs - 600 mm -
R2-3B - Direction Signs KEEP
RIGHT; Disc Type ea.
605(2)e4 Regulatory Signs - 600 mm -
R2-4B - Direction Signs LANE
SPLIT; Disc Type ea.
605(2)e5 Regulatory Signs - 600 mm -
R2-5B - Direction Signs ALL
TRAFFIC; Disc Type ea.
605(2)e6 Regulatory Signs - 600 mm -
R2-6B - Direction Signs
MERGING TRAFFIC; Disc Type
ea.
605(2)e7 Regulatory Signs - 600 mm -
R2-7B - Direction Signs TWO
WAY; Disc Type ea.
605(2)f1 Regulatory Signs - 750 mm -
R2-1C - Direction Signs NO
TURNS; Disc Type ea.
605(2)f2 Regulatory Signs - 750 mm -
R2-2C - Direction Signs ONE
WAY; Disc Type ea.
605(2)f3 Regulatory Signs - 750 mm -
R2-3C - Direction Signs KEEP
RIGHT; Disc Type ea.
605(2)f4 Regulatory Signs - 750 mm -
R2-4C - Direction Signs LANE
SPLIT; Disc Type ea.
605(2)f5 Regulatory Signs - 750 mm -
R2-5C - Direction Signs ALL
TRAFFIC; Disc Type ea.
605(2)f6 Regulatory Signs - 750 mm -
R2-6C - Direction Signs
MERGING TRAFFIC; Disc Type
ea.
605(2) Regulatory Signs - 750 mm -
R2-7C - Direction Signs TWO
WAY; Disc Type ea.
605(2)g1 Regulatory Signs - Disc Size
400 mm - R2-IPA - Direction
Signs NO TURNS; Plate Type;
450 x 750 mm ea.
605(2)g2 Regulatory Signs - Disc Size
400 mm - R2-2PA - Direction
Signs ONE WAY; Plate Type;
450 x 750 mm ea.
605(2)g3 Regulatory Signs - Disc Size
400 mm - R2-3PA - Direction
Signs KEEP RIGHT; Plate
Type; 450 x 750 mm
ea.
605(2)g4 Regulatory Signs - Disc Size
400 mm - R2-5PA - Direction
Signs ALL TRAFFIC; Plate
Type; 450 x 750 mm
ea.
605(2)g5 Regulatory Signs - Disc Size
400 mm - R2-6PA - Direction
Signs MERGING TRAFFIC;
Plate Type; 450 x 750 mm
ea.
605(2)h1 Regulatory Signs - 450 x 750
mm - R2-7PA - Other
Directional Signs TWO WAY
ea.
605(2)h2 Regulatory Signs - 900 x 700
mm - R2-7S - Other
Directional Signs SALUBONG
NA TRAPIKO ea.
605(2)h3 Regulatory Signs - 450 X 750
mm - R2-8A (R) - Other
Directional Signs RIGHT LANE
MUST TURN RIGHT
ea.
605(2)h4 Regulatory Signs - 450 X 750
mm - R2-8A (L) - Other
Directional Signs LEFT LANE
MUST TURN LEFT
ea.
605(2)h5 Regulatory Signs - 600 X 1000
mm - R2-8B (R) - Other
Directional Signs RIGHT LANE
MUST TURN RIGHT
ea.
605(2)h6 Regulatory Signs - 600 X 1000
mm - R2-8B (L) - Other
Directional Signs LEFT LANE
MUST TURN LEFT
ea.
605(2)i1 Regulatory Signs - 600 mm -
R3—1A - Prohibitive or
Restrictive Signs No Entry for
All Vehicles ea.
605(2)i2 Regulatory Signs - 750 mm -
R3-1B - Prohibitive or
Restrictive Signs No Entry for
All Vehicles ea.
605(2)i3 Regulatory Signs - 400 x 600
mm - R3-IPA - Prohibitive or
Restrictive Signs No Entry for
All Vehicles
ea.
605(2)i4 Regulatory Signs - 600 x 900
mm - R3-1PB - Prohibitive or
Restrictive Signs No Entry for
All Vehicles
ea.
605(2)i5 Regulatory Signs - 800 x 1200
mm - R3-IPC - Prohibitive or
Restrictive Signs No Entry for
All Vehicles
ea.
605(2)j1 Regulatory Signs - 450 mm -
R3-2A - Prohibitive or
Restrictive Signs No Entry for
Cars ea.
605(2)j2 Regulatory Signs - 450 mm -
R3-3A - Prohibitive or
Restrictive Signs No Entry for
Jeepneys ea.
605(2)j3 Regulatory Signs - 450 mm -
R3—4A - Prohibitive or
Restrictive Signs No Entry for
Bicycles ea.
605(2)j4 Regulatory Signs - 450 mm -
R3-5A - Prohibitive or
Restrictive Signs No Entry for
Motorcycles ea.
605(2)j5 Regulatory Signs - 450 mm -
R3-6A - Prohibitive or
Restrictive Signs No Entry for
Tricycles ea.
605(2)j6 Regulatory Signs - 450 mm -
R3—7A - Prohibitive or
Restrictive Signs No Entrv for
Buses ea.
605(2)j7 Regulatory Signs - 450 mm -
R3-8A - Prohibitive or
Restrictive Signs No
Entry for Trucks ea.
605(2)j8 Regulatory Signs - 450 mm -
R3-9A - Prohibitive or
Restrictive Signs No Entry for
Trucks with Trailer ea.
605(2)j9 Regulatory Signs - 450 mm -
R3-10A - Prohibitive or
Restrictive Signs No Entry for
Pedestrians ea.
605(2)j10 Regulatory Signs - 450 mm -
R3-11A - Prohibitive or
Restrictive Signs No Entry for
Animal Drawn Vehicle ea.
605(2)j11 Regulatory Signs - 450 mm -
R3-12A - Prohibitive or
Restrictive Signs No Entry for
Pushcarts ea.
605(2)k1 Regulatory Signs - 600 mm -
R3-2B - Prohibitive or
Restrictive Signs No Entry for
Cars ea.
605(2)k2 Regulatory Signs - 600 mm -
R3-3B - Prohibitive or
Restrictive Signs No Entry for
Jeepneys ea.
605(2)k3 Regulatory Signs - 600 mm -
R3-4B - Prohibitive or
Restrictive Signs No Entry for
Bicycles ea.
605(2)k4 Regulatory Signs - 600 mm -
R3-5B - Prohibitive or
Restrictive Signs No Entry for
Motorcycles ea.
605(2)k5 Regulatory Signs - 600 mm -
R3-6B - Prohibitive or
Restrictive Signs No Entry for
Tricycles ea.
605(2)k6 Regulatory Signs - 600 mm -
R3-7B - Prohibitive or
Restrictive Signs No Entry for
Buses ea.
605(2)k7 Regulatory Signs - 600 mm -
R3-8B - Prohibitive or
Restrictive Signs No Entry for
Trucks ea.
605(2)k8 Regulatory Signs - 600 mm -
R3-9B - Prohibitive or
Restrictive Signs No Entry for
Trucks with Trailer ea.
605(2)k9 Regulatory Signs - 600 mm -
R3-10B - Prohibitive or
Restrictive Signs No Entry for
Pedestrians ea.
605(2)k10 Regulatory Signs - 600 mm -
R3-11B - Prohibitive or
Restrictive Signs No Entry for
Animal Drawn Vehicle ea.
605(2)k11 Regulatory Signs - 600 mm -
R3-12B - Prohibitive or
Restrictive Signs No Entry for
Pushcarts ea.
605(2)11 Regulatory Signs - 750 mm -
R3-2C - Prohibitive or
Restrictive Signs No Entry for
Cars ea.
605(2)12 Regulatory Signs - 750 mm -
R3-3C - Prohibitive or
Restrictive Signs No Entry for
Jeepneys ea.
605(2)13 Regulatory Signs - 750 mm -
R3—4C - Prohibitive or
Restrictive Signs No Entry for
Bicycles ea.
605(2)I4 Regulatory Signs - 750 mm -
R3-5C - Prohibitive or
Restrictive Signs No Entry for
Motorcycles ea.
605(2)15 Regulatory Signs - 750 mm -
R3-6C - Prohibitive or
Restrictive Signs No Entry for
Tricycles ea.
605(2)16 Regulatory Signs - 750 mm -
R3-7C - Prohibitive or
Restrictive Signs No Entry for
Buses ea.
605(2)17 Regulatory Signs - 750 mm -
R3-8C - Prohibitive or
Restrictive Signs No Entry for
Trucks ea.
605(2)18 Regulatory Signs - 750 mm -
R3-9C - Prohibitive or
Restrictive Signs No Entry for
Trucks with Trailer ea.
605(2)19 Regulatory Signs - 750 mm -
R3-10C - Prohibitive or
Restrictive Signs No Entry for
Pedestrians ea.
605(2)110 Regulatory Signs - 750 mm -
R3-11C - Prohibitive or
Restrictive Signs No Entry for
Animal Drawn Vehicle ea.
605(2)111 Regulatory Signs - 750 mm -
R3-12C - Prohibitive or
Restrictive Signs No Entry for
Pushcarts ea.
605(2)m1 Regulatory Signs - 450 x 600
mm - R3-10P1 - Prohibitive or
Restrictive Signs Use Overpass
ea.
605(2)m2 Regulatory Signs - 450 X 600
mm - R3-10P2 - Prohibitive or
Restrictive Signs Use Ped Xing
ea.
605(2)m3 Regulatory Signs - 300 X 350
mm - R3-10P3 - Prohibitive or
Restrictive Signs Bawal
tumawid gamitin ang
Overpass ea.
605(2)n1 Regulatory Signs - 600 mm -
R3-13A - Prohibitive or
Restrictive Signs Turning
Prohibition; No Right Turn ea.
605(2)n2 Regulatory Signs - 900 mm -
R3-13B - Prohibitive or
Restrictive Signs Turning
Prohibition; No Right Turn ea.
605(2)n3 Regulatory Signs - 450 x 750
mm - R3-13 PA - Prohibitive or
Restrictive Signs Turning
Prohibition; No Right Turn
ea.
605(2)n4 Regulatory Signs - 600 x 1000
mm - R3-13 PB - Prohibitive or
Restrictive Signs Turning
Prohibition; No Right Turn
ea.
605(2)o1 Regulatory Signs - 600 mm -
R3-14A - Prohibitive or
Restrictive Signs Turning
Prohibition; No Left Turn ea.
605(2)o2 Regulatory Signs - 900 mm -
R3-14B - Prohibitive or
Restrictive Signs Turning
Prohibition; No Left Turn ea.
605(2)o3 Regulatory Signs - 450x750
mm - R3-14 PA - Prohibitive or
Restrictive Signs Turning
Prohibition; No Left Turn ea.
605(2)o4 Regulatory Signs - 600 x 1000
mm - R3-14 PB - Prohibitive or
Restrictive Signs Turning
Prohibition; No Left Turn
ea.
605(2)p1 Regulatory Signs - 600 mm -
R3-15A - Prohibitive or
Restrictive Signs Turning
Prohibition; No U Turn ea.
605(2)p2 Regulatory Signs - 900 mm -
R3-15B - Prohibitive or
Restrictive Signs Turning
Prohibition; No U Turn ea.
605(2)p3 Regulatory Signs - 450x750
mm - R3-15 PA - Prohibitive or
Restrictive Signs Turning
Prohibition; No U Turn ea.
605(2)p4 Regulatory Signs - 600 x 1000
mm - R3-15 PB - Prohibitive or
Restrictive Signs Turning
Prohibition; No U Turn
ea.
605(2)q1 Regulatory Signs - 600 mm -
R3-16A - Prohibitive or
Restrictive Signs Prohibition of
Overtaking ea.
605(2)q2 Regulatory Signs - 900 mm -
R3-16B - Prohibitive or
Restrictive Signs Prohibition of
Overtaking ea.
605(2)q3 Regulatory Signs - 600 x 900
mm - R3-16 PA - Prohibitive or
Restrictive Signs Prohibition of
Overtaking; Bawal Lumusot
ea.
605(2)q4 Regulatory Signs - 750 x 1000
mm - R3-16 PB - Prohibitive or
Restrictive Signs Prohibition of
Overtaking; Bawal Lumusot
ea.
605(2)r1 Regulatory Signs - 450 mm -
R4-1A - Speed Signs Speed
Restriction (Maximum )
ea.
605(2)r2 Regulatory Signs - 600 mm -
R4-1B - Speed Signs Speed
Restriction (Maximum )
ea.
605(2)r3 Regulatory Signs - 900 mm -
R4-1C - Speed Signs Speed
Restriction (Maximum )
ea.
605(2)r4 Regulatory Signs - 450 x 450
mm - R4-2A - Speed Signs
Speed Restriction (Minimum)
ea.
605(2)s1 Regulatory Signs - 600 x 600
mm - R4-2B - Speed Signs
Speed
Restriction Signs ea.
605(2)s2 Regulatory Signs - 450x750
mm - R4-2PA - Speed Signs
Speed
Restriction Signs ea.
605(2)s3 Regulatory Signs - 600 x 1000
mm - R4-2PB - Speed Signs
Speed
Restriction Signs ea.
605(2)s4 Regulatory Signs - 800 x 1334
mm - R4-2PC - Speed Signs
Speed
Restriction Signs ea.
605(2)s5 Regulatory Signs - 900 mm -
R4-3A - Speed Signs Speed
Restriction Signs
ea.
605(2)t1 Regulatory Signs - 450 mm -
R5-1SA - Parking Signs No
Parking (Disc) ea.
605(2)t2 Regulatory Signs - 600 mm -
R5-1SB - Parking Signs No
Parking (Disc) ea.
605(2)u1 Regulatory Signs - 450 x 750
mm - R5-IPA - Parking Signs
No Parking (Filipino Worded)
(Plate) ea.
605(2)u2 Regulatory Signs - 600 x 1000
mm - R5-IPC - Parking Signs
No Parking (Filipino Worded)
(Plate) ea.
605(2)V1 Regulatory Signs - 450 x 750
mm - R5-2PA - Parking Signs
No Parking - Loading Only
(Plate) ea.
605(2)v2 Regulatory Signs - 600 x 1000
mm - R5-2PB - Parking Signs
No Parking - Loading Only
(Plate) ea.
605(2)w1 Regulatory Signs - 450 x 750
mm - R5-3PA - Parking Signs
No Parking - Anytime (Plate)
ea.
605(2)w2 Regulatory Signs - 600 x 1000
mm - R5-3PB - Parking Signs
No Parking - Anytime (Plate)
ea.
605(2)x1 Regulatory Signs - 450 x 750
mm - R5-3CA - Parking Signs
No Parking - Tow Away (Plate)
ea.
605(2)x2 Regulatory Signs - 600 x 1000
mm - R5-3CB - Parking Signs
No Parking - Tow Away (Plate)
ea.
605(2)y1 Regulatory Signs - 450 x 750
mm - R5-4 - Parking Signs
Restricted Parking; Meter
Parking ea.
605(2)y2 Regulatory Signs - 450 x 750
mm - R5-4A - Parking Signs
Restricted Parking; 2 Hour
Parking ea.
605(2)z1 Regulatory Signs - 450 x 750
mm - R5-4B - Parking Signs
Loading Signs; Loading Zone
ea.
605(2)z2 Regulatory Signs - 450x750
mm - R5-4C - Parking Signs
Loading Signs; Loading and
Unloading Zone ea.
605(2)aa1 Regulatory Signs - 450 x 750
mm - R5-5 - Parking Signs No
Waiting Signs ea.
605(2)aa2 Regulatory Signs - 450x750
mm - R5-5A - Parking Signs
No Waiting Signs ea.
605(2)aa3 Regulatory Signs - 450 x 750
mm - R5-5B - Parking Signs
No Waiting Signs ea.
605(2)ab1 Regulatory Signs - 450 x 750
mm - R5-6 - Parking Signs No
Loading and Unloading Signs
ea.
605(2)ab2 Regulatory Signs - 450x750
mm - R5-6A - Parking Signs
No Loading and Unloading
Signs ea.
605(2)ab3 Regulatory Signs - 450 x 750
mm - R5-7 - Parking Signs No
Loading/Unloading Within
Red-Painted Curb ea.
605(2)ac1 Regulatory Signs - 450 x 750
mm - R5-8 - Parking Signs No
Stopping Anytime ea.
605(2)ac2 Regulatory Signs - 400 x 900
mm - R5-9A - Parking Signs
No Parking or Stopping Signs:
BUS Stop ea.
605(2)ac3 Regulatory Signs - 400 x 900
mm - R5-9B - Parking Signs
No Parking or Stopping Signs;
PUJ Stop ea.
605(2)ac4 Regulatory Signs - 400 x 900
mm - R5-9C - Parking Signs
No Parking or Stopping Signs:
Bus-PUJ Stop
ea.
605(2)ad1 Regulatory Signs - 400 x 600
mm - R5-10 - Parking Signs
Do Not Block Intersection
ea.
605(2)ae1 Regulatory Signs - 450 x 600
mm - R5-11 - Parking Signs
Right Turners Cross at Broken
White Lines ea.
605(2)af1 Regulatory Signs - 600 mm -
R6-1 - Miscellaneous Signs
Prohibition on Use of Audible
Warning Device ea.
605(2)ag1 Regulatory Signs - 600 mm -
R6-2 - Miscellaneous Signs
Load and Dimension
Restriction Signs ea.
605(2)ag2 Regulatory Signs - 600 mm -
R6-3 - Miscellaneous Signs
Load and Dimension
Restriction Signs ea.
605(2)ag3 Regulatory Signs - 600 mm -
R6-4 - Miscellaneous Signs
Load and Dimension
Restriction Signs ea.
605(2)ag4 Regulatory Signs - 600 mm -
R6-5 - Miscellaneous Signs
Load and Dimension
Restriction Signs ea.
605(2)ag5 Regulatory Signs - 600 mm -
R6-6 - Miscellaneous Signs
Load and Dimension
Restriction Signs ea.
605(2)ah1 Regulatory Signs - 450 x 675
mm - R6-7 - Miscellaneous
Signs Use Seat Belt Sign
ea.
605(2)ai1 Regulatory Signs - 450 mm -
R6-8A - Miscellaneous Signs
Pedestrian Crossing ea.
605(2)ai2 Regulatory Signs - 600 mm -
R6-8B - Miscellaneous Signs
Pedestrian Crossing ea.
605(2)a3 Regulatory Signs - 750 mm -
R6-8C - Miscellaneous Signs
Pedestrian Crossing ea.
605(2)aj1 Regulatory Signs - 450 mm -
R6-9A - Miscellaneous Signs
School Children Crossing
ea.
605(2)aj2 Regulatory Signs - 600 mm -
R6-9B - Miscellaneous Signs
School Children Crossing
ea.
605(2)aj3 Regulatory Signs - 750 mm -
R6-9C - Miscellaneous Signs
School Children Crossing
ea.
605(2)ak1 Regulatory Signs - 450 mm -
R6-10A - Miscellaneous Signs
Bike Lane Signs ea.
605(2)ak2 Regulatory Signs - 600 mm -
R6-10B - Miscellaneous Signs
Bike Lane Signs ea.
605(2)ak3 Regulatory Signs - 750 mm -
R6-10C - Miscellaneous Signs
Bike Lane Signs ea.
605(2)all Regulatory Signs - 450 mm -
R6-11A - Miscellaneous Signs
Wheel Chair Crossing Signs
ea.
605(2)al2 Regulatory Signs - 600 mm -
R6-11B - Miscellaneous Signs
Wheel Chair Crossing Signs
ea.
605(2)al3 Regulatory Signs - 750 mm -
R6-11C - Miscellaneous Signs
Wheel Chair Crossing Signs
ea.
605(3)a1 Guide or Information Signs -
G1-1 - Advance Direction
Signs Stack Signs ea.
605(3)a2 Guide or Information Signs -
G1-2 - Advance Direction
Signs Stack Signs ea.
605(3)a3 Guide or Information Signs -
G1-3 - Advance Direction
Signs Stack Signs ea.
605(3)b1 Guide or Information Signs -
G1-4 - Advance Direction
Signs Diagrammatic Direction
Signs ea.
605(3)b2 Guide or Information Signs -
G1-5 - Advance Direction
Signs Diagrammatic Direction
Signs ea.
605(3)c1 Guide or Information Signs -
G2-1 - Intersection Direction
Signs ea.
605(3)c2 Guide or Information Signs -
G2-2 - Intersection Direction
Signs ea.
605(3)c3 Guide or Information Signs -
G2-3 - Intersection Direction
Signs ea.
605(3)c4 Guide or Information Signs -
G2-4 - Intersection Direction
Signs ea.
605(3)d1 Guide or Information Signs -
G3-1 - Reassurance Direction
Signs
ea.
605(3)d2 Guide or Information Signs -
G3-2 - Reassurance Direction
Signs
ea.
605(3)e1 Guide or Information Signs -
G4-1 - Finger Board Direction
Signs ea.
605(3)e2 Guide or Information Signs -
G4-2 - Finger Board Direction
Signs ea.
605(3)e3 Guide or Information Signs -
G4-3 - Finger Board Direction
Signs ea.
605(3)f1 Guide or Information Signs -
G5-1 - Street Name Signs
605(3)f2 Guide or Information Signs -
G5-2A - Street Name Signs
ea.
605(3)f3 Guide or Information Siqns -
G5-2B - Street Name Signs
ea.
605(3)f4 Guide or Information Signs -
G5-3 - Street Name Signs ea.
605(3)g1 Guide or Information Signs -
G6-1 - Town Name and
Geographical Feature Signs
Town Name ea.
605(3)g2 Guide or Information Signs -
G6-2 - Town Name and
Geographical Feature Signs
Province Name ea.
605(3)g3 Guide or Information Signs -
G6-3 - Town Name and
Geographical Feature Signs
Geographic Feature ea.
605(3)g4 Guide or Information Signs -
G6-4 - Town Name and
Geographical Feature Signs
Local Government Boundary
ea.
605(3)h1 Guide or Information Signs -
G7-1 - Service Signs Service
Center 2km ea.
605(3)h2 Guide or Information Signs -
G7-2 - Service Signs
Weighbridge Station ea.
605(3)h3 Guide or Information Signs -
G7-3 - Service Signs Parking
and Restrooms ea.
605(3)h4 Guide or Information Signs -
G7-3A - Service Signs Gasoline
Station and Restaurant or
Cafes ea.
605(3)h5 Guide or Information Signs -
G7-4 - Service Signs Rest Area
and Truck Parking Turn Left
300m ea.
605(3)h6 Guide or Information Signs -
G7-5 - Service Signs Shopping
Center ea.
605(3)i1 Guide or Information Signs -
G8-1 - Tourist Information and
Tourist Destination Signs
ea.
605(3)i2 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)i3 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)i4 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j1 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j2 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j3 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j4 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j5 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j6 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j7 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)j8 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)k1 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(3)k2 Guide or Information Signs -
G8-2 - Tourist Information and
Tourist Destination Signs
ea.
605(4)a1 Signs on Expressways - GE2-2
- Expressway Information
Signs Toll Charges (Advance
Information)
ea.
605(4)a2 Signs on Expressways - GE2-2
- Expressway Information
Signs Toll Charges (Advance
Information)
ea.
605(4)a3 Signs on Expressways - GE2-2
- Expressway Information
Signs Toll Charges (Advance
Information)
ea.
605(4)b1 Signs on Expressways - GE2-2
- Expressway Information
Signs Toll Charges (Advance
Information)
ea.
605(4)b2 Signs on Expressways - GE2-2
- Expressway Information
Signs Toll Charges (Advance
Information)
ea.
605(4)b3 Signs on Expressways - GE2-2
- Expressway Information
Signs Toll Charges (Advance
Information)
ea.
605(4)b4 Signs on Expressways - GE2-2
- Expressway Information
Signs Toll Charges (Advance
Information)
ea.
605(4)b5 Signs on Expressways - GE2-3
- Expressway Information
Signs Lane Direction Sions
ea.
605(4)c1 Signs on Expressways - GE3-1
- Advance Exit Signs Advance
Exit with distance ea.
605(4)c2 Signs on Expressways - GE3-2
- Advance Exit Signs Advance
Exit with Distance plus RIGHT
LANE ea.
605(4)c3 Signs on Expressways - GE3-3
- Advance Exit Signs
Supplementary Advance
(NEXT EXIT) ea.
605(4)d1 Signs on Expressways - GE4-1
- Expressway Exit Direction
Signs Exit signs with
Destination ea.
605(4)d2 Signs on Expressways - GE4-2
- Expressway Exit Direction
Signs NEXT EXIT. KM
ea.
605(4)d3 Signs on Expressways - GE4-3
- Expressway Exit Direction
Signs EXIT ea.
605(4)d4 Signs on Expressways - GE4-
3A - Expressway Exit Direction
Signs Numbered exit
ea.
605(4)e1 Signs on Expressways -
2800mm X 1500 mm - GE5-1
- Expressway Service Signs
Rest Area Right Lane 2km
ea.
605(4)e2 Signs on Expressways -
2800mm X 1500 mm - GE5-1A
- Expressway Service Signs
Rest Area Right Lane 2km
ea.
605(4)e3 Signs on Expressways -
2500mm X 1100 mm - GE5-2
- Expressway Service Signs
Rest Area 2km
ea.
605 (4)e4 Signs on Expressways -
1500mm X 1800 mm - GE5-3
- Expressway Service Signs
Rest Area ea.
605 (4)e5 Signs on Expressways -
2800mm X 1500 mm - GE5-4 -
Expressway Service Signs
Service Center 2km
ea.
605 (4)e6 Signs on Expressways -
2240mm X 1800 mm - GE5-5 -
Expressway Service Signs
Truck Parking 2km
ea.
605(4)e7 Signs on Expressways -
3240mm X 1800 mm - GE5-6 -
Expressway Service Signs
Restaurant Next Exit
ea.
605(4)e8 Signs on Expressways -
2800mm X 1800 mm - GE5-7 -
Expressway Service Signs
Truck Parking exit
ea.
605(4)f1 Signs on Expressways -
2300mm X 1500 mm - GE6-1 -
End of Expressway END
EXPRWAY 1 Km ea.
605(4)f2 Signs on Expressways -
1200mm X 600 mm - GE6-1A -
End of Expressway END
EXPRWAY 2 Km ea.
605(4)f3 Signs on Expressways -
900mm X 450 mm - GE6-2 -
End of Expressway START
EXPRWAY ea.
605(4)f4 Signs on Expressways -
900mm X 450 mm - GE6-3 -
End of Expressway END
EXPRWAY ea.
605 (4)g1 Signs on Expressways -
2600mm X 1600 mm - GE7-1 -
Toll Signs Toll Plaza
Ahead ea.
605 (4)g2 Signs on Expressways -
1600mm X 1900 mm - GE7-2 -
Toll Signs Stop At Toll Gates
ea.
605(4)g3 Signs on Expressways -
2400mm X 1200 mm - GE7-3 -
Toll Signs Pay Toll Ahead
ea.
605(4)h1 Signs on Expressways -
2300mm X 1470 mm - GE8-1 -
Expressway Traffic Instruction
and Regulatory Signs Wrong
Way - Go Back
ea.
605(4)h2 Signs on Expressways -
1600mm X 1700 mm - GE8-2 -
Expressway Traffic Instruction
and Regulatory Signs Right
Lane Ends m ea.
605(4)h3 Signs on Expressways -
2700mm X 1700 mm - GE8-3 -
Expressway Traffic Instruction
and Regulatory Signs Right
Lanes Ends Merge Left
ea.
605(4)h4 Signs on Expressways -
2700mm X 1400 mm - GE8-4 -
Expressway Traffic Instruction
and Regulatory Signs Lane
Ends Merge Left
ea.
605(4)h5 Signs on Expressways -
1750mm X 1500 mm - GE8-5 -
Expressway Traffic Instruction
and Regulatory Signs Merge
Left ea.
605(4)h6 Signs on Expressways -
2400mm X 2950 mm - GE8-6 -
Expressway Traffic Instruction
and Regulatory Signs Slow
Vehicle Use Right Lane
ea.
605(4)h7 Signs on Expressways -
2000mm X 1100 mm - GE8-7 -
Expressway Traffic Instruction
and Regulatory Signs Check
Brakes ea.
605(4)i1 Signs on Expressways -
2600mm X 2000 mm - S1-4E -
Expressway Traffic Instruction
and Regulatory Signs Reduced
Speed Now ea.
605(4)j1 Signs on Expressways - 900
Disc - R4-1C (XXX) -
Expressway Traffic
Instruction and Regulatory
Signs Speed Limit Sign ea.
605(4)j2 Signs on Expressways - 1200
Disc - R4-1D (XXX) -
Expressway Traffic Instruction
and Regulatory Signs Speed
Limit Sign ea.
605(4)k1 Signs on Expressways - 900
Disc - R4-3A (XX) -
Expressway Traffic Instruction
and Regulatory Signs
Minimum Speed Limit ea.
605(4)k2 Signs on Expressways - 1200
Disc - R4-3B (XX) -
Expressway Traffic Instruction
and Regulatory Signs
Minimum Speed Limit ea.
605(4)I1 Signs on Expressways - 900
Disc - R4-2C - Expressway
Traffic Instruction and
Regulatory Signs Speed
Restrictions ea.
605(4)12 Signs on Expressways - 1200
Disc - R4-2D - Expressway
Traffic Instruction and
Regulatory Signs Speed
Restrictions ea.
605(5)a1 Traffic Instruction Signs -
600mm X 300 mm - S1-1 -
Supplementary Signs USE
OVERPASS ea.
605(5)a2 Traffic Instruction Signs -
600mm X 450 mm - S1-2 -
Supplementary Signs USE
PEDESTRIAN CROSSING ea.
605(5)a3 Traffic Instruction Signs -
800mm X 600 mm - S1-3A -
Supplementary Signs TRUCK
USE LOW GEAR ea.
605(5)a4 Traffic Instruction Signs -
1000mm X 750 mm - S1-3B -
Supplementary Signs TRUCK
USE LOW GEAR ea.
605(5)a5 Traffic Instruction Signs -
620mm X 420 mm - S1-4 -
Supplementary Signs CHECK
BRAKES ea.
605(5)b1 Traffic Instruction Signs -
1500mm X 750 mm - S2-1 -
Movement Instruction Signs
REDUCE SPEED ea.
605(5)b2 Traffic Instruction Signs -
450mm X 750 mm - S2-2 -
Movement Instruction Signs
STOP HERE ON RED SIGNAL
ea.
605(5)b3 Traffic Instruction Signs -
400mm X 600 mm - S2-3L -
Movement Instruction Signs
TURN LEFT WITH CARE
ea.
605(5)b4 Traffic Instruction Signs -
750mm X 500 mm - S2-3R -
Movement Instruction Signs
TURN RIGHT ANYTIME WITH
CARE ea.
605(5)b5 Traffic Instruction Signs -
1300mm X 350 mm - S2-4A -
Movement Instruction Signs
DETOUR FOR HIGH VEHICLES
(L or R) ea.
605(5)b6 Traffic Instruction Signs -
1400mm X 350 mm - S2-4A(L)
(R) - Movement Instruction
Signs DETOUR FOR HEAW
VEHICLES (L or R)
ea.
605(5)b7 Traffic Instruction Signs -
900mm X 600 mm - S2-5 -
Movement Instruction Signs
GIVEWAY TO PEDESTRIANS
ea.
605(5)b8 Traffic Instruction Signs -
500mm X 800 mm - S2-6 -
Movement Instruction Signs
NO RIGHT TURN ON RED
SIGNAL ea.
605(5)b9 Traffic Instruction Signs -
950mm X 1100 mm - S2-7 -
Plovement Instruction Signs
SLOW VEHICLES USE RIGHT
LANE ea.
605(5)b10 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(5)b11 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(5)b12 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(5)b13 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(5)b14 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(5)b15 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(5)b16 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)a Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)b1 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)c1 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)c2 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)c3 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)d1 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)d2 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)e1 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.
605(6)e2 Traffic Instruction Signs - S2-
7A - Movement Instruction
Signs MABAGAL NA SASAKYAN
MAMALAGI SA KANAN
ea.

606(1)a1 Pavement markings -


Premixed
Reflectorized - White sq.m.
606(1)a2 Pavement markings -
Premixed
Reflectorized - Yellow sq.m.
606(1)b1 Pavement markings -
Reflectorized
Thermoplastic - White sq.m.
606(1)b2 Pavement markings -
Reflectorized
ThermoPlastic - Yellow sq.m.

607(1)a Reflectorized Pavement


Studs Flush Type - Mono-
Directional ea.
607(1)b Reflectorized Pavement
Studs Flush Type - Bi-
Directional ea.
607(2)a Reflectorized Pavement Studs
Raised Profile Type - Mono-
Directional ea.
607(2)b Reflectorized Pavement Studs
Raised Profile Type - Bi-
Directional ea.
607(3) Internally Illuminated (Solar)
Pavement Levelled
Marker/Stud Flush Type -
Mono-Directional ea.
607(3)b Internally Illuminated (Solar)
Pavement Levelled
Marker/Stud Flush Type - Bi-
Directional ea.

608(1) Furnishing and Placing Topsoil


cu.m.
608(2) Placing Topsoil cu.m.

609(1) Sprigging 100 Square Meter


609(2) Sprigging sq.m.

610(1) Sodding sq.m.

611(1) Trees Furnishing and


Transplanting ea.
611(2) Trees Transplanting ea.

612(1) Reflectorized Thermoplastic


Pavement Markings, White
sq.m.
612(2) Reflectorized Thermoplastic
Pavement Markings, Yellow
sq.m.
612(3) Removal of Existing
Reflectorized Thermoplastic
Pavement Markings sq.m.
613(1) Concrete Joint Sealant (Hot-
Poured Elastic Type) kgs.
613(2) Concrete Joint Sealant (Cold-
Applied Type) kgs.

614(1)a Waterstop - 100 mm. m.


614(1)b Waterstop - 150 mm. m.
614(1)c Waterstop - 200 mm. m.
614(2) Waterstop L.S.

615(1) Noise Barrier l.m.

618(1) Reflectorized Thermoplastic


Rumble Strips sq.m.

622(1)a Coco-net - CN 400 sq.m.


622(1)b Coco-net - CN 700 sq.m.
622(1)c Coco-net - CN 900 sq.m.
622(2)a Coco-logs/Fascine - CN 100 l.m.
622(2)b Coco-logs/Fascine - CN 200 l.m.
622(2)c Coco-logs/Fascine - CN 300 l.m.
622(2)d Coco-logs/Fascine - CN 400 l.m.
622(2)e Coco-logs/Fascine - CN 500 l.m.
622(3)a Vegetation - Grass-Cover sq.m.
622(3)b Vegetation - Vetiver Grass
System sq.m.

623(1)a1 Supply & Install Local


Controller Microprocessor type
- TS1 - 8 Signal Group L.S.
623(1)a2 Supply & Install Local
Controller Microprocessor type
- TS2 - 16 Signal Group
L.S.
623(1)a3 Supply & Install Local
Controller Microprocessor type
- TS3 - 32 Signal Group
L.S.
623(2) Supply & Install Traffic Signal
Flasher Controller - TS4
L.S.
623(3)a1 Supply & Install Traffic Signal
Head, LED-type - 200mm 1
Aspect - TS5 - Amber Lens
L.S.
623(3)a2 Supply & Install Traffic Signal
Head, LED-type - 200mm 1
Aspect - TS6 - Red Lens
L.S.
623(3)a3 Supply & Install Traffic Signal
Head, LED-type - 200mm 1
Aspect - TS7 - Green Lens
L.S.
623(3)b1 Supply & Install Traffic Signal
Head, LED-type - 200mm 2
Aspect - TS8 L.S.
623(3)b2 Supply & Install Traffic Signal
Head, LED-type - 200mm 3
Aspect - TS9 L.S.
623(3)b3 Supply & Install Traffic Signal
Head, LED-type - 200mm 4
Aspect - TS10 L.S.
623(3)b4 Supply & Install Traffic Signal
Head, LED-type - 200mm 5
Aspect - TS11 L.S.
623(3)b5 Supply & Install Traffic Signal
Head, LED-type - 200mm 6
Aspect - TS12 L.S.
623(3)c1 Supply & Install Traffic Signal
Head, LED-type - 300mm 1
Aspect - TS13 - Amber Lens
L.S.
623(3)c2 Supply & Install Traffic Signal
Head, LED-type - 300mm 1
Aspect - TS14 - Red Lens
L.S.
623(3)c3 Supply & Install Traffic Signal
Head, LED-type - 300mm 1
Aspect - TS15 - Green Lens
L.S.
623(3)d1 Supply & Install Traffic Signal
Head, LED-type - 300mm 2
Aspect - TS16 L.S.
623(3)d2 Supply & Install Traffic Signal
Head, LED-type - 300mm 3
Aspect - TS17 L.S.
623(3)d3 Supply & Install Traffic Signal
Head, LED-type - 300mm 4
Aspect - TS18 L.S.
623(3)d4 Supply & Install Traffic Signal
Head, LED-type - 300mm 5
Aspect - TS19 L.S.
623(3)d5 Supply & Install Traffic Signal
Head, LED-type - 300mm 6
Aspect - TS20 L.S.
623(4) Supply and Install Pedestrian
Signal Head, LED-type -
300mm 2 Aspect - TS21
L.S.
623(5) Supply and Install Pedestrian
Pushbutton Assembly - TS22
L.S.
623(6)a Supply & Install Traffic Signal
Pole - TS23 - Type A Nlast
Arm 4m outreach with
concrete pedestal L.S.
623(6)b Supply & Install Traffic Signal
Pole - TS25 - Type B L.S.
623(6)C Supply & Install Traffic Signal
Pole - TS26 - Type C L.S.
623(6)d Supply & Install Traffic Signal
Pole - TS27 - Type D L.S.
623(6)e Supply & Install Traffic Signal
Pole - TS24 - Type A Nlast
Arm 4m outreach with
concrete pedestal L.S.
623(7)a Trenching - Double Barrel -
100mm dia. - TS28 - P.E Pipe
Concrete
Pavement l.m.
623(7)b Trenching - Single Barrel -
100mm dia. - TS29 - P.E Pipe
Concrete
Pavement l.m.
623(7)c Trenching - Double Barrel -
100mm dia. - TS30 - P.E. Pipe
on Asphalt
Pavement l.m.
623(7)d Trenching - Single Barrel -
100mm dia. - TS31 - P.E. Pipe
on Asphalt
Pavement l.m.
623(7)e Trenching - Double Barrel -
100mm dia. - TS32 - P.E. Pipe
on Concrete
Sidewalk l.m.
623(7)f Trenching - Single Barrel -
100mm dia. - TS33 - P.E. Pipe
on Concrete
Sidewalk l.m.
623(7)g Trenching - Double Barrel -
100mm dia. - TS34 - P.E. Pipe
on Earth
Surface l.m.
623(7)h Trenching - Single Barrel -
100mm dia. - TS35 - P.E. Pipe
on Earth
Surface l.m.
623(8)a Handhole - TS36 - Type B ea.
623(8)b Handhole - TS37 - Type A ea.
623(9)a Supply and Install Vehicle
Detector - TS38 - Inductive
Loop Type L.S.
623(9)b Supply and Install Vehicle
Detector - TS39 - Video
Camera Type L.S.
623(10) Installation of Local Controller
inc. Testing & Commissioning -
TS40 L.S.
623(11) Complete Installation of Local
Wiring & Connection to Local
Controller - TS41 site
623(12) Customization of Local
Controller - TS42 ea.
623(13)a1 Local Controller
Microprocessor type - TSP1 - 8
Signal Group ea.
623(13)a2 Local Controller
Microprocessor type - TSP2 -
16 Signal Group ea.
623(13)a3 Local Controller
Microprocessor type - TSP3 -
32 Signal Group ea.
623(13)a4 Traffic Signal Flasher
Controller - TSP4 ea.
623(14)a1 Detector Card/Board - TSP5 -
8 Channel ea.
623(14)a2 Detector Card/Board - TSP6 -
16 Channel ea.
623(15)a1 Traffic Signal Head, LED-type
- 200mm 1 Aspect - TSP7 -
Amber Lens sets
623(15)a2 Traffic Signal Head, LED-type
- 200mm 1 Aspect - TSP8 -
Red Lens sets
623(15)a3 Traffic Signal Head, LED-type
- 200mm 1 Aspect - TSP9 -
Green Lens sets
623(15)b1 Traffic Signal Head, LED-type
- 200mm 2 Aspect - TSP10
sets
623(15)b2 Traffic Signal Head, LED-type
- 200mm 3 Aspect - TSP11
sets
623(15)b3 Traffic Signal Head, LED-type
- 200mm 4 Aspect - TSP12
sets
623(15)b4 Traffic Signal Head, LED-type
- 200mm 5 Aspect - TSP13
sets
623(15)b5 Traffic Signal Head, LED-type
- 200mm 6 Aspect - TSP14
sets
623(15)c1 Traffic Signal Head, LED-type
- 300mm 1 Aspect - TSP15 -
Amber Lens sets
623(15)c2 Traffic Signal Head, LED-type
- 300mm 1 Aspect - TSP16 -
Red Lens sets
623(15)c3 Traffic Signal Head, LED-type
- 300mm 1 Aspect - TSP17 -
Green Lens sets
623(15)d1 Traffic Signal Head, LED-type
- 300mm 2 Aspect - TSP18
sets
623(15)d2 Traffic Signal Head, LED-type
- 300mm 3 Aspect - TSP19
sets
623(15)d3 Traffic Signal Head, LED-type
- 300mm 4 Aspect - TSP20
sets
623(15)d4 Traffic Signal Head, LED-type
- 300mm 5 Aspect - TSP21
sets
623(15)d5 Traffic Signal Head, LED-type
- 300mm 6 Aspect - TSP22
sets
623(16) Pedestrian Signal Head, LED-
type - 300mm 2 Aspect -
TSP23 sets
623(17) Pedestrian Pushbutton
Assembly - TSP24 sets
623(18)a1 Mounting Bracket - 200mm -
TSP25 sets
623(18)a2 Mounting Bracket - 300mm -
TSP26 sets
623(19)a1 Arrow Mask - 200mm - TSP27
ea.
623(19)a2 Arrow Mask - 300mm - TSP28
ea.
623(20)a1 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 200mm 3 Aspect -
TSP29
ea.
623(20)a2 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 200mm 4 Aspect -
TSP30
ea.
623(20)a3 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 200mm 5 Aspect -
TSP31
ea.
623(20)a4 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 200mm 6 Aspect -
TSP32
ea.
623(20)a5 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 300mm 3 Aspect -
TSP33
ea.
623(20)a6 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 300mm 4 Aspect -
TSP34
ea.
623(20)a7 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 300mm 5 Aspect -
TSP35
ea.
623(20)a8 Target Board Polycarbonate or
Powder-coated, Aluminum
Substrate for Traffic Signal
Head - 300mm 6 Aspect -
TSP36
ea.
623(21)a1 Traffic Signal Control Cable - 4
Core - TSP37 m.
623(21)a2 Traffic Signal Control Cable - 8
Core - TSP38 m.
623(21)a3 Traffic Signal Control Cable -
12 Core - TSP39 m.
623(21)a4 Traffic Signal Control Cable -
19 Core - TSP40 m.
623(21)a5 Traffic Signal Control Cable -
29 Core - TSP41 m.
623(22) Loop Detector Cable - TSP42
m.
623(23) Loop Feeder Cable - TSP43 m.
623(24) Loop Sealant - TSP44 pail
623(25) Splicing Kit - TSP45 ea.
623(26) Grounding Cable - TSP46 m.
623(27) Electricity/Power Supply Cable
- TSP47 m.
623(28) Main Circuit Breaker - TSP48
ea.
623(29) Mounting Strap - TSP49 roll
623(30) Plounting Buckle - TSP50 box
623(31) Terminal Board (20P) - TSP51
ea.
623(33) Terminal Lugs - TSP52 ea.
623(33) Grounding Rod & Connector -
TSP53 sets
623(34) Local Controller Footing -
TSC1 ea.
623(35)a Footing - TSC2 - Type A
(w/pedestal) ea.
623(35)b Footing - TSC3 - Type A (w/o
pedestal) ea.
623(35)c Footing - TSC4 - Type B ea.
623(35)d Footing - TSC5 - Type C ea.
623(35)e Footing - TSC6 - Type D ea.
623(36) Loop Detector Installation -
TSC7 slot
623(37) Concrete Bollard - TSC8 ea.
623(38) Protection Cape for Local
Controller - TSC9 ea.
624(1)a1 Single Arm Post, with Street
Light - 8m - LED - 130W ea.
624(1)a2 Single Arm Post, with Street
Light - 9m - LED - 175W ea.
624(1)a3 Single Arm Post, with Street
Light - 10m - LED - 175W ea.
624(1)b1 Single Arm Post, with Street
Light - 8m - HPS - 150W-
250W ea.
624(1)b2 Single Arm Post, with Street
Light - 9m - HPS - 250W ea.
624(1)b3 Single Arm Post, with Street
Light - 10m - HPS - 400W ea.
624(1)b4 Single Arm Post, with Street
Light - 12m - HPS - 400W ea.
624(2)a1 Double Arm Post, with Street
Light - 8m - LED - 130W
ea.
624(2)a2 Double Arm Post, with Street
Light - 9m - LED - 175W
ea.
624(2)a3 Double Arm Post, with Street
Light - 10m - LED - 175W
ea.
624(2)b1 Double Arm Post, with Street
Light - 8m - HPS - 150W-
250W ea.
624(2)b2 Double Arm Post, with Street
Light - 9m - HPS - 250W
ea.
624(2)b3 Double Arm Post, with Street
Light - 10m - HPS - 400W
ea.
624(2)b4 Double Arm Post, with Street
Light - 12m - HPS - 400W
ea.
624(3)a Undercarriage Luminaire - LED
- 75W ea.
624(3)b Undercarriage Luminaire - HPS
- 150W ea.
624(4) Warning Light, Complete with
Conduits ea.
624(5) Lighting Control Panel ea.
624(6) Main Feeder Distribution
System L.S.
624(7) Photoelectric Cells ea.
624(8) Solar LED Street Light ea.
624(9) Underground Electrical Works
L.S.
624(10) Roadway Lighting L.S.
625(1)a1 Delineators - 200mm X
100mm X
3mm thick plate with
3" dia. (75mm)
reflector - Button type - Zinc
anneal plate with glass
reflector of prismatic lenses ea.
625(1)a2 Delineators - 200mm X
100mm X
3mm thick plate with 3" dia.
(75mm) reflector - Button type
- G.I. plate with glass reflector
of prismatic
lenses
ea.
625(1)a3 Delineators - 200mm X
100mm X
3mm thick plate with 3" dia.
(75mm) retroflective sheeting
- Button type - Zinc anneal
plate with retrorflective
sheeting ea.
625(1)a4 Delineators - 200mm X
100mm X
3mm thick plate with 3" dia.
(75mm) retroflective sheeting
- Button type - G.I. plate with
retrorflective sheeting
ea.
625(1)b1 Delineators - 4"X4" -
Aluminum - Panel Type -
Retroflective Sheeting ea.
625(1)b2 Delineators - 4" X 4" - GI -
Panel Type - Retroflective
Sheeting ea.
625(1)b3 Delineators - 10" X 10" -
Aluminum - Panel Type -
Retroflective Sheeting ea.
625(1)b4 Delineators - 10" X 10" - GI -
Panel Type - Retroflective
Sheeting ea.
625(1)c1 Delineators - 2"X 4" -
Aluminum - Panel type (L
Shaped) Retroflective Sheeting
ea.
625(1)c2 Delineators - 2"X 4" - GI -
Panel type (L-Shaped)
Retroflective Sheeting ea.
625(2)a1 Linear Delineation System -
34"X 4" - Aluminum - Rib Type
ea.
625(2)a2 Linear Delineation System -
34"X 4" - GI - Rib Type ea.
625(2)a3 Linear Delineation System -
34"X 6" - Aluminum - Rib Type
ea.
625(2)a4 Linear Delineation System -
34"X 6" - GI - Rib Type ea.
625(3)a1 Tubular Markers - 1000mm
(40") X
75mm (3") dia. - Surface
Mounted - Collapsible Bollards
ea.
625(3)a2 Tubular Markers - 1000mm
(40") X
75mm (3") dia. - In-ground
Plounted - Collapsible Bollards
ea.
625(4)a Road Safety Barrier System -
Semi-rigid - Box-Beam Steel
ea.
625(4)b Road Safety Barrier System -
Rigid - Concrete Safety Shape
(F-Shape/Jersey Type)
ea.
625(4)c Road Safety Barrier System -
Rigid - Concrete Single Slope
ea.
625(4)d Road Safety Barrier System -
Plastic - Jersey Type -
Waterfilled
ea.
625(4)e Road Safety Barrier System -
Steel - Guard Fence
ea.
625(4)f Road Safety Barrier System -
Concrete - Cast-in-place
ea.
625(5)a1 Impact Attenuator/Crash
Cushion - Stationary - Gatinp -
Waterfilled ea.
625(5)a2 Impact Attenuator/Crash
Cushion - Stationary - Gating
- Sand Filled
Barrels ea.
625(5)a3 Impact Attenuator/Crash
Cushion - Stationary - Non-
gating - Independent
coIIaOsibIe bays ea.
625(5)a4 Impact Attenuator/Crash
Cushion - Stationary - Non-
gating - High Molecular
Weight/High Density
Polyethylene (HNIW/HDPE)
side panels ea.
625(5)a5 Impact Attenuator/Crash
Cushion - Stationary - Non-
gating - Shock
Absorbing Cable
Mechanism ea.
625(5)a6 Impact Attenuator/Crash
Cushion - Stationary - Truck-
Mounted-
Attenuator (TMA1 ea.
625(6)a1 Traffic Control Devices - 36" x
3" dia. - Plastic, Rubber,
Synthetic Rubber - Temporary
Bollard -
Surface Mounted
ea.
625(6)a2 Traffic Control Devices - 1000
mm (40") x 75
mm (3") dia. - Plastic, Rubber,
Synthetic Rubber - Temporary
Bollard - Surface Mounted
ea.
625(6)a3 Traffic Control Devices - 28"
high - Plastic, Rubber,
Synthetic Rubber - Reflective
Striped Traffic Cone
ea.
625(6)a4 Traffic Control Devices - 36"
high - Plastic, Rubber,
Synthetic Rubber - Reflective
Striped Traffic Cone
ea.
625(6)a5 Traffic Control Devices - 1500
x 450 mm - T5-4 - Temporary
Hazard
Markers ea.
625(6)a6 Traffic Control Devices - 600 x
600 mm - T5-5 - Temporary
Hazard
Markers ea.
625(6)a7 Traffic Control Devices - (2.5m
- 4 m) x (150
mm - 200 mm) - Timber -
Barrier Boards ea.
625(6)a8 Traffic Control Devices - (2.5m
- 4 m) x (150
mm - 200 mml - Plastic -
Barrier Boards ea.
625(7)a1 Traffic Control Devices -
100mm wide - Tapes -
Containment Fences m.
625(7)a2 Traffic Control Devices - 1 m
high - Mesh Fencing -
Containment Fences m.
625(8)a1 Traffic Control Devices -
Expanded
Polystyrene (EPS) Foam -
Antiglare Screen sets
625(8)a2 Traffic Control Devices -
Double Reverse Corrugated
(DRC) Galvanized Steel Fabric
- Antiglare Screen sets
625(9)a1 Traffic Control Devices - High
Impact
Polymer - Antiglare Screen ea.
625(9)a2 Traffic Control Devices -
Flashing Lamps ea.
625(10) Traffic Control Devices -
Concrete - Temporary Curb
l.m.
625(11)a1 Traffic Control Devices -
Interlocking
Blocks - Temporary Curb ea.
625(11)a2 Traffic Control Devices -
HNIW/HDPE
Plastic - Temporary Curb ea.
625(11)a3 Traffic Control Devices -
Rotating Lights - Vehicle
Mounted
Equipment ea.
625(11)a4 Traffic Control Devices -
Flashing Arrow
Board - Vehicle Mounted
Equipment ea.
625(11)a5 Traffic Control Devices -
Variable Message Signs ea.
625(11)a6 Traffic Control Devices -
Portable Traffic Signals ea.

626(1)a1 Advance Warning Sipns -


1800 x 600 mm - T1 - 1 -
Roadwork Ahead ea.
626(1)a2 Advance Warning Sipns -
1800 x 600 mm - T1 - 2 -
Bridgework Ahead ea.
626(1)a3 Advance Warning Signs -
1200 x 600 mm - T1 - 3 -
Road Machinery Ahead ea.
626(1)a4 Advance Warning Sipns - 900
x 600 mm - T1 - 4 - Grader
Ahead ea.
626(1)a5 Advance Warning Sipns - 900
x 600 mm - T1 - 5 - Workmen
Ahead ea.
626(1)a6 Advance Warning Sipns -
1800 x 600 mm - T1 - 24 -
Roadwork Next km ea.
626(1)a7 Advance Warning Signs -
1800 x 600 mm - T1 - 25 -
Roadwork On Side
Road ea.
626(1)a8 Advance Warning Sipns - 600
x 600 mm - T1 - 28 - Next 2
km ea.
626(1)a9 Advance Warning Sipns -
1800 x 600 mm - T2 - 16 -
End Roadwork ea.
626(2)a1 Regulatory Control Signs - 450
mm diameter - T7-2 - Stop
Hand Held Sign ea.
626(2)a2 Regulatory Control Signs - 450
mm diameter - T7 - 1 - Slow
Hand Held Sign ea.
626(2)a3 Regulatory Control Signs - 900
x 600 mm - T1 - 18 - Prepare
To Stop ea.
626(2)a4 Regulatory Control Signs - 600
x 800 mm (size B) - R4 - 1 (T)
- Speed Restriction
ea.
626(2)a5 Regulatory Control Signs - 600
x 400 mm (size B) - R4 - 3 (T)
- Road Work ea.
626(2)a6 Regulatory Control Signs - 600
x 1000 mm (size B) - R4 - 2P -
End Speed Restriction
ea.
626(2)a7 Regulatory Control Signs - 600
x 800 mm (size B) - R4 -2 (T)
- De - Restriction ea.
626(3)a1 Detour Signs - 1200 x 600 mm
- T1 - 6 - Detour Ahead
ea.
626(3)a2 Detour Signs - 1200 x 300 mm
- T5 - 1 - Detour (Right)
ea.
626(3)a3 Detour Signs - 1200 x 300 mm
- T5 - 1 - Detour (Left)
ea.
626(3)a4 Detour Signs - 450 x 450 mm
- T5 - 6A - Detour Marker
ea.
626(3)a5 Detour Signs - 900 x 600 mm
- G9 - 40 -2 - Local Traffic
Only ea.
626(3)a6 Detour Signs - 1200 x 600 mm
- T2 - 23 - End Detour ea.
626(4)a1 Road Conditions and Hazard
Signs - 900 x 600 mm - T3 - 1
- Wet Tar ea.
626(4)a2 Road Conditions and Hazard
Signs - 900 x 600 mm - T3 - 3
- Slippery ea.
626(4)a3 Road Conditions and Hazard
Signs - 900 x 600 mm - T3 -6
- Soft Edges ea.
626(4)a4 Road Conditions and Hazard
Signs - 900 x 600 mm - T3 —
7 - Rough Surface
ea.
626(4)a5 Road Conditions and Hazard
Signs - 900 x 600 mm - T3 - 9
- Loose Stones
ea.
626(4)a6 Road Conditions and Hazard
Signs - 900 x 600 mm - T3 -13
- Gravel Road ea.
626(4)a7 Road Conditions and Hazard
Signs - 900 x 600 mm - T3 -
14 - Loose Surface
ea.
626(4)a8 Road Conditions and Hazard
Signs - 1500 x 900 mm - T3 -
12 - No Lines Do Not Overtake
Unless Safe
ea.
626(4)a9 Road Conditions and Hazard
Signs - 1200 x 900 mm - T1 -
10 - Traffic Hazard Ahead
ea.
626(4)a10 Road Conditions and Hazard
Signs - 900 x 600 mm - T2 -
25 - Trucks Entering
ea.
626(4)a11 Road Conditions and Hazard
Signs - 1800 x 900 mm - T4- 5
- Power Line Works in
Proqress
ea.
626(5)a1 Lane and Road Closure Signs -
1800 x 300 mm - T2 - 4 -
Road Closed ea.
626(5)a2 Lane and Road Closure Signs -
1200 x 900 mm - T2 -6 -1 -
Lane Status ea.
626(5)a3 Lane and Road Closure Signs -
1800 x 900 mm - T2 - 6 -2 -
Lane Status ea.
626(6)a1 Blasting Signs - 1200 x 600
mm - T4-2 - Blasting Area
Switch Off Radio Transmitters
ea.
626(6)a2 Blasting Signs - 1200 x 450
mm - T4 - 3 - End Blasting
Area ea.
626(7)a1 Pedestrian Control Signs - 900
x 600 mm - T8 - 1 -
Pedestrians Watch
Your Step ea.
626(7)a2 Pedestrian Control Signs -
1200 x 300 mm - T8 -2 -
Pedestrians (Ripht) ea.
626(7)a3 Pedestrian Control Signs -
1200 x 300 mm - T8 -2 -
Pedestrians (Left) ea.
626(7)a4 Pedestrian Control Signs - 900
x 600 mm - T8 - 3 - Use Other
Path ea.

627(1)a1 Supply and Install Road


Sensors - 2 lanes - Loop-
piezo-loop L.S.
627(1)a2 Supply and Install Road
Sensors - 4 lanes - Loop-
oiezo-loop L.S.
627(1)a3 Supply and Install Road
Sensors - 6 lanes - Loop-
piezo-loop L.S.
627(1)a4 Supply and Install Road
Sensors - > 6 lanes - Loop-
piezo-loop L.S.
627(1)b1 Supply and Install Road
Sensors - 2 lanes - Dual piezo
L.S.
627(1)b2 Supply and Install Road
Sensors - 4 lanes - Dual piezo
L.S.
627(1)b3 Supply and Install Road
Sensors - 6 lanes - Dual piezo
L.S.
627(1)b4 Supply and Install Road
Sensors - > 6 lanes - Dual
piezo L.S.
627(2)a1 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 2 lanes - ATC without
solar L.S.
627(2)a2 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 4 lanes - ATC without
solar L.S.
627(2)a3 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 6 lanes - ATC without
solar L.S.
627(2)a4 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - > 6 lanes - ATC
without solar
L.S.
627(2)b1 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 2 lanes - ATC with
solar L.S.
627(2)b2 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 4 lanes - ATC with
solar L.S.
627(2)b3 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 6 lanes - ATC with
solar L.S.
627(2)b4 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - > 6 lanes - ATC with
solar L.S.
627(2)c1 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 2 lanes - with Remote
Access
Unit L.S.
627(2)c2 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 4 lanes - with Remote
Access
Unit L.S.
627(2)c3 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - 6 lanes - with Remote
Access
Unit L.S.
627(2)c4 Supply and Install Automatic
Traffic Counter/Classifier
(ATC) - > 6 lanes - with
Remote Access
Unit
L.S.
627(3) Complete Installation of Local
Wiring and Connection to ATC
including Testing &
Commissioning L.S.
627(4) Supply and Install ATC
Software L.S.
627(5) Supply and Install Solar Panel
L.S.
627(6)a Supply and Install Permanent
Type Weigh-in-Motion
Axle Scale - High-speed WIM,
sensor-based

L.S.
627(6)b Supply and Install Permanent
Type Weigh-in-Motion
Axle Scale - Low-speed WIM,
load
cell-based
L.S.
627(7) Supply of Portable Weigh-in-
Motion Axle Scale L.S.
627(8) Supply and Install WIM
CPU/Console L.S.
627(9) Supply and Install LED Display
L.S.
627(10) Complete Installation of Local
Wiring and Connection to
CPU/Console including
Testing & Commissioning
L.S.
627(11) Supply and Install WIM
Software L.S.
627(12)a Automatic traffic
counter/classifier (ATC) - In-
ground survey
type ea.
627(12)b Automatic traffic
counter/classifier (ATC) - On-
ground survey
type ea.
627(13) Pneumatic road tubes roll
627(14)a Road tube cable grip - Figure
8 ea.
627(14)b Road tube cable grip - Woven
cable ea.
627(14)c Road tube cable grip - End C-
clamp ea.
627(15)a Road tube anchor - Center
plate clamp ea.
627(15)b Road tube anchor - Center
lane flap ea.
627(15)c Road tube anchor - Bitumen
tape roll
627(16) Replacement road case ea.
627(17)a Battery pack - 6 V 4.5Ah ea.
627(17)b Battery pack - 6 V 12Ah ea.
627(17)c Battery pack - Welded 6 V ea.
627(17)d Battery pack - 36 Ah ea.
627(18) Inductive loop detector cable
roll
627(19)a Piezoelectric axle sensor -
Type I sets
627(19)b Piezoelectric axle sensor -
Type II sets
627(20) Remote access hardware sets
627(21) Solar panel sets
627(22) WIM strip scale ea.
627(23) Weighing scale indicator ea.
627(24) Load cell ea.
627(25) External axle weight/ticket
printer ea.
627(26) Roll-up ramp/levelling pad sets
627(27) Conductor cable with shield sets
627(28) Concrete bollard/protection
post ea.
627(29) Roadside Cabinet or Protection
Cage with
Identification Plate ea.
627(30) Portable Weigh-In Motion Axle
Scale (PWIM) pcs.
627(31) Weigh-In-Motion (WIM)
Systems L.S.
627(32) Automatic Traffic
Counter/Classifier (ATC)
Equipment pcs.

628(1)a Waterproofing on Deck Slab


sq.m.
628(1)b Waterproofing on Deck Slab -
Rubber compound
Membrane Type sq.m.
628(2) Epoxy Coating on Crack l.m.
628(3) Epoxy Injection on Crack l.m.
628(4) Replacement of Expansion
Joint l.m.
628(5) Waterproof Expansion Joint l.m.
628(6) Caulkinp m.
628(7) Patching sq.m.
628(8) Partial Deck Slab Replacement
cu.m.
628(9) Special Anti-Corrosion Paint sq.m.
628(10) Dismantling and Reinstallation
of Existing Signs
ea.
628(11) Structural Concrete Injection
and Crack Repair L.S.
628(12) Protective Coating for
Concrete Structures sq.m.
628(13) Bridge Seat Extension cu.m.

629(1) Bamboo Cribbing l.m.

630(1) Rubberized Playing Field l.m.


630(2) Artificial Turf l.m.

631(1) Drill and Bond Dowels l.m.


631(2) Drilling of Anchor Bolts l.m.
632(1) High Flow Epoxy Mortar for
Submerged and Wet Concrete
Structures cu.m.
PART I - MATE PART I - MATERIALS DETAILS

700 (1) Portland Cement and Masonry


Cement bags

701(1) Construction Lime (Hydrated)


bags

702(1) Bituminous Naterials metric ton

703(1) Aggregates cu.m.

703A(1) Mineral Filler cu.m.

704(1) Masonry Units ea.

705(1) Joint Materials cu.m.

706(1) Concrete, Clay, Plastic and


Fiber Pipe l.m.
707(1) Metal Pipe l.m.

708(1) Chemical Admixtures for


Concrete l

709(1) Paints l

710(1) Reinforcing Steel and Wire


Rope kgs.

711(1) Fence and Guardrail sq.m.

712(1) Structural Metal kgs.

713(1) Treated and Untreated


Timber bd.ft.

714(1) Water l

715(1) Geotextile sq.m.


715(2) Separation Geotextile sq.m.
715(3) Drainage Geotextile sq.m.
715(4) Pavinp Fabric sq.m.
715(5) Hydraulic Filter sq.m.
715(6) Silt Fence l.m.
715(7) Remaining Sediment cu.m.
715(8) Geotextile Bag pcs.

716(1) Drilling Slurry l

719(1) Epoxy-Resin-Base Bonding


Systems for Concrete l.m.

726(1) Coal Tar Surface Treatment


sq.m.

727(1) Non-Shrink Grout kgs.


*Non-shrink gro

729(1) Protective Coating for


Concrete l
“Protective coa

733(1) Zinc (Hot-Dip Galvanized)


Coatings on Iron and Steel
Products l

734(1) Stone Mastic Asphalt with


Cellulose Fiber Surface Course,
Hot-Laid - 0.05 m thick
sq.m.
735(1) Porous Asphalt Pavement with
Polymer Modified Bitumen -
0.05 m thick sq.m.

741(1) Concrete Paving Blocks sq.m.


741(2) Articulated Concrete Blocks sq.m.

PART A - EARTHWORK

800(1) Clearing and Grubbing sq.m.


800(2) Clearing and Grubbing L.S.
800(3)a1 Individual Removal of Trees -
150 - 300mm dia - Small
ea.
800(3)a2 Individual Removal of Trees -
301 - 500 mm.dia - Small
ea.
800(3)a3 Individual Removal of Trees -
501 - 750 mm.dia - Small
ea.
800(3)a4 Individual Removal of Trees -
751 - 900 mm.dia - Small
ea.
800(4) Individual Removal of Trees -
above 900mm dia. - Large
ea.

801(1) Removal of Structures and


Obstruction L.S.
801(2) Removal of Actual
Structures/Obstruction ea.
801(3)a Removal of Actual
Structures/Obstruction sq.m.
801(3)b Removal of Actual
Structures/Obstruction sq.m.
801(3)c Removal of Actual
Structures/Obstruction sq.m.
801(4)a1 Removal of Actual
Structures/Obstruction - 610
mm dia. l.m.
801(4)a2 Removal of Actual
Structures/Obstruction - 760
mm dia. l.m.
801(4)a3 Removal of Actual
Structures/Obstruction - 910
mm dia. l.m.
801(4)a4 Removal of Actual
Structures/Obstruction - 1070
mm dia. l.m.
801(4)a5 Removal of Actual
Structures/Obstruction - 1220
mm dia. l.m.
801(4)a6 Removal of Actual
Structures/Obstruction - 1520
mm dia. l.m.
801(4)b Removal of Actual
Structures/Obstruction l.m.
801(4)c Removal of Actual
Structures/Obstruction l.m.
801(5)a1 Removal of Pipes other than
Pipe Culverts - 50 mm dia. -
PVC l.m.
801(5)a2 Removal of Pipes other than
Pipe Culverts - 75 mm dia. -
PVC l.m.
801(5)a3 Removal of Pipes other than
Pipe Culverts - 100 mm dia. -
PVC l.m.
801(5)a4 Removal of Pipes other than
Pipe Culverts - 150 mm dia. -
PVC l.m.
801(5)a5 Removal of Pipes other than
Pipe Culverts - 200 mm dia. -
PVC l.m.
801(5)a6 Removal of Pipes other than
Pipe Culverts - 250 mm dia. -
PVC l.m.
801(5)a7 Removal of Pipes other than
Pipe Culverts - 300 mm dia. -
PVC l.m.
801(5)b1 Removal of Pipes other than
Pipe Culverts - 150 mm dia. -
Concrete l.m.
801(5)b2 Removal of Pipes other than
Pipe Culverts - 200 mm dia. -
Concrete l.m.
801(5)b3 Removal of Pipes other than
Pipe Culverts - 250 mm dia. -
Concrete l.m.
801(5)b4 Removal of Pipes other than
Pipe Culverts - 300 mm dia. -
Concrete l.m.
801(5)b5 Removal of Pipes other than
Pipe Culverts - 350 mm dia. -
Concrete l.m.
801(5)c1 Removal of Pipes other than
Pipe Culverts - 50 mm dia. -
High Density Polyethylene
HDPE l.m.
801(5)c2 Removal of Pipes other than
Pipe Culverts - 75 mm dia. -
High Density Polyethylene
HDPE l.m.
801(5)c3 Removal of Pipes other than
Pipe Culverts - 100 mm dia. -
High Density Polyethylene
HDPE l.m.
801(5)c4 Removal of Pipes other than
Pipe Culverts - 150 mm dia. -
High Density Polyethylene
HDPE l.m.
801(5)c5 Removal of Pipes other than
Pipe Culverts - 200 mm dia. -
High Density Polyethylene
HDPE l.m.
801(5)c6 Removal of Pipes other than
Pipe Culverts - 250 mm dia. -
High Density Polyethylene
HDPE l.m.
801(5)c7 Removal of Pipes other than
Pipe Culverts - 300 mm dia. -
High Density Polyethylene
HDPE l.m.
801(6) Removal of Structures and
Obstruction - Concrete cu.m.
801(7)a Removal of Structures and
Obstruction - Steel kgs.
801(7)b Removal of Structures and
Obstruction - Steel H-Piles kgs.
801(7)c Removal of Structures and
Obstruction - RSB kgs.
801(8) Relocation of Utilities L.S.
801(9) Relocation of Structures L.S.
801(10) Removal of Structures and
Obstruction (Offshore) - Steel
kgs.
801(11) Removal of Structures and
Obstruction (Offshore) -
Concrete cu.m.

802(1) Unsuitable Excavation cu.m.


802(2) Surplus Common Excavation
cu.m.
802(3)a Surplus Rock Excavation - Soft
cu.m.
802(3)b Surplus Rock Excavation -
Hard cu.m.
802(4) Surplus Unclassified
Excavation cu.m.

803(1)a Structure Excavation -


Common Soil cu.m.
803(1)b Structure Excavation - Soft
Rock cu.m.
803(1)c Structure Excavation - Solid
Rock cu.m.
803(2)a Bridge Excavation - Common
Soil cu.m.
803(2)b Bridge Excavation - Soft Rock
cu.m.
803(2)c Bridge Excavation - Hard Rock
cu.m.
803(3) Foundation Fill cu.m.
803(4) Excavation ordered below Plan
elevation cu.m.
803(5)a Shoring, cribbing and drain
excavation - Shoring L.S.
803(5)b Shoring, cribbing and drain
excavation -
Cribbing/Cofferdamming L.S.
803(6)a Pipe culverts and drain
excavation - Common Soil cu.m.
803(6)b Pipe culverts and drain
excavation - Soft Rock cu.m.
803(6)c Pipe culverts and drain
excavation - Hard Rock cu.m.
803(7) Trimming Works sq.m.

804(1)a Embankment - From structure


excavation cu.m.
804(1)b Embankment - From borrow
cu.m.
804(2)a Selected Borrow for topping -
Case 1 cu.m.
804(2)b Selected Borrow for topping -
Case 2 cu.m.
804(3) Earth Berm cu.m.
804(4) Gravel fill cu.m.

805(1) Dredging - soils cu.m.


805(2) Dredging - coral material cu.m.

806 (1) Reclamation cu.m.

807(1) Site Development L.S.


807(2) Softscape L.S.
807(3)a Softscape - Trees ea.
807(3)b Softscape - Shrubs ea.
807(4) Softscape - Grass sq.m.
807(5) Hardscape L.S.
807(6)a Hardscape - Fountains ea.
807(6)b Hardscape - Benches ea.
807(6)c Hardscape - Gazebos ea.
807(7) Garden Soil cu.m.
807(8)a Aquatic - Plants ea.
807(8)b Aquatic - Animals ea.
807(9) Paver Blocks sq.m.
807(10) Curbs l.m.
807(11) Column Guards ea.
807(12) Wheel Guards ea.
807(13) Fence - CHB sq.m.
807(14) Gate L.S.

PART B — PLAIN AND REINFORCE

900(1)a1 Structural Concrete - Class "A"


- 7 days cu.m.
900(1)a2 Structural Concrete (Footings
and Slab on Fill) - Class "A" - 7
days cu.m.
900(1)a3 Structural Concrete (Footing
Tie Beams) - Class "A" - 7
days cu.m.
900(1)a4 Structural Concrete (Columns)
- Class "A" - 7 days
cu.m.
900(1)a5 Structural Concrete
(Suspended Slab) - Class "A" -
7 days cu.m.
900(1)a6 Structural Concrete
(Beams/Girders) - Class "A" -
7 days cu.m.
900(1)b1 Structural Concrete - Class "A"
- 14 days cu.m.
900(1)b2 Structural Concrete (Footings
and Slab on Fill) - Class "A" -
14 days cu.m.
900(1)b3 Structural Concrete (Footing
Tie Beams) - Class "A" - 14
days cu.m.
900(1)b4 Structural Concrete (Columns)
- Class "A" - 14 days
cu.m.
900(1)b5 Structural Concrete
(Suspended Slab) - Class "A" -
14 days cu.m.
900(1)b6 Structural Concrete
(Beams/Girders) - Class "A" -
14 days cu.m.
900(1)c1 Structural Concrete - Class "A"
- 28 days cu.m.
900(1)c2 Structural Concrete (Footings
and Slab on Fill) - Class "A" -
28 days cu.m.
900(1)c3 Structural Concrete (Footing
Tie Beams) - Class "A" - 28
days cu.m.
900(1)c4 Structural Concrete (Columns)
- Class "A" - 28 days
cu.m.
900(1)c5 Structural Concrete
(Suspended Slab) - Class "A" -
28 days cu.m.
900(1)c6 Structural Concrete
(Beams/Girders) - Class "A" -
28 days cu.m.
900(2)a Structural Concrete - Class "B"
- 7 days cu.m.
900(2)b Structural Concrete - Class "B"
- 14 days cu.m.
900(2)c Structural Concrete - Class "B"
- 28 days cu.m.
900(3)a Structural Concrete - Class "C"
- 7 days cu.m.
900(3)b Structural Concrete - Class "C"
- 14 days cu.m.
900(3)c Structural Concrete - Class "C"
- 28 days cu.m.
900(4)a Structural Concrete - Class "P"
- 7 days cu.m.
900(4)b Structural Concrete - Class "P"
- 14 days cu.m.
900(4)c Structural Concrete - Class "P"
- 28 days cu.m.
900(5) Structural Concrete - Class
"AA" cu.m.
900(6) Seal Concrete cu.m.
900(7) Reinforced Concrete cu.m.
900(8) Structural Concrete - 27.58
Mpa - 28 days cu.m.

901(1) Lean Concrete cu.m.


902(1)a Reinforcing Steel (Deformed) -
Grade 40 kgs.
902(1)b Reinforcing Steel (Deformed) -
Grade 60 kgs.
902(2) Reinforcing Steel
(Plain/Round) kgs.

903(1) Formworks and Falseworks L.S.


903(2) Formworks and Falseworks sq.m.

PART C - FINISHINGS AND OTHER

1000(1) Soil Poisoning l


1000(2) Wood Preservative l
1000(3) Powder Termicide kgs.

1001(1)a1 Pipes and Fittings - 50 mm


dia. - PVC m.
1001(1)a2 Pipes and Fittings - 75 mm
dia. - PVC m.
1001(1)a3 Pipes and Fittings - 100 mm
dia. - PVC m.
1001(1)a4 Pipes and Fittings - 150 mm
dia. - PVC m.
1001(1)a5 Pipes and Fittings - 50 mm
dia. - PVC m.
1001(1)a6 Pipes and Fittings - 75 mm
dia. - PVC m.
1001(1)a7 Pipes and Fittings - 100 mm
dia. - PVC m.
1001(1)a8 Pipes and Fittings - 150 mm
dia. - PVC m.
1001(1)a9 Pipes and Fittings - 200 mm
dia. - PVC m.
1001(1)a10 Pipes and Fittings - 250 mm
dia. - PVC m.
1001(1)a11 Pipes and Fittings - 300 mm
dia. - PVC m.
1001(1)b1 Pipes and Fittings - 150 mm
dia. - Concrete m.
1001(1)b2 Pipes and Fittings - 200 mm
dia. - Concrete m.
1001(1)b3 Pipes and Fittings - 250 mm
dia. - Concrete m.
1001(1)b4 Pipes and Fittings - 300 mm
dia. - Concrete m.
1001(1)b5 Pipes and Fittings - 350 mm
dia. - Concrete m.
1001(1)c1 Pipes and Fittings - 50 mm
dia. - High Density
Polyethylene HDPE m.
1001(1)c2 Pipes and Fittings - 75 mm
dia. - High Density
Polyethylene HDPE m.
1001(1)c3 Pipes and Fittings - 100 mm
dia. - High Density
Polyethylene HDPE m.
1001(1)c4 Pipes and Fittings - 150 mm
dia. - High Density
Polyethylene HDPE m.
1001(1)c5 Pipes and Fittings - 200 mm
dia. - High Density
Polyethylene HDPE m.
1001(1)c6 Pipes and Fittings - 250 mm
dia. - High Density
Polyethylene HDPE m.
1001(1)c7 Pipes and Fittings - 300 mm
dia. - High Density
Polyethylene HDPE m.
1001(2) Concrete Gutter m.
1001(3) Concrete Canal m.
1001(4) Wrought Iron Grating sq.m.
1001(5)a Catch Basin - Concrete ea.
1001(5)b Catch Basin - CHB ea.
1001(6) Catch Basin L.S.
1001(7)a Junction Box - Concrete ea.
1001(7)b Junction Box - CHB ea.
1001(8) Sewer Line Works L.S.
1001(9) Storm Drainage and
Downspout L.S.
1001(10) Pipes with Fittings Connection
L.S.
1001(11) Septic Vault - Concrete/CHB
L.S.
1001(12) Septic Tank - PVC L.S.
1001(13) Septic Tank - PVC ea.
1001(14) Manhole - Concrete/CHB L.S.
1001(15) Manhole - Concrete/CHB ea.
1001(16)a1 Inlets - 150 mm dia. -
Concrete Inlet m.
1001(16)a2 Inlets - 200 mm dia. -
Concrete Inlet m.
1001(16)a3 Inlets - 250 mm dia. -
Concrete Inlet m.
1001(16)a4 Inlets - 300 mm dia. -
Concrete Inlet m.
1001(16)a5 Inlets - 350 mm dia. -
Concrete Inlet m.

1002(1)a Galvanized Iron Pipes with


Fittings - 13 mm dia. m.
1002(1)b Galvanized Iron Pipes with
Fittings - 25 mm dia. m.
1002(1)c Galvanized Iron Pipes with
Fittings - 32 mm dia. m.
1002(1)d Galvanized Iron Pipes with
Fittings - 40 mm dia. m.
1002(1)e Galvanized Iron Pipes with
Fittings - 50 mm dia. m.
1002(1)f Galvanized Iron Pipes with
Fittings - 65 mm dia. m.
1002(1)g Galvanized Iron Pipes with
Fittings - 75 mm dia. m.
1002(1)h Galvanized Iron Pipes with
Fittings - 100 mm dia. m.
1002(1)i Galvanized Iron Pipes with
Fittings - 150 mm dia. m.
1002(2)a1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 20 mm dia. - PN 10
m.
1002(2)a2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 20 mm dia. - PN 16
m.
1002(2)a3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 20 mm dia. - PN 20
m.
1002(2)b1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 25 mm dia. - PN 10
m.
1002(2)b2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 25 mm dia. - PN 16
m.
1002(2)b3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 25 mm dia. - PN 20
m.
1002(2)c1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 32 mm dia. - PN 10
m.
1002(2)c2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 32 mm dia. - PN 16
m.
1002(2)c3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 32 mm dia. - PN 20
m.
1002(2)d1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 40 mm dia. - PN 10
m.
1002(2)d2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 40 mm dia. - PN 16
m.
1002(2)d3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 40 mm dia. - PN 20
m.
1002(2)e1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 50 mm dia. - PN 10
m.
1002(2)e2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 50 mm dia. - PN 16
m.
1002(2)e3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 50 mm dia. - PN 20
m.
1002(2)f1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 63 mm dia. - PN 10
m.
1002(2)f2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 63 mm dia. - PN 16
m.
1002(2)f3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 63 mm dia. - PN 20
m.
1002(2)g1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 75 mm dia. - PN 10
m.
1002(2)g2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 75 mm dia. - PN 16
m.
1002(2)g3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 75 mm dia. - PN 20
m.
1002(2)h1 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 100 mm dia. - PN 10
m.
1002(2)h2 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 100 mm dia. - PN 16
m.
1002(2)h3 Polyprophylene Random
Copolymer (PPR-C) Pipes with
Fittings - 100 mm dia. - PN 20
m.
1002(3)a PVC Pipes (blue) with Fittings
- 13 mm dia. m.
1002(3)b PVC Pipes (blue) with Fittings
- 25 mm dia. m.
1002(3)c PVC Pipes (blue) with Fittings
- 32 mm dia. m.
1002(3)d PVC Pipes (blue) with Fittings
- 40 mm dia. m.
1002(3)e PVC Pipes (blue) with Fittings
- 50 mm dia. m.
1002(3)f PVC Pipes (blue) with Fittings
- 65 mm dia. m.
1002(3)g PVC Pipes (blue) with Fittings
- 75 mm dia. m.
1002(3)h PVC Pipes (blue) with Fittings
- 100 mm dia. m.
1002(4) Plumbing Fixtures L.S.
1002(5)a Water Closet, Elongated,
Complete - Tank Type sets
1002(5)b Water Closet, Elongated,
Complete - Flush Type sets
1002(6) Water Closet, Elongated,
Automatic Flush Valve,
Complete - Sensor Type sets
1002(7)a Water Closet, Round Front,
Complete - Tank Type sets
1002(7)b Water Closet, Round Front,
Complete - Flush Type sets
1002(8) Water Closet, Round Front,
Automatic Flush Valve,
Complete - Sensor Type sets
1002(9)a Urinal, Flush Valve, Complete -
Push Button Type
sets
1002(9)b Urinal, Flush Valve, Complete -
Lever Arm Type
sets
1002(10) Urinal, Automatic Flush Valve,
Complete - Sensor Type
sets
1002(11)a Kitchen Sink, Complete -
Stainless sets
1002(11)b Kitchen Sink, Complete -
Aluminum sets
1002(12) Scrub Up Sink, Complete sets
1002(13) Slop Sink, Complete sets
1002(14)a Lavatory, Wall Hung,
Complete - Manually Operated
sets
1002(14)b Lavatory, Wall Hung,
Complete - Sensor Type sets
1002(15)a Lavatory, Counter Top/Under
Counter, Complete - Manually
Operated
sets
1002(15)b Lavatory, Counter Top/Under
Counter, Complete - Sensor
Type sets
1002(16)a1 Floor Drain Plates - 50 mm
dia. - Stainless sets
1002(16)a2 Floor Drain Plates - 75 mm
dia. - Stainless sets
1002(16)a3 Floor Drain Plates - 100 mm
dia. - Stainless sets
1002(16)b1 Floor Drain Plates - 50 mm
dia. - Brass sets
1002(16)b2 Floor Drain Plates - 75 mm
dia. - Brass sets
1002(16)b3 Floor Drain Plates - 100 mm
dia. - Brass sets
1002(17) Bidet pcs.
1002(18) Stainless Steel Grab Bar,
40mm dia. l.m.
1002(19) Shower Head/Shower Valve sets
1002(20) Facial Mirror sq.m.
1002(21) Faucet pcs.
1002(22) Hose Bibb pcs.
1002(23)a Water Meter - 20 mm dia. pcs.
1002(23)b Water Meter - 25 mm dia. pcs.
1002(23)c Water Meter - 32 mm dia. pcs.
1002(24) Cold Water Lines L.S.
1002(25) Hot Water Lines L.S.
1002(26) Cistern L.S.
1002(27) Plumbing Works L.S.

1003(1)a1 Ceiling - 4.5 mm - Metal


Frame - Fiber Cement Board
sq.m.
1003(1)a2 Ceiling - 4.5 mm - Wood
Frame - Fiber Cement Board
sq.m.
1003(1)b1 Ceiling - 4.5 mm - Metal
Frame - Marine Plywood sq.m.
1003(1)b2 Ceiling - 4.5 mm - Wood
Frame - Marine Plywood sq.m.
1003(1)c1 Ceiling - 6 mm - Metal Frame -
Marine Plywood sq.m.
1003(1)c2 Ceiling - 6 mm - Wood Frame
- Marine Plywood sq.m.
1003(1)d1 Ceiling - 6 mm - Metal Frame -
Ordinary Plywood sq.m.
1003(1)d2 Ceiling - 6 mm - Wood Frame
- Ordinary Plywood sq.m.
1003(1)e1 Ceiling - Metal Frame -
Gypsum Board sq.m.
1003(1)e2 Ceiling - Metal Frame -
Prepainted Metal Panel sq.m.
1003(1)e3 Ceiling - Metal Frame -
Aluminum Metal Cladding sq.m.
1003(1)f Ceiling - Wood Frame - Wood
sq.m.
1003(1)g1 Ceiling - Wood Frame - PVC sq.m.
1003(1)g2 Ceiling - Metal Frame - PVC sq.m.
1003(1)h Ceiling L.S.
1003(2)a1 Wall - 4.5 mm - Metal Frame -
Fiber Cement Board
sq.m.
1003(2)a2 Wall - 4.5 mm - Wood Frame -
Fiber Cement Board
sq.m.
1003(2)b1 Wall - 6 mm - Metal Frame -
Fiber Cement Board sq.m.
1003(2)b2 Wall - 10 mm - Metal Frame -
Fiber Cement Board
sq.m.
1003(2)b3 Wall - 12 mm - Metal Frame -
Fiber Cement Board
sq.m.
1003(2)b4 Wall - 6 mm - Wood Frame -
Fiber Cement Board sq.m.
1003(2)c1 Wall - 4.5 mm - Metal Frame -
Marine Plywood sq.m.
1003(2)c2 Wall - 4.5 mm - Wood Frame -
Marine Plywood sq.m.
1003(2)d1 Wall - 6 mm - Metal Frame -
Marine Plywood sq.m.
1003(2)d2 Wall - 6 mm - Wood Frame -
Marine Plywood sq.m.
1003(2)e1 Wall - 6 mm - Metal Frame -
Ordinary Plywood sq.m.
1003(2)e2 Wall - 6 mm - Wood Frame -
Ordinary Plywood sq.m.
1003(2)f Wall - Aluminum Metal
Cladding sq.m.
1003(2)g Wall - Concrete Cladding L.S.
1003(2)h Wall L.S.
1003(3) Cabinets sq.m.
1003(4) Cabinets ea.
1003(5) Roof Frame - Wood bd.ft.
1003(6) Roof Frame - Wood bd.ft.
1003(7) Flooring - Wood sq.m.
1003(8) Flooring - Wood bd.ft.
1003(9) Wall Frame - Wood ea.
1003(10) Wall Frame - Wood m.
1003(11)a1 Fascia Board - 19 mm - Fiber
Cement Board m.
1003(11)a2 Fascia Board - 25 mm -
Lumber m.
1003(12) Fascia Board - Metal kgs.
1003(13) Phenolic Board ea.
1003(14) Phenolic Board sq.m.
1003(15)a Moulding - Wood m.
1003(15)b Moulding - Concrete m.
1003(15)c Moulding - Precast m.
1003(15)d Moulding - PVC m.
1003(15)e Moulding - Steel m.
1003(16) Pressurized Laminated Wood
Particles sq.m.
1003(17) Carpentry and Joinery Works
L.S.
1003(18) Lawanit sq.m.
1003(19) Wooden Post - Good Lumber
bd.ft.
1003(20) Coco Lumber bd.ft.
1003(21) Moulding L.S.
1003(22) Modular Partition sq.m.
1003(23) Modular Partition L.S.

1004(1) Rough Hardware L.S.


1004(2) Finishing Hardware L.S.

1005(1) Residential Casement (Steel)


sq.m.
1005(2) Heavy Duty Side-hinged
Ventilator sq.m.
1005(3) Projected Ventilator sq.m.
1005(4) Awning Ventilator sq.m.
1005(5) Steel Window L.S.
1005(6) Window Accessory L.S.
1005(7) Louver Window sq.m.

1006(1) Hollow Steel Door sq.m.


1006(2) Flush Door sq.m.
1006(3) Grille Door sq.m.
1006(4) Steel Louver Door sq.m.
1006(5) Fire Rated Fire Exit Steel Door
sq.m.
1006(6) Steel Doors and Frames L.S.

1007(1)a Aluminum Framed Glass Door


- Sliding Type sq.m.
1007(1)b Aluminum Framed Glass Door
- Swing Type sq.m.
1007(2) Aluminum Framed Glass Door
L.S.
1008(1)a Aluminum Glass Windows -
Sliding Type sq.m.
1008(1)b Aluminum Glass Windows -
Casement Type sq.m.
1008(1)c Aluminum Glass Windows -
Awning Type sq.m.
1008(1)d Aluminum Glass Windows -
Fixed Type sq.m.
1008(2) Aluminum Glass Windows L.S.

1009(1)a Jalousie Windows - Glass sq.m.


1009(1)b Jalousie Windows - Wood sq.m.
1009(2) Jalousie Windows L.S.

1010(1) Frames - Jambs, Sills, Head,


Transoms and Mullions
sets
1010(2)a Doors - Flush sq.m.
1010(2)b Doors - Wood Panel sq.m.
1010(2)c Doors - Glass Panel sq.m.
1010(3) Window Sashes sq.m.
1010(4) Wooden Doors and Windows
L.S.

1011(1)a Roll-Up Door - Steel sets


1011(1)b Roll-Up Door - Aluminum sets
1011(2) Roll-Up Doors L.S.

1012(1) Float Glass - 5.6mm sq.m.


1012(2) Ordinary window & Sheet
Glass - 5.6mm sq.m.
1012(3)a Tempered Glass Doors -
10mm sq.m.
1012(3)b Tempered Glass Doors -
12mm sq.m.
1012(4)a Tempered Glass Windows -
8mm sq.m.
1012(4)b Tempered Glass Windows -
10mm sq.m.
1012(5)a Tempered Glass
Walls/Barriers, etc. - 6mm sq.m.
1012(5)b Tempered Glass
Walls/Barriers, etc. - 8mm sq.m.
1012(5)c Tempered Glass
Walls/Barriers, etc. - 10mm sq.m.
1012(6) Glass and Glazing L.S.
1012(7) Facial Mirror sq.m.

1013(1) Corrugated Metal Roofing -


gauge 26 sq.m.
1013(2)a1 Fabricated Metal Roofing
Accessory - gauge 26 -
Ridge/Hip Rolls l.m.
1013(2)a2 Fabricated Metal Roofing
Accessory - gauge 26 -
Flashings l.m.
1013(2)b1 Fabricated Metal Roofing
Accessory - gauge 24 -
Gutters l.m.
1013(2)b2 Fabricated Metal Roofing
Accessory - gauge 24 -
Downspouts l.m.
1013(2)b3 Fabricated Metal Roofing
Accessory - gauge 24 - Valley
Rolls/Gutter l.m.
1013(2)b4 Fabricated Metal Roofing
Accessory - gauge 24 -
Counter Flashing Gutter l.m.
1013(3) Fabricated Metal Roofing
Accessory - gauge 26 - Plain
GI Sheet ea.
1013(4) Roof Ventilators ea.

1013A(1) Corrugated Asphalt Roofing -


gauge 26 sq.m.
1013A(2)a1 Fabricated Asphalt Roofing
Accessory - gauge 26 -
Ridge/Hip Rolls l.m.
1013A(2)a2 Fabricated Asphalt Roofing
Accessory - gauge 26 -
Flashings l.m.
1013A(2)b1 Fabricated Asphalt Roofing
Accessory - gauge 24 -
Gutters l.m.
1013A(2)b2 Fabricated Asphalt Roofing
Accessory - gauge 24 -
Downspouts l.m.
1013A(2)b3 Fabricated Asphalt Roofing
Accessory - gauge 24 - Valley
Rolls/Gutter l.m.
1013A(2)b4 Fabricated Asphalt Roofing
Accessory - gauge 24 -
Counter Flashing Gutter l.m.
1013A(3) Roof Ventilators ea.

1014(1)a1 Prepainted Metal Sheets -


below 0.427 mm - Corrugated
Type - Short Span
sq.m.
1014(1)a2 Prepainted Metal Sheets -
below 0.427 mm - Rib Type -
Short Span sq.m.
1014(1)b1 Prepainted Metal Sheets -
above 0.427 mm - Corrugated
Type - Long Span
sq.m.
1014(1)b2 Prepainted Metal Sheets -
above 0.427 mm - Rib Type -
Long Span sq.m.

1015 (1) Clay Roof Tile sq.m.

1016(1)a Waterproofing - Cement-base


sq.m.
1016(1)b Waterproofing - Liquid sq.m.
1016(2) Built-up and Preformed
Membrane sq.m.
1017(1)a Roof Drain with Strainer - 50
mm dia. sets
1017(1)b Roof Drain with Strainer - 75
mm dia. sets
1017(1)c Roof Drain with Strainer - 100
mm dia. sets
1017(1)d Roof Drain with Strainer - 150
mm dia. sets
1017(2)a Canopy Drain with Strainer -
50 mm dia. sets
1017(2)b Canopy Drain with Strainer -
75 mm dia. sets
1017(2)c Canopy Drain with Strainer -
100 mm dia. sets
1017(2)d Canopy Drain with Strainer -
150 mm dia. sets
1017(3)a Gutter Drain with Strainer - 50
mm dia. sets
1017(3)b Gutter Drain with Strainer - 75
mm dia. sets
1017(3)c Gutter Drain with Strainer -
100 mm dia. sets

1018(1) Glazed Tiles and Trims sq.m.


1018(2) Unglazed Tiles sq.m.
1018(3) Granite Tiles sq.m.
1018(4) Synthetic Granite Tiles sq.m.
1018(5) Glazed Tiles sq.m.
1018(6) Textured Glazed Tiles sq.m.
1018(7) Textured Unglazed Tiles sq.m.

1019(1)a Wood Tile - Narra sq.m.


1019(1)b Wood Tile - Tanguile sq.m.
1019(1)c Wood Tile - Others sq.m.
1019(1)d Wood Tile - Laminated sq.m.

1020(1)a Vinyl Floor Tile sq.m.


1020(1)b Vinyl Floor Tile L.S.
1021(1)a Cement Floor Finish - Plain sq.m.
1021(1)b Cement Floor Finish - Colored
sq.m.
1021(1)c Cement Floor Finish - with
Floor Hardener sq.m.
1021(2) Stamped Concrete sq.m.
1021(3)a Floor Topping - Plain sq.m.
1021(3)b Floor Topping - Trowelled
Finish sq.m.
1021(3)c Floor Topping - Dry-Shake
Finish sq.m.
1021(4) Straight to Finish sq.m.
1021(5) Cement Broom Finish sq.m.
1021(6) Nonslip Finish sq.m.
1021(7) Scratched Finish sq.m.
1021(8) Floated Finish sq.m.
1021(9) Exposed Aggregate Finish sq.m.
1021(10) Gloss-imparting Waxes sq.m.
1021(11) Evaporation Reducers sq.m.
1021(12) Floor Finishes L.S.

1022(1) Stucco Finish sq.m.

1023(1) Corridors and Stair Landings sq.m.


1023(2) Treads and Risers, etc. l.m.
1023(3) Rooms and others sq.m.

1024 (1) Pea Gravel Washout Finish sq.m.

1025(1)a Hammered Finish - Bush sq.m.


1025(1)b Hammered Finish - Fluted
Bush sq.m.
1026(1) Pebble Washout sq.m.

1027(1) Cement Plaster Finish sq.m.


1027(2) Simulated Red Bricks sq.m.
1027(3) Decorative Stone sq.m.
1027(4) Cement Plaster Finish L.S.

1028(1)a Synthetic Adobe Finish - Bush


Hammered sq.m.
1028(1)b Synthetic Adobe Finish -
Fluted Bush Hammered sq.m.
1028(2) Synthetic Finish - Piqueta Tool
Finish sq.m.

1029(1) Granatite Washout Finish sq.m.

1030(1) Acoustical Ceiling Panel sq.m.

1031(1)a Acoustical - Tile sq.m.


1031(1)b Acoustical - Board sq.m.
1031(1)c Acoustical - Panel sq.m.
1031(2) Sprayed-on acoustical material
sq.m.

1032(1)a Painting Works -


Masonry/Concrete sq.m.
1032(1)b Painting Works - Wood sq.m.
1032(1)c Painting Works - Steel sq.m.
1032(2) Varnishing sq.m.
1032(3) Sea-mist Finish sq.m.
1032(4) Ducco Finish sq.m.
1032(5) Textured Finish sq.m.

1033(1) Metal Deck Panel l.m.

1034(1)a Damp proofing - Asphalt sq.m.


1034(1)b Damp proofing - Polyethylene
Sheet sq.m.
1034(1)c Damp proofing - Coal-tar pitch
sq.m.
1034(1)d Damp proofing - Emulsified
Asphalt sq.m.

1035(1) Furring Channel l.m.

1036(1)a Polycarbonate - Sheets l.m.


1036(1)b Polycarbonate - Panel l.m.

1037(1) Concrete Roof Tile sq.m.

1038(1) Reflective Insulation sq.m.

1039(1) Aluminum Cladding sq.m.

1040(1) Metal Lath and Accessories L.S.


1041(1) Gypsum Board for Walls sq.m.
1041(2) Gypsum Board for Ceilings sq.m.

1042(1) Stainless Steel Door and


Frames sq.m.
1042(2) Stainless Steel Door and
Frames sets

1043(1) PVC Doors and Frames sq.m.


1043(2) PVC Doors and Frames sets

1044(1) Folding Door - Wooden sq.m.


1044(1) Folding Door - Steel/Aluminum
sq.m.
1044(1) Folding Door - Plastic sq.m.
1044(2) Folding Partition - Wooden sq.m.
1044(2) Folding Partition -
Steel/Aluminum sq.m.
1044(2) Folding Partition - Plastic sq.m.

1045(1) Perforated Ceiling Panels sq.m.

1046(1)a1 CHB Load Bearing (including


Reinforcing Steel) - 100 mm
sq.m.
1046(1)a2 CHB Load Bearing (including
Reinforcing Steel) - 150 mm
sq.m.
1046(2)a1 CHB Non-Load Bearing
(including Reinforcing Steel) -
100 mm sq.m.
1046(2)a2 CHB Non-Load Bearing
(including Reinforcing Steel) -
150 mm sq.m.
1046(3) Louver Blocks sq.m.
1046(4) AutoClaved Aerated Concrete
Blocks sq.m.

1047(1) Structural Steel L.S.


1047(2)a Structural Steel - Trusses kgs.
1047(2)b Structural Steel - Purlins kgs.
1047(2)c Structural Steel - Cladding kgs.
1047(3)a Metal Structure Accessories -
Bolts ea.
1047(3)b Metal Structure Accessories -
Sagrods ea.
1047(3)c Metal Structure Accessories -
Turnbuckle ea.
1047(3)d Metal Structure Accessories -
Cross Bracing ea.
1047(4) Metal Structure Accessories -
Cross Bracing kgs.
1047(5) Metal Structure Accessories -
Steel Plates ea.
1047(6) Metal Structure Accessories -
Steel Plates kgs.
1047(7)a Metal Structure Accessories -
Bolts kgs.
1047(7)b Metal Structure Accessories -
Sagrods kgs.
1047(7)c Metal Structure Accessories -
Turnbuckle kgs.
1047(8) Structural Steel - Roof
Framing L.S.
1047(9) Stainless Steel Pipe - Flagpole
Post kgs.
1047(10) Metal Structure Accessories L.S.

1048(1)a Carbon Fiber - 1 Layer sq.m.


1048(1)b Carbon Fiber - 2 Layers sq.m.
1048(1)c Carbon Fiber - 3 Layers sq.m.
1048(1)d Carbon Fiber - 4 Layers sq.m.
1048(1)e Carbon Fiber - Plate sq.m.
1048(2) Carbon Fiber L.S.
1048(3)a Aramid Fiber - 1 Layer sq.m.
1048(3)b Aramid Fiber - 2 Layers sq.m.
1048(3)c Aramid Fiber - 3 Layers sq.m.
1048(3)d Aramid Fiber - 4 Layers sq.m.
1048(4) Aramid Fiber L.S.
1048(5) Glass Fiber - Sheet sq.m.
1048(6) Glass Fiber L.S.

1049(1)a Jet Grouting - 0.8 m.


1049(1)b Jet Grouting - 1 m.
1049(1)c Jet Grouting - 1.2 m.

1051(1) Railing m.
1051(2)a Concrete Railing - Standard m.
1051(2)b Concrete Railing - Balluster m.
1051(2)c Concrete Railing - Parapet m.
1051(3) Wooden Railing m.
1051(4) Stone and Brick Railing m.
1051(5) Metal Railing m.
1051(6) Railing L.S.
1051(7) Glass Railing m.

1052(1) Untreated Timber Piles,


furnished m.
1052(2) Treated Timber Piles,
preservative, furnished m.
1052(3) Steel H-Piles, furnished m.
1052(4)a Precast Concrete Piles,
furnished - 400x400 mm m.
1052(4)b Precast Concrete Piles,
furnished - 450x450 mm m.
1052(5)a Precast, Prestresssed Concrete
Piles, furnished - 400x400 mm
m.
1052(5)b Precast, Prestresssed Concrete
Piles, furnished - 450x450 mm
m.
1052(6) Structural Steel Sheet Piles,
furnished m.
1052(7) Precast Concrete Sheet Piles,
furnished m.
1052(8) Untreated Timber Piles, driven
m.
1052(9) Treated Timber Piles, driven
m.
1052(10) Steel H-Piles, driven m.
1052(11) Steel Pipes Piles m.
1052(12) Structural Steel Sheet Piles,
driven m.
1052(13) Precast Concrete Sheet Piles,
driven m.
1052(14) Precast Concrete Piles, driven
m.
1052(15) Precast, Prestresssed Concrete
Piles, driven m.
1052(16) Test Piles, furnished and
driven m.
1052(17)a Concrete Piles cast in Drilled
Holes - 0.8 m.
1052(17)b Concrete Piles cast in Drilled
Holes - 0.9 m.
1052(17)c Concrete Piles cast in Drilled
Holes - 1 m.
1052(17)d Concrete Piles cast in Drilled
Holes - 1.1 m.
1052(17)e Concrete Piles cast in Drilled
Holes - 1.2 m.
1052(17)f Concrete Piles cast in Drilled
Holes - 1.3 m.
1052(17)g Concrete Piles cast in Drilled
Holes - 1.4 m.
1052(17)h Concrete Piles cast in Drilled
Holes - 1.5 m.
1052(17)i Concrete Piles cast in Drilled
Holes - 1.6 m.
1052(17)j Concrete Piles cast in Drilled
Holes - 1.7 m.
1052(17)k Concrete Piles cast in Drilled
Holes - 1.8 m.
1052(17)l Concrete Piles cast in Drilled
Holes - 1.9 m.
1052(17)m Concrete Piles cast in Drilled
Holes - 2 m.
1052(17)n Concrete Piles cast in Drilled
Holes - 2.1 m.
1052(17)o Concrete Piles cast in Drilled
Holes - 2.2 m.
1052(17)p Concrete Piles cast in Drilled
Holes - 2.3 m.
1052(17)q Concrete Piles cast in Drilled
Holes - 2.4 m.
1052(17)r Concrete Piles cast in Drilled
Holes - 2.5 m.
1052(17)s Concrete Piles cast in Drilled
Holes - 2.6 m.
1052(17)t Concrete Piles cast in Drilled
Holes - 2.7 m.
1052(17)u Concrete Piles cast in Drilled
Holes - 2.8 m.
1052(17)v Concrete Piles cast in Drilled
Holes - 2.9 m.
1052(17)w Concrete Piles cast in Drilled
Holes - 3 m.
1052(18) Concrete Piles cast in Steel
Shells - 400-500 mm dia. m.
1052(19) Concrete Piles cast in Steel
Pipes - 400-500 mm dia. m.
1052(20) Pile Shoes m.
1052(21) Splices m.
1052(22) Load Tests m.
1052(23)a1 Permanent Casing - 0.8 -
10mm thick m.
1052(23)a2 Permanent Casing - 0.8 -
12mm thick m.
1052(23)a3 Permanent Casing - 0.8 -
16mm thick m.
1052(23)b1 Permanent Casing - 0.9 -
10mm thick m.
1052(23)b2 Permanent Casing - 0.9 -
12mm thick m.
1052(23)b3 Permanent Casing - 0.9 -
16mm thick m.
1052(23)c1 Permanent Casing - 1 - 10mm
thick m.
1052(23)c2 Permanent Casing - 1 - 12mm
thick m.
1052(23)c3 Permanent Casing - 1 - 16mm
thick m.
1052(23)d1 Permanent Casing - 1.1 -
10mm thick m.
1052(23)d2 Permanent Casing - 1.1 -
12mm thick m.
1052(23)d3 Permanent Casing - 1.1 -
16mm thick m.
1052(23)e1 Permanent Casing - 1.2 -
10mm thick m.
1052(23)e2 Permanent Casing - 1.2 -
12mm thick m.
1052(23)e3 Permanent Casing - 1.2 -
16mm thick m.
1052(23)f1 Permanent Casing - 1.3 -
10mm thick m.
1052(23)f2 Permanent Casing - 1.3 -
12mm thick m.
1052(23)f3 Permanent Casing - 1.3 -
16mm thick m.
1052(23)g1 Permanent Casing - 1.4 -
10mm thick m.
1052(23)g2 Permanent Casing - 1.4 -
12mm thick m.
1052(23)g3 Permanent Casing - 1.4 -
16mm thick m.
1052(23)h1 Permanent Casing - 1.5 -
10mm thick m.
1052(23)h2 Permanent Casing - 1.5 -
12mm thick m.
1052(23)h3 Permanent Casing - 1.5 -
16mm thick m.
1052(23)i1 Permanent Casing - 1.6 -
12mm thick m.
1052(23)i2 Permanent Casing - 1.6 -
16mm thick m.
1052(23)j1 Permanent Casing - 1.7 -
12mm thick m.
1052(23)j2 Permanent Casing - 1.7 -
16mm thick m.
1052(23)k1 Permanent Casing - 1.8 -
12mm thick m.
1052(23)k2 Permanent Casing - 1.8 -
16mm thick m.
1052(23)l1 Permanent Casing - 1.9 -
12mm thick m.
1052(23)l2 Permanent Casing - 1.9 -
16mm thick m.
1052(23)m1 Permanent Casing - 2 - 12mm
thick m.
1052(23)m2 Permanent Casing - 2 - 16mm
thick m.
1052(23)n1 Permanent Casing - 2.1 -
12mm thick m.
1052(23)n2 Permanent Casing - 2.1 -
16mm thick m.
1052(23)o1 Permanent Casing - 2.2 -
12mm thick m.
1052(23)o2 Permanent Casing - 2.2 -
16mm thick m.
1052(23)p1 Permanent Casing - 2.3 -
12mm thick m.
1052(23)p2 Permanent Casing - 2.3 -
16mm thick m.
1052(23)q1 Permanent Casing - 2.4 -
12mm thick m.
1052(23)q2 Permanent Casing - 2.4 -
16mm thick m.
1052(23)r1 Permanent Casing - 2.5 -
16mm thick m.
1052(23)r2 Permanent Casing - 2.5 -
20mm thick m.
1052(23)s1 Permanent Casing - 2.6 -
16mm thick m.
1052(23)s2 Permanent Casing - 2.6 -
20mm thick m.
1052(23)t1 Permanent Casing - 2.7 -
16mm thick m.
1052(23)t2 Permanent Casing - 2.7 -
20mm thick m.
1052(23)u1 Permanent Casing - 2.8 -
16mm thick m.
1052(23)u2 Permanent Casing - 2.8 -
20mm thick m.
1052(23)v1 Permanent Casing - 2.9 -
16mm thick m.
1052(23)v2 Permanent Casing - 2.9 -
20mm thick m.
1052(23)w1 Permanent Casing - 3 - 16mm
thick m.
1052(23)w2 Permanent Casing - 3 - 20mm
thick m.
1052(24) Splicing of R.C. Piles with
Epoxy kgs.
1052(25) Splicing of R.C. Piles with
Epoxy ea.
1052(26)a Pile Integrity Testing -
Crosshole-Sonic ea.
1052(26)b Pile Integrity Testing - Low
Strain ea.
1052(27) High Strain Dynamic Testing
(P.D.A) ea.
1052(28)a Micro Piles - 0.2 m.
1052(28)b Micro Piles - 0.25 m.
1052(28)c Micro Piles - 0.3 m.
1052(29)a Permanent Casing (Micro
Piles) - 0.2 kgs.
1052(29)b Permanent Casing (Micro
Piles) - 0.25 kgs.
1052(29)c Permanent Casing (Micro
Piles) - 0.3 kgs.
1052(30) Rammed Aggregate Piers cu.m.
1052(31) Vibro Stone Columns cu.m.
1052(32) Modulus or Uplift Load Tests
ea.
1052(33) Steel Casing l.m.
1053(1) Carpet Floor Tiles sq.m.
1053(1) Carpet Floor Tiles L.S.

1054(1) Glass Fiber Reinforced


Concrete (GFRC) Cladding
Panels sq.m.

1055(1) Sprayed Cementitious


Fireproofing sq.m.

1056(1) Asphalt Roofing Shingles sq.m.

PART D - ELECTRICAL

1100(1)a Rigid Steel Conduit (RSC) - 15


mm dia. m.
1100(1)b Rigid Steel Conduit (RSC) - 20
mm dia. m.
1100(1)c Rigid Steel Conduit (RSC) - 25
mm dia. m.
1100(1)d Rigid Steel Conduit (RSC) - 32
mm dia. m.
1100(1)e Rigid Steel Conduit (RSC) - 40
mm dia. m.
1100(1)f Rigid Steel Conduit (RSC) - 50
mm dia. m.
1100(1)g Rigid Steel Conduit (RSC) - 65
mm dia. m.
1100(1)h Rigid Steel Conduit (RSC) - 80
mm dia. m.
1100(1)i Rigid Steel Conduit (RSC) - 90
mm dia. m.
1100(1)j Rigid Steel Conduit (RSC) -
100 mm dia. m.
1100(1)k Rigid Steel Conduit (RSC) -
125 mm dia. m.
1100(1)l Rigid Steel Conduit (RSC) -
150 mm dia. m.
1100(2)a Intermediate Metal Conduit
(IMC) - 15 mm dia. m.
1100(2)b Intermediate Metal Conduit
(IMC) - 20 mm dia. m.
1100(2)c Intermediate Metal Conduit
(IMC) - 25 mm dia. m.
1100(2)d Intermediate Metal Conduit
(IMC) - 32 mm dia. m.
1100(2)e Intermediate Metal Conduit
(IMC) - 40 mm dia. m.
1100(2)f Intermediate Metal Conduit
(IMC) - 50 mm dia. m.
1100(2)g Intermediate Metal Conduit
(IMC) - 65 mm dia. m.
1100(2)h Intermediate Metal Conduit
(IMC) - 80 mm dia. m.
1100(2)i Intermediate Metal Conduit
(IMC) - 90 mm dia. m.
1100(2)j Intermediate Metal Conduit
(IMC) - 100 mm dia. m.
1100(3)a Flexible Metal Conduit - 15
mm dia. m.
1100(3)b Flexible Metal Conduit - 20
mm dia. m.
1100(3)c Flexible Metal Conduit - 25
mm dia. m.
1100(3)d Flexible Metal Conduit - 32
mm dia. m.
1100(3)e Flexible Metal Conduit - 40
mm dia. m.
1100(3)f Flexible Metal Conduit - 50
mm dia. m.
1100(3)g Flexible Metal Conduit - 65
mm dia. m.
1100(3)h Flexible Metal Conduit - 80
mm dia. m.
1100(3)i Flexible Metal Conduit - 90
mm dia. m.
1100(3)j Flexible Metal Conduit - 100
mm dia. m.
1100(4)a Electrical Metallic Tubing
(EMT) - 15 mm dia. m.
1100(4)b Electrical Metallic Tubing
(EMT) - 20 mm dia. m.
1100(4)c Electrical Metallic Tubing
(EMT) - 25 mm dia. m.
1100(4)d Electrical Metallic Tubing
(EMT) - 32 mm dia. m.
1100(4)e Electrical Metallic Tubing
(EMT) - 40 mm dia. m.
1100(4)f Electrical Metallic Tubing
(EMT) - 50 mm dia. m.
1100(4)g Electrical Metallic Tubing
(EMT) - 65 mm dia. m.
1100(4)h Electrical Metallic Tubing
(EMT) - 80 mm dia. m.
1100(4)i Electrical Metallic Tubing
(EMT) - 90 mm dia. m.
1100(4)j Electrical Metallic Tubing
(EMT) - 100 mm dia. m.
1100(5)a Rigid Type Flexible Non-
Metallic Conduit - 10 mm dia.
m.
1100(5)b Rigid Type Flexible Non-
Metallic Conduit - 15 mm dia.
m.
1100(5)c Rigid Type Flexible Non-
Metallic Conduit - 20 mm dia.
m.
1100(5)d Rigid Type Flexible Non-
Metallic Conduit - 25 mm dia.
m.
1100(5)e Rigid Type Flexible Non-
Metallic Conduit - 32 mm dia.
m.
1100(5)f Rigid Type Flexible Non-
Metallic Conduit - 40 mm dia.
m.
1100(5)g Rigid Type Flexible Non-
Metallic Conduit - 50 mm dia.
m.
1100(6)a Polyvinyl Chloride Pipes
(PVC/uPVC) - 20 mm dia. m.
1100(6)b Polyvinyl Chloride Pipes
(PVC/uPVC) - 25 mm dia. m.
1100(6)c Polyvinyl Chloride Pipes
(PVC/uPVC) - 32 mm dia. m.
1100(6)d Polyvinyl Chloride Pipes
(PVC/uPVC) - 40 mm dia. m.
1100(6)e Polyvinyl Chloride Pipes
(PVC/uPVC) - 50 mm dia. m.
1100(6)f Polyvinyl Chloride Pipes
(PVC/uPVC) - 65 mm dia. m.
1100(6)g Polyvinyl Chloride Pipes
(PVC/uPVC) - 80 mm dia. m.
1100(6)h Polyvinyl Chloride Pipes
(PVC/uPVC) - 90 mm dia. m.
1100(6)i Polyvinyl Chloride Pipes
(PVC/uPVC) - 100 mm dia. m.
1100(6)j Polyvinyl Chloride Pipes
(PVC/uPVC) - 110 mm dia. m.
1100(6)k Polyvinyl Chloride Pipes
(PVC/uPVC) - 160 mm dia. m.
1100(7)a1 Weatherhead Condulet - 15
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a2 Weatherhead Condulet - 20
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a3 Weatherhead Condulet - 25
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a4 Weatherhead Condulet - 32
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a5 Weatherhead Condulet - 40
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a6 Weatherhead Condulet - 50
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a7 Weatherhead Condulet - 65
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a8 Weatherhead Condulet - 80
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a9 Weatherhead Condulet - 90
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a10 Weatherhead Condulet - 100
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a11 Weatherhead Condulet - 125
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(7)a12 Weatherhead Condulet - 150
mm dia. - Rigid Steel, Hot
Dipped pcs.
1100(8) Boxes/Wire Gutter L.S.
1100(9) Fittings and Accessories L.S.
1100(10) Conduits, Boxes & Fittings
(Conduit Works/Conduit
Rough-in) L.S.
1100(11) Repair/Replacement of
Conduits/Pipes, Boxes, Fittings
(Conduit Works/Rough-in)
L.S.
1101(1)a1 Electric Wire - 1.6 mm2 dia.
TW/THHN/THWN2 - Solid
roll
1101(1)a2 Electric Wire - 2.0 mm2 dia.
TW/THHN/THWN2 - Solid
roll
1101(1)a3 Electric Wire - 2.6 mm2 dia.
TW/THHN/THWN2 - Solid
roll
1101(1)a4 Electric Wire - 3.2 mm2 dia.
TW/THHN/THWN2 - Solid
roll
1101(1)b1 Electric Wire - 2.0 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b2 Electric Wire - 3.5 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b3 Electric Wire - 5.5 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b4 Electric Wire - 8.0 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b5 Electric Wire - 14 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b6 Electric Wire - 22 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b7 Electric Wire - 30 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b8 Electric Wire - 38 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b9 Electric Wire - 50 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b10 Electric Wire - 60 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b11 Electric Wire - 80 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b12 Electric Wire - 100 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b13 Electric Wire - 125 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b14 Electric Wire - 150 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b15 Electric Wire - 200 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b16 Electric Wire - 250 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b17 Electric Wire - 325 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b18 Electric Wire - 400 mm2 dia.
TW/THHN/THWN2 roll
1101(1)b19 Electric Wire - 500 mm2 dia.
TW/THHN/THWN2 roll
1101(1)c1 Electric Wire - 14 mm2 - ACSR
roll
1101(1)c2 Electric Wire - 22 mm2 - ACSR
roll
1101(1)c3 Electric Wire - 30 mm2 - ACSR
roll
1101(1)c4 Electric Wire - 38 mm2 - ACSR
roll
1101(1)c5 Electric Wire - 50 mm2 - ACSR
roll
1101(1)c6 Electric Wire - 60 mm2 - ACSR
roll
1101(1)c7 Electric Wire - 80 mm2 - ACSR
roll
1101(1)c8 Electric Wire - 100 mm2 -
ACSR roll
1101(1)c9 Electric Wire - 125 mm2 -
ACSR roll
1101(1)c10 Electric Wire - 150 mm2 -
ACSR roll
1101(1)c11 Electric Wire - 200 mm2 -
ACSR roll
1101(1)c12 Electric Wire - 250 mm2 -
ACSR roll
1101(1)d1 Electric Wire - 1C X 4 - XLPE
roll
1101(1)d2 Electric Wire - 1C X 6 - XLPE
roll
1101(1)d3 Electric Wire - 1C X 10 - XLPE
roll
1101(1)d4 Electric Wire - 1C X 25 - XLPE
roll
1101(1)d5 Electric Wire - 1C X 35 - XLPE
roll
1101(1)d6 Electric Wire - 1C X 50 - XLPE
roll
1101(1)d7 Electric Wire - 1C X 70 - XLPE
roll
1101(1)d8 Electric Wire - 1C X 95 - XLPE
roll
1101(1)d9 Electric Wire - 1C X 120 - XLPE
roll
1101(1)d10 Electric Wire - 1C X 185 - XLPE
roll
1101(1)d11 Electric Wire - 1C X 240 - XLPE
roll
1101(1)d12 Electric Wire - 1C X 300 - XLPE
roll
1101(1)d13 Electric Wire - 1C X 400 - XLPE
roll
1101(1)d14 Electric Wire - 1C X 500 - XLPE
roll
1101(1)e1 Electric Wire - 2C X 4 - XLPE
roll
1101(1)e2 Electric Wire - 2C X 6 - XLPE
roll
1101(1)e3 Electric Wire - 2C X 10 - XLPE
roll
1101(1)e4 Electric Wire - 2C X 25 - XLPE
roll
1101(1)e5 Electric Wire - 2C X 35 - XLPE
roll
1101(1)e6 Electric Wire - 2C X 50 - XLPE
roll
1101(1)e7 Electric Wire - 2C X 70 - XLPE
roll
1101(1)e8 Electric Wire - 2C X 95 - XLPE
roll
1101(1)e9 Electric Wire - 2C X 120 - XLPE
roll
1101(1)e10 Electric Wire - 2C X 185 - XLPE
roll
1101(1)e11 Electric Wire - 2C X 240 - XLPE
roll
1101(1)e12 Electric Wire - 2C X 300 - XLPE
roll
1101(1)e13 Electric Wire - 2C X 400 - XLPE
roll
1101(1)e14 Electric Wire - 2C X 500 - XLPE
roll
1101(1)f1 Electric Wire - 3C X 4 - XLPE
roll
1101(1)f2 Electric Wire - 3C X 6 - XLPE
roll
1101(1)f3 Electric Wire - 3C X 10 - XLPE
roll
1101(1)f4 Electric Wire - 3C X 25 - XLPE
roll
1101(1)f5 Electric Wire - 3C X 35 - XLPE
roll
1101(1)f6 Electric Wire - 3C X 50 - XLPE
roll
1101(1)f7 Electric Wire - 3C X 70 - XLPE
roll
1101(1)f8 Electric Wire - 3C X 95 - XLPE
roll
1101(1)f9 Electric Wire - 3C X 120 - XLPE
roll
1101(1)f10 Electric Wire - 3C X 185 - XLPE
roll
1101(1)f11 Electric Wire - 3C X 240 - XLPE
roll
1101(1)f12 Electric Wire - 3C X 300 - XLPE
roll
1101(1)f13 Electric Wire - 3C X 400 - XLPE
roll
1101(1)f14 Electric Wire - 3C X 500 - XLPE
roll
1101(2)a1 Electric Wire - 1.6 mm2 dia.
TW/THHN/THWN2 m.
1101(2)a2 Electric Wire - 2.0 mm2 dia.
TW/THHN/THWN2 m.
1101(2)a3 Electric Wire - 2.6 mm2 dia.
TW/THHN/THWN2 m.
1101(2)a4 Electric Wire - 3.2 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b1 Electric Wire - 2.0 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b2 Electric Wire - 3.5 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b3 Electric Wire - 5.5 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b4 Electric Wire - 8.0 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b5 Electric Wire - 14 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b6 Electric Wire - 22 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b7 Electric Wire - 30 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b8 Electric Wire - 38 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b9 Electric Wire - 50 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b10 Electric Wire - 60 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b11 Electric Wire - 80 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b12 Electric Wire - 100 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b13 Electric Wire - 125 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b14 Electric Wire - 150 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b15 Electric Wire - 200 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b16 Electric Wire - 250 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b17 Electric Wire - 325 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b18 Electric Wire - 400 mm2 dia.
TW/THHN/THWN2 m.
1101(2)b19 Electric Wire - 500 mm2 dia.
TW/THHN/THWN2 m.
1101(2)c1 Electric Wire - 14 mm2 - ACSR
m.
1101(2)c2 Electric Wire - 22 mm2 - ACSR
m.
1101(2)c3 Electric Wire - 30 mm2 - ACSR
m.
1101(2)c4 Electric Wire - 38 mm2 - ACSR
m.
1101(2)c5 Electric Wire - 50 mm2 - ACSR
m.
1101(2)c6 Electric Wire - 60 mm2 - ACSR
m.
1101(2)c7 Electric Wire - 80 mm2 - ACSR
m.
1101(2)c8 Electric Wire - 100 mm2 -
ACSR m.
1101(2)c9 Electric Wire - 125 mm2 -
ACSR m.
1101(2)c10 Electric Wire - 150 mm2 -
ACSR m.
1101(2)c11 Electric Wire - 200 mm2 -
ACSR m.
1101(2)c12 Electric Wire - 250 mm2 -
ACSR m.
1101(2)c13 Electric Wire - 1C X 4 - XLPE
m.
1101(2)c14 Electric Wire - 1C X 6 - XLPE
m.
1101(2)d1 Electric Wire - 1C X 10 - XLPE
m.
1101(2)d2 Electric Wire - 1C X 25 - XLPE
m.
1101(2)d3 Electric Wire - 1C X 35 - XLPE
m.
1101(2)d4 Electric Wire - 1C X 50 - XLPE
m.
1101(2)d5 Electric Wire - 1C X 70 - XLPE
m.
1101(2)d6 Electric Wire - 1C X 95 - XLPE
m.
1101(2)d7 Electric Wire - 1C X 120 - XLPE
m.
1101(2)d8 Electric Wire - 1C X 185 - XLPE
m.
1101(2)d9 Electric Wire - 1C X 240 - XLPE
m.
1101(2)d10 Electric Wire - 1C X 300 - XLPE
m.
1101(2)d11 Electric Wire - 1C X 400 - XLPE
m.
1101(2)d12 Electric Wire - 1C X 500 - XLPE
m.
1101(2)d13 Electric Wire - 2C X 4 - XLPE
m.
1101(2)d14 Electric Wire - 2C X 6 - XLPE
m.
1101(2)e1 Electric Wire - 2C X 10 - XLPE
m.
1101(2)e2 Electric Wire - 2C X 25 - XLPE
m.
1101(2)e3 Electric Wire - 2C X 35 - XLPE
m.
1101(2)e4 Electric Wire - 2C X 50 - XLPE
m.
1101(2)e5 Electric Wire - 2C X 70 - XLPE
m.
1101(2)e6 Electric Wire - 2C X 95 - XLPE
m.
1101(2)e7 Electric Wire - 2C X 120 - XLPE
m.
1101(2)e8 Electric Wire - 2C X 185 - XLPE
m.
1101(2)e9 Electric Wire - 2C X 240 - XLPE
m.
1101(2)e10 Electric Wire - 2C X 300 - XLPE
m.
1101(2)e11 Electric Wire - 2C X 400 - XLPE
m.
1101(2)e12 Electric Wire - 2C X 500 - XLPE
m.
1101(2)e13 Electric Wire - 3C X 4 - XLPE
m.
1101(2)e14 Electric Wire - 3C X 6 - XLPE
m.
1101(2)f1 Electric Wire - 3C X 10 - XLPE
m.
1101(2)f2 Electric Wire - 3C X 25 - XLPE
m.
1101(2)f3 Electric Wire - 3C X 35 - XLPE
m.
1101(2)f4 Electric Wire - 3C X 50 - XLPE
m.
1101(2)f5 Electric Wire - 3C X 70 - XLPE
m.
1101(2)f6 Electric Wire - 3C X 95 - XLPE
m.
1101(2)f7 Electric Wire - 3C X 120 - XLPE
m.
1101(2)f8 Electric Wire - 3C X 185 - XLPE
m.
1101(2)f9 Electric Wire - 3C X 240 - XLPE
m.
1101(2)f10 Electric Wire - 3C X 300 - XLPE
m.
1101(2)f11 Electric Wire - 3C X 400 - XLPE
m.
1101(2)f12 Electric Wire - 3C X 500 - XLPE
m.
1101(3) Single Pole Wall Switch on one
switch plate sets
1101(4) Duplex (2 Single Pole Wall
Switches on one switch plate)
sets
1101(5) Triplex (3 Single Pole Wall
Switches on one switch plate)
sets
1101(6) Three-way Switch sets
1101(7) Four-way Switch sets
1101(8) Double Pole Switch sets
1101(9) Three Pole Switch sets
1101(10) Dimmer Switch sets
1101(11) Master Selector Switch sets
1101(12) Automatic Door Switch sets
1101(13) Switch Bank sets
1101(14)a Passive Infra-Red (Presence)
Detector/Switch - Surface
Mounted sets
1101(14)b Passive Infra-Red (Presence)
Detector/Switch - Recessed
sets
1101(15) Single Convenience
Outlet/Receptacle, Grounding
Type (GT) sets
1101(16) Duplex Convenience
Outlets/Receptacles (GT) sets
1101(17) Heavy Duty Convenience
Outlet/Receptacles (GT) sets
1101(18) Weatherproof Single
Convenience
Outlet/Receptacle (GT) sets
1101(19) Weatherproof Single
Convenience
Outlet/Receptacle (GT) sets
1101(20) Special Purpose
Outlet/Receptacle, (GT) for
ACU, WH, etc. sets
1101(21) Pop-up type/Floor Single
Convenience
Outlet/Receptacle (GT) sets
1101(22) Pop-up type/Floor Duplex
Convenience
Outlet/Receptacle (GT) sets
1101(23) Pop-up type/Floor Triplex
Convenience
Outlet/Receptacle (GT) sets
1101(24) Explosion Proof type Single
Convenience
Outlet/Receptacle (GT) sets
1101(25) Explosion Proof type Duplex
Convenience
Outlet/Receptacle (GT) sets
1101(26) Single Convenience Outlet
with Ground Fault Circuit
Interrupter (GFCI) sets
1101(27) Duplex Convenience Outlet
with GFCI sets
1101(28) PVC Tape roll
1101(29) Rubber Tape/ Friction Tape roll
1101(30) Mica Tubing m.
1101(30) Mica Tubing m.
1101(30) Mica Tubing m.
1101(30) Mica Tubing m.
1101(31) Messenger Wire m.
1101(32) Guy Wire L.S.
1101(33) Wires and Wiring Devices L.S.
1101(34) Repair/Replacement of Wires
and Wiring Devices L.S.

1102(1) Panelboard with Main &


Branch Breakers L.S.
1102(2) Motor Control Center with
Main, Branch Breakers and
Motor Starters/controllers -
NEMA 1 - Flushed Type sets
1102(3) Cupper Bus Bar NEMA I
Enclosure - Surface Mounted
sets
1102(4) Manual Transfer Switch with
renewable Fuse - Flushed
Type sets
1102(5) Manual Transfer Switch,
Breaker Type - Free Standing
sets
1102(6) Automatic Transfer Switch,
Breaker Type - Flushed Type
sets
1102(7) Automatic Transfer Switch,
Breaker Type - Free Standing
sets
1102(8) Pad Mounted Distrbution
Transformer (OISC) with
Complete Accessories - Free
Standing L.S.
1102(9) Pad Mounted Power
Transformer (OISC) with
Complete Accessories - single
or three phase - Free Standing
L.S.
1102(10) Pole Mounted Distribution
Transformer (OISC) with
Complete Accessories - Pole
type L.S.
1102(11) Pole Mounted Power
Transformer (OISC) with
Complete Accessories - single
or three phase - Pole type or
Flatform L.S.
1102(12) Dry Type Transformer - single
or three phase - Free Standing
or Flatform L.S.
1102(13) Current Transformer L.S.
1102(14) Potential Transformer L.S.
1102(15) Isolation Transformer L.S.
1102(16)a1 Generator - single or three
phase - Stand-by L.S.
1102(16)a2 Generator - single or three
phase - Continuous L.S.
1102(17) Synchronizing Panel for
Generators L.S.
1102(18) Solar Panel with inverter,
battery and other devices L.S.
1102(19) Apitong or Approved Equal
Creosoted Wood Pole pcs.
1102(20) Anchor Rod pcs.
1102(21) Anchor Log pcs.
1102(22) Powerload Studs with Nuts pcs.
1102(23) Repair/Replacement of Power
Load Center, Switchgear and
Panelboards, and other
Overcurrent Protection
Devices
pcs.

1103(1) Lighting Fixtures and Lamps


L.S.
1103(2) Repair/Replacement of
Lighting Fixtures and Lamps
L.S.

1104(1) Auxillary System L.S.

1105(1)a Data Cabinet - Wall type sets


1105(1)b Data Cabinet - Free standing
sets
1105(2)a Distribution Frame Panel - Sub
sets
1105(2)b Distribution Frame Panel -
Main sets
1105(3) Terminal Block sets
1105(4) UTP patch Panel sets
1105(5) Fiber Management Panel sets
1105(6) UTP CAT5 Cable roll
1105(7) UTP CAT6 Cable roll
1105(8) Fiber Optic Cable roll
1105(9) Fiber Connector sets
1105(10) Patch Cord CAT5 sets
1105(11) Patch Cord CAT6 sets
1105(12) Fiber Patch Cord sets
1105(13) Modular Jack sets
1105(14) Wall Plate Single (Voice/Data
Outlet) sets
1105(15) Wall Plate 2 port (Voice/Data
Outlet) sets
1105(16) Wall Plate 3 port (Voice/Data
Outlet) sets
1105(17) Floor Mounted 2 port
(Voice/Data Outlet) sets
1105(18) Floor Mounted 3 port
(Voice/Data Outlet) sets
1105(19) Network Equipment (Servers,
Fire Wall, Repeaters, etc.)
sets
1105(20) Network Cabling L.S.
1105(21) UTP CAT5e Cable roll

1106(1) CCTV System L.S.


1106(2) IP - Fixed Dome Camera sets
1106(3) IP - Pinhole Type Camera sets
1106(4) Movable Camera sets
1106(5) Weather Proof Camera sets
1106(6) Data Digital Video Recorder sets
1106(7) Network Video Recorder sets
1106(8) Centralized Power Supply with
UPS sets
1106(9) LCD, LED Monitor sets
1106(10) CCTV Console sets
1106(11) RG59 Coaxial Cable m.
1106(12) Digital Disc Recorder sets

1107(1) Public Address System L.S.


1107(2) Management System Amplifier
sets
1107(3) Power Amplifier sets
1107(4) Voice Announcement Board sets
1107(5) Remote Microphone sets
1107(6) Ceiling Speaker sets
1107(7) Wall Mount Speaker sets
1107(8) CD/DVD Player units
1107(9) AM/FM Tuner units
1107(10) Fabricated Rack sets
1107(11) Booster Transformer sets
1107(12) Horn sets
1107(13) Wires/Cables L.S.

1108(1) Door Access and Card Reader


System L.S.
1108(2) Security Cabinet units
1108(3) Magnetic Card pcs.
1108(4) Magnetic Door Contact sets
1108(5)a Biometric Scanner - Face sets
1108(5)b Biometric Scanner - Finger sets
1108(5)c Biometric Scanner -
Face/Finger sets

1109(1) Grounding System L.S.


1109(2) Exothermic Weld Connector pcs.
1109(3) Air Terminal sets
1109(4)a Bare Copper Wire - 2.0 mm2
m.
1109(4)b Bare Copper Wire - 3.4 mm2
m.
1109(4)c Bare Copper Wire - 5.5 mm2
m.
1109(4)d Bare Copper Wire - 8.0 mm2
m.
1109(4)e Bare Copper Wire - 14 mm2
m.
1109(4)g Bare Copper Wire - 22 mm2
m.
1109(4)h Bare Copper Wire - 30 mm2
m.
1109(4)i Bare Copper Wire - 38 mm2
m.
1109(4)j Bare Copper Wire - 50 mm2
m.
1109(4)k Bare Copper Wire - 60 mm2
m.
1109(4)l Bare Copper Wire - 80 mm2
m.
1109(4)m Bare Copper Wire - 100 mm2
m.
1109(5)a Grounding Clamps for Electric
Wires - 2.0 mm2 pcs.
1109(5)b Grounding Clamps for Electric
Wires - 3.4 mm2 pcs.
1109(5)c Grounding Clamps for Electric
Wires - 5.5 mm2 pcs.
1109(5)d Grounding Clamps for Electric
Wires - 8.0 mm2 pcs.
1109(5)e Grounding Clamps for Electric
Wires - 14 mm2 pcs.
1109(5)f Grounding Clamps for Electric
Wires - 22 mm2 pcs.
1109(5)g Grounding Clamps for Electric
Wires - 30 mm2 pcs.
1109(5)h Grounding Clamps for Electric
Wires - 38 mm2 pcs.
1109(5)i Grounding Clamps for Electric
Wires - 50 mm2 pcs.
1109(5)j Grounding Clamps for Electric
Wires - 60 mm2 pcs.
1109(5)k Grounding Clamps for Electric
Wires - 80 mm2 pcs.
1109(5)l Grounding Clamps for Electric
Wires - 100 mm2 pcs.
1109(5)m Grounding Clamps for Electric
Wires - 125 mm2 pcs.
1109(5)n Grounding Clamps for Electric
Wires - 200 mm2 pcs.
1109(5)o Grounding Clamps for Electric
Wires - 250 mm2 pcs.
1109(5)p Grounding Clamps for Electric
Wires - 400 mm2 pcs.
1109(6)a Grounding Rod Copper Clad -
14.2mm dia x 3m length
1109(6)b Grounding Rod Copper Clad -
16mm dia x 3m length
1109(6)c Grounding Rod Copper Clad -
17.2mm dia x 3m length
1109(6)d Grounding Rod Copper Clad -
18mm dia x 3m length
1109(6)e Grounding Rod Copper Clad -
20mm dia x 3m length
1109(6)f Grounding Rod Copper Clad -
22mm dia x 3m length
1109(6)g Grounding Rod Copper Clad -
25mm dia x 3m length

1110(1) Nurse Call System L.S.


1110(2) Area Control Unit sets
1110(3) Nurse Call Console sets
1110(4) Patient Bed Station sets
1110(5) Corridor Lights and Zone
Lights sets

1111(1) Reinforced Concrete Pedestal /


Pole L.S.
1111(2) Reinforced Concrete
Envelop/encasement L.S.
1111(3) Concrete Envelop/encasement
L.S.
1111(4) Handhole L.S.
1111(5) Manhole L.S.
1111(6) Cable Tray L.S.
1111(7) Wire Trench L.S.
1111(8) 2 Spool Insulator Wire Rack sets
1111(9) 3 Spool Insulator Wire Rack sets
1111(10) 4 Spool Insulator Wire Rack sets

PART E - MECHANICAL

1200(1) Ventilating Equipment L.S.


1200(2)a Oscillating - Stand Fan sets
1200(2)b Oscillating - Wall Fan sets
1200(2)c Oscillating - Ceiling Fan sets
1200(3) Stand Fan, Industrial Type sets
1200(4)a Propeller - Wall Mounted Fan
sets
1200(4)b Propeller - Ceiling Fan sets
1200(4)c Propeller - Tube Axial Roof
Mounted sets
1200(5)a Exhaust fan - Ceiling Cassette
sets
1200(5)b Exhaust fan - Wall Mounted
sets
1200(5)c Exhaust fan - Wall Mounted,
Industrial Type sets
1200(5)d Exhaust Fan - Tubular In Line
sets
1200(6) Supply fan, ceiling cassette sets
1200(7) Centrifugal Cabinet in line
Ducted type (CCI) sets
1200(8) Centrifugal Backward Incline
sets
1200(9) Kitchen Hood sets
1200(10) Induced Jet Fan sets
1200(11)a Freon (Gas) - 23 kgs.
1200(11)b Freon (Gas) - 134a kgs.
1200(11)c Freon (Gas) - 134b kgs.
1200(11)d Freon (Gas) - 410a kgs.
1200(11)e Freon (Gas) - 410b kgs.
1200(12) Sand Trap Louver sq.m.
1200(13)a Airconditioning - Package/Split
type L.S.
1200(13)b Airconditioning - VRF/VRV L.S.
1200(13)c Airconditioning - Centralized
Air- Condition Ducting L.S.
1200(14) Ventilation L.S.
1201(1) Water Pumping System L.S.
1201(2) Centrifugal Pump with control
sets
1201(3) Submersible Multi-Stage
Deepwell Pump with control sets
1201(4) Submersible Sump Pump with
control sets
1201(5) Submersible Sewage Ejector
Pump with control sets
1201(6) Booster Pump with control sets
1201(7) Jet Pump with control sets
1201(8) Water Tank sets
1201(9)a Overhead Tank - Stainless sets
1201(9)b Overhead Tank - Galvanized
Iron sets
1201(9)c Overhead Tank - Polyethylene
sets
1201(9)d Overhead Tank - Concrete sets
1201(10)a Pneumatic - Stainless sets
1201(10)b Pneumatic - Galvanized Iron
sets
1201(11) Air Compressor sets
1201(12) Valves and Pipe Fittings L.S.
1201(13) Electrode sets

1202(1) Automatic Fire Sprinkler


System (AFSS) L.S.
1202(2) Fire Pump complete with
control and standard
accessories - 250 - 1000gpm
sets
1202(3) Jockey Pump complete with
control and standard
accessories sets
1202(4) Fire hose valve siames 150mm
dia x 2w x 65mm dia with cap
- 150 mm dia. sets
1202(5) Fire hose cabinet assembly sets
1202(6)a1 Fire Extinguisher - 10 lbs -
ABC with bracket sets
1202(6)a2 Fire Extinguisher - 20 lbs -
ABC with bracket sets
1202(6)a3 Fire Extinguisher - 10 lbs -
CO2/HCFC123 with bracket sets
1202(6)a4 Fire Extinguisher - 20 lbs -
CO2/HCFC123 with bracket sets
1202(6)a5 Fire Extinguisher - 50 lbs -
CO2/HCFC123 with bracket sets
1202(7) Fire Department connections
100 x 65 x 65 mm for Dry
Type system sets
1202(8) Fire Hydrant sets

1203(1)a Electric Elevator - up to 500


kgs L.S.
1203(1)b Electric Elevator - 501 - 1000
kgs L.S.
1203(1)c Electric Elevator - above 1000
kgs L.S.
1203(2) Lift Elevator

1204(1) Electric Dumbwaiter L.S.


1204(2) Electric Wires and Conduits length
1204(3) Electric Wires and Conduits m.

1205(1) Oxygen, Nitrous Oxide, Gas


Manifold and Duplex Vacuum
Pump sets
1205(2) Humidifier, Vacuum Trap
Bottle, Outlets, Valves pcs.

1206(1) Boilers, Fuel Pump, Storage


Tank and Fuel Day Tank
including Foundation sets
1206(2) Pipes m.
1206(3) Valves and Fittings pcs.

1207(1) Steam Boilers, Air


Compressor, Heat Exchanger
& Fuel Pump sets
1207(2) Pipes with Insulation m.
1207(3) Valves and Fittings L.S.

1208(1) Fire Alarm System L.S.


1208(2) Smoke Detector with base sets
1208(3) Heat Detector with base sets
1208(4) Fire Alarm Bell sets
1208(5) Fire Alarm Control Panel sets
1208(6) Manual Pull Station Switch sets
1208(7) Back-up Battery Pack sets
1208(8) Automatic Voltage Regulator
sets
1208(9) Extended Power Supply sets
1208(10) Loop Expander Module sets
1208(11) Loop Control Module sets
1208(12) Annunciator Addressable
Module sets

PART F - PILING

1300(1) Untreated Timber Piles,


furnished m.
1300(2) Treated Timber Piles,
preservative, furnished m.
1300(3) Steel H-Piles, furnished m.
1300(4)a Precast Concrete Piles,
furnished - 400x400 mm m.
1300(4)b Precast Concrete Piles,
furnished - 450x450 mm m.
1300(5)a Precast, Prestresssed Concrete
Piles, furnished - 400x400 mm
m.
1300(5)b Precast, Prestresssed Concrete
Piles, furnished - 450x450 mm
m.
1300(6)a Structural Steel Sheet Piles,
furnished - New m.
1300(6)b Structural Steel Sheet Piles,
furnished - Rental m.
1300(7) Precast Concrete Sheet Piles,
furnished m.
1300(8) Untreated Timber Piles, driven
m.
1300(9) Treated Timber Piles, driven
m.
1300(10) Steel H-Piles, driven m.
1300(11) Steel Pipes Piles m.
1300(12) Structural Steel Sheet Piles,
driven m.
1300(13) Precast Concrete Sheet Piles,
driven m.
1300(14) Precast Concrete Piles, driven
m.
1300(15) Precast, Prestresssed Concrete
Piles, driven m.
1300(16) Test Piles, furnished and
driven m.
1300(17)a Concrete Piles cast in Drilled
Holes - 0.8 m.
1300(17)b Concrete Piles cast in Drilled
Holes - 0.9 m.
1300(17)c Concrete Piles cast in Drilled
Holes - 1 m.
1300(17)d Concrete Piles cast in Drilled
Holes - 1.1 m.
1300(17)e Concrete Piles cast in Drilled
Holes - 1.2 m.
1300(17)f Concrete Piles cast in Drilled
Holes - 1.3 m.
1300(17)g Concrete Piles cast in Drilled
Holes - 1.4 m.
1300(17)h Concrete Piles cast in Drilled
Holes - 1.5 m.
1300(17)i Concrete Piles cast in Drilled
Holes - 1.6 m.
1300(17)j Concrete Piles cast in Drilled
Holes - 1.7 m.
1300(17)k Concrete Piles cast in Drilled
Holes - 1.8 m.
1300(17)l Concrete Piles cast in Drilled
Holes - 1.9 m.
1300(17)m Concrete Piles cast in Drilled
Holes - 2 m.
1300(17)n Concrete Piles cast in Drilled
Holes - 2.1 m.
1300(17)o Concrete Piles cast in Drilled
Holes - 2.2 m.
1300(17)p Concrete Piles cast in Drilled
Holes - 2.3 m.
1300(17)q Concrete Piles cast in Drilled
Holes - 2.4 m.
1300(17)r Concrete Piles cast in Drilled
Holes - 2.5 m.
1300(17)s Concrete Piles cast in Drilled
Holes - 2.6 m.
1300(17)t Concrete Piles cast in Drilled
Holes - 2.7 m.
1300(17)u Concrete Piles cast in Drilled
Holes - 2.8 m.
1300(17)v Concrete Piles cast in Drilled
Holes - 2.9 m.
1300(17)w Concrete Piles cast in Drilled
Holes - 3 m.
1300(18) Concrete Piles cast in Steel
Shells - 400-500 mm dia. m.
1300(19) Concrete Piles cast in Steel
Pipes - 400-500 mm dia. m.
1300(20) Pile Shoes m.
1300(21) Splices m.
1300(22) Load Tests m.
1300(23)a1 Permanent Casing - 0.8 -
10mm thick m.
1300(23)a2 Permanent Casing - 0.8 -
12mm thick m.
1300(23)a3 Permanent Casing - 0.8 -
16mm thick m.
1300(23)b1 Permanent Casing - 0.9 -
10mm thick m.
1300(23)b2 Permanent Casing - 0.9 -
12mm thick m.
1300(23)b3 Permanent Casing - 0.9 -
16mm thick m.
1300(23)c1 Permanent Casing - 1 - 10mm
thick m.
1300(23)c2 Permanent Casing - 1 - 12mm
thick m.
1300(23)c3 Permanent Casing - 1 - 16mm
thick m.
1300(23)d1 Permanent Casing - 1.1 -
10mm thick m.
1300(23)d2 Permanent Casing - 1.1 -
12mm thick m.
1300(23)d3 Permanent Casing - 1.1 -
16mm thick m.
1300(23)e1 Permanent Casing - 1.2 -
10mm thick m.
1300(23)e2 Permanent Casing - 1.2 -
12mm thick m.
1300(23)e3 Permanent Casing - 1.2 -
16mm thick m.
1300(23)f1 Permanent Casing - 1.3 -
10mm thick m.
1300(23)f2 Permanent Casing - 1.3 -
12mm thick m.
1300(23)f3 Permanent Casing - 1.3 -
16mm thick m.
1300(23)g1 Permanent Casing - 1.4 -
10mm thick m.
1300(23)g2 Permanent Casing - 1.4 -
12mm thick m.
1300(23)g3 Permanent Casing - 1.4 -
16mm thick m.
1300(23)h1 Permanent Casing - 1.5 -
10mm thick m.
1300(23)h2 Permanent Casing - 1.5 -
12mm thick m.
1300(23)h3 Permanent Casing - 1.5 -
16mm thick m.
1300(23)i1 Permanent Casing - 1.6 -
12mm thick m.
1300(23)i2 Permanent Casing - 1.6 -
16mm thick m.
1300(23)j1 Permanent Casing - 1.7 -
12mm thick m.
1300(23)j2 Permanent Casing - 1.7 -
16mm thick m.
1300(23)k1 Permanent Casing - 1.8 -
12mm thick m.
1300(23)k2 Permanent Casing - 1.8 -
16mm thick m.
1300(23)l1 Permanent Casing - 1.9 -
12mm thick m.
1300(23)l2 Permanent Casing - 1.9 -
16mm thick m.
1300(23)m1 Permanent Casing - 2 - 12mm
thick m.
1300(23)m2 Permanent Casing - 2 - 16mm
thick m.
1300(23)n1 Permanent Casing - 2.1 -
12mm thick m.
1300(23)n2 Permanent Casing - 2.1 -
16mm thick m.
1300(23)o1 Permanent Casing - 2.2 -
12mm thick m.
1300(23)o2 Permanent Casing - 2.2 -
16mm thick m.
1300(23)p1 Permanent Casing - 2.3 -
12mm thick m.
1300(23)p2 Permanent Casing - 2.3 -
16mm thick m.
1300(23)q1 Permanent Casing - 2.4 -
12mm thick m.
1300(23)q2 Permanent Casing - 2.4 -
16mm thick m.
1300(23)r1 Permanent Casing - 2.5 -
16mm thick m.
1300(23)r2 Permanent Casing - 2.5 -
20mm thick m.
1300(23)s1 Permanent Casing - 2.6 -
16mm thick m.
1300(23)s2 Permanent Casing - 2.6 -
20mm thick m.
1300(23)t1 Permanent Casing - 2.7 -
16mm thick m.
1300(23)t2 Permanent Casing - 2.7 -
20mm thick m.
1300(23)u1 Permanent Casing - 2.8 -
16mm thick m.
1300(23)u2 Permanent Casing - 2.8 -
20mm thick m.
1300(23)v1 Permanent Casing - 2.9 -
16mm thick m.
1300(23)v2 Permanent Casing - 2.9 -
20mm thick m.
1300(23)w1 Permanent Casing - 3 - 16mm
thick m.
1300(23)w2 Permanent Casing - 3 - 20mm
thick m.
1300(24) Splicing of R.C. Piles with
Epoxy kgs.
1300(25) Splicing of R.C. Piles with
Epoxy ea.
1300(26)a Pile Integrity Testing -
Crosshole-Sonic ea.
1300(26)b Pile Integrity Testing - Low
Strain ea.
1300(27) High Strain Dynamic Testing
(P.D.A) ea.
1300(28)a Micro Piles - 0.2 m.
1300(28)b Micro Piles - 0.25 m.
1300(28)c Micro Piles - 0.3 m.
1300(29)a Permanent Casing (Micro
Piles) - 0.2 kgs.
1300(29)b Permanent Casing (Micro
Piles) - 0.25 kgs.
1300(29)c Permanent Casing (Micro
Piles) - 0.3 kgs.
1300(30)a Painting Works - Concrete
Structures sq.m.
1300(30)b Painting Works - Steel
Structures sq.m.
1300(31) Structural Steel Sheet Piles,
extracted m.
1300(32) Rammed Aggregate Piers cu.m.
1300(33) Vibro Stone Columns cu.m.
1300(34) Modulus or Uplift Load Tests
ea.
1300(35) Steel Casing l.m.
PART G — PROTECTIVE WORKS A

1400(1) Cleat - with Accessories sets


1400(2) Post - with Accessories sets
1400(3) Bitt - with Accessories sets
1400(4) Bollard - with Accessories sets
1400(5) Cleat - Replacement ea.
1400(6) Post - Replacement ea.
1400(7) Bitt - Replacement ea.
1400(8) Bollard - Replacement ea.

1401(1) Timber Waling l.m.

1402(1)a Pile Cluster - 3 sets


1402(1)b Pile Cluster - 4 sets
1402(1)c Pile Cluster - 5 sets
1402(1)d Pile Cluster - 7 sets
1402(1)e Pile Cluster - 9 sets
1402(1)f Pile Cluster - 12 sets
1402(2) Concrete Dolphin sets
1402(3) Tubular Steel Dolphin sets

1403(1) Installation of Rubber Dock


Fenders sets

1404(1) Filter Fabric Material sq.m.


1404(2) Filter Aggregate Material cu.m.

1405(1) Reinforcing Mat sq.m.


1406(1) Deflector Wall l.m.
1406(2) Bulkhead Curbs l.m.
1406(3) Stair Landing l.m.

1407(1) Tetrapod pcs.


1407(2) Tetrapod cu.m.
1407(3) Hexapod pcs.
1407(4) Hexapod cu.m.
1407(5) Tria Blocks pcs.
1407(6) Tria Blocks cu.m.

PART H — BULKHEADS

1500(1) Sand Mattress cu.m.

1501(1) Rock Works - Class I Rock tonnes


1501(2) Rock Works - Class II Rock tonnes
1501(3) Rock Works - Class III Rock
tonnes

1502(2) Filter Material sq.m.

1503(1) Excavation for Bulkheads and


Reclamation cu.m.

PART I — WATER SUPPLY

1600(1) Excavation Beneath Proposed


Structures cu.m.
1600(2) Pipeline Trench Excavation cu.m.
1600(3) Dewatering L.S.
1601(1) Fill and Backfill cu.m.

1602(1) Mortar Lined and Coated Steel


Pipe L.S.
1602(2) Cast Iron Water Pipe L.S.
1602(3) Asbestos-Cement Water Pipe
L.S.
1602(4) PVC Polyvinyl Chloride Pipe L.S.
1602(5) Polyethylene (PE) Plastic Pipe
L.S.

1603(1) Valve L.S.

1604(1) Water Treatment Plant L.S.

Part 3 — FLOOD CONTROL AND D

1700(1) Clearing and Grubbing sq.m.


1700(2) Clearing and Grubbing L.S.
1700(3)a1 Individual Removal of Trees -
150-300 mm dia. - Small
ea.
1700(3)a2 Individual Removal of Trees -
301-500 mm dia. - Small
ea.
1700(3)a3 Individual Removal of Trees -
501-750 mm dia. - Small
ea.
1700(3)a4 Individual Removal of Trees -
751-900 mm dia. - Small
ea.
1700(4) Individual Removal of Trees -
above 900mm dia. - Large
ea.
1701(1) Unsuitable Excavation cu.m.
1701(2) Surplus Common Excavation
cu.m.
1701(3) Surplus Rock cu.m.
1701(4) Surplus Unclassified
Excavation cu.m.

1702(1)a Structure Excavation -


Common Soil cu.m.
1702(1)b Structure Excavation - Soft
Rock cu.m.
1702(1)c Structure Excavation - Hard
Rock cu.m.
1702(2)a Bridge Excavation - Common
Soil cu.m.
1702(2)b Bridge Excavation - Soft Rock
cu.m.
1702(2)c Bridge Excavation - Hard Rock
cu.m.
1702(3) Foundation Fill cu.m.
1702(4) Excavation ordered below Plan
elevation cu.m.
1702(5)a Shoring, cribbing and related
works - Shoring L.S.
1702(5)b Shoring, cribbing and related
works - Cribbing/
Cofferdamming L.S.
1702(6)a Pipe culverts and drain
excavation - Common Soil cu.m.
1702(6)b Pipe culverts and drain
excavation - Soft Rock cu.m.
1702(6)c Pipe culverts and drain
excavation - Hard Rock cu.m.

1703(1)a Dredging using cutter suction


- up to 300mm dia. cu.m.
1703(1)b Dredging using cutter suction
- above 300mm dia.
cu.m.
1703(2) Dredging using amphibious
excavator cu.m.
1703(3) Dredging using backhoe on
barge cu.m.
1703(4) Dredging using backhoe on
bank cu.m.
1703(5) Dredging using clampshell cu.m.

1704(1)a Embankment - From


roadway/structure excavation
cu.m.
1704(1)b Embankment - From borrow
cu.m.
1704(2)a Selected Borrow for topping -
Case 1 cu.m.
1704(2)b Selected Borrow for topping -
Case 2 cu.m.
1704(3) Earth Berm cu.m.
1704(4) Boulder Fill cu.m.
cu.m.

1705(1) Fill and Backfill cu.m.


1705(2) Backfill - Sand cu.m.

1706(1) Overhaul
cu.m.-km.
1706(2) Overhaul of Borrow Case 1 -
Sand cu.m.-km.

1707(1) Aggregate Subbase Course cu.m.

1708(1) Aggregate Base Course cu.m.

1709(1) Crushed Aggregate Base


Course cu.m.
1710(1)a Riprap - Class A cu.m.
1710(1)b Riprap - Class B cu.m.
1710(1)c Riprap - Class C cu.m.
1710(1)d Riprap - Class D cu.m.
1710(2)a Grouted Riprap - Class A cu.m.
1710(2)b Grouted Riprap - Class B cu.m.
1710(2)c Grouted Riprap - Class C cu.m.
1710(2)d Grouted Riprap - Class D cu.m.
1710(3) Filter layer of granular
material cu.m.

1711(1) Stone Masonry cu.m.

1712(1) Bed Course Granular Material


cu.m. in-place
1712(2) Concrete - Slope Protection
cu.m. in-place

1713(1) Rubble Concrete cu.m.

1714(1)a1 Gabions - 0.5m x 1m x 3m -


Metallic Coated cu.m.
1714(1)a2 Gabions - 0.5m x 1m x 4m -
Metallic Coated cu.m.
1714(1)a3 Gabions - 1m x 1m x 2m -
Metallic Coated cu.m.
1714(1)a4 Gabions - 1m x 1m x 3m -
Metallic Coated cu.m.
1714(1)a5 Gabions - 1m x 1m x 4m -
Metallic Coated cu.m.
1714(1)a6 Gabions - 0.5 x 1m x 2m -
Metallic Coated cu.m.
1714(1)b1 Gabions - 0.5m x 1m x 3m -
PVC Coated cu.m.
1714(1)b2 Gabions - 0.5m x 1m x 4m -
PVC Coated cu.m.
1714(1)b3 Gabions - 1m x 1m x 2m - PVC
Coated cu.m.
1714(1)b4 Gabions - 1m x 1m x 3m - PVC
Coated cu.m.
1714(1)b5 Gabions - 1m x 1m x 4m - PVC
Coated cu.m.
1714(1)b6 Gabions - 0.5m x 1m x 2m -
PVC Coated cu.m.
1714(2)a1 Mattresses - 0.3m x 2m x 6m -
Metallic Coated cu.m.
1714(2)a2 Mattresses - 0.3m x 2m x 6m -
PVC Coated cu.m.
1714(3) Filter Cloth sq.m.
1714(4)a1 Polyester Net Gabion - 1 tonne
- Type I ea.
1714(4)a2 Polyester Net Gabion - 2
tonnes - Type I ea.
1714(4)a3 Polyester Net Gabion - 3
tonnes - Type I ea.
1714(4)a4 Polyester Net Gabion - 4
tonnes - Type I ea.
1714(4)b1 Polyester Net Gabion - 1 tonne
- Type II ea.
1714(4)b2 Polyester Net Gabion - 2
tonnes - Type II ea.
1714(4)b3 Polyester Net Gabion - 3
tonnes - Type II ea.
1714(4)b4 Polyester Net Gabion - 4
tonnes - Type II ea.
1714(4)b5 Polyester Net Gabion - 5
tonnes - Type II ea.
1714(4)b6 Polyester Net Gabion - 6
tonnes - Type II ea.

1715(1) Filter Material sq.m.


1715(2) Filter Fabric with Aluminum
Frame sq.m.

1716(1) Untreated Timber Piles,


furnished m.
1716(2) Treated Timber Piles,
preservative, furnished m.
1716(3) Steel H-Piles, furnished m.
1716(4)a Precast Concrete Piles,
furnished - 400x400 mm m.
1716(4)b Precast Concrete Piles,
furnished - 450x450 mm m.
1716(5)a Precast, Prestresssed Concrete
Piles, furnished - 400x400 mm
m.
1716(5)b Precast, Prestresssed Concrete
Piles, furnished - 450x450 mm
m.
1716(6)a Structural Steel Sheet Piles,
furnished - New m.
1716(6)b Structural Steel Sheet Piles,
furnished - Rental m.
1716(7) Precast Concrete Sheet Piles,
furnished m.
1716(8) Untreated Timber Piles, driven
m.
1716(9) Treated Timber Piles, driven
m.
1716(10) Steel H-Piles, driven m.
1716(11) Steel Pipes Piles m.
1716(12) Structural Steel Sheet Piles,
driven m.
1716(13) Precast Concrete Sheet Piles,
driven m.
1716(14) Precast Concrete Piles, driven
m.
1716(15) Precast, Prestresssed Concrete
Piles, driven m.
1716(16) Test Piles, furnished and
driven m.
1716(17)a Concrete Piles cast in Drilled
Holes - 0.8 m.
1716(17)b Concrete Piles cast in Drilled
Holes - 0.9 m.
1716(17)c Concrete Piles cast in Drilled
Holes - 1 m.
1716(17)d Concrete Piles cast in Drilled
Holes - 1.1 m.
1716(17)e Concrete Piles cast in Drilled
Holes - 1.2 m.
1716(17)f Concrete Piles cast in Drilled
Holes - 1.3 m.
1716(17)g Concrete Piles cast in Drilled
Holes - 1.4 m.
1716(17)h Concrete Piles cast in Drilled
Holes - 1.5 m.
1716(17)i Concrete Piles cast in Drilled
Holes - 1.6 m.
1716(18) Concrete Piles cast in Steel
Shells - 400-500 mm dia. m.
1716(19) Concrete Piles cast in Steel
Pipes - 400-500 mm dia. m.
1716(20) Pile Shoes m.
1716(21) Splices m.
1716(22) Load Tests m.
1716(23)a Permanent Casing - 0.8 -
10mm thick m.
1716(23)b Permanent Casing - 0.9 -
10mm thick m.
1716(23)c Permanent Casing - 1 - 10mm
thick m.
1716(23)d Permanent Casing - 1.1 -
10mm thick m.
1716(23)e Permanent Casing - 1.2 -
10mm thick m.
1716(23)f Permanent Casing - 1.3 -
10mm thick m.
1716(23)g Permanent Casing - 1.4 -
10mm thick m.
1716(23)h Permanent Casing - 1.5 -
10mm thick m.
1716(23)i Permanent Casing - 1.6 -
12mm thick m.
1716(24) Permanent Casing kgs.
1716(25) Splicing of R.C. Piles with
Epoxy ea.
1716(26)a Pile Integrity Testing -
Crosshole-Sonic ea.
1716(26)b Pile Integrity Testing - Low
Strain ea.
1716(27) High Strain Dynamic Testing
(P.D.A) ea.
1716(28)a Painting Works - Concrete
Structures sq.m.
1716(28)b Painting Works - Steel
Structures sq.m.
1716(29) Structural Steel Sheet Piles,
extracted m.
1716(30) Rammed Aggregate Piers cu.m.
1716(31) Vibro Stone Columns cu.m.
1716(32) Modulus or Uplift Load Tests
ea.
1716(33) Steel Casing l.m.

1717(1) Sheet Piles Timber m.


1717(2)a1 Sheet Piles - Steel - Slope
Protection m.
1717(2)a2 Sheet Piles - Steel -
Cofferdamming m.
1717(2)a3 Sheet Piles - Steel - Extraction
m.
1717(3)a1 Sheet Piles - Concrete -
Furnished m.
1717(3)a2 Sheet Piles - Concrete - Driven
m.
1717(3)a3 Sheet Piles - Concrete -
Furnished and Driven m.
1717(4)a1 Furnishing of Steel Sheet Pile -
U-Type - Grade 40 kgs.
1717(4)a2 Furnishing of Steel Sheet Pile -
U-Type - Grade 50 kgs.
1717(4)b Furnishing of Steel Sheet Pile -
Z-Type - Grade 50 kgs.
1717(4)c Furnishing of Steel Sheet Pile -
Hat Type - Grade 50 kgs.
1717(4)d Furnishing of Steel Sheet Pile -
Pipe Type - Grade 50 kgs.
1717(5)a1 Furnished and Driven of Steel
Sheet Pile - U-Type - Grade 40
m.
1717(5)a2 Furnished and Driven of Steel
Sheet Pile - U-Type - Grade 50
m.
1717(5)a1 Furnished and Driven of Steel
Sheet Pile - Z-Type - Grade 50
m.
1717(5)a2 Furnished and Driven of Steel
Sheet Pile - Hat Type - Grade
50 m.
1717(5)a3 Furnished and Driven of Steel
Sheet Pile - Pipe Type - Grade
50 m.
1717(6) Steel Sheet Pile Flexible Joint -
Type 2 m.
1717(7) End Connection - Type 1 pcs.
1717(8)a1 Sheet Piles - PVC - Furnished
l.m.
1718(8)a2 Sheet Piles - PVC - Driven l.m.

1718(1) Pipe Culverts l.m.


1718(2) Storm Drain l.m.
1719(1) Underdrain l.m.
1719(2) Blind Drain l.m.
1719(3) Granular Backfill Filter Material
for underdrains cu.m.
1719(4)a1 Fiber Reinforced Plastic Mortar
(FRPM) - 300mm dia. - FRPM
Pipe m.
1719(4)a2 Fiber Reinforced Plastic Mortar
(FRPM) - 200mm dia. - FRPM
Pipe m.
1719(4)b Fiber Reinforced Plastic Mortar
(FRPM) - 300mm dia. - FRPM
Perforated Pipe m.
1719(5)a1 Fiber Reinforced Plastic Flap
Gate - 300mm dia. - FRP Flap
Gate ea.
1719(5)a2 Fiber Reinforced Plastic Flap
Gate - 750mm dia. - FRP Flap
Gate ea.
1719(5)a3 Fiber Reinforced Plastic Flap
Gate - 900mm dia. - FRP Flap
Gate ea.
1719(6)a1 Rectangular Aluminum Flap
Gate - 2000 x 2000mm -
Aluminum Flap Gate ea.
1719(6)a2 Rectangular Aluminum Flap
Gate - 1700 x 1700mm -
Aluminum Flap Gate ea.

1720(1)a1 Manholes - 610 mm dia. -


Concrete ea.
1720(1)a2 Manholes - 760 mm dia. -
Concrete ea.
1720(1)a3 Manholes - 910 mm dia. -
Concrete ea.
1720(1)a4 Manholes - 1070 mm dia. -
Concrete ea.
1720(1)a5 Manholes - 1220 mm dia. -
Concrete ea.
1720(1)a6 Manholes - 1520 mm dia. -
Concrete ea.
1720(1)a7 Manholes - 1830 mm dia. -
Concrete ea.
1720(1)b1 Manholes - 610 mm dia. - CHB
ea.
1720(1)b2 Manholes - 760 mm dia. - CHB
ea.
1720(1)b3 Manholes - 910 mm dia. - CHB
ea.
1720(1)b4 Manholes - 1070 mm dia. -
CHB ea.
1720(1)b5 Manholes - 1220 mm dia. -
CHB ea.
1720(1)b6 Manholes - 1520 mm dia. -
CHB ea.
1720(1)b7 Manholes - 1830 mm dia. -
CHB ea.
1720(2)a1 Inlets, type - 610 mm dia. ea.
1720(2)a2 Inlets, type - 760 mm dia. ea.
1720(2)a3 Inlets, type - 910 mm dia. ea.
1720(2)a4 Inlets, type - 1070 mm dia.
ea.
1720(2)a5 Inlets, type - 1220 mm dia.
ea.
1720(2)a6 Inlets, type - 1520 mm dia.
ea.
1720(3)a1 Catch Basins - 610 mm dia.
ea.
1720(3)a2 Catch Basins - 760 mm dia.
ea.
1720(3)a3 Catch Basins - 910 mm dia.
ea.
1720(3)a4 Catch Basins - 1070 mm dia.
ea.
1720(3)a5 Catch Basins - 1220 mm dia.
ea.
1720(3)a6 Catch Basins - 1520 mm dia.
ea.
1720(4)a1 Concrete Covers - 610 mm
dia. ea.
1720(4)a2 Concrete Covers - 760 mm
dia. ea.
1720(4)a3 Concrete Covers - 910 mm
dia. ea.
1720(4)a4 Concrete Covers - 1070 mm
dia. ea.
1720(4)a5 Concrete Covers - 1220 mm
dia. ea.
1720(4)a6 Concrete Covers - 1520 mm
dia. ea.
1720(5) Metal Frames and Gratings,
type pairs
1720(6) Metal Frames and Covers pairs
1720(7) Adjusting Manholes Each ea.
1720(8) Adjusting Catch Basin ea.
1721(1) Removing, Cleaning,
Stockpiling Salvaged Culvert
Pipe l.m.
1721(2) Removing, Cleaning, and
Relaying Salvaged Culvert Pipe
l.m.
1721(3) Cleaning Culvert Pipe in place
l.m.
1721(4) Reconditioning Drainage
Structures ea.

1722(1)a Fence - CHB sq.m.


1722(1)b Fence - Precast sq.m.
1722(1)c Fence - Cyclone/Welded Wire
sq.m.
1722(1)d Fence - Galvanized sq.m.
1722(1)e Fence - Precast Plant Box l.m.
1722(2) Railings l.m.

1724(1) Submersible Axial and Mixed


Flow Pump - above 1.0 m3/s
cap sets
1724(2) Submersible Vertical Axial
Flow Pump - above 1.0 m3/s
cap sets
1724(3) Horizontal Axial Flow Pump -
above 1.0 m3/s cap sets
1724(4) Suction Column Pipe set with
Flanges and Bolt & Nuts - 6 -
10mmt - carbon steel -
1500mmØ and below
sets
1724(5) Discharge Column Pipe set
with Flanges and Bolt & Nuts -
6 -10mmt - carbon steel -
1500mmØ and below
sets
1724(6) Flapper Valve - 12mmt -
carbon steel - 1500mmØ and
below sets
1724(7) Butterfly Valve - 12mmt -
carbon steel - 1500mmØ and
below sets
1724(8)a Water Elevation Indicator -
Meter Stick sets
1724(8)b Water Elevation Indicator -
Electronic Sensor sets
1724(9) Bulk Fuel Storage Tank -
20,000 ltrs. sets
1724(10) Fuel Day Tank - 1500 ltrs. sets
1724(11) Fuel Transfer Pump - 0.187-
0.75kW sets
1724(12) Overhead Water Tank with
Pump - stainless - 2-5cu.meter
sets
1724(13) Water Supply Centrifugal
Pump - 0.75 - 2.24kW sets
1724(14) Portable Submersible Pump -
0.75 -3.73kW sets
1724(15)a1 Rectangular Flap Gate -
610mm dia. - Cast Iron ea.
1724(15)a2 Rectangular Flap Gate -
910mm dia. - Cast Iron ea.
1724(15)a3 Rectangular Flap Gate -
1070mm dia. - Cast Iron ea.
1724(15)a4 Rectangular Flap Gate -
1220mm dia. - Cast Iron ea.
1724(15)a5 Rectangular Flap Gate -
1524mm dia. - Cast Iron ea.
1724(16) Pump House and Accessories
L.S.

1725(1) Submersible Axial and Mixed


Flow Sewage Pump - 1.0 m3/s
cap and below sets
1725(2) Submersible Vertical Axial
Flow Sewage Pump - 1.0 m3/s
cap and below sets
1725(3) Suction Column Pipe Set with
Flanges and Bolts and Nuts -
700mmФ below sets
1725(4) Discharge Column Pipe Set
with Flanges and Bolts and
Nuts - 700mmФ below sets
1725(5) Flapper Valve (Carbon Steel) -
700mmФ below sets
1725(6) Fuel Transfer Pump - 0.187-
0.75 KW sets
1725(7) Fuel Storage Tank - 5,000 lts.
sets
1725(8)a Fuel Day Tank - 1,000 lts. sets
1725(8)b Fuel Day Tank - above 1000 -
15000 lts. sets
1725(9) Steel Grating sets
1725(10) Meter Stick - 1m/3ft Metric /
English Aluminum meter stick
- (0.5 ton cap chain host with
trolley) sets
1725(11)a1 Gantry Crane - LDY type
Metallurgy, single overhead
crance - (0.5 ton cap chain
host with trolley) sets
1725(11)a2 Gantry Crane - LDY type
Metallurgy, single overhead
crance - (0.5 ton cap chain
host with trolley) sets
1725(11)a3 Gantry Crane - LDY type
Metallurgy, single overhead
crance - (0.5 ton cap chain
host with trolley) sets
1725(11)a4 Gantry Crane - LDY type
Metallurgy, single overhead
crance - (0.5 ton cap chain
host with trolley) sets
1725(11)a5 Gantry Crane - LDY type
Metallurgy, single overhead
crance - (0.5 ton cap chain
host with trolley) sets

1726(1) Motor Control Center (for main


pumps and facilities) L.S.
1726(2) Generator Set L.S.
1726(3) Local Panel Control Center (for
Auxiliary Equipment) L.S.

1727(1) Hoist Crane sets


1727(2)a Overhead Crane sets
1727(2)b Overhead crane sets
1727(2)c Overhead crane sets
1727(3)a Gantry Crane sets
1727(3)b Gantry Crane sets
1727(3)c Gantry Crane sets
1727(4)a Automatic trash rake complete
with accessories ready for
service sets
1727(4)b Trash rake complete with
accessories ready for service
sets
1727(5) Flood gate complete with
accessories ready for service
sets
1727(6) Horizontal conveyor complete
with accessories ready for
service sets
1727(7) Inclined conveyor with hooper
complete with accessories
ready for service
sets
PART I - FACILITIES FOR THE ENGINEER
FACILITIES FOR THE ENGINEER
PART II - OTHER GENERAL REQUIREMENTS
OTHER GENERAL REQUIREMENTS
EARTHWORK

SUBBASE AND BASE COURSE Lump SumL.S.

SURFACE COURSE Month mo.

BRIDGE CONSTRUCTION Piece pcs.

DRAINAGE AND SLOPE PROTECTION STRUCTURES Each ea.

MISCELLANEOUS STRUCTURES Linear Metl.m.

MATERIALS DETAILS Square Mesq.m.

PART III - CIVIL, MECHANICAL, ELECTRICAL AND SANITARY Cubic Metecu.m.

EARTHWORK Roll roll

PLAIN AND REINFORCED CONCRETE WORK Meter m.

FINISHINGS AND OTHER CIVIL WORKS Kilogram kgs.

ELECTRICAL Kilometer kms.

MECHANICAL Hour hrs.

PILING PS PS
PROTECTIVE WORKS AND ACCESSORIES Liter l

BULKHEADS Tonne tonnes

WATER SUPPLY Span span

FLOOD CONTROL AND DRAINAGE Set sets

Pair pairs
Site site
Pail pail
Box box
Slot slot

Bag bags

Metric Tonmetric ton

Board Footbd.ft.

Unit units

Length length

Hectare ha.
OTHER GENERAL REQUIREMENTS
EARTHWORK
— SUBBASE AND BASE COURSE
SURFACE COURSE
BRIDGE CONSTRUCTION
DRAINAGE AND SLOPE PROTECTION STRUCTURES
MISCELLANEOUS STRUCTURES
MATERIALS DETAILS
EARTHWORK
PLAIN AND REINFORCED CONCRETE WORK
FINISHINGS AND OTHER CIVIL WORKS
ELECTRICAL
MECHANICAL
PROTECTIVE WORKS AND ACCESSORIES
BULKHEADS

— WATER SUPPLY
FLOOD CONTROL AND DRAINAGE
BACK UP COMPUTATIONS OF QUANTITIES
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

ITEM A.1.1(8): Provision of Field Office for the Engineer(Rental Basis)


Quantity = 94.00 / 30.00
= 3.13 mo.

ITEM B.5: Project Billboard (DPWH)


Quantity = 2.00 ea.

ITEM B.5: Project Billboard (COA)


Quantity = 1.00 ea.

ITEM B.7(1): Occupational Safety & Health Program


Quantity = 114.00 / 30.00
= 3.80 mo.

ITEM B.8(1): Traffic Management


Quantity = 114.00 / 30.00
= 3.80 mo.

ITEM B.9: Mobilization/Demobilization


Quantity = LUMPSUM

ITEM 100(2): Clearing & Grubbing


Quantity = LUMPSUM

ITEM 101(3)b5: Removal of Actual Structures/Obstruction - 0.28m thick - PCCP (Unreinforced)


Station Width Ave. Width Length Area
0 0.30
0.30 20.00 6.00
20 0.30
0.30 20.00 6.00
40 0.30
0.30 20.00 6.00
60 0.30
0.30 20.00 6.00
80 0.30
0.30 20.00 6.00
100 0.30
0.30 20.00 6.00
120 0.30
0.30 20.00 6.00
140 0.30
0.30 20.00 6.00
160 0.30
0.30 20.00 6.00
180 0.30
0.30 20.00 6.00
200 0.30
0.30 20.00 6.00
220 0.30
0.30 20.00 6.00
240 0.30
0.30 20.00 6.00
260 0.30
0.30 20.00 6.00
280 0.30
0.30 20.00 6.00
300 0.30
0.30 20.00 6.00
320 0.30
0.30 20.00 6.00
340 0.30
0.30 20.00 6.00
360 0.30
0.30 11.00 3.30
371 0.30

TOTAL = 111.30 sq.m


ITEM 101(3)c1: Removal of Actual Structures/Obstruction - 0.05 m thick - ACP
Station Width Ave. Width Length Area
0 0.30
0.30 20.00 6.00
20 0.30
0.30 20.00 6.00
40 0.30
0.30 20.00 6.00
60 0.30
0.30 20.00 6.00
80 0.30
0.30 20.00 6.00
100 0.30
0.30 20.00 6.00
120 0.30
0.30 20.00 6.00
140 0.30
0.30 20.00 6.00
160 0.30
0.30 20.00 6.00
180 0.30
0.30 20.00 6.00
200 0.30
0.30 20.00 6.00
220 0.30
0.30 20.00 6.00
240 0.30
0.30 20.00 6.00
260 0.30
0.30 20.00 6.00
280 0.30
0.30 20.00 6.00
300 0.30
0.30 20.00 6.00
320 0.30
0.30 20.00 6.00
340 0.30
0.30 20.00 6.00
360 0.30
0.30 11.00 3.30
371 0.30

TOTAL = 111.30 sq.m

ITEM 101(6): Removal of Actual Structures/Obstruction - Concrete


Station Area Ave. Area Length Volume
0 0.405
0.405 20.00 8.10
20 0.405
0.405 20.00 8.10
40 0.405
0.405 20.00 8.10
60 0.405
0.405 20.00 8.10
80 0.405
0.405 20.00 8.10
100 0.405
0.405 20.00 8.10
120 0.405
0.405 20.00 8.10
140 0.405
0.405 20.00 8.10
160 0.405
0.405 20.00 8.10
180 0.405
0.405 20.00 8.10
200 0.405
0.405 20.00 8.10
220 0.405
0.405 20.00 8.10
240 0.405
0.405 20.00 8.10
260 0.405
0.405 20.00 8.10
280 0.405
0.405 20.00 8.10
300 0.405
0.405 20.00 8.10
320 0.405
0.405 20.00 8.10
340 0.405
0.405 20.00 8.10
360 0.405
0.405 11.00 4.46
371 0.405

TOTAL = 150.26 sq.m

ITEM 102(2): Surplus Common Excavation


Station Width Depth Area End Area Length Volume

0 7.90 0.50 3.95


3.95 20.00 79.00
20 7.90 0.50 3.95
3.95 20.00 79.00
40 7.90 0.50 3.95
3.95 20.00 79.00
60 7.90 0.50 3.95
3.95 20.00 79.00
80 7.90 0.50 3.95
3.95 20.00 79.00
100 7.90 0.50 3.95
3.95 20.00 79.00
120 7.90 0.50 3.95
3.95 20.00 79.00
140 7.90 0.50 3.95
3.95 20.00 79.00
160 7.90 0.50 3.95
3.95 20.00 79.00
180 7.90 0.50 3.95
3.95 20.00 79.00
200 7.90 0.50 3.95
3.95 20.00 79.00
220 7.90 0.50 3.95
3.95 20.00 79.00
240 7.90 0.50 3.95
3.95 20.00 79.00
260 7.90 0.50 3.95
3.95 20.00 79.00
280 7.90 0.50 3.95
3.95 20.00 79.00
300 7.90 0.50 3.95
3.95 20.00 79.00
320 7.90 0.50 3.95
3.95 20.00 79.00
340 7.90 0.50 3.95
3.95 20.00 79.00
360 7.90 0.50 3.95
3.95 11.00 43.45
371 7.90 0.50 3.95

TOTAL = 1,465.45 sq.m

ITEM 105(1)a: Subgrade Preparation (Common Material)


Station Width Ave. Width Length Area
0 7.90
7.90 20.00 158.00
20 7.90
7.90 20.00 158.00
40 7.90
7.90 20.00 158.00
60 7.90
7.90 20.00 158.00
80 7.90
7.90 20.00 158.00
100 7.90
7.90 20.00 158.00
120 7.90
7.90 20.00 158.00
140 7.90
7.90 20.00 158.00
160 7.90
7.90 20.00 158.00
180 7.90
7.90 20.00 158.00
200 7.90
7.90 20.00 158.00
220 7.90
7.90 20.00 158.00
240 7.90
7.90 20.00 158.00
260 7.90
7.90 20.00 158.00
280 7.90
7.90 20.00 158.00
300 7.90
7.90 20.00 158.00
320 7.90
7.90 20.00 158.00
340 7.90
7.90 20.00 158.00
360 7.90
7.90 11.00 86.90
371 7.90

TOTAL = 2,930.90 sq.m

ITEM 200(1): Aggregate Subbase Course


Station Width Depth Area End Area Length Volume

0 7.90 0.20 1.58


1.58 20.00 31.60
20 7.90 0.20 1.58
1.58 20.00 31.60
40 7.90 0.20 1.58
1.58 20.00 31.60
60 7.90 0.20 1.58
1.58 20.00 31.60
80 7.90 0.20 1.58
1.58 20.00 31.60
100 7.90 0.20 1.58
1.58 20.00 31.60
120 7.90 0.20 1.58
1.58 20.00 31.60
140 7.90 0.20 1.58
1.58 20.00 31.60
160 7.90 0.20 1.58
1.58 20.00 31.60
180 7.90 0.20 1.58
1.58 20.00 31.60
200 7.90 0.20 1.58
1.58 20.00 31.60
220 7.90 0.20 1.58
1.58 20.00 31.60
240 7.90 0.20 1.58
1.58 20.00 31.60
260 7.90 0.20 1.58
1.58 20.00 31.60
280 7.90 0.20 1.58
1.58 20.00 31.60
300 7.90 0.20 1.58
1.58 20.00 31.60
320 7.90 0.20 1.58
1.58 20.00 31.60
340 7.90 0.20 1.58
1.58 20.00 31.60
360 7.90 0.20 1.58
1.58 11.00 17.38
371 7.90 0.20 1.58

TOTAL = 586.18 sq.m


ITEM 302(2): Emulsified Asphalt
Main Carriageway
Length = - m
Width = 6.70 m
Area = - sq.m

Widening
Length = - m
Width = 6.10 m
2 Layers = 2.00
Area = - sq.m

Total Area = - sq.m

Areaemul = 7011.90 sq.m x 0.70 ltr/sq.m. = 4908.33sq.m.

Qty = - sq.m

ITEM 310(1)c: Bituminous Concrete Surface Wearing Course, Hot-Laid (50mm thk)
Main Carriageway
Length = - m
Width = 6.70 m
Area = - sq.m

Widening
Length = - m
Width = 6.10 m
2 Layers = 2.00
Area = - sq.m

Total Area = - sq.m

ITEM 311(1)f1: Portland Cement Concrete Pavement (Unreinforced, 0.30 m thick)


Station Width Ave. Width Length Area
0 7.90
7.90 20.00 158.00
20 7.90
7.90 20.00 158.00
40 7.90
7.90 20.00 158.00
60 7.90
7.90 20.00 158.00
80 7.90
7.90 20.00 158.00
100 7.90
7.90 20.00 158.00
120 7.90
7.90 20.00 158.00
140 7.90
7.90 20.00 158.00
160 7.90
7.90 20.00 158.00
180 7.90
7.90 20.00 158.00
200 7.90
7.90 20.00 158.00
220 7.90
7.90 20.00 158.00
240 7.90
7.90 20.00 158.00
260 7.90
7.90 20.00 158.00
280 7.90
7.90 20.00 158.00
300 7.90
7.90 20.00 158.00
320 7.90
7.90 20.00 158.00
340 7.90
7.90 20.00 158.00
360 7.90
7.90 11.00 86.90
371 7.90

SUB TOTAL = 2,930.90 sq.m

ITEM 404(1)a: Reinforcing Steel Bars (Grade 40)


Qty

ITEM 405(1)a2: Structural Concrete, Class "A" (20.68 Mpa), 14 days

ITEM 502(5): Metal Frames & Gratings, type


* at Fence of Mormons to MNR
Length = 40.00 m
Spacing = 20.00 m
Cover = 3.00 pcs

Total = 3.00 pcs

ITEM 612(1): Reflectorized Thermoplastic Pavement Markings White


Edge Line Center Line - Dash

Length = 371.00 l.m. Length = 742.00 l.m.


Width = 100.00 mm # of Pcs = 83.00 pcs
Area = 37.10 sq.m. Length of Line = 3.00 m
# of Edge line = 2.00 Width of Line = 150.00 mm
Area per Pc = 0.45 sq.m
Total Area = 74.20 sq.m. Total Area = 37.35 sq.m.

Center Line - Solid


Length = 371.00 l.m.
Width = 150.00 mm
Area = 37.10 sq.m.
# of Edge line = 1.00

Total Area = 37.10 sq.m.

Total Area = 148.65 sq.m.

ITEM 612(2): Reflectorized Thermoplastic Pavement Markings Yellow


Overtaking Permitted

Length = 261.00 l.m.


Width = 150.00 mm
Area = 39.15 sq.m.
# of line = 1.00

Total Area = 39.15 sq.m.

ITEM 624(9)a2: Single Arm Solar LED Roadway Lighting, 9m-Pole, 80W-125W

Qty = 28.00 pcs

ITEM 103(1)a: Structure Excavation(Common Soil)


Length = 1.20 m
Width = 1.20 m
Depth = 1.60 m
Volume = 2.30 cu.m
Qty of Solar = 28.00 pc
Total Volume = 64.51 cu.m

ITEM 104(1)a: Embankment from roadway/structure excavation


Length = 1.20 m Length = 0.50 m
Width = 1.20 m Width = 0.50 m
Depth = 1.20 m Depth = 1.20 m
Volume = 1.73 cu.m Volume = 0.30 cu.m
Total Volume = 1.43 cu.m
Qty of Solar = 28.00 pc
Total Volume = 39.98 cu.m

ITEM 104(7): Gravel Fill


Length = 1.20 m
Width = 1.20 m
Depth = 0.10 m
Volume = 0.14 cu.m
Qty of Solar = 28.00 pc
Total Volume = 4.03 cu.m

ITEM 404(1)a: Reinforcing Steel (Grade 40)


Footing - 16mm
Length = 1.50 m
# of Bars = 4.00
Bothways = 2.00
Tot Length = 12.00 m
Weight/meter = 1.58 kg/m
Weight = 18.96 kg

Column - 16mm and 10mm


Length = 2.00 m Length = 2.60 m
# of Bars = 8.00 # of Bars = 8.00
Tot Length = 16.00 m Tot Length = 20.80 m
Weight/meter = 1.58 kg/m Weight/meter = 0.62 kg/m
Weight = 25.28 kg Weight = 12.90 kg

Total = 57.14 kg
Qty of Solar = 28.00 pc
Total Weight = 1,599.81 kg

ITEM 405(1)a2: Structural Concrete, Class "A" (20.68 Mpa)


Footing Column
Length = 1.20 m Length = 0.50 m
Width = 1.20 m Width = 0.50 m
Depth = 0.30 m Depth = 1.20 m
Volume = 0.43 cu.m Volume = 0.30 cu.m

Total Volume = 0.73 cu.m


Qty of Solar = 28.00 pc
Total Volume = 20.50 cu.m
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I
LA UNION FIRST DISTRICT ENGINEERING OFFICE
City of San Fernando, La Union

PROGRAM OF WORK / BUDGET COST

Project : Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

Project ID : Net Length : Road 0.696 lane km. (2 lanes)


Location : Sudipen, La Union Drainage
Station Limits :
Target Start Date : Upon Approval
Total Project Duration : 114 Calendar Days
Appropriation : ₱ 17,400,000.00 No. of Pre-determined :
Source of Fund : Unworkable Days

AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
Part A: Facilities for the Engineer 0.28% 38,000.00 #VALUE! 113,507.60
B: Other General Requirements 3.23% 438,574.61 #VALUE! 421,307.48
C: Earthwork 3.98% 540,498.05 #VALUE! #VALUE!
D: Subbase and Base Course 2.08% 281,943.13 #VALUE! 281,943.12
E: Surface Course ( PLS. SEE FORM POW-2015-01C-00 ) 32.04% 4,352,119.70 #REF! #REF!
F: Bridge Construction 26.73% 3,631,117.09 #VALUE! -
G: Draiange and Slope Protection Structures 6.37% 865,763.18 #REF! #REF!
H: Miscellaneous Structures 25.29% 3,434,694.41 #NAME? #NAME?
I: Materials Details 0.00% - #VALUE!
J: Daywork 0.00% - #VALUE!
Total 100.00% 13,582,710.17 #VALUE! #VALUE!

EQUIPMENT: BREAKDOWN OF EXPENDITURES:


DESCRIPTION REQUIRED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED
1. Labor 673,425.40 #VALUE! A. Total Direct Cost 13,582,710.17 #VALUE!
2. Materials 12,041,550.73 335,841.70 B. OCM and Profit 2,657,289.82 #VALUE!
3. Rental of Equipment 867,734.03 227,995.68 C. Value Added Tax 812,000.00 #VALUE!
4. Provisional Sum / Daywork - - D. Total Construction Cost 17,052,000.00 #VALUE!
5. Daywork - - E. Eng'g & Administrative Overhead 348,000.00 348,000.00
( PLS. SEE FORM POW-2015-O1B-00 ) 6. OCM and Profit 2,657,289.82 #VALUE! F. RROW Acquisition
7. Value Added Tax 812,000.00 #VALUE! G. Physical Reserved (Contingency) - -
8. EAO, 2% 348,000.00 348,000.00
9. RROW Acquisition
10. Physical Reserved (Contingency) - -
11. TOTAL ESTIMATED COST 17,400,000.00 #VALUE! H. TOTAL ESTIMATED COST 17,400,000.00 #VALUE!

Preparation and Submission: Approval :

Prepared by : Checked / Submitted by : Recommending Approval : Approved :

RAMIL A. BALISNOMO SHERYLANN B. GONZALES SHERYLANN B. GONZALES JOSE G. GINETE, JR.


Engineer II Concurrent Chief - OIC, Planning & Design Section Assistant District Engineer District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I
LA UNION FIRST DISTRICT ENGINEERING OFFICE
Lingsat, City of San Fernando, La Union

Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-01A-00

ITEMIZED BREAKDOWN

DIRECT COST TOTAL UNIT COST


% DIRECT
QUANTITY
COST
ITEM NO DESCRIPTION UNIT TOTAL UNIT COST (DIRECT + INDIRECT)

AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS EVALUATED

PART A FACILITIES OF ENGINEERS

A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 3.80 0.00 mo. 38,000.00 38,000.00 10,000.00 - 11,340.00 -

TOTAL OF PART A 38,000.00 38,000.00

PART B OTHER GENERAL REQUIREMENTS

B.5 Project Billboard / Signboard (DPWH) 2.00 2.00 ea. 6,152.01 6,083.50 3,076.00 3,041.75 3,875.77 3,832.61

B.5 Project Billboard / Signboard (COA) 1.00 2.00 ea. 6,152.01 6,152.01 6,152.01 3,832.61 7,751.53 7,665.21

B.7(1) Occupational Safety and Health Program 3.80 3.80 mo. 107,964.27 107,964.26 28,411.65 28,411.65 32,218.81 32,218.81

B.8(1) Traffic Management 3.80 3.80 mo. 204,798.72 193,752.12 53,894.40 50,987.40 61,116.25 57,819.71

B.9 Mobilization / Demobilization 1.00 1.00 L.S. 113,507.60 113,507.60 113,507.60 113,507.60 119,182.98 119,182.98

TOTAL OF PART B 438,574.61 427,459.49

PART C EARTHWORK

100(2) Clearing and Grubbing 1.00 1.00 L.S. 13,568.60 11,165.84 13,568.60 11,165.84 17,096.44 Err:509

100(3)a2 Individual Removal of Trees - 301 - 500mm dia. - Small 1.00 0.00 ea. 2,461.98 11,165.84 2,461.98 17,096.44 3,102.09 Err:509

100(3)a3 Individual Removal of Trees - 501 - 750mm dia. - Small 1.00 0.00 ea. 12,305.16 0.00 12,305.17 - 15,504.51 Err:509

101(1) Removal of Structures & Obstruction 1.00 1.00 L.S. 110,817.35 21,883.60 110,817.35 - 141,957.03 Err:509
Removal of Actual Structures/Obstruction (0.23mm thick PCCP
101(3)b3 346.75 1.00 sq.m. 59,029.94 21,883.60 170.24 - 214.50 Err:509
Unreinforced)
102(2) Surplus Common Excavation 1,109.93 0.00 cu.m. 230,688.59 0.00 157.05 125.10 197.88 -

103(1)a Structure Excavation (Common Soil) 64.51 1,109.93 cu.m. 27,450.49 #VALUE! - - 965.04 -
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-01A-00

ITEMIZED BREAKDOWN

DIRECT COST TOTAL UNIT COST


% DIRECT
QUANTITY
COST
ITEM NO DESCRIPTION UNIT TOTAL UNIT COST (DIRECT + INDIRECT)

AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS EVALUATED

104(1)a Embankment from roadway/structure excavation (Common Soil) 39.98 39.98 cu.m. 4,971.92 4,971.92 124.36 - 156.69 20.73

104(7) Gravel Fill 28.73 cu.m. 30,168.82 1,050.01 1,323.01

105(1)a Subgrade Preparation (Common Material) 2,365.80 2,365.80 sq.m. 49,035.20 49,035.19 20.73 20.73 26.12 26.12

TOTAL OF PART C 540,498.05 #VALUE!

PART D SUBBASE AND BASE COURSE

200(1) Aggregate Subbase Course 473.17 473.17 cu.m. 281,943.13 281,943.12 595.86 595.86 750.78 750.78

TOTAL OF PART D 281,943.13 281,943.12

PART E SURFACE COURSE


Portland Cement Concrete Pavement (Unreinforced, 0.30 m thick), 14
311(1)f1 2,365.80 0.00 sq.m. 4,352,119.70 1,092.88 1,839.60 - 2,317.89 -
Days
TOTAL OF PART E 4,352,119.70 #REF!

PART F BRIDGE CONSTRUCTION

404(1)a Reinforcing Steel (Grade 40) 30,190.60 0.00 kg. 1,944,898.91 0.00 64.42 - 81.17 -

405(1)a2 Structural Concrete, Class "A" (20.68 Mpa), 14 days 197.30 0.00 cu.m. 1,686,218.18 4,352,119.70 8,546.47 - 10,768.56 -

TOTAL OF PART F 3,631,117.09 #REF!

PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES

502(5) Metal Frames and Gratings, Type 43.00 0.00 pair 865,763.18 0.00 20,134.03 - 25,368.87 3,028.27

TOTAL OF PART G 865,763.18 #REF!

PART H MISCELLANEOUS STRUCTURES

612(1) Reflectorized Thermoplastic Pavement Markings White 69.60 0.00 sq.m. 52,874.91 0.00 759.70 - 957.22 -

624(1)a2 Single Arm Roadway Lighting - 9m-Pole - LED - 100W-125W 28.00 0.00 ea. 3,381,819.50 3,028.27 120,779.27 - 152,181.88 -

TOTAL OF PART H 3,434,694.41 #REF!

GRAND TOTAL 13,582,710.17 #VALUE!


Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I
LA UNION FIRST DISTRICT ENGINEERING OFFICE
Lingsat, City of San Fernando, La Union

Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

SCOPE OF WORK
EARTHWORKS
CONSTRUCTION OF PCCP (WIDENING) - 300mm
CONSTRUCTION OF LINE CANAL (RIGHT SIDE)
THERMOPLASTIC PAVEMENT MARKING (WHITE)
INSTALLATION OF SOLAR POWERED LED STREETLIGHTS - 9m POLE - 120W
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I
LA UNION FIRST DISTRICT ENGINEERING OFFICE
Lingsat, City of San Fernando, La Union

Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-01B-00

MINIMUM EQUIPMENT REQUIREMENT


Number of
No. Equipment Description Capacity
Equipment
1 Dump Truck 12 cu.yd. 2
2 Backhoe 0.80 cu.m. 1
3 Motorized Road Grader G710A 1
4 Vibratory Roller 10 mt., SD100DC 1
5 Concrete Vibrator 1
6 Concrete Saw 14", 7.5hp 1
7 Cargo Truck (2-5 MT) 1
8 Kneading Machine 1
9 Applicator Machine 1
SUB-TOTAL 10
TOTAL 10
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I
LA UNION FIRST DISTRICT ENGINEERING OFFICE
Lingsat, City of San Fernando, La Union

Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

Contract Duration : 114 C.D.

SUMMARY OF APPROVED BUDGET FOR THE CONTRACT

ESTIMATED DIRECT TOTAL MARK UP TOTAL INDIRECT


ITEM NO DESCRICPTION 5% VAT TOTAL COST
COST COST
% VALUE
AS EVALUATED 113,507.60 25%/10% - 5,675.38 5,675.38 119,182.98
PART A FACILITIES FOR THE ENGINEER
AS SUBMITTED 38,000.00 25%/10% 3,040.00 2,052.00 5,092.00 43,092.00
AS EVALUATED 421,307.48 25%/10% 24,623.99 22,296.57 46,920.56 468,228.04
PART B OTHER GENERAL REQUIREMENTS
AS SUBMITTED 438,574.61 25%/10% 27,481.84 23,302.82 50,784.66 489,359.27
AS EVALUATED 60,201.03 25% 12,040.21 3,612.06 15,652.27 75,853.30
PART C EARTHWORKS
AS SUBMITTED 540,498.04 25% 113,640.48 32,706.92 146,347.40 686,845.44
AS EVALUATED 281,943.12 25% 56,388.62 16,916.59 73,305.21 355,248.34
PART D SUBBASE AND BASE COURSE
AS SUBMITTED 281,943.13 25% 56,388.63 16,916.59 73,305.22 355,248.35
AS EVALUATED - 25% - - - -
PART E SURFACE COURSE
AS SUBMITTED 4,352,119.70 25% 870,423.94 261,127.19 1,131,551.13 5,483,670.83
AS EVALUATED - 25% - - -
PART F BRIDGE CONSTRUCTION
AS SUBMITTED 3,631,117.09 25% 726,223.42 217,867.04 944,090.46 4,575,207.55
AS EVALUATED 3,028.27 25% 605.65 181.70 787.35
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS SUBMITTED 865,763.18 25% 173,152.64 51,945.79 225,098.43 1,090,861.61
AS EVALUATED 3,028.27 25% 605.65 181.70 787.35
PART H MISCELLANEOUS STRUCTURES
AS SUBMITTED 3,434,694.41 25% 686,938.88 206,081.66 893,020.54 4,327,714.95
AS EVALUATED 763,451.63 93,052.82 42,825.22 135,878.04 899,329.68
GRAND TOTAL AS SUBMITTED 13,582,710.16 2,657,289.83 812,000.01 3,469,289.84 17,052,000.00

Preparation and Submission: Approval:

Prepared by: Checked / Submitted by: Recommending Approval: Approved:

RAMIL A. BALISNOMO SHERYLANN B. GONZALES SHERYLANN B. GONZALES JOSE G. GINETE, JR.


Engineer II Concurrent Chief - OIC, Planning & Design Section Assistant District Engineer District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I
LA UNION FIRST DISTRICT ENGINEERING OFFICE
Lingsat, City of San Fernando, La Union

Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

Contract Duration : 114 C.D.

APPROVED BUDGET FOR THE CONTRACT


TOTAL DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QTY UNIT 5% VAT TOTAL COST UNIT COST
COST % VALUE COST
PART A FACILITIES FOR THE ENGINEER
AS EVALUATED 3.80 ### Err:509 8% Err:509 Err:509 Err:509 Err:509 Err:509
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis)
AS SUBMITTED 3.80 mo. 38,000.00 8% 3,040.00 2,052.00 5,092.00 43,092.00 11,340.00
AS SUBMITTED Err:509 #VALUE! Err:509 Err:509 Err:509
TOTAL OF PART A
AS EVALUATED 38,000.00 3,040.00 2,052.00 5,092.00 43,092.00
PART B OTHER GENERAL REQUIREMENTS
AS EVALUATED 2.00 ea. 6,083.50 8% 486.68 328.51 815.19 6,898.69 3,449.35
B.5 Project Billboard / Signboard (DPWH)
AS SUBMITTED 2.00 ea. 6,152.01 20% 1,230.40 369.12 1,599.52 7,751.53 3,875.77
AS EVALUATED 1.00 ea. 3,041.75 8% 243.34 164.25 407.59 3,449.34 3,449.34
B.5 Project Billboard / Signboard (COA)
AS SUBMITTED 1.00 ea. 6,152.01 20% 1,230.40 369.12 1,599.52 7,751.53 7,751.53
AS EVALUATED 3.80 mo. 107,964.26 8% 8,637.14 5,830.07 14,467.21 122,431.47 32,218.81
B.7(1) Occupational Safety and Health Program
AS SUBMITTED 3.80 mo. 107,964.27 8% 8,637.14 5,830.07 14,467.21 122,431.48 32,218.81
AS EVALUATED 3.80 mo. 193,752.12 8% 15,500.17 10,462.61 25,962.78 219,714.90 57,819.71
B.8(1) Traffic Management
AS SUBMITTED 3.80 mo. 204,798.72 8% 16,383.90 11,059.13 27,443.03 232,241.75 61,116.25
AS EVALUATED 1.00 mo. 113,507.60 0% - 5,675.38 5,675.38 119,182.98 119,182.98
B.9 Mobilization / Demobilization
AS EVALUATED 1.00 L.S. 113,507.60 0% - 5,675.38 5,675.38 119,182.98 119,182.98
AS SUBMITTED 421,307.48 24,623.99 22,296.57 46,920.56 468,228.04
TOTAL OF PART B
AS EVALUATED 438,574.61 27,481.84 23,302.82 50,784.66 489,359.27
PART C EARTHWORKS
AS EVALUATED 1.00 L.S. 11,165.84 20% 2,233.17 669.95 2,903.12 14,068.96 14,068.96
100(2) Clearing and Grubbing
AS SUBMITTED 1.00 L.S. 13,568.60 20% 2,713.72 814.12 3,527.84 17,096.44 17,096.44
AS EVALUATED 1.00 ea. 21,883.60 20% 4,376.72 1,313.02 5,689.74 27,573.34 27,573.34
100(3)a2 Individual Removal of Trees - 301 - 500mm dia. - Small
AS SUBMITTED 1.00 ea. 2,461.98 20% 492.40 147.72 640.12 3,102.10 3,102.10
AS EVALUATED 1.00 ea. 28,262.28 20% 5,652.46 1,695.74 7,348.20 35,610.48 35,610.48
100(3)a3 Individual Removal of Trees - 501 - 750mm dia. - Small
AS SUBMITTED 1.00 ea. 12,305.16 20% 2,461.03 738.31 3,199.34 15,504.50 15,504.50
AS EVALUATED 1.00 L.S. - 20% - - - - -
101(1) Removal of Structures & Obstruction
AS SUBMITTED 1.00 L.S. 110,817.35 25% 27,704.34 6,926.08 34,630.42 145,447.77 145,447.77
AS EVALUATED 346.75 sq.m. - 20% - - - - -
101(3)b3 Removal of Actual Structures/Obstruction (0.23mm thick PCCP Unreinforced)
AS SUBMITTED 346.75 sq.m. 59,029.94 20% 11,805.99 3,541.80 15,347.79 74,377.73 214.50
AS EVALUATED 1,109.93 cu.m. #VALUE! 20% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
102(2) Surplus Common Excavation
AS SUBMITTED 1,109.93 cu.m. 230,688.59 20% 46,137.72 13,841.32 59,979.04 290,667.63 261.88
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

Contract Duration : 114 C.D.

APPROVED BUDGET FOR THE CONTRACT


TOTAL DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QTY UNIT 5% VAT TOTAL COST UNIT COST
COST % VALUE COST
AS EVALUATED 64.51 cu.m. #VALUE! 20% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
103(1)a Structure Excavation (Common Soil)
AS SUBMITTED 64.51 cu.m. 27,450.49 20% 5,490.10 1,647.03 7,137.13 34,587.62 536.16
AS EVALUATED 39.98 - #VALUE! 20% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
104(1)a Embankment from roadway/structure excavation (Common Soil)
AS SUBMITTED 39.98 cu.m. 4,971.92 20% 994.38 298.32 1,292.70 6,264.62 156.69
AS EVALUATED
104(7) Gravel Fill
AS SUBMITTED 28.73 cu.m. 30,168.82 20% 6,033.76 1,810.13 7,843.89 38,012.71 1,323.01
AS EVALUATED 2,365.80 sq.m. 49,035.19 20% 9,807.04 2,942.11 12,749.15 61,784.34 26.12
105(1)a Subgrade Preparation (Common Material)
AS SUBMITTED 2,365.80 sq.m. 49,035.19 20% 9,807.04 2,942.11 12,749.15 61,784.34 26.12
AS EVALUATED 60,201.03 12,040.21 3,612.06 15,652.27 75,853.30
TOTAL OF PART C
AS SUBMITTED 540,498.04 113,640.48 32,706.93 146,347.41 686,845.44
PART D SUBBASE AND BASE COURSE
AS EVALUATED 473.17 cu.m. 281,943.12 20% 56,388.62 16,916.59 73,305.21 355,248.34 750.78
200(1) Aggregate Subbase Course
AS SUBMITTED 473.17 cu.m. 281,943.13 20% 56,388.63 16,916.59 73,305.21 355,248.35 750.78
AS EVALUATED 281,943.12 56,388.62 16,916.59 73,305.21 355,248.34
TOTAL OF PART D
AS SUBMITTED 281,943.13 56,388.63 16,916.59 73,305.21 355,248.35
PART E SURFACE COURSE
AS EVALUATED 2,365.80 sq.m. 2,469.91 20% 493.98 148.19 642.17 3,112.08 1.32
311(1)f1 Portland Cement Concrete Pavement (Unreinforced, 0.30 m thick), 14 Days
AS SUBMITTED 2,365.80 sq.m. 4,352,119.70 20% 870,423.94 261,127.18 1,131,551.12 5,483,670.83 2,317.88
AS EVALUATED - - - - -
TOTAL OF PART E
AS SUBMITTED 4,352,119.70 870,423.94 261,127.18 1,131,551.12 5,483,670.83
PART F BRIDGE CONSTRUCTION
AS EVALUATED 30,190.60 kg. - 20% - - - - -
404(1)a Reinforcing Steel (Grade 40)
AS SUBMITTED 30,190.60 kg. 1,944,898.91 20% 388,979.78 116,693.93 505,673.72 2,450,572.63 81.17
AS EVALUATED 197.30 cu.m. #VALUE! 20% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
405(1)a2 Structural Concrete, Class "A" (20.68 Mpa), 14 days
AS SUBMITTED 197.30 cu.m. 1,686,218.18 20% 337,243.64 101,173.09 438,416.73 2,124,634.91 10,768.55
AS EVALUATED 4,352,119.70 870,423.94 261,127.18 1,131,551.12 5,483,670.83
TOTAL OF PART F
AS SUBMITTED 3,631,117.09 726,223.42 217,867.03 944,090.45 4,575,207.54
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS EVALUATED 43.00 pair 3,028.27 20% 605.65 181.70 787.35 3,815.61 88.74
502(5) Metal Frames and Gratings, Type
AS SUBMITTED 43.00 pair 865,763.18 20% 173,152.64 51,945.79 225,098.43 1,090,861.61 25,368.87
AS EVALUATED - - - - -
TOTAL OF PART G
AS SUBMITTED 865,763.18 173,152.64 51,945.79 225,098.43 1,090,861.61
PART H MISCELLANEOUS STRUCTURES
AS EVALUATED 69.60 sq.m. - 20% - - - - -
612(1) Reflectorized Thermoplastic Pavement Markings White
AS SUBMITTED 69.60 sq.m. 52,874.91 20% 10,574.98 3,172.49 13,747.47 66,622.38 957.22
AS EVALUATED 28.00 ea. - 20% - - - - -
624(1)a2 Single Arm Roadway Lighting - 9m-Pole - LED - 100W-125W
AS SUBMITTED 28.00 ea. 3,381,819.50 20% 676,363.90 202,909.17 879,273.07 4,261,092.57 152,181.88
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

Contract Duration : 114 C.D.

APPROVED BUDGET FOR THE CONTRACT


TOTAL DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QTY UNIT 5% VAT TOTAL COST UNIT COST
COST % VALUE COST
AS EVALUATED 865,763.18 173,152.64 51,945.79 225,098.43 1,090,861.61
TOTAL OF PART H
AS SUBMITTED 3,434,694.41 686,938.88 206,081.66 893,020.54 4,327,714.95
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

Contract Duration : 114 C.D.

APPROVED BUDGET FOR THE CONTRACT


TOTAL DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QTY UNIT 5% VAT TOTAL COST UNIT COST
COST % VALUE COST
AS EVALUATED 763,451.63 93,052.82 42,825.22 135,878.04 899,329.68
GRAND TOTAL
AS SUBMITTED 13,582,710.16 2,657,289.83 812,000.00 3,469,289.83 17,052,000.00

Preparation and Submission:

Prepared by: Submitted by:

RAMIL A. BALISNOMO SHERYLANN B. GONZALES


Engineer II Concurrent Chief - OIC, Planning & Design Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I
LA UNION FIRST DISTRICT ENGINEERING OFFICE
Lingsat, City of San Fernando, La Union

Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-O1C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
PART A FACILITIES OF ENGINEERS
AS EVALUATED Err:509 3.80 Err:509 Err:509 Err:509 Err:509 Err:509 8% Err:509 Err:509 Err:509
A.1.1(8) Provision of Field Office for the Engineer (Rental Basis)
AS SUBMITTED 0.25% 3.80 mo. 38,000.00 0.00 0.00 38,000.00 8% 3,040.00 2,052.00 43,092.00
AS EVALUATED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL OF PART A
AS SUBMITTED 0.25% 38,000.00 0.00 0.00 38,000.00 3,040.00 2,052.00 43,092.00
PART B OTHER GENERAL REQUIREMENTS
AS EVALUATED 0.04% 2.00 ea. 5,398.40 685.10 0.00 6,083.50 8% 486.68 328.51 6,898.69
B.5 Project Billboard / Signboard (DPWH)
AS SUBMITTED 0.05% 2.00 ea. 5,398.40 685.10 68.51 6,152.01 20% 1,230.40 369.12 7,751.53
AS EVALUATED 0.02% 1.00 ea. 0.00 0.00 3,041.75 3,041.75 8% 243.34 164.25 3,449.34
B.5 Project Billboard / Signboard (COA)
AS SUBMITTED 0.05% 1.00 ea. 5,398.40 685.10 68.51 6,152.01 20% 1,230.40 369.12 7,751.53
AS EVALUATED 0.72% 3.80 mo. 27,390.89 80,573.38 0.00 107,964.26 8% 8,637.14 5,830.07 122,431.47
B.7(1) Occupational Safety and Health Program
AS SUBMITTED 0.72% 3.80 mo. 27,390.89 80,573.38 0.00 107,964.27 8% 8,637.14 5,830.07 122,431.48
AS EVALUATED 1.29% 3.80 mo. 79,952.76 113,799.36 0.00 193,752.12 8% 15,500.17 10,462.61 219,714.90
B.8(1) Traffic Management
AS SUBMITTED 1.36% 3.80 mo. 87,442.56 113,799.36 3,556.80 204,798.72 8% 16,383.90 11,059.13 232,241.75
AS EVALUATED 0.70% 1.00 L.S. 0.00 0.00 113,507.60 113,507.60 0% 0.00 5,675.38 119,182.98
B.9 Mobilization / Demobilization
AS SUBMITTED 0.70% 1.00 L.S. 0.00 0.00 113,507.60 113,507.60 0% 0.00 5,675.38 119,182.98
AS EVALUATED 2.75% 112,742.05 195,057.84 113,507.60 421,307.48 24,623.99 22,296.57 468,228.04
TOTAL OF PART B
AS SUBMITTED 2.87% 125,630.25 195,742.94 117,201.42 438,574.61 27,481.84 23,302.82 489,359.27
PART C EARTHWORK
AS EVALUATED 0.08% 1.00 L.S. 0.00 448.08 10,717.76 11,165.84 20% 2,233.17 669.95 14,068.96
100(2) Clearing and Grubbing
AS SUBMITTED 0.10% 1.00 L.S. 0.00 2,444.56 11,124.04 13,568.60 20% 2,713.72 814.12 17,096.44
AS EVALUATED 0.16% 1.00 ea. 10,717.76 0.00 11,165.84 21,883.60 20% 4,376.72 1,313.02 27,573.34
100(3)a2 Individual Removal of Trees - 301 - 500mm dia. - Small
AS SUBMITTED 0.02% 1.00 ea. 14.00 212.85 2,235.13 2,461.98 20% 492.40 147.72 3,102.09
AS EVALUATED 0.21% 1.00 ea. 11,165.84 17,096.44 0.00 28,262.28 20% 5,652.46 1,695.74 35,610.48
100(3)a3 Individual Removal of Trees - 501 - 750mm dia. - Small
AS SUBMITTED 0.09% 1.00 ea. 14.00 1,057.87 11,233.29 12,305.16 20% 2,461.03 738.31 15,504.50
AS EVALUATED 0.00% 1.00 L.S. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
101(1) Removal of Structures & Obstruction
AS SUBMITTED 0.85% 1.00 L.S. 0.00 10,641.96 100,175.39 110,817.35 25% 27,704.34 6,926.08 145,447.77
Removal of Actual Structures/Obstruction (0.23mm thick PCCP AS EVALUATED 0.00% 346.75 sq.m. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
101(3)b3
Unreinforced) AS SUBMITTED 0.44% 346.75 sq.m. 0.00 2,052.76 56,977.18 59,029.94 20% 11,805.99 3,541.80 74,377.72
AS EVALUATED #VALUE! 1,109.93 cu.m. 0.00 AS EVALUATED 0.00 #VALUE! 20% #VALUE! #VALUE! #VALUE!
102(2) Surplus Common Excavation
AS SUBMITTED 1.70% 1,109.93 cu.m. 0.00 4,380.52 226,308.07 230,688.59 20% 46,137.72 13,841.32 290,667.63
AS EVALUATED #VALUE! 64.51 cu.m. 0.00 AS EVALUATED 0.00 #VALUE! 20% #VALUE! #VALUE! #VALUE!
103(1)a Structure Excavation (Common Soil)
AS SUBMITTED 0.20% 64.51 cu.m. 0.00 965.04 26,485.45 27,450.49 20% 5,490.10 1,647.03 34,587.62
AS EVALUATED #VALUE! 39.98 0.00 0.00 AS EVALUATED 0.00 #VALUE! 20% #VALUE! #VALUE! #VALUE!
104(1)a Embankment from roadway/structure excavation (Common Soil)
AS SUBMITTED 0.04% 39.98 cu.m. 0.00 189.35 4,782.57 4,971.92 20% 994.38 298.32 6,264.62
AS EVALUATED
104(7) Gravel Fill
AS SUBMITTED 0.22% 28.73 cu.m. 20,816.33 7,163.61 2,188.88 30,168.82 20% 6,033.76 1,810.13 38,012.71
AS EVALUATED 0.36% 2,365.80 sq.m. 0.00 1,867.40 47,167.78 49,035.19 20% 9,807.04 2,942.11 61,784.34
105(1)a Subgrade Preparation (Common Material)
AS SUBMITTED 0.36% 2,365.80 sq.m. 0.00 1,867.40 47,167.78 49,035.19 20% 9,807.04 2,942.11 61,784.34
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

FORM POW-2015-O1C-00
DETAILED BREAKDOWN OF COMPONENT FOR EACH ITEM
DIRECT COST TOTAL MARK-UP
ITEM NO. DESCRIPTION % QTY UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT TOTAL % VALUE
AS EVALUATED 0.44% 0.00 2,315.48 57,885.54 60,201.03 0.20 12,040.21 #VALUE! 75,853.30
TOTAL OF PART C
AS SUBMITTED 4.03% 20,844.33 30,975.92 488,677.78 540,498.04 113,640.47 32,706.94 686,845.45
PART D SUBBASE AND BASE COURSE
AS EVALUATED 2.08% 473.17 cu.m. 223,099.65 2,240.93 56,602.54 281,943.12 20% 56,388.62 16,916.59 355,248.33
200(1) Aggregate Subbase Course
AS SUBMITTED 2.08% 473.17 cu.m. 223,099.66 2,240.93 56,602.54 281,943.13 20% 56,388.63 16,916.59 355,248.35
AS EVALUATED 2.08% 223,099.65 2,240.93 56,602.54 281,943.12 20% 56,388.62 16,916.59 355,248.33
TOTAL OF PART D
AS SUBMITTED 2.08% 223,099.66 2,240.93 56,602.54 281,943.13 56,388.63 16,916.59 355,248.35
PART E SURFACE COURSE
Portland Cement Concrete Pavement (Unreinforced, 0.30 m thick), 14 AS EVALUATED 0.02% 2,365.80 sq.m. 1,092.88 1,377.03 0.00 2,469.91 20% 493.98 148.19 3,112.08
311(1)f1
Days AS SUBMITTED 32.16% 2,365.80 sq.m. 4,273,622.05 48,723.96 29,773.70 4,352,119.70 20% 870,423.94 261,127.18 5,483,670.83
AS EVALUATED 0.00% 0.00 0.00 0.00 0.00 0.20 0.00 0.00 0.00
TOTAL OF PART E
AS SUBMITTED 32.16% 4,273,622.05 48,723.96 29,773.70 4,352,119.70 870,423.94 261,127.18 5,483,670.83
PART F BRIDGE CONSTRUCTION
AS EVALUATED 0.00% 30,190.60 kg. 0.00 0.00 0.00 0.00 20% 0.00 0.00 0.00
404(1)a Reinforcing Steel (Grade 40)
AS SUBMITTED 14.37% 30,190.60 kg. 1,730,827.10 129,635.08 84,436.73 1,944,898.91 20% 388,979.78 116,693.93 2,450,572.63
AS EVALUATED #VALUE! 197.30 cu.m. 0.00 AS EVALUATED 0.00 #VALUE! 20% #VALUE! #VALUE! #VALUE!
405(1)a2 Structural Concrete, Class "A" (20.68 Mpa), 14 days
AS SUBMITTED 12.46% 197.30 cu.m. 1,410,067.94 247,653.78 28,496.46 1,686,218.18 20% 337,243.64 101,173.09 2,124,634.91
AS EVALUATED 32.16% 4,273,622.05 48,723.96 29,773.70 4,352,119.70 0.25 870,423.94 261,127.18 5,483,670.83
TOTAL OF PART F
AS SUBMITTED 26.83% 3,140,895.04 377,288.86 112,933.19 3,631,117.09 726,223.42 217,867.02 4,575,207.54
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS EVALUATED 0.02% 43.00 pair 0.00 0.00 3,028.27 3,028.27 20% 605.65 181.70 3,815.62
502(5) Metal Frames and Gratings, Type
AS SUBMITTED 6.40% 43.00 pair 860,000.00 5,488.74 274.44 865,763.18 20% 173,152.64 51,945.79 1,090,861.61
AS EVALUATED #VALUE! 0.00 #VALUE! 0.00 #VALUE! 0.20 #VALUE! #VALUE! #VALUE!
TOTAL OF PART G
AS SUBMITTED 6.40% 860,000.00 5,488.74 274.44 865,763.18 173,152.64 51,945.79 1,090,861.61
PART H MISCELLANEOUS STRUCTURES
AS EVALUATED 0.00% 69.60 sq.m. 0.00 20% 0.00 0.00 0.00
612(1) Reflectorized Thermoplastic Pavement Markings White
AS SUBMITTED 0.39% 69.60 sq.m. 45,939.40 1,804.37 5,131.14 52,874.91 20% 10,574.98 3,172.49 66,622.38
AS EVALUATED 0.00% 28.00 ea. 0.00 20% 0.00 0.00 0.00
624(1)a2 Single Arm Roadway Lighting - 9m-Pole - LED - 100W-125W
AS SUBMITTED 24.99% 28.00 ea. 3,313,520.00 11,159.68 57,139.82 3,381,819.50 20% 676,363.90 202,909.17 4,261,092.57
AS EVALUATED 0.00% 0.00 0.00 0.00 0.00 0.20 0.00 0.00 0.00
TOTAL OF PART H
AS SUBMITTED 25.38% 3,359,459.40 12,964.05 62,270.96 3,434,694.41 686,938.88 206,081.66 4,327,714.95
AS EVALUATED #VALUE! 335,841.70 #VALUE! 227,995.68 #VALUE! #VALUE! #VALUE! #VALUE!
GRAND TOTAL
AS SUBMITTED 100.00% 12,041,550.73 673,425.40 867,734.03 13,582,710.16 2,657,289.82 812,000.00 17,052,000.00
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : A.1.1(8) Provision of Field Office for the Engineer (Rental Basis)
Unit of Measurement : mo.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of No. of
Designation Monthly Rate Amount
Person Months
Labor
A.1

Sub - Total for A.1 - As Submitted 0.00


Labor

A.2

Sub - Total for A.2 - As Evaluated 0.00


No. of
Name and Capacity No of Units Monthly Rate Amount
Months
Equipment
B.1

Sub - Total for B.1 - As Submitted 0.00


Equipment

B.2

Sub - Total for B.2 - As Evaluated 0.00


C.1 Total (A.1 + B.1) - As Submitted 0.00
C.2 Total (A.2 + B.2) - As Evaluated 0.00
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 0.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 0.00

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1 Field Office (rental) including electric and water bills mo. 1.00 10,000.00 10,000.00

Sub - Total for F.1 - As Submitted 10,000.00


Materials
Field Office (rental) including electric and water bills mo. 1.00 10,000.00 10,000.00
F.2

Sub - Total for F.2 - As Evaluated 10,000.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 10,000.00
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 10,000.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% 0.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% 0.00
I.1 Contractor's Profit (CP) - As Submitted 8% 800.00
I.2 Contractor's Profit (CP) - As Evaluated 8% 800.00
J.1 Value Added Tax (VAT) - As Submitted 5% 540.00
J.2 Value Added Tax (VAT) - As Evaluated 5% 540.00
K.1 Total Unit Cost - As Submitted 11,340.00
K.2 Total Unit Cost - As Evaluated 11,340.00

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : B.5 Project Billboard / Signboard (DPWH)
Unit of Measurement : ea.
Output per hour - As Submitted : 2.00
Output per hour - As Evaluated : 2.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 4 1.00 62.39 249.56
Sub - Total for A.1 - As Submitted 685.10
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 4 1.00 62.39 249.56
Sub - Total for A.2 - As Evaluated 685.10

Name and Capacity No of Units No. of Hours Hourly Rate Amount

B.1 Equipment
Minor Tools, 10% of Labor Cost 68.51 68.51
Sub - Total for B.1 - As Submitted 68.51
Equipment
B.2
Sub - Total for B.2 - As Evaluated 0.00
C.1 Total (A.1 + B.1) - As Submitted 753.61
C.2 Total (A.2 + B.2) - As Evaluated 685.10
D.1 Outout per hour - As Submitted 2.00
D.2 Output per hour - As Evaluated 2.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 376.80
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 342.55

Name and Specification Unit Quantity Unit Cost Amount

Materials
Marine Plywood, 3/16" x 4' x 8' pcs. 1.00 460.00 460.00
F.1 Coco Lumber 6 - 2" x 3" x 10' bd.ft. 30.00 21.00 630.00
5 - 2" x 2" x 8' bd.ft. 14.00 21.00 294.00
Hardware, CWN (assorted) kg. 0.44 80.00 35.20
Tarpaulin (4' x 8') pcs. 1.00 1,280.00 1,280.00
Sub - Total for F.1 - As Submitted 2,699.20
Materials
Marine Plywood, 3/16" x 4' x 8' pcs. 1.00 460.00 460.00
Coco Lumber 6 - 2" x 3" x 10' bd.ft. 30.00 21.00 630.00
F.2 5 - 2" x 2" x 8' bd.ft. 14.00 21.00 294.00
Hardware, CWN (assorted) kg. 0.44 80.00 35.20
Tarpaulin (4' x 8') pcs. 1.00 1,280.00 1,280.00
Sub - Total for F.2 - As Evaluated 2,699.20
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 3,076.00
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 3,041.75
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 369.12
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 365.01
I.1 Contractor's Profit (CP) - As Submitted 8% 246.08
I.2 Contractor's Profit (CP) - As Evaluated 8% 243.34
J.1 Value Added Tax (VAT) - As Submitted 5% 184.56
J.2 Value Added Tax (VAT) - As Evaluated 5% 182.51
K.1 Total Unit Cost - As Submitted 3,875.77
K.2 Total Unit Cost - As Evaluated 3,832.61

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : B.5 Project Billboard / Signboard (COA)
Unit of Measurement : ea.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 4 1.00 62.39 249.56
Sub - Total for A.1 - As Submitted 685.10
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 4 1.00 62.39 249.56
Sub - Total for A.2 - As Evaluated 685.10

Name and Capacity No of Units No. of Hours Hourly Rate Amount

B.1 Equipment
Minor Tools, 10% of Labor Cost 68.51 68.51
Sub - Total for B.1 - As Submitted 68.51
Equipment
B.2
Sub - Total for B.2 - As Evaluated 0.00
C.1 Total (A.1 + B.1) - As Submitted 753.61
C.2 Total (A.2 + B.2) - As Evaluated 685.10
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 753.61
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 685.10

Name and Specification Unit Quantity Unit Cost Amount

Materials
Marine Plywood, 3/16" x 4' x 8' pcs. 2.00 460.00 920.00
F.1 Coco Lumber 6 - 2" x 3" x 10' bd.ft. 60.00 21.00 1,260.00
5 - 2" x 2" x 8' bd.ft. 28.00 21.00 588.00
Hardware, CWN (assorted) kg. 0.88 80.00 70.40
Tarpaulin (8' x 8') pcs. 1.00 2,560.00 2,560.00
Sub - Total for F.1 - As Submitted 5,398.40
Materials
Marine Plywood, 3/16" x 4' x 8' pcs. 2.00 460.00 920.00
Coco Lumber 6 - 2" x 3" x 10' bd.ft. 60.00 21.00 1,260.00
F.2 5 - 2" x 2" x 8' bd.ft. 28.00 21.00 588.00
Hardware, CWN (assorted) kg. 0.88 80.00 70.40
Tarpaulin (8' x 8') pcs. 1.00 2,560.00 2,560.00
Sub - Total for F.2 - As Evaluated 5,398.40
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 6,152.01
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 6,083.50
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 738.24
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 730.02
I.1 Contractor's Profit (CP) - As Submitted 8% 492.16
I.2 Contractor's Profit (CP) - As Evaluated 8% 486.68
J.1 Value Added Tax (VAT) - As Submitted 5% 369.12
J.2 Value Added Tax (VAT) - As Evaluated 5% 365.01
K.1 Total Unit Cost - As Submitted 7,751.53
K.2 Total Unit Cost - As Evaluated 7,665.21

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : B.7(1) Occupational Safety and Health Program
Unit of Measurement : mo.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Days Daily Rate Amount
Person
Labor
A.1
Partime Safety Practitioner 1 2.00 896.16 1,792.32
First Aider 1 30.00 647.04 19,411.20
Sub - Total for A.1 - As Submitted 21,203.52
Labor
Partime Safety Practitioner 1 2.00 896.16 1,792.32
A.2
First Aider 1 30.00 647.04 19,411.20
Sub - Total for A.2 - As Evaluated 21,203.52

Name and Capacity No of Units No. of Days Daily Rate Amount

B.1 Equipment

Sub - Total for B.1 - As Submitted 0.00


Equipment
B.2 Minor Tools L.S. 0.00
Sub - Total for B.2 - As Evaluated 0.00
C.1 Total (A.1 + B.1) - As Submitted 21,203.52
C.2 Total (A.2 + B.2) - As Evaluated 21,203.52
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 21,203.52
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 21,203.52

Name and Specification Unit Quantity Unit Cost Amount

Materials
Safety Helmet mandays 614.50 0.25 153.63
Safety Shoes mandays 614.50 2.77 1,702.17
F.1
Safety Vest mandays 614.50 0.78 479.31
Working Gloves mandays 614.50 7.67 4,713.22
Rain Coats mandays 184.35 0.38 70.05
Rubber Boots mandays 93.50 0.96 89.76
Sub - Total for F.1 - As Submitted 7,208.13
Materials
Safety Helmet mandays 614.50 0.25 153.63
Safety Shoes mandays 614.50 2.77 1,702.17
Safety Vest mandays 614.50 0.78 479.31
F.2
Working Gloves mandays 614.50 7.67 4,713.22
Rain Coats mandays 184.35 0.38 70.05
Rubber Boots mandays 93.50 0.96 89.76
Sub - Total for F.2 - As Evaluated 7,208.13
Direct Unit Cost (E.1+ F.1) - As Submitted 28,411.65
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 28,411.65
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% 0.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% 0.00
I.1 Contractor's Profit (CP) - As Submitted 8% 2,272.93
I.2 Contractor's Profit (CP) - As Evaluated 8% 2,272.93
J.1 Value Added Tax (VAT) - As Submitted 5% 1,534.23
J.2 Value Added Tax (VAT) - As Evaluated 5% 1,534.23
K.1 Total Unit Cost - As Submitted 32,218.81
K.2 Total Unit Cost - As Evaluated 32,218.81

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 1700(1) Clearing & Grubbing


Unit of Measurement : sq.m.
Output per hour - As Submitted : 500.00
Output per hour - As Evaluated : 500.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 69.42 69.42
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.1 - As Submitted 147.42
Labor
Construction Foreman 1 1.00 69.42 69.42
A.2
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.2 - As Evaluated 147.42

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Dump Truck (12 cu. yd.) 2 1.00 1,420.00 2,840.00
Payloader (1.50 cu.m.) 1 1.00 1,733.00 1,733.00
Backhoe (0.80 cu.m.) 1 1.00 1,537.00 1,537.00
Sub - Total for B.1 - As Submitted 6,110.00
Equipment
Dump Truck (12 cu. yd.) 2 1.00 1,420.00 2,840.00
B.2
Payloader (1.50 cu.m.) 1 1.00 1,733.00 1,733.00
Sub - Total for B.2 - As Evaluated 6,110.00
C.1 Total (A.1 + B.1) - As Submitted 6,257.42
C.2 Total (A.2 + B.2) - As Evaluated 6,257.42
D.1 Outout per hour - As Submitted 500.00
D.2 Output per hour - As Evaluated 500.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 12.51
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 12.51

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials
F.2
Sub - Total for F.2 - As Evaluated 0.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 12.51
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 12.51
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 1.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 1.50
I.1 Contractor's Profit (CP) - As Submitted 8% 1.00
I.2 Contractor's Profit (CP) - As Evaluated 8% 1.00
J.1 Value Added Tax (VAT) - As Submitted 5% 0.75
J.2 Value Added Tax (VAT) - As Evaluated 5% 0.75
K.1 Total Unit Cost - As Submitted 15.77
K.2 Total Unit Cost - As Evaluated 15.77

Prepared by: 0
RAMIL A. BALISNOMO 0
Engineer II 0
DETAILED CALCULATIONS OF COST OF CONSTRUCTION SAFETY AND HEALTH

OUTPUT NO. OF SAFETY SAFETY SAFETY RAIN EAR BODY RUBBER


ITEM NO./DESCRIPTION QUANTITY WORKERS DAYS MAN-DAYS WORKING DUST/GAS LANYARD EYEGOGGLES
PER HOUR PERSONNEL HELMET SHOES VEST COATS MUFF HARNESS BOOTS
GLOVES MASK
102(2)
Surplus Common FOREMAN 1.00 2.50 2.50 2.50 2.50 2.50 2.50 0.75
1,109.93 cu.m.
Excavation SKILLED LABORER - - - - - - - -
UNSKILLED LABORER 2.00 2.50 5.00 5.00 5.00 5.00 5.00 1.50
103(1)a
Structure Excavation FOREMAN 1.00 0.50 0.50 0.50 0.50 0.50 0.50 0.15
64.51 cu.m.
(Common Soil) SKILLED LABORER - - - - - - - -
UNSKILLED LABORER 3.00 0.50 1.50 1.50 1.50 1.50 1.50 0.45
105(1)a
Subgrade Preparation FOREMAN 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.30
2,365.80 sq.m.
(Common Material) SKILLED LABORER - - - - - - - -
UNSKILLED LABORER 2.00 1.00 2.00 2.00 2.00 2.00 2.00 0.60
200(1)
Aggregate Subbase Course FOREMAN 1.00 1.50 1.50 1.50 1.50 1.50 1.50 0.45
473.17 cu.m.
SKILLED LABORER - - - - - - - -
UNSKILLED LABORER 2.00 1.50 3.00 3.00 3.00 3.00 3.00 0.90
302(2)
Emulsified Asphalt FOREMAN - - - - - - - - -
- sq.m.
SKILLED LABORER - - - - - - - -
UNSKILLED LABORER - - - - - - - - -
310(1)c
Bituminous Concrete FOREMAN - - - - - - - - -
- sq.m.
Surface Wearing Course, Hot SKILLED LABORER - - - - - - - - -
laid, 50mm UNSKILLED LABORER - - - - - - - - -
311(1)a
Portland Cement Concrete FOREMAN - - - - - - - - -
- sq.m.
Pavement (Unreinforced, SKILLED LABORER - - - - - - - - -
0.15 m thick) UNSKILLED LABORER - - - - - - - - -
311(1)b1
Portland Cement Concrete FOREMAN - - - - - - - - -
- sq.m.
Pavement (Unreinforced, SKILLED LABORER - - - - - - - - -
0.20 m thick) UNSKILLED LABORER - - - - - - - - -
311(1)e1
Portland Cement Concrete FOREMAN - - - - - - - - -
- sq.m.
Pavement (Unreinforced, SKILLED LABORER - - - - - - - - -
0.28 m thick), 14 Days UNSKILLED LABORER - - - - - - - - -
311(1)f1
Portland Cement Concrete FOREMAN 1.00 5.50 5.50 5.50 5.50 5.50 5.50 1.65 5.50
2,365.80 sq.m.
Pavement (Unreinforced, SKILLED LABORER 4.00 5.50 22.00 22.00 22.00 22.00 22.00 6.60 22.00
0.30 m thick), 14 Days UNSKILLED LABORER 12.00 5.50 66.00 66.00 66.00 66.00 66.00 19.80 66.00
404(1)a
Reinforcing Steel (Grade FOREMAN 1.00 21.00 21.00 21.00 21.00 21.00 21.00 6.30
30,190.60 kg.
40) SKILLED LABORER 2.00 21.00 42.00 42.00 42.00 42.00 42.00 12.60
UNSKILLED LABORER 8.00 21.00 168.00 168.00 168.00 168.00 168.00 50.40
405(1)a2
Structural Concrete, Class FOREMAN 1.00 18.00 18.00 18.00 18.00 18.00 18.00 5.40
197.30 cu.m.
"A" (20.68 Mpa), 14 days SKILLED LABORER 4.00 18.00 72.00 72.00 72.00 72.00 72.00 21.60
UNSKILLED LABORER 8.00 18.00 144.00 144.00 144.00 144.00 144.00 43.20
502(5)
Metal Frames and Gratings, FOREMAN 1.00 5.50 5.50 5.50 5.50 5.50 5.50 1.65
43.00 pair
Type SKILLED LABORER 1.00 5.50 5.50 5.50 5.50 5.50 5.50 1.65
UNSKILLED LABORER 1.00 5.50 5.50 5.50 5.50 5.50 5.50 1.65
612(1)
Reflectorized Thermoplastic FOREMAN 1.00 0.50 0.50 0.50 0.50 0.50 0.50 0.15
69.60 sq.m.
Pavement Markings White SKILLED LABORER 2.00 0.50 1.00 1.00 1.00 1.00 1.00 0.30
UNSKILLED LABORER 6.00 0.50 3.00 3.00 3.00 3.00 3.00 0.90
612(2)
Reflectorized Thermoplastic FOREMAN 1.00 - - - - - - -
- sq.m.
Pavement Markings Yellow SKILLED LABORER 2.00 - - - - - - -
UNSKILLED LABORER 6.00 - - - - - - -
624(9)a1
Single Arm Solar LED FOREMAN 1.00 - - - - - - -
- ea.
Roadway Lighting, 8m-Pole, SKILLED LABORER 2.00 - - - - - - -
60W-80W UNSKILLED LABORER 2.00 - - - - - - -
A. TOTAL, PERSONNEL/MAN-DAYS 145.00 614.50 614.50 614.50 614.50 614.50 184.35 - - - - 93.50 -
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : B.8(1) Traffic Management
Unit of Measurement : mo.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of No. of
Designation Monthly Rate Amount
Person Months
Labor
A.1 Traffic Aide and Enforcers 2 1.00 14,973.60 29,947.20

Sub - Total for A.1 - As Submitted 29,947.20


Labor
Traffic Aide and Enforcers 2 1.00 14973.60 29,947.20

A.2

Sub - Total for A.2 - As Evaluated 29,947.20


No. of
Name and Capacity No of Units Monthly Rate Amount
Months
Equipment
Barricades Flasher Light 6 1.00 156.00 936.00
(3 Volts, Battery Operated, Amber Color w/ lifespan
B.1 consideration of 6 months)

Sub - Total for B.1 - As Submitted 936.00


Equipment

B.2

Sub - Total for B.2 - As Evaluated 0.00


C.1 Total (A.1 + B.1) - As Submitted 30,883.20
C.2 Total (A.2 + B.2) - As Evaluated 29,947.20
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 30,883.20
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 29,947.20

Name and Specification Unit Quantity Unit Cost Amount

Materials
Roadwork Ahead (T1-1) each 4.00 328.50 1,314.00
Speed Restriction (R4-1) each 4.00 141.90 567.60
Workmen Ahead (T1-5) each 4.00 169.20 676.80
Temporary Hazard Marker (Chevron T5-5) each 4.00 172.80 691.20
End Speed Restriction (R4-2) each 2.00 141.90 283.80
End Roadwork (T2-16) each 4.00 329.40 1,317.60
F.1
Prepare to Stop (T1-18) each 4.00 169.20 676.80
Road Machinery (T1-3) each 2.00 196.20 392.40
Roadwork Next 300m each 2.00 328.50 657.00
Roadwork Next 200m each 2.00 328.50 657.00
Roadwork Next 100m each 2.00 328.50 657.00
Plastic Safety Barriers each 160.00 82.20 13,152.00
Temporary Bollards (@5 meters apart) each 40.00 49.20 1,968.00
Unit Price of a Traffic Cone/Lifespan (2 years)
Sub - Total for F.1 - As Submitted 23,011.20
Materials
Roadwork Ahead (T1-1) each 4.00 328.50 1,314.00
Lane Status (T2-6-1) each 0.00 265.80 0.00
Roadwork (R4-3) each 0.00 116.10 0.00
Speed Restriction (R4-1) each 4.00 141.90 567.60
Workmen Ahead (T1-5) each 4.00 169.20 676.80
Temporary Hazard Marker (Chevron T5-5) each 4.00 172.80 691.20
End Speed Restriction (R4-2) each 2.00 141.90 283.80
F.2
End Roadwork (T2-16) each 4.00 329.40 1,317.60
Prepare to Stop (T1-18) each 4.00 169.20 676.80
Road Machinery (T1-3) each 2.00 196.20 392.40
Concrete Safety Barriers each 0.00 75.00 0.00
Construction Safety Fence each 0.00 118.20 0.00
Plastic Safety Barriers each 160.00 82.20 13,152.00
Temporary Bollards (@5 meters apart) each 40.00 49.20 1,968.00
Sub - Total for F.2 - As Evaluated 21,040.20
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 53,894.40
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 50,987.40
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% 0.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% 0.00
I.1 Contractor's Profit (CP) - As Submitted 8% 4,311.55
I.2 Contractor's Profit (CP) - As Evaluated 8% 4,078.99
J.1 Value Added Tax (VAT) - As Submitted 5% 2,910.30
J.2 Value Added Tax (VAT) - As Evaluated 5% 2,753.32
K.1 Total Unit Cost - As Submitted 61,116.25
K.2 Total Unit Cost - As Evaluated 57,819.71

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : B.9 Mobilization / Demobilization
Unit of Measurement : L.S.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Days Daily Rate Amount
Person
Labor
A.1

Sub - Total for A.1 - As Submitted 0.00


Labor

A.2

Sub - Total for A.2 - As Evaluated 0.00

Name and Capacity No of Units No. of Trips Daily Rate Amount

Equipment
Low Bed Trailer Truck (25MT capacity) 1 2.00 18,000.00 36,000.00
B.1 Cargo Truck (9-10 MT, 270Hp) 1 4.00 2,442.08 9,768.32
Dump Truck (12 cu.yd.) 2 12.00 2,822.47 67,739.28

Sub - Total for B.1 - As Submitted 113,507.60


Equipment
Low Bed Trailer Truck (25MT capacity) 1 2.00 18,000.00 36,000.00
Truck Mounted Crane (45T) 1 4.00 0.00 -
B.2

Dump Truck (12 cu.yd.) 2 12.00 2,822.47 67,739.28


Sub - Total for B.2 - As Evaluated 113,507.60
C.1 Total (A.1 + B.1) - As Submitted 113,507.60
C.2 Total (A.2 + B.2) - As Evaluated 113,507.60
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 113,507.60
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 113,507.60

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 113,507.60
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 113,507.60
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 0% 0.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0% 0.00
I.1 Contractor's Profit (CP) - As Submitted 0% 0.00
I.2 Contractor's Profit (CP) - As Evaluated 0% 0.00
J.1 Value Added Tax (VAT) - As Submitted 5% 5,675.38
J.2 Value Added Tax (VAT) - As Evaluated 5% 5,675.38
K.1 Total Unit Cost - As Submitted 119,182.98
K.2 Total Unit Cost - As Evaluated 119,182.98

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 100(2) Clearing and Grubbing


Unit of Measurement : L.S.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 4.00 112.02 448.08
Unskilled Laborer 8 4.00 62.39 1,996.48

Sub - Total for A.1 - As Submitted 2,444.56


Labor
Construction Foreman 1 4.00 112.02 448.08
A.2

Sub - Total for A.2 - As Evaluated 448.08

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 1 2.00 2,822.47 5,644.94
B.1
Backhoe (0.80 cu.m.) 1 2.00 2,536.41 5,072.82
Minor Tools 406.28 406.28

Sub - Total for B.1 - As Submitted 11,124.04


Equipment
Dump Truck (12 cu. yd.) 1 2.00 2,822.47 5,644.94
Backhoe (0.80 cu.m.) 1 2.00 2,536.41 5,072.82
B.2

Sub - Total for B.2 - As Evaluated 10,717.76


C.1 Total (A.1 + B.1) - As Submitted 13,568.60
C.2 Total (A.2 + B.2) - As Evaluated 11,165.84
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 13,568.60
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 11,165.84

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 13,568.60
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 11,165.84
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 1,628.23
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 1,339.90
I.1 Contractor's Profit (CP) - As Submitted 8% 1,085.49
I.2 Contractor's Profit (CP) - As Evaluated 8% 893.27
J.1 Value Added Tax (VAT) - As Submitted 5% 814.12
J.2 Value Added Tax (VAT) - As Evaluated 5% 669.95
K.1 Total Unit Cost - As Submitted 17,096.44
K.2 Total Unit Cost - As Evaluated 14,068.96

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 100(1) Clearing and Grubbing


Unit of Measurement : ha
Output per hour - As Submitted : 0.05
Output per hour - As Evaluated : 0.05

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 70.00 70.00
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.1 - As Submitted 148.00
Labor
Construction Foreman 1 1.00 70.00 70.00
A.2
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.2 - As Evaluated 148.00

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 2 1.00 1,420.00 2,840.00
B.1 Payloader (1.5 cu.m., 110hp) 1 1.00 1,733.00 1,733.00
Bulldozer (D6H SERIES II PSDS/DD) 1 1.00 3,379.00 3,379.00

Sub - Total for B.1 - As Submitted 7,952.00


Equipment
Dump Truck (12 cu. yd.) 2 1.00 1,420.00 2,840.00
Payloader (1.5 cu.m., 110hp) 1 1.00 1,733.00 1,733.00
B.2 Bulldozer (D6H SERIES II PSDS/DD) 1 1.00 3,379.00 3,379.00

Sub - Total for B.2 - As Evaluated 7,952.00


C.1 Total (A.1 + B.1) - As Submitted 8,100.00
C.2 Total (A.2 + B.2) - As Evaluated 8,100.00
D.1 Outout per hour - As Submitted 0.05
D.2 Output per hour - As Evaluated 0.05
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 162,000.00
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 162,000.00

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 162,000.00
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 162,000.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 19,440.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 19,440.00
I.1 Contractor's Profit (CP) - As Submitted 8% 12,960.00
I.2 Contractor's Profit (CP) - As Evaluated 8% 12,960.00
J.1 Value Added Tax (VAT) - As Submitted 5% 9,720.00
J.2 Value Added Tax (VAT) - As Evaluated 5% 9,720.00
K.1 Total Unit Cost - As Submitted 204,120.00
K.2 Total Unit Cost - As Evaluated 204,120.00

Prepared by: Evaluated by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 101(3)b1 Removal of Actual Structures/Obstruction (0.15mm thick PCCP)


Unit of Measurement : sq.m.
Output per hour - As Submitted : 61.33
Output per hour - As Evaluated : 61.33

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.1 - As Submitted 236.80


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
B.1
Backhoe with breaker (0.80 cu.m.) 1 1.00 3,064.71 3,064.71
Payloader (1.5 cu.m., 110hp) 1 1.00 2,073.08 2,073.08
Minor Tools, 10% of Labor Cost 23.68 23.68
Sub - Total for B.1 - As Submitted 6,572.71
Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
Backhoe with breaker (0.80 cu.m.) 1 1.00 3,064.71 3,064.71
B.2
Minor Tools, 10% of Labor Cost 23.68 23.68

Sub - Total for B.2 - As Evaluated 4,499.63


C.1 Total (A.1 + B.1) - As Submitted 6,809.51
C.2 Total (A.2 + B.2) - As Evaluated 4,736.43
D.1 Outout per hour - As Submitted 61.33
D.2 Output per hour - As Evaluated 61.33
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 111.02
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 77.22

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials
0 0 0 0.00 0.00
F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 111.02
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 77.22
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 13.32
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 9.27
I.1 Contractor's Profit (CP) - As Submitted 8% 8.88
I.2 Contractor's Profit (CP) - As Evaluated 8% 6.18
J.1 Value Added Tax (VAT) - As Submitted 5% 6.66
J.2 Value Added Tax (VAT) - As Evaluated 5% 4.63
K.1 Total Unit Cost - As Submitted 139.89
K.2 Total Unit Cost - As Evaluated 97.30

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 101(4)a1 Removal of Actual Structures/Obstruction - 610mm dia. - RCPC


Unit of Measurement : ea
Output per hour - As Submitted : 6.00
Output per hour - As Evaluated : 6.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 94.10 94.10
Unskilled Laborer 2 1.00 52.50 105.00
Sub - Total for A.1 - As Submitted 199.10
Labor
Construction Foreman 1 1.00 94.10 94.10
A.2
Unskilled Laborer 2 1.00 52.50 105.00
Sub - Total for A.2 - As Evaluated 199.10

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Backhoe (0.80 cu.m.) 1 1.00 1,537.00 1,537.00
B.1
Boom Truck (2 - 5 mt) 1 0.50 1,017.90 508.95
Minor Tools (10% of Labor Cost) 19.91 19.91

Sub - Total for B.1 - As Submitted 2,065.86


Equipment
Backhoe (0.80 cu.m.) 1 1.00 1,537.00 1,537.00
Boom Truck (2 - 5 mt) 1 0.50 1,017.90 508.95
B.2 Minor Tools (10% of Labor Cost) 0 0.00 19.91 -

0 0 0.00 0.00 -
Sub - Total for B.2 - As Evaluated 2,045.95
C.1 Total (A.1 + B.1) - As Submitted 2,264.96
C.2 Total (A.2 + B.2) - As Evaluated 2,245.05
D.1 Outout per hour - As Submitted 6.00
D.2 Output per hour - As Evaluated 6.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 377.49
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 374.18

Name and Specification Unit Quantity Unit Cost Amount

F.1 Materials

Sub - Total for F.1 - As Submitted 0.00


Materials
F.2 0 0 0 0.00 0.00
Sub - Total for F.2 - As Evaluated 0.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 377.49
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 374.18
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 45.30
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 44.90
I.1 Contractor's Profit (CP) - As Submitted 8% 30.20
I.2 Contractor's Profit (CP) - As Evaluated 8% 29.93
J.1 Value Added Tax (VAT) - As Submitted 5% 22.65
J.2 Value Added Tax (VAT) - As Evaluated 5% 22.45
K.1 Total Unit Cost - As Submitted 475.64
K.2 Total Unit Cost - As Evaluated 471.46

Prepared by: Evaluated by:


RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 101(6)b Removal of Existing PCC Pavement


Unit of Measurement : sq.m.
Output per hour - As Submitted : 30.00
Output per hour - As Evaluated : 30.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 93.71 93.71
Unskilled Laborer 2 1.00 52.29 104.58
Sub - Total for A.1 - As Submitted 198.29
Labor
Construction Foreman 1 1.00 93.71 93.71
A.2
Unskilled Laborer 2 1.00 52.29 104.58
Sub - Total for A.2 - As Evaluated 198.29

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 1 0.50 1,420.00 710.00
B.1 Backhoe with breaker (0.80 cu.m.) 1 1.00 1,998.10 1,998.10
Payloader (1.5 cu.m., 110hp) 1 1.00 1,733.00 1,733.00
Concrete Saw (7.5hp, 14" Blade Ø) 1 0.50 32.63 16.32
Minor Tools, 10% of Labor Cost 19.83 19.83
Sub - Total for B.1 - As Submitted 4,477.24
Equipment
Dump Truck (12 cu. yd.) 1 0.50 1,420.00 710.00
Backhoe with breaker (0.80 cu.m.) 1 1.00 1,998.10 1,998.10
B.2
Concrete Saw (7.5hp, 14" Blade Ø) 1 0.50 32.63 16.32
Minor Tools, 10% of Labor Cost 19.83 19.83
Sub - Total for B.2 - As Evaluated 2,744.24
C.1 Total (A.1 + B.1) - As Submitted 4,675.53
C.2 Total (A.2 + B.2) - As Evaluated 2,942.53
D.1 Outout per hour - As Submitted 30.00
D.2 Output per hour - As Evaluated 30.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 155.85
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 98.08

Name and Specification Unit Quantity Unit Cost Amount

F.1 Materials
Concrete Saw (Diamond Blade 14" Ø) pc. 0.00015 8,000.00 1.20
Sub - Total for F.1 - As Submitted 1.20
Materials
F.2 Concrete Saw (Diamond Blade 14" Ø) pc. 0.00015 8,000.00 1.20
Sub - Total for F.2 - As Evaluated 1.20
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 157.05
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 99.28
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 18.85
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 11.91
I.1 Contractor's Profit (CP) - As Submitted 8% 12.56
I.2 Contractor's Profit (CP) - As Evaluated 8% 7.94
J.1 Value Added Tax (VAT) - As Submitted 5% 9.42
J.2 Value Added Tax (VAT) - As Evaluated 5% 5.96
K.1 Total Unit Cost - As Submitted 197.88
K.2 Total Unit Cost - As Evaluated 125.10

Prepared by: Evaluated by:


RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 101(3)b5 Removal of Actual Structures/Obstruction (0.28mm thick PCCP


Unreinforced)
Unit of Measurement : sq.m.
Output per hour - As Submitted : 32.86
Output per hour - As Evaluated : 32.86

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.1 - As Submitted 236.80


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
B.1
Backhoe with breaker (0.80 cu.m.) 1 1.00 3,064.71 3,064.71
Payloader (1.5 cu.m., 110hp) 1 1.00 2,073.08 2,073.08
Minor Tools, 10% of Labor Cost 23.68 23.68
Sub - Total for B.1 - As Submitted 6,572.71
Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
Backhoe with breaker (0.80 cu.m.) 1 1.00 3,064.71 3,064.71
B.2
Minor Tools, 10% of Labor Cost 23.68 23.68

Sub - Total for B.2 - As Evaluated 4,499.63


C.1 Total (A.1 + B.1) - As Submitted 6,809.51
C.2 Total (A.2 + B.2) - As Evaluated 4,736.43
D.1 Outout per hour - As Submitted 32.86
D.2 Output per hour - As Evaluated 32.86
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 207.25
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 144.15

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials
0 0 0 0.00 0.00
F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 207.25
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 144.15
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 24.87
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 17.30
I.1 Contractor's Profit (CP) - As Submitted 8% 16.58
I.2 Contractor's Profit (CP) - As Evaluated 8% 11.53
J.1 Value Added Tax (VAT) - As Submitted 5% 12.43
J.2 Value Added Tax (VAT) - As Evaluated 5% 8.65
K.1 Total Unit Cost - As Submitted 261.13
K.2 Total Unit Cost - As Evaluated 181.63

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 101(3)b3 Removal of Actual Structures/Obstruction (0.23mm thick PCCP
Unit of Measurement : sq.m. Unreinforced)
Output per hour - As Submitted : 40.00
Output per hour - As Evaluated : 40.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.1 - As Submitted 236.80


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
B.1
Backhoe with breaker (0.80 cu.m.) 1 1.00 3,064.71 3,064.71
Payloader (1.5 cu.m., 110hp) 1 1.00 2,073.08 2,073.08
Minor Tools, 10% of Labor Cost 23.68 23.68
Sub - Total for B.1 - As Submitted 6,572.71
Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
Backhoe with breaker (0.80 cu.m.) 1 1.00 3,064.71 3,064.71
B.2
Minor Tools, 10% of Labor Cost 23.68 23.68

Sub - Total for B.2 - As Evaluated 4,499.63


C.1 Total (A.1 + B.1) - As Submitted 6,809.51
C.2 Total (A.2 + B.2) - As Evaluated 4,736.43
D.1 Outout per hour - As Submitted 40.00
D.2 Output per hour - As Evaluated 40.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 170.24
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 118.41

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials
0 0 0 0.00 0.00
F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 170.24
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 118.41
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 20.43
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 14.21
I.1 Contractor's Profit (CP) - As Submitted 8% 13.62
I.2 Contractor's Profit (CP) - As Evaluated 8% 9.47
J.1 Value Added Tax (VAT) - As Submitted 5% 10.21
J.2 Value Added Tax (VAT) - As Evaluated 5% 7.10
K.1 Total Unit Cost - As Submitted 214.50
K.2 Total Unit Cost - As Evaluated 149.20

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00

Item No./Description : 101(3)c1 Removal of Actual Structures/Obstruction-ACP(0.05m thk)


Unit of Measurement : sq.m.
Output per hour - As Submitted : 120.00
Output per hour - As Evaluated : 120.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78
Sub - Total for A.1 - As Submitted 236.80
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2
Unskilled Laborer 2 1.00 62.39 124.78
Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
B.1
Motorized Road Grader w/ Scarifier, G710A 1 1.00 2,611.65 2,611.65
Payloader (1.5 cu.m., 110hp) 1 1.00 2,073.08 2,073.08
Minor Tools, 10% of Labor Cost 23.68 23.68
Sub - Total for B.1 - As Submitted 6,119.65
Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
Motorized Road Grader w/ Scarifier, G710A 1 1.00 2,611.65 2,611.65
B.2
Payloader (1.5 cu.m., 110hp) 1 1.00 2,073.08 2,073.08
Minor Tools, 10% of Labor Cost 23.68 23.68
Sub - Total for B.2 - As Evaluated 6,119.65
C.1 Total (A.1 + B.1) - As Submitted 6,356.45
C.2 Total (A.2 + B.2) - As Evaluated 6,356.45
D.1 Outout per hour - As Submitted 120.00
D.2 Output per hour - As Evaluated 120.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 52.97
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 52.97

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 52.97
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 52.97
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 6.36
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 0.00
I.1 Contractor's Profit (CP) - As Submitted 8% 4.24
I.2 Contractor's Profit (CP) - As Evaluated 0.00
J.1 Value Added Tax (VAT) - As Submitted 5% 3.18
J.2 Value Added Tax (VAT) - As Evaluated 0.00
K.1 Total Unit Cost - As Submitted 66.74
K.2 Total Unit Cost - As Evaluated 52.97
Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 100(3)a1 Individual Removal of Trees - 150 - 300mm dia. - Small
Unit of Measurement : ea.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 0.33 112.02 36.97
Skilled Laborer 1 0.33 80.88 26.69
Unskilled Laborer 2 0.33 62.39 41.18
Sub - Total for A.1 - As Submitted 104.83
Labor
Construction Foreman 1 0.33 112.02 36.97
A.2 Skilled Laborer 1 0.33 80.88 26.69
Unskilled Laborer 2 0.33 62.39 41.18
Sub - Total for A.2 - As Evaluated 104.83

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Backhoe (0.80 cu.m.) 1 0.25 2,536.41 634.10
B.1
Dump Truck (12 cu. yd.) 1 0.17 2,822.47 479.82
Chain Saw 1 0.17 75.36 12.81
Minor Tools (5% of Labor Cost) 5.24 5.24
Sub - Total for B.1 - As Submitted 1,131.98
Equipment
Backhoe (0.80 cu.m.) 1 0.25 2,536.41 634.10
Dump Truck (12 cu. yd.) 1 0.17 2,822.47 479.82
B.2
Chain Saw 1 0.17 75.36 12.81

Sub - Total for B.2 - As Evaluated 1,126.73


C.1 Total (A.1 + B.1) - As Submitted 1,236.81
C.2 Total (A.2 + B.2) - As Evaluated 1,231.57
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,236.81
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,231.57

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
Rope, 1"Ø - 5 uses m 20 3.50 14.00

Sub - Total for F.1 - As Submitted 14.00


Materials
Rope, 1"Ø - 5 uses m 20 3.50 70.00
F.2

Sub - Total for F.2 - As Evaluated 70.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 1,250.81
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 1,301.57
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 150.10
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 156.19
I.1 Contractor's Profit (CP) - As Submitted 8% 100.06
I.2 Contractor's Profit (CP) - As Evaluated 8% 104.13
J.1 Value Added Tax (VAT) - As Submitted 5% 75.05
J.2 Value Added Tax (VAT) - As Evaluated 5% 78.09
K.1 Total Unit Cost - As Submitted 1,576.02
K.2 Total Unit Cost - As Evaluated 1,639.98

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 100(3)a2 Individual Removal of Trees - 301 - 500mm dia. - Small
Unit of Measurement : ea.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 0.67 112.02 75.05
Skilled Laborer 1 0.67 80.88 54.19
Unskilled Laborer 2 0.67 62.39 83.60
Sub - Total for A.1 - As Submitted 212.85
Labor
Construction Foreman 1 0.67 112.02 75.05
A.2 Skilled Laborer 1 0.67 80.88 54.19
Unskilled Laborer 2 0.67 62.39 83.60
Sub - Total for A.2 - As Evaluated 212.85

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Backhoe (0.80 cu.m.) 1 0.50 2,536.41 1,268.21
B.1
Dump Truck (12 cu. yd.) 1 0.33 2,822.47 931.42
Chain Saw 1 0.33 75.36 24.87
Minor Tools (5% of Labor Cost) 10.64 10.64
Sub - Total for B.1 - As Submitted 2,235.13
Equipment
Backhoe (0.80 cu.m.) 1 0.50 2,536.41 1,268.21
Dump Truck (12 cu. yd.) 1 0.33 2,822.47 931.42
B.2
Chain Saw 1 0.33 75.36 24.87

Sub - Total for B.2 - As Evaluated 2,224.49


C.1 Total (A.1 + B.1) - As Submitted 2,447.98
C.2 Total (A.2 + B.2) - As Evaluated 2,437.33
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,447.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,437.33

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
Rope, 1"Ø - 5 uses m 20 3.50 14.00

Sub - Total for F.1 - As Submitted 14.00


Materials
Rope, 1"Ø - 5 uses m 20 3.50 70.00
F.2

Sub - Total for F.2 - As Evaluated 70.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 2,461.98
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 2,507.33
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 295.44
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 300.88
I.1 Contractor's Profit (CP) - As Submitted 8% 196.96
I.2 Contractor's Profit (CP) - As Evaluated 8% 200.59
J.1 Value Added Tax (VAT) - As Submitted 5% 147.72
J.2 Value Added Tax (VAT) - As Evaluated 5% 150.44
K.1 Total Unit Cost - As Submitted 3,102.09
K.2 Total Unit Cost - As Evaluated 3,159.24

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 100(3)a3 Individual Removal of Trees - 501 - 750mm dia. - Small
Unit of Measurement : ea.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 3.33 112.02 373.03
Skilled Laborer 1 3.33 80.88 269.33
Unskilled Laborer 2 3.33 62.39 415.52
Sub - Total for A.1 - As Submitted 1,057.87
Labor
Construction Foreman 1 3.33 112.02 373.03
A.2 Skilled Laborer 1 3.33 80.88 269.33
Unskilled Laborer 2 3.33 62.39 415.52
Sub - Total for A.2 - As Evaluated 1,057.87

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Backhoe (0.80 cu.m.) 1 2.50 2,536.41 6,341.03
B.1
Dump Truck (12 cu. yd.) 1 1.67 2,822.47 4,713.52
Chain Saw 1 1.67 75.36 125.85
Minor Tools (5% of Labor Cost) 52.89 52.89
Sub - Total for B.1 - As Submitted 11,233.29
Equipment
Backhoe (0.80 cu.m.) 1 2.50 2,536.41 6,341.03
Dump Truck (12 cu. yd.) 1 1.67 2,822.47 4,713.52
B.2
Chain Saw 1 1.67 75.36 125.85

Sub - Total for B.2 - As Evaluated 11,180.40


C.1 Total (A.1 + B.1) - As Submitted 12,291.17
C.2 Total (A.2 + B.2) - As Evaluated 12,238.28
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 12,291.17
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 12,238.28

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
Rope, 1"Ø - 5 uses m 20 3.50 14.00

Sub - Total for F.1 - As Submitted 14.00


Materials
Rope, 1"Ø - 5 uses m 20 3.5 14.00
F.2

Sub - Total for F.2 - As Evaluated 14.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 12,305.17
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 12,252.28
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 1,476.62
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 1,470.27
I.1 Contractor's Profit (CP) - As Submitted 8% 984.41
I.2 Contractor's Profit (CP) - As Evaluated 8% 980.18
J.1 Value Added Tax (VAT) - As Submitted 5% 738.31
J.2 Value Added Tax (VAT) - As Evaluated 5% 735.14
K.1 Total Unit Cost - As Submitted 15,504.51
K.2 Total Unit Cost - As Evaluated 15,437.87

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00

Item No./Description : 101(1) Removal of Structures & Obstruction


Unit of Measurement : L.S.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 28.00 112.02 3,136.56
Skilled Laborer 1 28.00 80.88 2,264.64
Unskilled Laborer 3 28.00 62.39 5,240.76
Sub - Total for A.1 - As Submitted 10,641.96
Labor
Construction Foreman 1 28.00 112.02 3,136.56
A.2 Skilled Laborer 1 28.00 80.88 2,264.64
Unskilled Laborer 3 28.00 62.39 5,240.76
Sub - Total for A.2 - As Evaluated 10,641.96

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Dump Truck (12 cu. yd.) 1 14.00 2,822.47 39,514.58
Backhoe with breaker (0.80 cu.m.) 1 14.00 3,064.71 42,905.94
Backhoe (0.80 cu.m.) - for loading 1 7.00 2,536.41 17,754.87
Sub - Total for B.1 - As Submitted 100,175.39
Equipment
Dump Truck (12 cu. yd.) 1 14.00 2,822.47 39,514.58
B.2 Backhoe with breaker (0.80 cu.m.) 1 14.00 3,064.71 42,905.94
Backhoe (0.80 cu.m.) - for loading 1 7.00 2,536.41 17,754.87
Sub - Total for B.2 - As Evaluated 100,175.39
C.1 Total (A.1 + B.1) - As Submitted 110,817.35
C.2 Total (A.2 + B.2) - As Evaluated
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 110,817.35
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1 *Note:
This item is for the removal of fence and other structures
located within the RROW.
Sub - Total for F.1 - As Submitted 0.00
Materials
*Note: 0 0 0.00 0.00
F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 110,817.35
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 0.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 13,298.08
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12%
I.1 Contractor's Profit (CP) - As Submitted 10% 11,081.73
I.2 Contractor's Profit (CP) - As Evaluated 10%
J.1 Value Added Tax (VAT) - As Submitted 5% 6,759.86
J.2 Value Added Tax (VAT) - As Evaluated 5%
K.1 Total Unit Cost - As Submitted 141,957.03
K.2 Total Unit Cost - As Evaluated

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00

Item No./Description : 101(6) Removal of Structures & Obstruction-Concrete


Unit of Measurement : cu.m.
Output per hour - As Submitted : 2.00
Output per hour - As Evaluated : 2.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 1 1.00 80.88 80.88
Unskilled Laborer 2 1.00 62.39 124.78
Sub - Total for A.1 - As Submitted 317.68
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Skilled Laborer 1 1.00 80.88 80.88
Unskilled Laborer 2 1.00 62.39 124.78
Sub - Total for A.2 - As Evaluated 317.68

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
B.1
Backhoe with breaker (0.80 cu.m.) 1 0.50 3,064.71 1,532.36
Backhoe (0.80 cu.m.) - for loading 1 0.25 2,536.41 634.10
Cutting Outfit 1 1.00 45.45 45.45
Sub - Total for B.1 - As Submitted 3,623.14
Equipment
Dump Truck (12 cu. yd.) 1 0.50 2,822.47 1,411.24
Backhoe with breaker (0.80 cu.m.) 1 0.50 3,064.71 1,532.36
B.2 Backhoe (0.80 cu.m.) - for loading 1 0.25 2,536.41 634.10
Cutting Outfit 1 1.00 45.45 45.45

Sub - Total for B.2 - As Evaluated 3,623.14


C.1 Total (A.1 + B.1) - As Submitted 3,940.82
C.2 Total (A.2 + B.2) - As Evaluated
D.1 Outout per hour - As Submitted 2.00
D.2 Output per hour - As Evaluated
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,970.41
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated

Name and Specification Unit Quantity Unit Cost Amount

F.1 Materials
Oxy/Acetylene set 0.10 2,500.00 250.00
Sub - Total for F.1 - As Submitted 250.00
Materials
F.2 Oxy/Acetylene set 0.1 2,500.00 250.00
Sub - Total for F.2 - As Evaluated 250.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 2,220.41
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 0.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 266.45
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12%
I.1 Contractor's Profit (CP) - As Submitted 10% 222.04
I.2 Contractor's Profit (CP) - As Evaluated 10%
J.1 Value Added Tax (VAT) - As Submitted 5% 135.45
J.2 Value Added Tax (VAT) - As Evaluated 5%
K.1 Total Unit Cost - As Submitted 2,844.35
K.2 Total Unit Cost - As Evaluated

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 102(2) Surplus Common Excavation
Unit of Measurement : cu.m.
Output per hour - As Submitted : 60.00
Output per hour - As Evaluated : 60.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.1 - As Submitted 236.80


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Bulldozer, DX175 1 1.00 3,997.35 3,997.35
B.1
Payloader (1.50 cu.m.) 1 1.00 2,073.08 2,073.08
Payloader (1.50 cu.m.) - at disposal area 1 0.25 2,073.08 518.27
Dumptruck (12 cu.yd.) 2 1.00 2,822.47 5,644.94
Sub - Total for B.1 - As Submitted 12,233.64
Equipment
Bulldozer, DX175 1 1.00 3,997.35 3,997.35
Payloader (1.50 cu.m.) 1 1.00 2,073.08 2,073.08
B.2
Payloader (1.50 cu.m.) - at disposal area 1 0.25 2,073.08 518.27
Dumptruck (12 cu.yd.) 2 1.00 2,822.47 5,644.94
Sub - Total for B.2 - As Evaluated 12,233.64
C.1 Total (A.1 + B.1) - As Submitted 12,470.44
C.2 Total (A.2 + B.2) - As Evaluated 12,470.44
D.1 Outout per hour - As Submitted 60.00
D.2 Output per hour - As Evaluated 60.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 207.84
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 207.84

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 207.84
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 207.84
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 24.94
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 24.94
I.1 Contractor's Profit (CP) - As Submitted 8% 16.63
I.2 Contractor's Profit (CP) - As Evaluated 8% 16.63
J.1 Value Added Tax (VAT) - As Submitted 5% 12.47
J.2 Value Added Tax (VAT) - As Evaluated 5% 12.47
K.1 Total Unit Cost - As Submitted 261.88
K.2 Total Unit Cost - As Evaluated 261.88

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 103(1)a Structure Excavation (Common Soil)
Unit of Measurement : cu.m.
Output per hour - As Submitted : 20.00
Output per hour - As Evaluated : 20.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 3 1.00 62.39 187.17

Sub - Total for A.1 - As Submitted 299.19


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 3 1.00 62.39 187.17

Sub - Total for A.2 - As Evaluated 299.19

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu.yd.) 2 1.00 2,822.47 5,644.94
B.1
Backhoe (0.80 cu.m.) 1 1.00 2,536.41 2,536.41
Minor Tools, 10% of Labor Cost 29.92 29.92

Sub - Total for B.1 - As Submitted 8,211.27


Equipment
Dump Truck (12 cu.yd.) 2 1.00 2822.47 5,644.94
Backhoe (0.80 cu.m.) 1 1.00 2536.41 2,536.41
B.2
Minor Tools, 10% of Labor Cost 0 0.00 29.92 29.92

Sub - Total for B.2 - As Evaluated 8,211.27


C.1 Total (A.1 + B.1) - As Submitted 8,510.46
C.2 Total (A.2 + B.2) - As Evaluated 8,510.46
D.1 Outout per hour - As Submitted 20.00
D.2 Output per hour - As Evaluated 20.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 425.52
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 425.52

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 425.52
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 425.52
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 51.06
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 51.06
I.1 Contractor's Profit (CP) - As Submitted 8% 34.04
I.2 Contractor's Profit (CP) - As Evaluated 8% 34.04
J.1 Value Added Tax (VAT) - As Submitted 5% 25.53
J.2 Value Added Tax (VAT) - As Evaluated 5% 25.53
K.1 Total Unit Cost - As Submitted 536.16
K.2 Total Unit Cost - As Evaluated 536.16

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 103(1)b Structure Excavation (Soft Rock)


Unit of Measurement : cu.m.
Output per hour - As Submitted : 20.00
Output per hour - As Evaluated : 20.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 94.10 94.10
Unskilled Laborer 3 1.00 52.50 157.50
Sub - Total for A.1 - As Submitted 251.60
Labor
Construction Foreman 1 1.00 94.10 94.10
A.2
Unskilled Laborer 3 1.00 52.50 157.50
Sub - Total for A.2 - As Evaluated 251.60

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Dump Truck (12 cu.yd.) 2 1.00 1,420.00 2,840.00
B.1
Backhoe (0.80 cu.m.) 1 0.50 1,998.10 999.05
Backhoe with breaker (0.80 cu.m.) 1 0.50 1,998.10 999.05
Minor Tools, 10% of Labor Cost 25.16 25.16
Sub - Total for B.1 - As Submitted 4,863.26
Equipment
Dump Truck (12 cu.yd.) 2 1.00 1420.00 2,840.00
Backhoe (0.80 cu.m.) 1 0.50 1998.10 999.05
B.2
Backhoe with breaker (0.80 cu.m.) 1 0.50 1998.10 999.05
Minor Tools, 10% of Labor Cost 0 0.00 25.16 25.16
Sub - Total for B.2 - As Evaluated 4,863.26
C.1 Total (A.1 + B.1) - As Submitted 5,114.86
C.2 Total (A.2 + B.2) - As Evaluated 5,114.86
D.1 Outout per hour - As Submitted 20.00
D.2 Output per hour - As Evaluated 20.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 255.74
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 255.74

Name and Specification Unit Quantity Unit Cost Amount

F.1 Materials

Sub - Total for F.1 - As Submitted 0.00


Materials
F.2
Sub - Total for F.2 - As Evaluated 0.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 255.74
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 255.74
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 30.69
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 30.69
I.1 Contractor's Profit (CP) - As Submitted 8% 20.46
I.2 Contractor's Profit (CP) - As Evaluated 8% 20.46
J.1 Value Added Tax (VAT) - As Submitted 5% 15.34
J.2 Value Added Tax (VAT) - As Evaluated 5% 15.34
K.1 Total Unit Cost - As Submitted 322.24
K.2 Total Unit Cost - As Evaluated 322.24

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 103(3) Foundation Fill


Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.25
Output per hour - As Evaluated : 1.25

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 4 1.00 62.39 249.56

Sub - Total for A.1 - As Submitted 361.58


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 4 1.00 62.39 249.56

Sub - Total for A.2 - As Evaluated 361.58

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Plate Compactor (5 Hp) 1 1.00 123.00 123.00
B.1
Water Truck/Pump (16000 L) 1 0.01 4,080.78 40.81
Minor Tools (10% of Labor Cost) 36.16 36.16

Sub - Total for B.1 - As Submitted 199.97


Equipment
Plate Compactor (5 Hp) 1 1.00 123.00 123.00
Minor Tools (10% of Labor Cost) 36.16 36.16
B.2

Sub - Total for B.2 - As Evaluated 159.16


C.1 Total (A.1 + B.1) - As Submitted 561.55
C.2 Total (A.2 + B.2) - As Evaluated 520.74
D.1 Outout per hour - As Submitted 1.25
D.2 Output per hour - As Evaluated 1.25
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 449.24
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 416.59

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
Filler Material cu.m 1.15 450.00 517.50
(with 15% compaction)
Sub - Total for F.1 - As Submitted 517.50
Materials
Filler Material cu.m 1.15 450.00 517.50
F.2

Sub - Total for F.2 - As Evaluated 517.50


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 966.74
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 934.09
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 116.01
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 112.09
I.1 Contractor's Profit (CP) - As Submitted 8% 77.34
I.2 Contractor's Profit (CP) - As Evaluated 8% 74.73
J.1 Value Added Tax (VAT) - As Submitted 5% 58.00
J.2 Value Added Tax (VAT) - As Evaluated 5% 56.05
K.1 Total Unit Cost - As Submitted 1,218.09
K.2 Total Unit Cost - As Evaluated 1,176.95

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 104(1)a Embankment from roadway/structure excavation (Common Soil)
Unit of Measurement : cu.m.
Output per hour - As Submitted : 50.00
Output per hour - As Evaluated : 50.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Spreading and Compaction
Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78
Sub - Total for A.1 - As Submitted 236.80
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Spreading and Compaction
B.1
Motorized Road Grader, G710A 1 1.00 2,611.65 2,611.65
Vibratory Roller (10 mt.), SD100DC 1 1.00 2,349.36 2,349.36
Water Truck / Pump (16000 L) 1 0.25 4,080.78 1,020.20
Sub - Total for B.1 - As Submitted 5,981.21
Equipment
Motorized Road Grader, G710A 1 1.00 2,611.65 2,611.65
Vibratory Roller (10 mt.), SD100DC 1 1.00 2,349.36 2,349.36
B.2
Water Truck / Pump (16000 L) 1 0.25 4,080.78 1,020.20

Sub - Total for B.2 - As Evaluated 5,981.21


C.1 Total (A.1 + B.1) - As Submitted 6,218.01
C.2 Total (A.2 + B.2) - As Evaluated 6,218.01
D.1 Outout per hour - As Submitted 50.00
D.2 Output per hour - As Evaluated 50.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 124.36
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 124.36

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials
0 0 0.00 0.00 0.00
F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 124.36
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 124.36
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 14.92
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 14.92
I.1 Contractor's Profit (CP) - As Submitted 8% 9.95
I.2 Contractor's Profit (CP) - As Evaluated 8% 9.95
J.1 Value Added Tax (VAT) - As Submitted 5% 7.46
J.2 Value Added Tax (VAT) - As Evaluated 5% 7.46
K.1 Total Unit Cost - As Submitted 156.69
K.2 Total Unit Cost - As Evaluated 156.69

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 104(7) Gravel Fill
Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.20
Output per hour - As Evaluated : 1.20

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 3 1.00 62.39 187.17

Sub - Total for A.1 - As Submitted 299.19


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 3 1.00 62.39 187.17

Sub - Total for A.2 - As Evaluated 299.19

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Plate Compactor (5hp) 1 0.50 123.00 61.50
Minor Tools (10% of Labor Cost) 29.92 29.92

Sub - Total for B.1 - As Submitted 91.42


Equipment
Plate Compactor (5hp) 1 0.50 123.00 61.50
B.2 Minor Tools (10% of Labor Cost) 0 0.00 29.92 29.92
0 0 0.00 - 0.00
Sub - Total for B.2 - As Evaluated 91.42
C.1 Total (A.1 + B.1) - As Submitted 390.61
C.2 Total (A.2 + B.2) - As Evaluated 390.61
D.1 Outout per hour - As Submitted 1.20
D.2 Output per hour - As Evaluated 1.20
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 325.51
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 325.51

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1 Gravel Bedding G1 (w/ 5% Shrinkage) cu.m. 1.050 690.00 724.50

Sub - Total for F.1 - As Submitted 724.50


Materials
Gravel Bedding G1 (w/ 5% Shrinkage) cu.m. 1.05 690.00 724.50
F.2

Sub - Total for F.2 - As Evaluated 724.50


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 1,050.01
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 1,050.01
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 126.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 126.00
I.1 Contractor's Profit (CP) - As Submitted 8% 84.00
I.2 Contractor's Profit (CP) - As Evaluated 8% 84.00
J.1 Value Added Tax (VAT) - As Submitted 5% 63.00
J.2 Value Added Tax (VAT) - As Evaluated 5% 63.00
K.1 Total Unit Cost - As Submitted 1,323.01
K.2 Total Unit Cost - As Evaluated 1,323.01

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 105(1)a Subgrade Preparation (Common Material)
Unit of Measurement : sq.m.
Output per hour - As Submitted : 300.00
Output per hour - As Evaluated : 300.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.1 - As Submitted 236.80


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Motorized Road Grader, G710A 1 1.00 2,611.65 2,611.65
Vibratory Roller (10 mt.), SD100DC 1 1.00 2,349.36 2,349.36
Water Truck / Pump (16000 L) 1 0.25 4,080.78 1,020.20
Sub - Total for B.1 - As Submitted 5,981.21
Equipment
Motorized Road Grader, G710A 1 1.00 2611.65 2,611.65
B.2 Vibratory Roller (10 mt.), SD100DC 1 1.00 2349.36 2,349.36
Water Truck / Pump (16000 L) 1 0.25 4080.78 1,020.20
Sub - Total for B.2 - As Evaluated 5,981.21
C.1 Total (A.1 + B.1) - As Submitted 6,218.01
C.2 Total (A.2 + B.2) - As Evaluated 6,218.01
D.1 Outout per hour - As Submitted 300.00
D.2 Output per hour - As Evaluated 300.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 20.73
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 20.73

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1

Sub - Total for F.1 - As Submitted 0.00


Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 20.73
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 20.73
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 2.49
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 2.49
I.1 Contractor's Profit (CP) - As Submitted 8% 1.66
I.2 Contractor's Profit (CP) - As Evaluated 8% 1.66
J.1 Value Added Tax (VAT) - As Submitted 5% 1.24
J.2 Value Added Tax (VAT) - As Evaluated 5% 1.24
K.1 Total Unit Cost - As Submitted 26.12
K.2 Total Unit Cost - As Evaluated 26.12

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 200(1) Aggregate Subbase Course
Unit of Measurement : cu.m.
Output per hour - As Submitted : 50.00
Output per hour - As Evaluated : 50.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.1 - As Submitted 236.80


Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.2 - As Evaluated 236.80

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Motorized Road Grader, G710A 1 1.00 2,611.65 2,611.65
B.1
Vibratory Roller (10 mt.), SD100DC 1 1.00 2,349.36 2,349.36
Water Truck / Pump (16000 L) 1 0.25 4,080.78 1,020.20

Sub - Total for B.1 - As Submitted 5,981.21


Equipment
Motorized Road Grader, G710A 1 1.00 2611.65 2,611.65
Vibratory Roller (10 mt.), SD100DC 1 1.00 2349.36 2,349.36
B.2
Water Truck / Pump (16000 L) 1 0.25 4080.78 1,020.20

Sub - Total for B.2 - As Evaluated 5,981.21


C.1 Total (A.1 + B.1) - As Submitted 6,218.01
C.2 Total (A.2 + B.2) - As Evaluated 6,218.01
D.1 Outout per hour - As Submitted 50.00
D.2 Output per hour - As Evaluated 50.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 124.36
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 124.36

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
Aggregate Subbase Course (w/ 15% Shrinkage Factor) cu.m. 1.15 410.00 471.50

Sub - Total for F.1 - As Submitted 471.50


Materials
Aggregate Subbase Course (w/ 15% Shrinkage Factor) cu.m. 1.15 410.00 471.50
F.2

Sub - Total for F.2 - As Evaluated 471.50


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 595.86
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 595.86
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 71.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 71.50
I.1 Contractor's Profit (CP) - As Submitted 8% 47.67
I.2 Contractor's Profit (CP) - As Evaluated 8% 47.67
J.1 Value Added Tax (VAT) - As Submitted 5% 35.75
J.2 Value Added Tax (VAT) - As Evaluated 5% 35.75
K.1 Total Unit Cost - As Submitted 750.78
K.2 Total Unit Cost - As Evaluated 750.78

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 311(1)a Portland Cement Concrete Pavement (Unreinforced, 0.15 m thick)
Unit of Measurement : sq.m.
Output per hour - As Submitted : 107.33
Output per hour - As Evaluated : 107.33

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 102.80 102.80
Skilled Laborer 4 1.00 74.26 297.04
Unskilled Laborer 12 1.00 57.20 686.40
Sub - Total for A.1 - As Submitted 1,086.24
Labor
Construction Foreman 1 1.00 102.80 102.8
A.2 Skilled Laborer 4 1.00 74.26 297.04
Unskilled Laborer 12 1.00 57.20 686.4
Sub - Total for A.2 - As Evaluated 1,086.24

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Concrete Screeder (5.5 hp) 1 1.00 545.00 545.00
Concrete Vibrator 2 1.00 57.17 114.34
B.1
Joint Sealer Machine 1 0.10 86.75 8.68
Concrete Saw (14", 7.5hp) 1 1.00 32.63 32.63
Bar Cutter (25mm, single phase) 1 0.10 105.47 10.55
Minor Tools, 5% of Labor Cost 54.31 54.31
Sub - Total for B.1 - As Submitted 765.50
Equipment
Concrete Screeder (5.5 hp) 1 1.00 545.00 545.00
Concrete Vibrator 2 1.00 57.17 114.34
B.2 Joint Sealer Machine 1 0.10 86.75 8.68
Bar Cutter (25mm, single phase) 1 0.10 105.47 10.55
Minor Tools, 5% of Labor Cost 0 0.00 54.31 0.00
Sub - Total for B.2 - As Evaluated 678.56
C.1 Total (A.1 + B.1) - As Submitted 1,851.74
C.2 Total (A.2 + B.2) - As Evaluated 1,764.80
D.1 Outout per hour - As Submitted 107.33
D.2 Output per hour - As Evaluated 107.33
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 17.25
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 16.44

Name and Specification Unit Quantity Unit Cost Amount

Materials
Ready Mix Concrete, 3500 psi (14 days) cu.m. 0.15 0.00
Reinforcing Steel Bar kgs. 0.33 58.00 19.14
Steel Forms (Rental) m. 0.46 71.00 32.66
F.1
Asphalt Sealant L 0.12 44.00 5.28
Curing Compound L 0.29 75.00 21.75
Concrete Saw (14", 7.5hp) pc. 0.00015 8,000.00 1.20
Pipe Sleeve, 1" dia. m. 0.0078 48.50 0.38
Grease / Tar L 0.0015 210.00 0.32
Sub - Total for F.1 - As Submitted 80.73
Materials
Ready Mix Concrete, 3500 psi (14 days) cu.m. 0.15 0.00 0.00
Reinforcing Steel Bar kgs. 0.33 58.00 19.14
Steel Forms (Rental) m. 0.46 71.00 32.66
Asphalt Sealant L 0.12 44.00 5.28
F.2
Curing Compound L 0.29 75.00 21.75
Concrete Saw (14", 7.5hp) pc. 0.00015 8000.00 1.20
F.2

Pipe Sleeve, 1" dia. m. 0.0078 48.50 0.38


Grease / Tar L 0.0015 210.00 0.32
Sub - Total for F.2 - As Evaluated 80.41
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 97.98
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 96.85
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 11.76
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 11.62
I.1 Contractor's Profit (CP) - As Submitted 8% 7.84
I.2 Contractor's Profit (CP) - As Evaluated 8% 7.75
J.1 Value Added Tax (VAT) - As Submitted 5% 5.88
J.2 Value Added Tax (VAT) - As Evaluated 5% 5.81
K.1 Total Unit Cost - As Submitted 123.46
K.2 Total Unit Cost - As Evaluated 122.03

Prepared by: Checked/Reviewed by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 311(1)b1 Portland Cement Concrete Pavement (Unreinforced, 0.20 m thick)
Unit of Measurement : sq.m.
Output per hour - As Submitted : 80.50
Output per hour - As Evaluated : 80.5

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 94.10 94.10
Skilled Laborer 4 1.00 68.01 272.04
Unskilled Laborer 12 1.00 52.50 630.00
Sub - Total for A.1 - As Submitted 996.14
Labor
Construction Foreman 1 1.00 94.10 94.1
A.2 Skilled Laborer 4 1.00 68.01 272.04
Unskilled Laborer 12 1.00 52.50 630
Sub - Total for A.2 - As Evaluated 996.14

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Concrete Screeder (5.5 hp) 1 1.00 545.00 545.00
B.1 Concrete Vibrator/Mechanized Joint Sealer 2 1.00 91.25 182.50
Concrete Saw (14", 7.5hp) 1 1.00 32.63 32.63
Bar Cutter (25mm, single phase) 1 0.10 219.75 21.98
Minor Tools, 5% of Labor Cost 49.81 49.81
Sub - Total for B.1 - As Submitted 831.91
Equipment
Concrete Screeder (5.5 hp) 1 1.00 545.00 545.00
Concrete Vibrator/Mechanized Joint Sealer 2 1.00 91.25 182.50
B.2
Bar Cutter (25mm, single phase) 1 0.10 219.75 21.98
Minor Tools, 5% of Labor Cost 49.81 49.81
Sub - Total for B.2 - As Evaluated 799.28
C.1 Total (A.1 + B.1) - As Submitted 1,828.05
C.2 Total (A.2 + B.2) - As Evaluated 1,795.42
D.1 Outout per hour - As Submitted 80.50
D.2 Output per hour - As Evaluated 80.50
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 22.71
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 22.30

Name and Specification Unit Quantity Unit Cost Amount

Materials
Ready Mix Concrete, 3500 psi (14 days) cu.m. 0.2 5,000.00 1,000.00
Reinforcing Steel Bar kgs. 0.39 51.00 19.89
Steel Forms (Rental) m. 0.46 56.00 25.76
F.1
Asphalt Sealant L 0.12 44.00 5.28
Curing Compound L 0.29 75.00 21.75
Concrete Saw (14", 7.5hp) pc. 0.00015 8,000.00 1.20
Pipe Sleeve, 1" dia. m. 0.0086 34.33 0.30
Grease / Tar L 0.0056 300.00 1.68
Sub - Total for F.1 - As Submitted 1,075.86
Materials
Ready Mix Concrete, 3500 psi (14 days) cu.m. 0.2 5000.00 1,000.00
Materials kgs. 0.39 51.00 19.89
Ready Mix Concrete, 3500 psi (14 days) m. 0.46 56.00 25.76
F.2 Steel Forms (Rental) L 0.29 75.00 21.75
Asphalt Sealant pc. 0.00015 8000.00 1.20
F.2

Curing Compound m. 0.0086 34.33 0.30


Concrete Saw (14", 7.5hp) L 0.0056 300.00 1.68
Sub - Total for F.2 - As Evaluated 1,070.58
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 1,098.56
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 1,092.88
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 131.83
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 131.15
I.1 Contractor's Profit (CP) - As Submitted 8% 87.89
I.2 Contractor's Profit (CP) - As Evaluated 8% 87.43
J.1 Value Added Tax (VAT) - As Submitted 5% 65.91
J.2 Value Added Tax (VAT) - As Evaluated 5% 65.57
K.1 Total Unit Cost - As Submitted 1,384.19
K.2 Total Unit Cost - As Evaluated 1,377.03

Prepared by: Evaluated by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 302(2) Emulsified Asphalt


Unit of Measurement : sq.m.
Output per hour - As Submitted : 428.57
Output per hour - As Evaluated :

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 3 1.00 62.39 187.17

Sub - Total for A.1 - As Submitted 299.19


Labor

A.2

Sub - Total for A.2 - As Evaluated 0.00

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Asphalt Distributor, ROSCO/5 TON - 3000 USG - 100 hp 1 1.00 1,347.89 1,347.89
Power Broom, Towed Type with 2m Wide 6-30km/hr sweeping capacity 1 1.00 130.54 130.54

Sub - Total for B.1 - As Submitted 1,478.43


Equipment

B.2

Sub - Total for B.2 - As Evaluated 0.00


C.1 Total (A.1 + B.1) - As Submitted 1,777.62
C.2 Total (A.2 + B.2) - As Evaluated 0.00
D.1 Outout per hour - As Submitted 428.57
D.2 Output per hour - As Evaluated 0.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 4.15
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1 Emulsified Asphalt SS-1 m.t. 1.05 55.50 58.28
(w/ 5% wastage)
1 mt = 55,500.00/1000 = 55.50
Sub - Total for F.1 - As Submitted 58.28
Materials

F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 62.43
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 0.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 7.49
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated
I.1 Contractor's Profit (CP) - As Submitted 8% 4.99
I.2 Contractor's Profit (CP) - As Evaluated
J.1 Value Added Tax (VAT) - As Submitted 5% 3.75
J.2 Value Added Tax (VAT) - As Evaluated
K.1 Total Unit Cost - As Submitted 78.66
K.2 Total Unit Cost - As Evaluated

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Preventive Maintenance - Primary Roads - Manila North Rd - K0278+830 - K0279+507

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 303(3)a Bituminous Seal Coat - RC-Cut-back Asphalt


Unit of Measurement : tonne
Output per hour - As Submitted : 0.30
Output per hour - As Evaluated : 0.30

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 112.02 112.02
Unskilled Laborer 3 1.00 62.39 187.17
Sub - Total for A.1 - As Submitted 299.19
Labor
1 1.00 112.02 112.02
A.2
3 1.00 62.39 187.17
Sub - Total for A.2 - As Evaluated 299.19

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Asphalt Distributor, ROSCO/5 TON - 3000 USG - 100 hp 1 1.00 1,362.50 1,362.50
Power Broom, Towed Type with 2m Wide 6-30km/hr sweeping capacity 1 1.00 130.54 130.54

Sub - Total for B.1 - As Submitted 1,493.04


Equipment
Asphalt Distributor, ROSCO/5 TON - 3000 USG - 100 hp 1 1.00 1362.50 1,362.50
B.2 Power Broom, Towed Type with 2m Wide 6-30km/hr sweeping capacity 1 1.00 130.54 130.54
0 0 0.00 0.00 0.00
Sub - Total for B.2 - As Evaluated 1,493.04
C.1 Total (A.1 + B.1) - As Submitted 1,792.23
C.2 Total (A.2 + B.2) - As Evaluated 1,792.23
D.1 Outout per hour - As Submitted 0.30
D.2 Output per hour - As Evaluated 0.30
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 5,974.10
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 5,974.10

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
RC 70 Cut-Back Asphalt mt 1.05 46,000.00 48,300.00
(w/ 5% wastage)
Sub - Total for F.1 - As Submitted 48,300.00
Materials
F.2
Sub - Total for F.2 - As Evaluated 0.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 54,274.10
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 5,974.10
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 6,512.89
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated
I.1 Contractor's Profit (CP) - As Submitted 8% 4,341.93
I.2 Contractor's Profit (CP) - As Evaluated
J.1 Value Added Tax (VAT) - As Submitted 5% 3,256.45
J.2 Value Added Tax (VAT) - As Evaluated
K.1 Total Unit Cost - As Submitted 68,385.37
K.2 Total Unit Cost - As Evaluated 5,974.10

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 310(1)c Bituminous Concrete Surface Wearing Course, Hot laid, 50mm
Unit of Measurement : sq.m.
Output per hour - As Submitted : 171.30
Output per hour - As Evaluated : 171.30

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Construction Foreman 1 1.00 112.02 112.02
A.1 Skilled Labor 4 1.00 80.88 323.52
Unskilled Laborer 8 1.00 62.39 499.12

Sub - Total for A.1 - As Submitted 934.66


Labor
1 1.00 112.02 112.02
8 1.00 62.39 499.12
A.2

Sub - Total for A.2 - As Evaluated 611.14

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Asphalt Paver (80hp), NF220BIIVDM 1 1.00 1,988.50 1,988.50
Pneumatic Tire Roller, 9 - WHL, 9.00X 20, 4PR 1 1.00 561.00 561.00
B.1
Tandem Steel Roller, HD110, 11 m.t. 1 1.00 2,591.94 2,591.94
Water Truck/Pump, 16000 L - 360 hp 1 1.00 4,080.78 4,080.78
Minor Tools (10% of Labor Cost) 93.47

Sub - Total for B.1 - As Submitted 9,315.69


Equipment
Asphalt Paver (80hp), NF220BIIVDM 1 1.00 1988.50 1,988.50
Minor Tools (10% of Labor Cost) 0 0.00 0.00 0.00
Sub - Total for B.1 - As Submitted 0 0.00 0.00 0.00
B.2

Sub - Total for B.2 - As Evaluated 1,988.50


C.1 Total (A.1 + B.1) - As Submitted 10,250.35
C.2 Total (A.2 + B.2) - As Evaluated 2,599.64
D.1 Outout per hour - As Submitted 171.30
D.2 Output per hour - As Evaluated 171.30
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 59.84
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 15.18

Name and Specification Unit Quantity Unit Cost Amount

Materials
Bituminous Concrete Surface Course mt 0.123 8,321.23 1,023.51
F.1 Thickness = 50mm (w/ 5% wastage)

Sub - Total for F.1 - As Submitted 1,023.51


Materials

F.2
F.2

Sub - Total for F.2 - As Evaluated 0.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 1,083.35
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 15.18
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 130.00
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated
I.1 Contractor's Profit (CP) - As Submitted 8% 86.67
I.2 Contractor's Profit (CP) - As Evaluated
J.1 Value Added Tax (VAT) - As Submitted 5% 65.00
J.2 Value Added Tax (VAT) - As Evaluated
K.1 Total Unit Cost - As Submitted 1,365.02
K.2 Total Unit Cost - As Evaluated 15.18

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 311(1)e1 Portland Cement Concrete Pavement (Unreinforced, 0.28 m thick), 14
Unit of Measurement : sq.m. Days
Output per hour - As Submitted : 57.50
Output per hour - As Evaluated : 57.5

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 12 1.00 62.39 748.68
Sub - Total for A.1 - As Submitted 1,184.22
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 12 1.00 62.39 62.39
Sub - Total for A.2 - As Evaluated 497.93

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Concrete Screeder (5.5 hp) 1 1.00 487.90 487.90
Concrete Vibrator 2 1.00 57.17 114.34
B.1
Joint Sealer Machine 1 0.10 84.55 8.46
Concrete Saw (14", 7.5hp) 1 1.00 32.64 32.64
Bar Cutter (42mm), Three Phase 1 0.10 210.94 21.09
Minor Tools, 5% of Labor Cost 59.21 59.21
Sub - Total for B.1 - As Submitted 723.64
Equipment
Concrete Screeder (5.5 hp) 1 1.00 487.90 487.90
Concrete Vibrator 2 1.00 57.17 114.34
B.2 Joint Sealer Machine 1 0.10 84.55 8.46
Concrete Saw (14", 7.5hp) 1 1.00 32.64 32.64
Bar Cutter (42mm), Three Phase 1 0.10 210.94 21.09
Sub - Total for B.2 - As Evaluated 723.64
C.1 Total (A.1 + B.1) - As Submitted 1,907.86
C.2 Total (A.2 + B.2) - As Evaluated 1,221.57
D.1 Outout per hour - As Submitted 57.50
D.2 Output per hour - As Evaluated 57.50
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 33.18
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 21.24

Name and Specification Unit Quantity Unit Cost Amount

Materials
Ready Mix Concrete, 3500 psi cu.m. 0.28 5,100.00 1,428.00
Reinforcing Steel Bar kgs. 0.50 55.00 27.50
Steel Forms (Rental), 28 cm width m. 0.46 75.00 34.50
F.1
Asphalt Sealant L 0.17 44.00 7.48
Curing Compound L 0.29 80.00 23.20
Concrete Saw (14", 7.5hp) pc. 0.00015 8,000.00 1.20
Pipe Sleeve, 2" dia. m. 0.0078 237.50 1.85
Grease L 0.0078 200.00 1.56
Sub - Total for F.1 - As Submitted 1,525.29
Materials
Ready Mix Concrete, 3500 psi cu.m. 0.28 5100.00 1,428.00
Reinforcing Steel Bar kgs. 0.5 55.00 27.50
Steel Forms (Rental), 28 cm width m. 0.46 75.00 34.50
Asphalt Sealant L 0.17 44.00 7.48
F.2
Curing Compound L 0.29 80.00 23.20
Concrete Saw (14", 7.5hp) pc. 0.00015 8000.00 1.20
F.2

Pipe Sleeve, 2" dia. m. 0.0078 237.50 1.85


Grease L 0.0078 200.00 1.56
Sub - Total for F.2 - As Evaluated 1,525.29
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 1,558.47
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 1,546.54
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 187.02
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 185.58
I.1 Contractor's Profit (CP) - As Submitted 8% 124.68
I.2 Contractor's Profit (CP) - As Evaluated 8% 123.72
J.1 Value Added Tax (VAT) - As Submitted 5% 93.51
J.2 Value Added Tax (VAT) - As Evaluated 5% 92.79
K.1 Total Unit Cost - As Submitted 1,963.68
K.2 Total Unit Cost - As Evaluated 1,948.64

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Bucao -
Amontoc Access Road leading to Tangadan Falls, Brgy. Bucao, San Gabriel, La Union

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 500(1)b3 Pipe Culverts, 910mm dia. (Class IV)


Unit of Measurement : m.
Output per hour - As Submitted : 1.75
Output per hour - As Evaluated : 1.75

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 94.10 94.10
Skilled Laborer 2 1.00 68.01 136.02
Unskilled Laborer 4 1.00 52.50 210.00
Sub - Total for A.1 - As Submitted 440.12
Labor
Construction Foreman 1 1.00 94.10 94.10
A.2
Skilled Laborer 2 1.00 68.01 136.02
Sub - Total for A.2 - As Evaluated 440.12

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 One Bagger Mixer 1 0.50 1,537.00 768.50
Water Truck / Pump (16000L, 360Hp) 1 0.50 123.00 61.50
Minor Tools (10% of Labor Cost) 44.01 44.01
Sub - Total for B.1 - As Submitted 874.01
Equipment
One Bagger Mixer 1 0.50 1537.00 768.50
B.2 Water Truck / Pump (16000L, 360Hp) 1 0.50 123.00 61.50
Minor Tools (10% of Labor Cost) 44.01 44.01
Sub - Total for B.2 - As Evaluated 874.01
C.1 Total (A.1 + B.1) - As Submitted 1,314.13
C.2 Total (A.2 + B.2) - As Evaluated 1,314.13
D.1 Outout per hour - As Submitted 1.75
D.2 Output per hour - As Evaluated 1.75
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 750.93
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 750.93

Name and Specification Unit Quantity Unit Cost Amount

Materials
Portland Cement bags 1.08 260.00 280.80
F.1
Sand cu.m. 0.061 547.00 33.37
R.C. Pipes (910 mm dia.) pc. 1.00 4,550.00 4,550.00
Sand Bedding / Selected Sandy Soil cu.m. 0.128 696.00 89.09
Sub - Total for F.1 - As Submitted 4,953.26
Materials
Portland Cement bags 1.08 260.00 280.80
F.2 Sand cu.m. 0.06 547.00 33.37
R.C. Pipes (910 mm dia.) pc. 1.00 4550.00 4,550.00
Sub - Total for F.2 - As Evaluated 4,953.26
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 5,704.19
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 5,704.19
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 684.50
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 684.50
I.1 Contractor's Profit (CP) - As Submitted 8% 456.34
I.2 Contractor's Profit (CP) - As Evaluated 8% 456.34
J.1 Value Added Tax (VAT) - As Submitted 5% 342.25
J.2 Value Added Tax (VAT) - As Evaluated 5% 342.25
K.1 Total Unit Cost - As Submitted 7,187.28
K.2 Total Unit Cost - As Evaluated 7,187.28

Prepared by: Checked / Submitted by:


RAMIL A. BALISNOMO RHESTYTOM L. BUNNAO
Engineer II Engineer II
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads - Manila North
Rd - K0287+500 - K287+780

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 505(2)a Grouted Riprap (Class A)


Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.25
Output per hour - As Evaluated : 1.25

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Construction Foreman 1 1.00 102.80 102.80
A.1
Skilled Laborer 2 1.00 74.26 148.52
Unskilled Laborer 8 1.00 57.20 457.60

Sub - Total for A.1 - As Submitted 708.92


Labor
Construction Foreman 1 1.00 102.80 102.80
Skilled Laborer 2 1.00 74.26 148.52
A.2
Unskilled Laborer 8 1.00 57.20 457.60

Sub - Total for A.2 - As Evaluated 708.92

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
One Bagger Mixer 1 1.00 172.00 172.00
B.1
Water Truck / Pump (16000L, 360Hp) 1 0.05 2,450.00 122.50
Minor Tools (5% of Labor Cost) 35.45 35.45

Sub - Total for B.1 - As Submitted 329.95


Equipment
One Bagger Mixer 1 1.00 172.00 172.00
Water Truck / Pump (16000L, 360Hp) 1 0.05 2,450.00 122.50
B.2
Minor Tools (5% of Labor Cost) 35.45 35.45

Sub - Total for B.2 - As Evaluated 329.95


C.1 Total (A.1 + B.1) - As Submitted 1,038.87
C.2 Total (A.2 + B.2) - As Evaluated 1,038.87
D.1 Outout per hour - As Submitted 1.25
D.2 Output per hour - As Evaluated 1.25
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 831.09
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 831.09

Name and Specification Unit Quantity Unit Cost Amount

Materials
Portland Cement bags 3.00 260.00 780.00
Sand cu.m. 0.25 547.00 136.75
Boulders (15-25 kg.) cu.m. 1.05 589.00 618.45
F.1
Weep Holes (PVC Ø4") m. 0.30 98.33 29.50
Gravel Fill cu.m. 0.015 630.00 9.45
Filter Cloth sq.m. 0.015 164.00 2.46
Miscellaneous (1% of Material Cost) 15.77 15.77

Sub - Total for F.1 - As Submitted 1,592.38


Materials
Portland Cement bags 3.00 260.00 780.00
Sand cu.m. 0.25 547.00 136.75
Boulders (15-25 kg.) cu.m. 1.05 589.00 618.45
Weep Holes (PVC Ø4") m. 0.30 98.33 29.50
F.2 Gravel Fill cu.m. 0.015 630.00 9.45
Filter Cloth sq.m. 0.015 164.00 2.46
Miscellaneous (1% of Material Cost) 15.77 15.77
F.2

Sub - Total for F.2 - As Evaluated 1,592.38


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 2,423.47
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 2,423.47
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 290.82
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 290.82
I.1 Contractor's Profit (CP) - As Submitted 8% 193.88
I.2 Contractor's Profit (CP) - As Evaluated 8% 193.88
J.1 Value Added Tax (VAT) - As Submitted 5% 145.41
J.2 Value Added Tax (VAT) - As Evaluated 5% 145.41
K.1 Total Unit Cost - As Submitted 3,053.57
K.2 Total Unit Cost - As Evaluated 3,053.57

Prepared by: Evaluated by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 506(1) Stone Masonry


Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.60
Output per hour - As Evaluated : 1.6000

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 8 1.00 62.39 499.12
Sub - Total for A.1 - As Submitted 772.90
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 8 1.00 62.39 499.12
Sub - Total for A.2 - As Evaluated 772.90

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
One Bagger Mixer 1 1.00 172.00 172.00
B.1 Water Truck / Pump (16000L, 360Hp) 1 0.05 4,080.78 204.04
Backhoe (wheel mounted, 0.28cu.m.) 1 0.10 1,054.95 105.50
Minor Tools (10% of Labor Cost) 48.18 48.18

Sub - Total for B.1 - As Submitted 529.71


Equipment
One Bagger Mixer 1 1.00 172.00 172.00
Water Truck / Pump (16000L, 360Hp) 1 0.05 4080.78 204.04
Backhoe (wheel mounted, 0.28cu.m.) 1 0.10 1054.95 105.50
B.2
Minor Tools (10% of Labor Cost) 48.18 48.18

Sub - Total for B.2 - As Evaluated 529.71


C.1 Total (A.1 + B.1) - As Submitted 1,302.61
C.2 Total (A.2 + B.2) - As Evaluated 1,302.61
D.1 Outout per hour - As Submitted 1.60
D.2 Output per hour - As Evaluated 1.60
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 814.13
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 814.13

Name and Specification Unit Quantity Unit Cost Amount

Materials
Cement bags 5.50 235.00 1,292.50
Sand cu.m. 0.30 680.00 204.00
Boulders (15-25 kg.) cu.m. 1.05 589.00 618.45
F.1
Weep Holes (PVC Ø4") m. 0.30 196.67 59.00
Gravel Fill cu.m. 0.02 790.00 15.80
Filter Cloth sq.m. 0.015 164.00 2.46
Miscellaneous (1% of Material Cost) 21.92 21.92

Sub - Total for F.1 - As Submitted 2,214.13


Materials
Cement bags 5.50 235.00 1,292.50
Sand cu.m. 0.30 680.00 204.00
Boulders (15-25 kg.) cu.m. 1.05 589.00 618.45
Weep Holes (PVC Ø4") m. 0.30 196.67 59.00
F.2
Gravel Fill cu.m. 0.02 790.00 15.80
Filter Cloth sq.m. 0.015 164.00 2.46
F.2

Miscellaneous (1% of Material Cost) 21.92 21.92

Sub - Total for F.2 - As Evaluated 2,214.13


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 3,028.27
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 3,028.27
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 363.39
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 363.39
I.1 Contractor's Profit (CP) - As Submitted 8% 242.26
I.2 Contractor's Profit (CP) - As Evaluated 8% 242.26
J.1 Value Added Tax (VAT) - As Submitted 5% 181.70
J.2 Value Added Tax (VAT) - As Evaluated 5% 181.70
K.1 Total Unit Cost - As Submitted 3,815.62
K.2 Total Unit Cost - As Evaluated 3,815.61

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 510(1) Bed Course Granular Material


Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.25
Output per hour - As Evaluated : 1.25

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 94.10 94.10
Unskilled Laborer 4 1.00 52.50 210.00

Sub - Total for A.1 - As Submitted 304.10


Labor
Construction Foreman 1 1.00 94.10 94.10
A.2
Unskilled Laborer 4 1.00 52.50 210.00
Sub - Total for A.2 - As Evaluated 304.10

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Plate Compactor 1 1.00 172.00 172.00
Minor Tools (10% of Labor Cost) 30.41

Sub - Total for B.1 - As Submitted 202.41


Equipment
Plate Compactor 1 1.00 172.00 172.00
B.2
Minor Tools (10% of Labor Cost) 30.41
Sub - Total for B.2 - As Evaluated 202.41
C.1 Total (A.1 + B.1) - As Submitted 506.51
C.2 Total (A.2 + B.2) - As Evaluated 506.51
D.1 Outout per hour - As Submitted 1.25
D.2 Output per hour - As Evaluated 1.25
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 405.21
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 405.21

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
Aggregate Subbase Course cu.m. 1.15 380.00 437.00
(w/ 15% Shrinkage Factor)
Sub - Total for F.1 - As Submitted 437.00
Materials
Aggregate Subbase Course cu.m. 1.15 380.00 437.00
F.2
(w/ 15% Shrinkage Factor)
Sub - Total for F.2 - As Evaluated 437.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 842.21
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 842.21
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 101.06
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 101.06
I.1 Contractor's Profit (CP) - As Submitted 8% 67.38
I.2 Contractor's Profit (CP) - As Evaluated 8% 67.38
J.1 Value Added Tax (VAT) - As Submitted 5% 50.53
J.2 Value Added Tax (VAT) - As Evaluated 5% 50.53
K.1 Total Unit Cost - As Submitted 1,061.18
K.2 Total Unit Cost - As Evaluated 1,061.18

Prepared by: Checked/Reviewed by:


RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 601(1) Sidewalk


Unit of Measurement : sq.m.
Output per hour - As Submitted : 20.00
Output per hour - As Evaluated : 20.0000

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 94.10 94.10
Skilled Laborer 4 1.00 68.01 272.04
Unskilled Laborer 12 1.00 52.50 630.00
Sub - Total for A.1 - As Submitted 996.14
Labor
Construction Foreman 1 1.00 94.10 94.10
A.2 Skilled Laborer 4 1.00 68.01 272.04
Unskilled Laborer 12 1.00 52.50 630.00
Sub - Total for A.2 - As Evaluated 996.14

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Concrete Vibrator 2 1.00 91.25 182.50
B.1 One Bagger Mixer 1 1.00 172.00 172.00
Water Truck / Pump (16000L, 360Hp) 1 0.13 2,450.00 318.50
Concrete Saw (7.5 hp), 14" Blade Ø 1 0.05 32.63 1.63
Minor Tools (10% of Labor Cost) 99.61 99.61
Sub - Total for B.1 - As Submitted 774.25
Equipment
Concrete Vibrator 2 1.00 91.25 182.50
One Bagger Mixer 1 1.00 172.00 172.00
B.2 Water Truck / Pump (16000L, 360Hp) 1 0.13 2450.00 318.50
Concrete Saw (7.5 hp), 14" Blade Ø 1 0.05 32.63 1.63
Minor Tools (10% of Labor Cost) 99.61 99.61
Sub - Total for B.2 - As Evaluated 774.25
C.1 Total (A.1 + B.1) - As Submitted 1,770.39
C.2 Total (A.2 + B.2) - As Evaluated 1,770.39
D.1 Outout per hour - As Submitted 20.00
D.2 Output per hour - As Evaluated 20.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 88.52
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 88.52

Name and Specification Unit Quantity Unit Cost Amount

Materials
Cement bags 0.95 260.00 247.00
Sand cu.m. 0.055 547.00 30.09
F.1 Gravel cu.m. 0.10 625.00 62.50
Forms m 0.46 56.00 6.44
Asphalt Sealant L 0.12 44.00 5.28
Curing Compound L 0.29 75.00 21.75

Sub - Total for F.1 - As Submitted 373.05


Materials
Cement bags 1.29 255.00 328.95
Sand cu.m. 0.07 580.00 40.60
Gravel cu.m. 0.14 700.00 98.00
F.2 Forms bd-ft 11.47 55.00 157.71
Asphalt Sealant kg 0.11 70.00 7.70
F.2

Curing Compound kg 0.11 70.00 7.70

Sub - Total for F.2 - As Evaluated 640.66


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 461.57
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 729.18
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 55.39
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 87.50
I.1 Contractor's Profit (CP) - As Submitted 8% 36.93
I.2 Contractor's Profit (CP) - As Evaluated 8% 58.33
J.1 Value Added Tax (VAT) - As Submitted 5% 27.69
J.2 Value Added Tax (VAT) - As Evaluated 5% 43.75
K.1 Total Unit Cost - As Submitted 581.58
K.2 Total Unit Cost - As Evaluated 918.77

Prepared by: Evaluated by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 403(5) Structural Steel (Erection)


Unit of Measurement : kg.
Output per hour - As Submitted : 510.94
Output per hour - As Evaluated : 510.94

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 69.42 69.42
Skilled Laborer 6 1.00 50.18 301.08
Unskilled Laborer 6 1.00 39.00 234.00
Sub - Total for A.1 - As Submitted 604.50
Labor
Construction Foreman 1 1.00 69.42 69.42
A.2 Skilled Laborer 6 1.00 50.18 301.08
Unskilled Laborer 6 1.00 39.00 234
Sub - Total for A.2 - As Evaluated 604.50

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Truck Mounted Crane (41-45 MT) 1 1.00 2,606.00 2,606.00
Welding Machine, 500 Amp, Electric Driven 2 0.40 391.00 312.80
B.1
Generator Set (900kW) 1 0.40 2,659.44 1,063.78
Vibro Hammer 1 0.20 3,069.00 613.80
Cutting Outfit 2 0.40 45.45 36.36
Minor Tools(10% of Labor Cost) 60.45 60.45
Sub - Total for B.1 - As Submitted 4,693.19
Equipment
Truck Mounted Crane (41-45 MT) 1 1.00 2,606.00 2606.00
Welding Machine, 500 Amp, Electric Driven 2 0.40 391.00 312.80
Generator Set (900kW) 1 0.40 2,659.44 1,063.78
B.2
Vibro Hammer 1 0.20 3,069.00 613.80
Cutting Outfit 2 0.40 45.45 36.36
Minor Tools(10% of Labor Cost) 60.45 60.45
Sub - Total for B.2 - As Evaluated 4,693.19
C.1 Total (A.1 + B.1) - As Submitted 5,297.69
C.2 Total (A.2 + B.2) - As Evaluated 5,297.69
D.1 Outout per hour - As Submitted 510.94
D.2 Output per hour - As Evaluated 510.94
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 10.37
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 10.37

Name and Specification Unit Quantity Unit Cost Amount

Materials
Base Plate (6.30 x 1.2 x 20mm thick, top and bottom) nos. 52.00 0.10 5.32
F.1 Steel Casing (300mm Ø x 5.0m) nos. 130.00 0.08 10.60
H beam (12" x 12" x 6.00m) nos. 26.00 0.06 1.51
Cross Brace (G.I. Pipe Schedule 4" Schedule 20) nos. 156.00 0.01 1.09
Miscellaneous (1% of Material Cost) 3.96 3.96
Sub - Total for F.1 - As Submitted 22.47
Materials
Base Plate (6.30 x 1.2 x 20mm thick, top and bottom) nos. 52.00 0.10 5.32
Steel Casing (300mm Ø x 5.0m) nos. 130.00 0.08 10.60
F.2 H beam (12" x 12" x 6.00m) nos. 26.00 0.06 1.51
Cross Brace (G.I. Pipe Schedule 4" Schedule 20) nos. 156.00 0.01 1.09
F.2

Miscellaneous (1% of Material Cost) 3.96 3.96


Sub - Total for F.2 - As Evaluated 22.47
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 32.84
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 32.84
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 3.94
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 3.94
I.1 Contractor's Profit (CP) - As Submitted 8% 2.63
I.2 Contractor's Profit (CP) - As Evaluated 8% 2.63
J.1 Value Added Tax (VAT) - As Submitted 5% 1.97
J.2 Value Added Tax (VAT) - As Evaluated 5% 1.97
K.1 Total Unit Cost - As Submitted 41.38
K.2 Total Unit Cost - As Evaluated 41.38

Prepared by: Checked / Submitted by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 403(5)b Structural Steel, ASTM Grade 36 (Erection)


Unit of Measurement : kg.
Output per hour - As Submitted : 510.94
Output per hour - As Evaluated : 510.94

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 69.42 69.42
Skilled Laborer 6 1.00 50.18 301.08
Unskilled Laborer 6 1.00 39.00 234.00
Sub - Total for A.1 - As Submitted 604.50
Labor
Construction Foreman 1 1.00 69.42 69.42
A.2 Skilled Laborer 6 1.00 50.18 301.08
Unskilled Laborer 6 1.00 39.00 234
Sub - Total for A.2 - As Evaluated 604.50

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Truck Mounted Crane (41-45 MT) 1 1.00 2,606.00 2,606.00
Welding Machine, 500 Amp, Electric Driven 2 0.40 391.00 312.80
B.1
Generator Set (900kW) 1 0.40 2,659.44 1,063.78
Vibro Hammer 1 0.20 3,069.00 613.80
Cutting Outfit 2 0.40 45.45 36.36
Minor Tools(10% of Labor Cost) 60.45 60.45
Sub - Total for B.1 - As Submitted 4,693.19
Equipment
Truck Mounted Crane (41-45 MT) 1 1.00 2,606.00 2606.00
Welding Machine, 500 Amp, Electric Driven 2 0.40 391.00 312.80
Generator Set (900kW) 1 0.40 2,659.44 1,063.78
B.2
Vibro Hammer 1 0.20 3,069.00 613.80
Cutting Outfit 2 0.40 45.45 36.36
Minor Tools(10% of Labor Cost) 60.45 60.45
Sub - Total for B.2 - As Evaluated 4,693.19
C.1 Total (A.1 + B.1) - As Submitted 5,297.69
C.2 Total (A.2 + B.2) - As Evaluated 5,297.69
D.1 Outout per hour - As Submitted 510.94
D.2 Output per hour - As Evaluated 510.94
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 10.37
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 10.37

Name and Specification Unit Quantity Unit Cost Amount

Materials
Structural Steel (imported), Erection Only
Structural Steel Support (4 uses)
WF 21" x 9m, wt. = 150.288 kg/m kg. 0.0949 55.00 5.22
F.1 Tubular Pipe, 9.50 mm thk x 450mm Ø x 30m kg. 0.0080 951.00 7.61
Cover Plate, 500mm x 500mm x 12mm thick kg. 0.0066 900.00 5.94
Channel, 27.8526 kg/m kg. 0.0080 55.00 0.44
Welding Rod (1 kg/2000 kg of steel) kg. 0.0003 120.00 0.04
Oxy / Acetylene (1 kg/5000 kg of steel) set 0.0001 2,500.00 0.25
Miscellaneous (1% of Material Cost) 0.19 0.19
Sub - Total for F.1 - As Submitted 19.69
Materials
Structural Steel (imported), Erection Only
Structural Steel Support (4 uses)
WF 21" x 9m, wt. = 150.288 kg/m kg. 0.0949 55.00 5.22
Tubular Pipe, 9.50 mm thk x 450mm Ø x 30m kg. 0.0080 951.00 7.61
F.2 Cover Plate, 500mm x 500mm x 12mm thick kg. 0.0066 900.00 5.94
Channel, 27.8526 kg/m kg. 0.0080 55.00 0.44
Welding Rod (1 kg/2000 kg of steel) kg. 0.0003 120.00 0.04
Oxy / Acetylene (1 kg/5000 kg of steel) set 0.0001 2,500.00 0.25
Miscellaneous (1% of Material Cost) 0.19 0.19
Sub - Total for F.2 - As Evaluated 19.69
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 30.06
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 30.06
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 3.61
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 3.61
I.1 Contractor's Profit (CP) - As Submitted 8% 2.40
I.2 Contractor's Profit (CP) - As Evaluated 8% 2.40
J.1 Value Added Tax (VAT) - As Submitted 5% 1.80
J.2 Value Added Tax (VAT) - As Evaluated 5% 1.80
K.1 Total Unit Cost - As Submitted 37.87
K.2 Total Unit Cost - As Evaluated 37.87

Prepared by: Checked / Submitted by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 1704(1) Embankment


Unit of Measurement : cu.m.
Output per hour - As Submitted : 50.00
Output per hour - As Evaluated : 50.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1
Construction Foreman 1 1.00 69.42 69.42
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.1 - As Submitted 147.42
Labor
Construction Foreman 1 1.00 69.42 69.42
A.2
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.2 - As Evaluated 147.42

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Motorized Road Grader, G710A 1 1.00 2,173.00 2,173.00
Vibratory Roller (10 mt.), SD100DC 1 1.00 1,846.00 1,846.00
Water Truck / Pump (16000 L) 1 0.25 2,450.00 612.50
Sub - Total for B.1 - As Submitted 4,631.50
Equipment
Motorized Road Grader, G710A 1 1.00 2,173.00 2,173.00
B.2
Vibratory Roller (10 mt.), SD100DC 1 1.00 1,846.00 1,846.00
Sub - Total for B.2 - As Evaluated 4,631.50
C.1 Total (A.1 + B.1) - As Submitted 4,778.92
C.2 Total (A.2 + B.2) - As Evaluated 4,778.92
D.1 Outout per hour - As Submitted 50.00
D.2 Output per hour - As Evaluated 50.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 95.58
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 95.58

Name and Specification Unit Quantity Unit Cost Amount

F.1 Materials
Embankment (Selected Borrow, w/ 25% Shrinkage Factor) cu.m. 1.25 270.00 337.50
Sub - Total for F.1 - As Submitted 337.50
Materials
F.2 Embankment (Selected Borrow, w/ 25% Shrinkage Factor) cu.m. 1.25 270.00 337.50
Sub - Total for F.2 - As Evaluated 337.50
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 433.08
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 433.08
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 51.97
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 51.97
I.1 Contractor's Profit (CP) - As Submitted 8% 34.65
I.2 Contractor's Profit (CP) - As Evaluated 8% 34.65
J.1 Value Added Tax (VAT) - As Submitted 5% 25.98
J.2 Value Added Tax (VAT) - As Evaluated 5% 25.98
K.1 Total Unit Cost - As Submitted 545.68
K.2 Total Unit Cost - As Evaluated 545.68

Prepared by: 0
RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 1714(1) Gabions (1m x 1m x 2m)


Unit of Measurement : cu.m.
Output per hour - As Submitted : 2.50
Output per hour - As Evaluated : 2.50

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 69.42 69.42
Skilled Laborer 2 1.00 50.18 100.36
Unskilled Laborer 8 1.00 39.00 312.00
Sub - Total for A.1 - As Submitted 481.78
Labor
Construction Foreman 1 1.00 69.42 69.42
A.2
Skilled Laborer 2 1.00 50.18 100.36
Sub - Total for A.2 - As Evaluated 481.78

Name and Capacity No of Units No. of Hours Hourly Rate Amount

B.1 Equipment

Sub - Total for B.1 - As Submitted 0.00


Equipment
B.2
Sub - Total for B.2 - As Evaluated 0.00
C.1 Total (A.1 + B.1) - As Submitted 481.78
C.2 Total (A.2 + B.2) - As Evaluated 481.78
D.1 Outout per hour - As Submitted 2.50
D.2 Output per hour - As Evaluated 2.50
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 192.71
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 192.71

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1 Gabion Wire Mesh (1m x 1m x 2m) - PVC Coated pc. 0.50 2,750.00 1,375.00
w/ complete accessories
Boulders cu.m. 1.05 600.00 630.00
Sub - Total for F.1 - As Submitted 2,005.00
Materials
F.2 Gabion Wire Mesh (1m x 1m x 2m) - PVC Coated pc. 0.50 2,750.00 1,375.00
Sub - Total for F.2 - As Evaluated 2,005.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 2,197.71
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 2,197.71
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 263.73
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 263.73
I.1 Contractor's Profit (CP) - As Submitted 8% 175.82
I.2 Contractor's Profit (CP) - As Evaluated 8% 175.82
J.1 Value Added Tax (VAT) - As Submitted 5% 131.86
J.2 Value Added Tax (VAT) - As Evaluated 5% 131.86
K.1 Total Unit Cost - As Submitted 2,769.12
K.2 Total Unit Cost - As Evaluated 2,769.12

Prepared by: 0
RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 1714(3) Filter Cloth


Unit of Measurement : sq.m.
Output per hour - As Submitted : 100.00
Output per hour - As Evaluated : 100.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 69.42 69.42
Skilled Laborer 2 1.00 50.18 100.36
Unskilled Laborer 8 1.00 39.00 312.00
Sub - Total for A.1 - As Submitted 481.78
Labor
Construction Foreman 1 1.00 69.42 69.42
A.2 Skilled Laborer 2 1.00 50.18 100.36
Unskilled Laborer 8 1.00 39.00 312.00
Sub - Total for A.2 - As Evaluated 481.78

Name and Capacity No of Units No. of Hours Hourly Rate Amount

B.1 Equipment
Cargo Truck (9-10MT) 1 0.25 1,212.00 303.00
Sub - Total for B.1 - As Submitted 303.00
Equipment
B.2 Cargo Truck (9-10MT) 1 0.25 1212.00 303.00
Sub - Total for B.2 - As Evaluated 303.00
C.1 Total (A.1 + B.1) - As Submitted 784.78
C.2 Total (A.2 + B.2) - As Evaluated 784.78
D.1 Outout per hour - As Submitted 100.00
D.2 Output per hour - As Evaluated 100.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 7.85
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 7.85

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1
Filter Cloth sq.m. 1.05 160.00 168.00
Miscellaneous (5% of Material Cost) 8.40 8.40
Sub - Total for F.1 - As Submitted 176.40
Materials
F.2 Filter Cloth sq.m. 1.05 160.00 168.00
Sub - Total for F.2 - As Evaluated 176.40
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 184.25
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 184.25
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 22.11
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 22.11
I.1 Contractor's Profit (CP) - As Submitted 8% 14.74
I.2 Contractor's Profit (CP) - As Evaluated 8% 14.74
J.1 Value Added Tax (VAT) - As Submitted 5% 11.05
J.2 Value Added Tax (VAT) - As Evaluated 5% 11.05
K.1 Total Unit Cost - As Submitted 232.15
K.2 Total Unit Cost - As Evaluated 232.15

Prepared by: 0
RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 517(1)a Drain Pipe (Galvanized)


Unit of Measurement : l.m.
Output per hour - As Submitted : 2.40
Output per hour - As Evaluated : 2.40

No. of No. of
Designation Hourly Rate Amount
Person Hours
Labor
A.1 Construction Foreman 1 1.00 69.42 69.42
Skilled Laborer 1 1.00 50.18 50.18
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.1 - As Submitted 197.60
Labor
Construction Foreman 1 1.00 69.42 69.42
A.2 Skilled Laborer 1 1.00 50.18 50.18
Unskilled Laborer 2 1.00 39.00 78.00
Sub - Total for A.2 - As Evaluated 197.60
No. of
Name and Capacity No of Units Hourly Rate Amount
Hours
Equipment
B.1
Welding Machine, 500Amp 1 0.10 391.00 39.10
Minor Tools (10% of Labor Cost) 19.76 19.76
Sub - Total for B.1 - As Submitted 58.86
Equipment
Welding Machine, 500Amp 1 0.10 391.00 39.10
B.2
Minor Tools (10% of Labor Cost) 19.76 19.76
Sub - Total for B.2 - As Evaluated 58.86
C.1 Total (A.1 + B.1) - As Submitted 256.46
C.2 Total (A.2 + B.2) - As Evaluated 256.46
D.1 Outout per hour - As Submitted 2.40
D.2 Output per hour - As Evaluated 2.40
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 106.86
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 106.86

Name and Specification Unit Quantity Unit Cost Amount

Materials
GI Pipe Schedule 40 x 150mmØ l.m. 1.90 2,500.00 4,750.00
F.1 (Fabricated GI Pipe with accessories)
Square bar, 10mm x 10mm (weld around pipe) l.m. 0.47 15.70 7.38
Welding Rod kg. 0.10 120.00 12.00
Miscellaneous, 20% of Material Cost (Tap Bolt and Nuts, etc.) 953.88 953.88
Sub - Total for F.1 - As Submitted 5,723.25
Materials
GI Pipe Schedule 40 x 150mmØ l.m. 1.90 2500.00 4,750.00
(Fabricated GI Pipe with accessories)
F.2 Square bar, 10mm x 10mm (weld around pipe) l.m. 0.47 15.70 7.38
Welding Rod kg. 0.10 120.00 12.00
Miscellaneous, 20% of Material Cost (Tap Bolt and Nuts, etc.) 953.88 953.88
Sub - Total for F.2 - As Evaluated 5,723.25
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 5,830.11
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 5,830.11
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 699.61
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 699.61
I.1 Contractor's Profit (CP) - As Submitted 8% 466.41
I.2 Contractor's Profit (CP) - As Evaluated 8% 466.41
J.1 Value Added Tax (VAT) - As Submitted 5% 349.81
J.2 Value Added Tax (VAT) - As Evaluated 5% 349.81
K.1 Total Unit Cost - As Submitted 7,345.94
K.2 Total Unit Cost - As Evaluated 7,345.94

Prepared by: Evaluated by:

RAMIL A. BALISNOMO 0
Engineer II 0
AS SUBMITTED
260,980.42 Material Unit Cost
QUANTITY 45.60 l.m. 3,754.40 Labor Unit Cost
1,118.34 Equipment Unit Cost

Mandays 5,830.11 Direct Unit Cost


4.00 man 7,345.94 Total Unit Cost
2.50 ( 2.38 ) 2.50 day/s 334,974.98 Total Item Cost
10.00 mandays
2.50
AS EVALUATED
260,980.42 Material Unit Cost
3,754.40 Labor Unit Cost
1,118.34 Equipment Unit Cost

5,830.11 Direct Unit Cost


7,345.94 Total Unit Cost
334,974.98 Total Item Cost
ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT
MANAGEMENT SYSTEM/
HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)
MANGALDAN-MANAOAG-BINALONAN ROAD

SUMMARY OF QUANTITIES
QUANTITY
ITEM DESCRIPTION UNITS AS PER REMARKS
PLAN

200 Aggregate Sub-Base Course cu.m. 2,011.00 For Shoulder 2m width

302 Bituminous Tack Coat sq.m. 64,743.00 Carriageway, W = 6.700m

303 Bituminous Seal Coat Tonne 1.00 Carriageway, W = 6.700m

310(a) Bituminous Surface Coat (Leveling, t=40mm) sq.m. 39,338.00 Carriageway, W = 6.700m

310(b) Bituminous Surface Coat (Wearing, t=40mm) sq.m. 39,338.00 Carriageway, W = 6.700m

409-1 Special Provision Construction of Waiting Shed ea. 2.00 For GAD

603(3a) Metal Beam Guard Rail Including Post l.m. 616.00 For Side Protections

603(3b) Metal Beam End Piece ea. 10.00 For Side Protections

605-1 Warning Signs ea. 34.00 Warning signs

620 Hazard Markers ea. 58.00 CHEVRON, HM-1A

For centerline, edgeline and pedestrian


612(a) Thermoplastic Pavement Markings, White sq.m. 1,672.00
crossing.

612(b) Thermoplastic Pavement Markings, Yellow sq.m. 380.20 For non passing lanes

618 Reflectorized Thermoplastic Rumble Strips, White sq.m. 131.00 For Rumble strips

jmnj\DPWH\CY2014
ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT
MANAGEMENT SYSTEM/
HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)
MANGALDAN-MANAOAG-BINALONAN ROAD

jmnj\DPWH\CY2015
ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT
MANAGEMENT SYSTEM/
HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)
MANGALDAN-MANAOAG-BINALONAN ROAD
000 + 000

ITEM 200
STATION DIST. END AREA
VOLUME
L/S R/S

191 + 027 - 0.223 2.000 -


191 + 040 13.00 0.227 0.194 17.19
191 + 060 20.00 0.277 0.194 8.92
191 + 080 20.00 0.149 0.149 7.69
191 + 100 20.00 0.149 0.149 5.96
191 + 120 20.00 0.222 0.194 7.14
191 + 140 20.00 0.161 - 5.77
191 + 160 20.00 0.161 0.161 4.83
191 + 180 20.00 0.161 0.179 6.62
191 + 200 20.00 0.161 0.126 6.27
191 + 220 20.00 0.161 0.126 5.74
191 + 240 20.00 0.161 0.126 5.74
191 + 260 20.00 0.161 0.196 6.44
191 + 280 20.00 0.160 0.160 6.77
191 + 300 20.00 0.076 0.071 4.67
191 + 320 20.00 - - 1.47
191 + 340 20.00 0.128 0.126 2.54
191 + 360 20.00 0.128 0.128 5.10
191 + 380 20.00 0.128 0.128 5.12
191 + 400 20.00 0.118 0.145 5.19
191 + 420 20.00 0.118 0.145 5.26
191 + 440 20.00 0.145 0.145 5.53
191 + 460 20.00 0.230 0.154 6.74
191 + 480 20.00 0.230 0.154 7.68
191 + 500 20.00 0.141 0.154 6.79
191 + 520 20.00 0.141 0.154 5.90
191 + 540 20.00 0.141 0.154 5.90
191 + 560 20.00 0.122 0.200 6.17
191 + 580 20.00 0.223 0.200 7.45
191 + 600 20.00 0.223 0.192 8.38
191 + 620 20.00 0.231 - 6.46
191 + 640 20.00 0.110 0.110 4.51
191 + 660 20.00 0.223 0.200 6.43
191 + 680 20.00 0.223 0.200 8.46
191 + 700 20.00 0.223 0.200 8.46
191 + 720 20.00 0.223 0.200 8.46
191 + 740 20.00 - 0.200 6.23
191 + 760 20.00 0.223 - 4.23
191 + 780 20.00 - 0.200 4.23
191 + 800 20.00 - 0.200 4.00
191 + 820 20.00 - 0.146 3.46
191 + 840 20.00 - 0.160 3.06
191 + 860 20.00 - 1.414 15.74

jmnj\DPWH\CY2014 891 of 924


ITEM 200
STATION DIST. END AREA
VOLUME
L/S R/S
191 + 880 20.00 - 1.414 28.28
191 + 900 20.00 0.161 0.200 17.75
191 + 920 20.00 0.223 0.200 7.84
191 + 940 20.00 0.223 0.200 8.46
191 + 960 20.00 0.223 0.196 8.42
191 + 980 20.00 0.367 0.200 9.86
192 + 000 20.00 0.311 0.200 10.78
192 + 020 20.00 0.311 0.200 10.22
192 + 040 20.00 0.597 0.402 15.10
192 + 060 20.00 0.428 0.200 16.27
192 + 080 20.00 0.428 0.200 12.56
192 + 100 20.00 0.428 0.200 12.56
192 + 120 20.00 - 0.125 7.53
192 + 140 20.00 - 0.187 3.12
192 + 160 20.00 - 0.200 3.87
192 + 180 20.00 0.119 0.200 5.19
192 + 200 20.00 0.325 0.200 8.44
192 + 220 20.00 0.325 0.200 10.50
192 + 240 20.00 0.223 - 7.48
192 + 260 20.00 0.223 - 4.46
192 + 280 20.00 0.223 0.258 7.04
192 + 300 20.00 0.223 0.200 9.04
192 + 320 20.00 0.223 0.200 8.46
192 + 340 20.00 0.223 0.200 8.46
192 + 360 20.00 0.223 0.200 8.46
192 + 380 20.00 0.223 0.200 8.46
192 + 400 20.00 0.223 0.200 8.46
192 + 420 20.00 0.223 0.200 8.46
192 + 440 20.00 0.223 0.200 8.46
192 + 460 20.00 0.223 - 6.46
192 + 480 20.00 0.223 - 4.46
192 + 500 20.00 0.223 0.200 6.46
192 + 520 20.00 0.223 0.200 8.46
192 + 540 20.00 0.223 0.151 7.97
192 + 560 20.00 0.223 0.196 7.93
192 + 580 20.00 0.161 0.196 7.76
192 + 600 20.00 - 0.155 5.12
192 + 620 20.00 0.173 0.370 6.98
192 + 640 20.00 0.223 0.200 9.66
192 + 660 20.00 0.474 2.000 28.97
192 + 680 20.00 - - 24.74
192 + 700 20.00 0.303 0.110 4.13
192 + 720 20.00 0.223 0.614 12.50
192 + 740 20.00 0.223 0.442 15.02
192 + 760 20.00 0.223 - 8.88
192 + 780 20.00 0.223 0.200 6.46
192 + 800 20.00 0.223 0.231 8.77
192 + 820 20.00 0.298 0.379 11.31
192 + 840 20.00 0.432 0.200 13.09

jmnj\DPWH\CY2014 892 of 924


ITEM 200
STATION DIST. END AREA
VOLUME
L/S R/S
192 + 860 20.00 0.223 0.200 10.55
192 + 880 20.00 0.332 0.316 10.71
192 + 900 20.00 - 0.316 9.64
192 + 920 20.00 0.223 0.316 8.55
192 + 940 20.00 0.223 - 7.62
192 + 960 20.00 0.223 - 4.46
192 + 980 20.00 0.223 0.221 6.67
193 + 000 20.00 0.295 0.221 9.60
193 + 020 20.00 - - 5.16
193 + 040 20.00 - - -
193 + 060 20.00 - - -
193 + 080 20.00 - - -
193 + 100 20.00 - - -
193 + 120 20.00 - - -
193 + 140 20.00 - - -
193 + 160 20.00 - - -
193 + 180 20.00 - - -
193 + 200 20.00 - - -
193 + 220 20.00 - - -
193 + 240 20.00 - - -
193 + 260 20.00 - - -
193 + 280 20.00 - - -
193 + 300 20.00 - - -
193 + 320 20.00 - - -
193 + 340 20.00 - - -
193 + 360 20.00 - - -
193 + 380 20.00 - - -
193 + 400 20.00 - - -
193 + 420 20.00 - - -
193 + 440 20.00 - - -
193 + 460 20.00 - - -
193 + 480 20.00 - - -
193 + 500 20.00 - - -
193 + 520 20.00 - - -
193 + 540 20.00 - - -
193 + 560 20.00 - - -
193 + 580 20.00 - - -
193 + 600 20.00 - - -
193 + 620 20.00 - - -
193 + 640 20.00 - - -
193 + 660 20.00 - - -
193 + 680 20.00 - - -
193 + 700 20.00 - - -
193 + 720 20.00 - - -
193 + 740 20.00 - - -
193 + 760 20.00 - - -
193 + 780 20.00 - - -
193 + 800 20.00 - 0.140 1.40
193 + 820 20.00 0.223 0.431 7.94

jmnj\DPWH\CY2014 893 of 924


ITEM 200
STATION DIST. END AREA
VOLUME
L/S R/S
193 + 840 20.00 0.223 0.200 10.77
193 + 860 20.00 0.223 0.200 8.46
193 + 880 20.00 0.223 0.200 8.46
193 + 900 20.00 0.223 - 6.46
193 + 920 20.00 0.223 - 4.46
193 + 940 20.00 0.223 0.200 6.46
193 + 960 20.00 0.223 0.099 7.45
193 + 980 20.00 0.159 0.200 6.81
194 + 000 20.00 0.156 0.200 7.15
194 + 020 20.00 - - 3.56
194 + 040 20.00 0.223 0.195 4.18
194 + 060 20.00 0.350 0.196 9.64
194 + 080 20.00 0.178 0.166 8.90
194 + 100 20.00 0.178 0.166 6.88
194 + 120 20.00 0.178 0.166 6.88
194 + 140 20.00 0.178 0.166 6.88
194 + 160 20.00 0.178 0.166 6.88
194 + 180 20.00 0.070 0.114 5.28
194 + 200 20.00 0.223 0.161 5.68
194 + 220 20.00 0.364 0.200 9.48
194 + 240 20.00 0.223 0.200 9.87
194 + 260 20.00 0.223 0.247 8.93
194 + 280 20.00 0.223 0.259 9.52
194 + 300 20.00 0.146 0.200 8.28
194 + 320 20.00 0.223 - 5.69
194 + 340 20.00 0.223 - 4.46
194 + 360 20.00 0.223 0.200 6.46
194 + 380 20.00 0.223 0.200 8.46
194 + 400 20.00 0.223 0.200 8.46
194 + 420 20.00 0.223 0.223 8.69
194 + 440 20.00 0.223 0.223 8.92
194 + 460 20.00 0.702 - 11.48
194 + 480 20.00 0.702 0.107 15.11
194 + 500 20.00 - - 8.09
194 + 520 20.00 - 0.359 3.59
194 + 540 20.00 - 0.359 7.18
194 + 560 20.00 0.168 0.387 9.14
194 + 580 20.00 0.198 0.200 9.53
194 + 600 20.00 0.199 0.200 7.97
194 + 620 20.00 0.199 0.200 7.98
194 + 640 20.00 0.223 0.099 7.21
194 + 660 20.00 0.223 0.200 7.45
194 + 680 20.00 0.223 0.338 9.84
194 + 700 20.00 0.086 - 6.47
194 + 720 20.00 0.295 0.440 8.21
194 + 740 20.00 0.228 0.228 11.91
194 + 760 20.00 0.641 0.149 12.46
194 + 780 20.00 0.645 0.149 15.84
194 + 800 20.00 0.122 - 9.16

jmnj\DPWH\CY2014 894 of 924


ITEM 200
STATION DIST. END AREA
VOLUME
L/S R/S
194 + 820 20.00 - - 1.22
194 + 840 20.00 0.105 - 1.05
194 + 860 20.00 - - 1.05
194 + 880 20.00 - 0.705 7.05
194 + 900 20.00 0.140 0.131 9.76
194 + 920 20.00 0.162 0.131 5.64
194 + 940 20.00 0.162 0.132 5.87
194 + 960 20.00 0.131 0.155 5.80
194 + 980 20.00 - - 2.86
195 + 000 20.00 0.235 0.120 3.55
195 + 020 20.00 0.205 0.223 7.83
195 + 040 20.00 0.160 - 5.88
195 + 060 20.00 0.160 - 3.20
195 + 080 20.00 0.152 0.117 4.29
195 + 100 20.00 0.047 0.153 4.69
195 + 120 20.00 0.042 0.149 3.91
195 + 140 20.00 0.200 0.148 5.39
195 + 160 20.00 0.122 0.116 5.86
195 + 180 20.00 0.152 0.115 5.05
195 + 200 20.00 0.152 0.114 5.33
195 + 220 20.00 0.150 0.079 4.95
195 + 240 20.00 0.159 0.129 5.17
195 + 260 20.00 0.134 0.132 5.54
195 + 280 20.00 0.150 0.133 5.49
195 + 300 20.00 0.068 0.127 4.78
195 + 320 20.00 0.068 0.125 3.88
195 + 340 20.00 0.122 0.146 4.61
195 + 360 20.00 0.122 0.134 5.24
195 + 380 20.00 - 0.084 3.40
195 + 400 20.00 0.157 0.304 5.45
195 + 420 20.00 0.161 0.302 9.24
195 + 440 20.00 0.160 0.302 9.25
195 + 460 20.00 0.209 0.209 8.80
195 + 480 20.00 - 0.074 4.92
195 + 500 20.00 0.119 0.157 3.50
195 + 520 20.00 0.140 0.157 5.73
195 + 540 20.00 - 0.161 4.58
195 + 560 20.00 0.076 0.180 4.17
195 + 580 20.00 0.077 0.179 5.12
195 + 600 20.00 0.077 0.160 4.93
195 + 620 20.00 0.077 0.136 4.50
195 + 640 20.00 0.078 0.137 4.28
195 + 660 20.00 0.076 0.199 4.90
195 + 680 20.00 0.114 0.168 5.57
195 + 700 20.00 0.114 0.169 5.65
195 + 720 20.00 0.174 0.130 5.87
195 + 740 20.00 0.341 - 6.45
195 + 760 20.00 0.483 0.107 9.31
195 + 780 20.00 0.183 0.127 9.00

jmnj\DPWH\CY2014 895 of 924


ITEM 200
STATION DIST. END AREA
VOLUME
L/S R/S
195 + 800 20.00 - 0.090 4.00
195 + 820 20.00 0.233 0.165 4.88
195 + 840 20.00 0.143 0.149 6.90
195 + 860 20.00 0.183 0.110 5.85
195 + 880 20.00 0.203 0.182 6.78
195 + 900 20.00 0.155 0.178 6.76
195 + 920 20.00 0.183 0.149 5.33
195 + 940 20.00 0.142 0.149 5.30
195 + 960 20.00 0.092 0.150 5.84
195 + 980 20.00 0.139 0.149 5.66
196 + 000 20.00 0.145 0.151 5.88
196 + 020 20.00 0.115 0.155 5.66
196 + 040 20.00 0.157 0.161 5.88
196 + 060 20.00 0.165 0.166 6.49
196 + 080 20.00 0.138 0.142 6.11
196 + 100 20.00 - 0.155 4.35
196 + 120 20.00 0.078 0.208 4.41
196 + 140 20.00 0.478 0.168 9.32
196 + 160 20.00 0.564 0.178 13.88
196 + 180 20.00 0.150 0.214 11.06
196 + 200 20.00 0.152 0.149 6.65
196 + 220 20.00 0.152 0.147 6.00
196 + 240 20.00 0.558 0.147 10.04
196 + 260 20.00 0.443 0.074 12.22
196 + 280 20.00 0.120 0.074 7.11
196 + 300 20.00 0.063 0.035 2.92
196 + 320 20.00 0.067 0.035 2.00
196 + 340 20.00 - - 1.02
196 + 360 20.00 - - -
196 + 380 20.00 - - -
196 + 400 20.00 0.067 0.035 1.02
196 + 420 20.00 0.067 0.035 2.04
196 + 440 20.00 0.067 0.035 2.04
196 + 460 20.00 0.085 0.083 2.70
196 + 480 20.00 0.085 0.083 3.36
196 + 500 20.00 0.860 0.083 11.11
196 + 520 20.00 0.088 0.083 11.14
196 + 540 20.00 0.087 0.083 3.41
196 + 560 20.00 0.088 0.083 3.41
196 + 580 20.00 0.087 0.082 3.40
196 + 600 20.00 0.148 0.139 4.56
196 + 620 20.00 0.148 0.139 5.74
196 + 640 20.00 0.148 0.018 4.53
196 + 660 20.00 0.153 0.082 4.01
196 + 680 20.00 0.150 0.079 4.64
196 + 700 20.00 - - 2.29
196 + 720 20.00 0.153 - 1.53
196 + 740 20.00 - - 1.53
196 + 760 20.00 0.153 - 1.53

jmnj\DPWH\CY2014 896 of 924


ITEM 200
STATION DIST. END AREA
VOLUME
L/S R/S
196 + 780 20.00 - - 1.53
196 + 800 20.00 0.153 0.161 3.14
196 + 820 20.00 0.275 0.161 7.50
196 + 840 20.00 0.277 0.161 8.74
196 + 860 20.00 0.064 0.116 6.18
196 + 880 20.00 0.064 0.178 4.22
196 + 900 20.00 0.063 0.179 4.84
196 + 920 20.00 0.062 0.180 4.84
196 + 940 20.00 0.060 0.161 4.63
196 + 960 20.00 0.047 0.158 4.26
196 + 980 20.00 0.056 0.179 4.40
197 + 000 20.00 0.056 0.178 4.69
197 + 020 20.00 0.048 0.179 4.61
197 + 040 20.00 0.048 0.179 4.54
197 + 060 20.00 0.048 0.179 4.54
197 + 080 20.00 0.048 0.065 3.40
197 + 100 20.00 0.490 0.065 6.68
197 + 120 20.00 0.048 0.064 6.67
197 + 140 20.00 0.132 0.131 3.75
197 + 160 20.00 0.232 0.178 6.73
197 + 180 20.00 0.133 0.178 7.21
197 + 200 20.00 0.132 0.133 5.76
197 + 220 20.00 0.142 0.133 5.40
197 + 240 20.00 0.142 0.133 5.50
197 + 260 20.00 0.143 0.134 5.52
197 + 280 20.00 0.136 0.114 5.27
197 + 300 20.00 0.153 0.041 4.44
197 + 320 20.00 0.122 0.119 4.35
197 + 340 20.00 0.122 0.119 4.82
197 + 360 20.00 0.916 0.327 14.84
197 + 380 20.00 0.907 0.252 24.02
197 + 400 20.00 - 0.253 14.12
197 + 420 20.00 0.852 0.119 12.24
197 + 440 20.00 0.826 0.125 19.22
197 + 460 20.00 0.063 0.102 11.16
197 + 480 20.00 0.063 0.088 3.16
197 + 500 20.00 0.062 0.095 3.08
197 + 520 20.00 0.650 0.067 8.74
197 + 527 7.00 - - 2.51
TOTAL : 2,010.30

jmnj\DPWH\CY2014 897 of 924


ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT
MANAGEMENT SYSTEM/
HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)
MANGALDAN-MANAOAG-BINALONAN ROAD

ITEM 200 - AGGREGATE SUB- BASE COURSE


Shoulder:
V1 = 2,010.30 cu.m. (see attached tabulation)
VTotal = 2,010.30 cu.m.
SAY ; 2,011.00 cu.m.

ITEM 302 - BITUMINOUS TACK COAT


Roadway :
A1 = 32,371.05 sq.m. (see attached tabulation)
64,742.11 sq.m.
ATotal = 64,742.11 sq.m.
SAY ; 64,743.00 sq.m.

WtTotal = 45.32 Tonnes


SAY 46.00 Tonnes
ITEM 303 - BITUMINOUS SEAL COAT
Roadway :
A1 = 227.23 sq.m. (see attached tabulation)
Weight = 0.16 Tonnes

WtTotal = 0.16 Tonnes


SAY 1.00 Tonnes
ITEM 310(a) - BITUMINOUS SURFACE COURSE (LEVELING; t = 40mm)
Roadway :
A1 = 39,337.25 sq.m. (see attached tabulation)

ATotal = 39,337.25 sq.m.


SAY ; 39,338.00 sq.m.

ITEM 310(b) - BITUMINOUS SURFACE COURSE (WEARING; t = 40mm)


Roadway :
A1 = 39,337.25 sq.m. (see attached tabulation)

ATotal = 39,337.25 sq.m.


SAY ; 39,338.00 sq.m.

ITEM 409-1 SPECIAL PROVISION CONTRUCTION OF WAITING SHED


191 + 031.00 L/S 1.00 Each
194 + 030.00 L/S 1.00 Each
Total 2.00 Each
SAY ; 2.00 Each
ITEM 603(3a) - METAL BEAM GUARDRAIL INCLUDING POSTS
STATION LIMIT LENGTH REMARKS
191 + 035.00 - 191 + 125.00 90.00 R/S
191 + 110.00 - 191 + 295.00 185.00 LS
191 + 329.00 - 191 + 395.00 66.00 R/S
191 + 817.00 - 192 + 051.00 234.00 R/S
195 + 400.00 - 195 + 441.00 41.00 R/S
Total : 616.00 l.m.
LTotal = 616.00 l.m.
SAY ; 616.00 l.m.

ITEM 603(3b) - METAL BEAM END PIECE


LOCATION PIECES REMARKS
191 + 035.00 1.00 R/S
191 + 125.00 1.00 R/S
191 + 110.00 1.00 L/S
191 + 295.00 1.00 L/S
191 + 329.00 1.00 R/S
191 + 395.00 1.00 R/S
191 + 817.00 1.00 R/S
192 + 051.00 1.00 R/S
195 + 400.00 1.00 R/S
195 + 441.00 1.00 R/S

Total : 10.00 ea.


Qty. = 10.00 ea.
ITEM 605(1) - WARNING SIGNS
NO. STATION LOCATION SIGN
1 191 + 070.00 R/S SCHOOL CHILDER CROSSING (R6-9)
1 191 + 077.00 L/S SCHOOL CHILDER CROSSING (R6-9)
1 193 + 993.00 R/S SCHOOL CHILDER CROSSING (R6-9)
1 193 + 997.00 L/S SCHOOL CHILDER CROSSING (R6-9)

jmnj\DPWH\CY2014 Page 898 of 924


ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT
MANAGEMENT SYSTEM/
HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)
MANGALDAN-MANAOAG-BINALONAN ROAD

1 194 + 090.00 R/S SCHOOL CHILDER CROSSING (R6-9)


1 194 + 096.00 L/S SCHOOL CHILDER CROSSING (R6-9)
1 196 + 687.00 R/S PEDESTRIAN (W6-1))
1 196 + 693.00 L/S PEDESTRIAN (W6-1))
1 191 + 027.00 R/S SLOW DOWN PEDESTRIAN AHEAD (W6-1P)
1 191 + 174.00 L/S SLOW DOWN PEDESTRIAN AHEAD (W6-1P)
1 193 + 895.00 R/S SLOW DOWN PEDESTRIAN AHEAD (W6-1P)
1 194 + 195.00 L/S SLOW DOWN PEDESTRIAN AHEAD (W6-1P)
1 196 + 590.00 R/S SLOW DOWN PEDESTRIAN AHEAD (W6-1P)
1 196 + 790.00 L/S SLOW DOWN PEDESTRIAN AHEAD (W6-1P)
1 195 + 280.00 R/S TWO-WAY HAZARD MARKERS (HM6B)
1 195 + 380.00 L/S TWO-WAY HAZARD MARKERS (HM6B)
1 192 + 960.00 L/S T-JUNCTION(W2_6)
1 192 + 780.00 R/S T-JUNCTION(W2_6)
1 196 + 260.00 R/S NARROW BRIDGE (W4-1B)
1 196 + 470.00 L/S NARROW BRIDGE (W4-1B)
1 191 + 980.00 R/S CURVE(W1-3A)
1 192 + 170.00 L/S CURVE(W1-3A)
1 192 + 510.00 R/S CURVE(W1-3A)
1 192 + 770.00 L/S CURVE(W1-3A)
1 192 + 980.00 R/S CURVE(W1-3A)
1 193 + 220.00 L/S CURVE(W1-3A)
1 195 + 810.00 R/S CURVE(W1-3A)
1 196 + 110.00 L/S CURVE(W1-3A)
1 196 + 070.00 R/S CURVE(W1-3A)
1 196 + 320.00 L/S CURVE(W1-3A)
1 196 + 400.00 R/S CURVE(W1-3A)
1 196 + 590.00 L/S CURVE(W1-3A)
1 196 + 460.00 R/S CURVE(W1-3A)
1 196 + 740.00 L/S CURVE(W1-3A)
Qty. = 34.00 ea.

ITEM 605(5) - HAZARD MARKERS


NO. STATION LOCATION SIGN
2 192 + 050.00 R/S CHEVRON, HM-1A
2 192 + 070.00 R/S CHEVRON, HM-1A
2 192 + 090.00 R/S CHEVRON, HM-1A
2 192 + 620.00 L/S CHEVRON, HM-1A
2 192 + 640.00 L/S CHEVRON, HM-1A
2 192 + 660.00 L/S CHEVRON, HM-1A
2 192 + 680.00 L/S CHEVRON, HM-1A
2 192 + 700.00 L/S CHEVRON, HM-1A
2 193 + 050.00 R/S CHEVRON, HM-1A
2 193 + 070.00 R/S CHEVRON, HM-1A
2 193 + 090.00 R/S CHEVRON, HM-1A
2 193 + 110.00 R/S CHEVRON, HM-1A
2 193 + 130.00 R/S CHEVRON, HM-1A
2 193 + 150.00 R/S CHEVRON, HM-1A
2 193 + 170.00 R/S CHEVRON, HM-1A
2 195 + 950.00 L/S CHEVRON, HM-1A
2 195 + 970.00 L/S CHEVRON, HM-1A
2 195 + 990.00 L/S CHEVRON, HM-1A
2 196 + 195.00 R/S CHEVRON, HM-1A
2 196 + 215.00 R/S CHEVRON, HM-1A
2 196 + 235.00 R/S CHEVRON, HM-1A
2 196 + 470.00 R/S CHEVRON, HM-1A
2 196 + 490.00 R/S CHEVRON, HM-1A
2 196 + 510.00 R/S CHEVRON, HM-1A
2 196 + 560.00 R/S CHEVRON, HM-1A
2 196 + 580.00 R/S CHEVRON, HM-1A
2 196 + 600.00 R/S CHEVRON, HM-1A
2 196 + 620.00 R/S CHEVRON, HM-1A
2 196 + 640.00 R/S CHEVRON, HM-1A
Qty. = 58.00 ea.

jmnj\DPWH\CY2014 Page 899 of 924


ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT
MANAGEMENT SYSTEM/
HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)
MANGALDAN-MANAOAG-BINALONAN ROAD

ITEM 612(1) - THERMOPLASTIC PAVEMENT MARKINGS, WHITE


Centerline/Stripline:
STATION LIMIT LENGTH
191 + 027 - 196 + 334 5,307.00 m.
196 + 385 - 197 + 527 1,142.00 m.
Total: 6,449.00 m.
Length = 6,449.00 m.
No. of Strip = 717.00 ea.
Width = 0.15 m.
Length per strip = 3.00 m.
Area1 = 322.65 sq.m.

Edgeline:
STATION LIMIT LENGTH
191 + 027 - 196 + 334 5,307.00 m.
196 + 385 197 + 527 1,142.00
Total: 6,449.00 m.
Length = 6,449.00 m.
Width = 0.10 m.
No. = 2.00
Area2 = 1,289.80 sq.m.

Pedestrian Crossing:
LOCATION
1 191 + 073
2 193 + 995
3 194 + 093
4 196 + 690
No. of Set = 4.00 sets
Length per Strip = 4.00 m.
Width per Strip = 0.30 m.
No. of Strip/set = 11.00 sets
Area3 = 52.80 sq.m.

Reflectorized Thermoplastic Pavement Arrow Marker Sign, White

Through Arrow LOCATION


1 191 + 805 R/S
2 191 + 925 L/S
Area = 1.21 sq.m.
Area 4 2.42
Combined Arrow 1 191 + 820 R/S
2 191 + 915 L/S

Area = 2.25 sq.m.


Area 5 4.50
ATOTAL = 1,672.17 sq.m.
SAY ; 1,672.00 sq.m.

ITEM 612(1) - THERMOPLASTIC PAVEMENT MARKINGS, YELLOW


Edgeline:
STATION LIMIT LENGTH
191 + 908 - 192 + 203 295.00 m.
193 + 304 - 193 + 705 401.00
195 + 309 - 195 + 681 372.00
195 + 802 - 196 + 334 532.00
196 + 385 - 196 + 686 301.00
Total: 1,901.00 m.
Length = 1,901.00 m.
Width = 0.10 m.
No. = 2.00
Area2 = 380.20 sq.m.

ITEM 618 - REFLECTORIZED THERMOPLASTIC RUMBLE STRIPS, WHITE

LOCATION
1 191 + 180 L/S
2 193 + 985 R/S
3 194 + 093 L/S
4 196 + 590 R/S
5 196 + 790 L/S
No. of Set = 5.00 sets
Length per Strip = 3.50 m.
Width per Strip = 0.30 m.
No. of Strip/set = 25.00 strips

jmnj\DPWH\CY2014 Page 900 of 924


ASSET PRESERVATION PREVENTIVE MAINTENANCE BASED ON PAVEMENT
MANAGEMENT SYSTEM/
HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4)
MANGALDAN-MANAOAG-BINALONAN ROAD

Area1 = 131.25 sq.m.


ATOTAL = 131.25 sq.m.
SAY ; 131.00 sq.m.

jmnj\DPWH\CY2014 Page 901 of 924


Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 509(1)b1 Structural Steel Sheet Pile


Unit of Measurement : l.m.
Output per hour - As Submitted : 14.50
Output per hour - As Evaluated : 14.5000

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 84.72 84.72
Skilled Laborer 2 1.00 61.34 122.68
Unskilled Laborer 4 1.00 47.30 189.20
Sub - Total for A.1 - As Submitted 396.60
Labor
Construction Foreman 1 1.00 84.72 84.72
A.2 Skilled Laborer 2 1.00 61.34 122.68
Unskilled Laborer 4 1.00 47.30 189.20
Sub - Total for A.2 - As Evaluated 396.60

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Crawler Crane (36-40 mt) 1 1.00 2,282.40 2,282.40
B.1
Vibro Hammer (Hydraulic Operated) 1 1.00 4,118.00 4,118.00
Welding Machine (300A), Gas Diesel Driven 1 0.25 539.00 134.75
Cutting Outfit 1 0.25 45.10 11.28
Sub - Total for B.1 - As Submitted 6,546.42
Equipment
Crawler Crane (36-40 mt) 1 1.00 2282.40 2282.40
Vibro Hammer (Hydraulic Operated) 1 1.00 4118.00 4118.00
B.2
Welding Machine (300A), Gas Diesel Driven 1 0.25 539.00 134.75
Cutting Outfit 1 0.25 45.10 11.28
Sub - Total for B.2 - As Evaluated 6,546.42
C.1 Total (A.1 + B.1) - As Submitted 6,943.03
C.2 Total (A.2 + B.2) - As Evaluated 6,943.03
D.1 Outout per hour - As Submitted 14.50
D.2 Output per hour - As Evaluated 14.50
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 478.83
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 478.83
Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1 MHZ12 - Z Type Sheet Piles 770 x 343.50 x 8.6/8.5mm T kgs 69.60 72.80 5,066.88
Section Modulus: 1,252 cu.m. / m Steel Grade S355
Miscellaneous 277.29 277.29
Sub - Total for F.1 - As Submitted 5,344.17
Materials
MHZ12 - Z Type Sheet Piles 770 x 343.50 x 8.6/8.5mm T kgs 69.60 72.80 5,066.88
F.2 Section Modulus: 1,252 cu.m. / m Steel Grade S355 0 0.00 0.00 0.00
Miscellaneous 277.29 277.29
Sub - Total for F.2 - As Evaluated 5,344.17
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 5,823.00
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 5,823.00
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 698.76
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 698.76
I.1 Contractor's Profit (CP) - As Submitted 8% 465.84
I.2 Contractor's Profit (CP) - As Evaluated 8% 465.84
J.1 Value Added Tax (VAT) - As Submitted 5% 349.38
J.2 Value Added Tax (VAT) - As Evaluated 5% 349.38
K.1 Total Unit Cost - As Submitted 7,336.98
K.2 Total Unit Cost - As Evaluated 7,336.98

Prepared by: Evaluated by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 600(4) Curb & Gutter (Cast in Place)


Unit of Measurement : l.m.
Output per hour - As Submitted : 10.30
Output per hour - As Evaluated : 10.3000

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 84.72 84.72
Skilled Laborer 4 1.00 61.34 245.36
Unskilled Laborer 8 1.00 47.30 378.40
Sub - Total for A.1 - As Submitted 708.48
Labor
Construction Foreman 1 1.00 84.72 84.72
A.2 Skilled Laborer 4 1.00 61.34 245.36
Unskilled Laborer 8 1.00 47.30 378.40
Sub - Total for A.2 - As Evaluated 708.48

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Concrete Vibrator 1 1.00 91.25 91.25
B.1
One Bagger Mixer 1 1.00 172.00 172.00
Water Truck / Pump (16000L, 360Hp) 1 0.05 2,450.00 122.50
Minor Tools (10% of Labor Cost) 38.58 38.58
Sub - Total for B.1 - As Submitted 424.33
Equipment
Concrete Vibrator 1 1.00 91.25 91.25
One Bagger Mixer 1 1.00 172.00 172.00
B.2
Water Truck / Pump (16000L, 360Hp) 1 0.05 2450.00 122.50
Minor Tools (10% of Labor Cost) 38.58 38.58
Sub - Total for B.2 - As Evaluated 424.33
C.1 Total (A.1 + B.1) - As Submitted 1,132.81
C.2 Total (A.2 + B.2) - As Evaluated 1,132.81
D.1 Outout per hour - As Submitted 10.30
D.2 Output per hour - As Evaluated 10.30
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 109.98
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 109.98
Name and Specification Unit Quantity Unit Cost Amount

Materials
Cement bags 1.29 255.00 328.95
Sand cu.m. 0.07 580.00 40.60
F.1 Gravel cu.m. 0.14 700.00 98.00
Plywood Marine, 1/2" thk x 4' x 8' - 4 uses pc 0.24 750.00 45.00
Form Lumber - 4 uses bd-ft 11.47 55.00 157.71
Assorted CWN (1 kg/100bd-ft of Lumber) kg 0.11 70.00 7.70
Miscellaneous (2% of Material Cost) 6.70 6.70
Sub - Total for F.1 - As Submitted 684.67
Materials
Cement bags 1.29 255.00 328.95
Sand cu.m. 0.07 580.00 40.60
Gravel cu.m. 0.14 700.00 98.00
F.2 Plywood Marine, 1/2" thk x 4' x 8' - 4 uses pc 0.24 750.00 45.00
Form Lumber - 4 uses bd-ft 11.47 55.00 157.71
Assorted CWN (1 kg/100bd-ft of Lumber) kg 0.11 70.00 7.70
Miscellaneous (2% of Material Cost) 6.70 6.70
Sub - Total for F.2 - As Evaluated 684.67
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 794.65
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 794.65
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 95.36
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 95.36
I.1 Contractor's Profit (CP) - As Submitted 8% 63.57
I.2 Contractor's Profit (CP) - As Evaluated 8% 63.57
J.1 Value Added Tax (VAT) - As Submitted 5% 47.68
J.2 Value Added Tax (VAT) - As Evaluated 5% 47.68
K.1 Total Unit Cost - As Submitted 1,001.25
K.2 Total Unit Cost - As Evaluated 1,001.25

Prepared by: Evaluated by:

RAMIL A. BALISNOMO 0
Engineer II 0
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 311(1)f1 Portland Cement Concrete Pavement (Unreinforced, 0.30 m thick), 14
Unit of Measurement : sq.m. Days
Output per hour - As Submitted : 57.50
Output per hour - As Evaluated : 57.5

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 12 1.00 62.39 748.68
Sub - Total for A.1 - As Submitted 1,184.22
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 12 1.00 62.39 62.39
Sub - Total for A.2 - As Evaluated 497.93

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Concrete Screeder (5.5 hp) 1 1.00 487.90 487.90
Concrete Vibrator 2 1.00 57.17 114.34
B.1
Joint Sealer Machine 1 0.10 84.55 8.46
Concrete Saw (14", 7.5hp) 1 1.00 32.64 32.64
Bar Cutter (42mm), Three Phase 1 0.10 210.94 21.09
Minor Tools, 5% of Labor Cost 59.21 59.21
Sub - Total for B.1 - As Submitted 723.64
Equipment
Concrete Screeder (5.5 hp) 1 1.00 487.90 487.90
Concrete Vibrator 2 1.00 57.17 114.34
B.2 Joint Sealer Machine 1 0.10 84.55 8.46
Concrete Saw (14", 7.5hp) 1 1.00 32.64 32.64
Bar Cutter (42mm), Three Phase 1 0.10 210.94 21.09
Sub - Total for B.2 - As Evaluated 723.64
C.1 Total (A.1 + B.1) - As Submitted 1,907.86
C.2 Total (A.2 + B.2) - As Evaluated 1,221.57
D.1 Outout per hour - As Submitted 57.50
D.2 Output per hour - As Evaluated 57.50
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 33.18
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 21.24

Name and Specification Unit Quantity Unit Cost Amount

Materials
Ready Mix Concrete, 3500 psi cu.m. 0.3 5,684.12 1,705.23
Reinforcing Steel Bar kgs. 0.55 55.00 30.25
Steel Forms (Rental), 28 cm width m. 0.46 75.00 34.50
F.1
Asphalt Sealant L 0.18 44.00 7.92
Curing Compound L 0.29 80.00 23.20
Concrete Saw (14", 7.5hp) pc. 0.00015 8,000.00 1.20
Pipe Sleeve, 2" dia. m. 0.0094 237.50 2.23
Grease L 0.0094 200.00 1.88
Sub - Total for F.1 - As Submitted 1,806.42
Materials
Ready Mix Concrete, 3500 psi cu.m. 0.3 5684.12 1,705.23
Reinforcing Steel Bar kgs. 0.55 55.00 30.25
Steel Forms (Rental), 28 cm width m. 0.46 75.00 34.50
Asphalt Sealant L 0.18 44.00 7.92
F.2
Curing Compound L 0.29 80.00 23.20
Concrete Saw (14", 7.5hp) pc. 0.00015 8000.00 1.20
F.2

Pipe Sleeve, 2" dia. m. 0.0094 237.50 2.23


Grease L 0.0094 200.00 1.88
Sub - Total for F.2 - As Evaluated 1,806.42
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 1,839.60
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 1,827.66
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 220.75
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 219.32
I.1 Contractor's Profit (CP) - As Submitted 8% 147.17
I.2 Contractor's Profit (CP) - As Evaluated 8% 146.21
J.1 Value Added Tax (VAT) - As Submitted 5% 110.38
J.2 Value Added Tax (VAT) - As Evaluated 5% 109.66
K.1 Total Unit Cost - As Submitted 2,317.89
K.2 Total Unit Cost - As Evaluated 2,302.85

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 404(1)a Reinforcing Steel (Grade 40)
Unit of Measurement : kg.
Output per hour - As Submitted : 180.00
Output per hour - As Evaluated : 180.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 8 1.00 62.39 499.12
Sub - Total for A.1 - As Submitted 772.90
Labor
Construction Foreman 1 1.00 112.02 112.02
A.2 Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 8 1.00 62.39 499.12
Sub - Total for A.2 - As Evaluated 772.90

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Bar Cutter (25mm) 1 0.50 105.47 52.74
Bar Bender 1 0.50 168.75 84.38
Cargo Truck (10T, 270Hp) 1 0.15 2,442.08 366.31
Sub - Total for B.1 - As Submitted 503.42
Equipment
Bar Cutter (25mm) 1 0.50 105.47 52.74
B.2 Bar Bender 1 0.50 168.75 84.38
Cargo Truck (10T, 270Hp) 1 0.15 2,442.08 366.31
Sub - Total for B.2 - As Evaluated 503.42
C.1 Total (A.1 + B.1) - As Submitted 1,276.32
C.2 Total (A.2 + B.2) - As Evaluated 1,276.32
D.1 Outout per hour - As Submitted 180.00
D.2 Output per hour - As Evaluated 180.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 7.09
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 7.09

Name and Specification Unit Quantity Unit Cost Amount

Materials
F.1 Reinforcing Steel Bars, Grade 40 (w/ 5% wastage) kg. 1.05 53.00 55.65
Tie Wires, #16 (2% of RSB) kg. 0.021 80.00 1.68

Sub - Total for F.1 - As Submitted 57.33


Materials
Reinforcing Steel Bars, Grade 40 (w/ 5% wastage) kg. 1.05 53.00 55.65
F.2 Tie Wires, #16 (2% of RSB) kg. 0.021 80.00 1.68

Sub - Total for F.2 - As Evaluated 57.33


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 64.42
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 64.42
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 7.73
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 7.73
I.1 Contractor's Profit (CP) - As Submitted 8% 5.15
I.2 Contractor's Profit (CP) - As Evaluated 8% 5.15
J.1 Value Added Tax (VAT) - As Submitted 5% 3.87
J.2 Value Added Tax (VAT) - As Evaluated 5% 3.87
K.1 Total Unit Cost - As Submitted 81.17
K.2 Total Unit Cost - As Evaluated 81.17

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 405(1)a2 Structural Concrete, Class "A" (20.68 Mpa), 14 days
Unit of Measurement : cu.m.
Output per hour - As Submitted : 1.40
Output per hour - As Evaluated : 1.40

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 4 1.00 80.88 323.52
A.1 Unskilled Laborer 8 1.00 62.39 499.12

Installation and Removal of Formworks / Falseworks


Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 8 1.00 62.39 499.12
Sub - Total for A.1 - As Submitted 1,757.30
Labor
Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 8 1.00 62.39 499.12
A.2 Installation and Removal of Formworks / Falseworks

Skilled Laborer 4 1.00 80.88 323.52


Unskilled Laborer 8 1.00 62.39 499.12
Sub - Total for A.2 - As Evaluated 1,757.30

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
B.1 Concrete Vibrator 2 1.00 57.17 114.34
Minor Tools (5% of Labor Cost) 87.87 87.87

Sub - Total for B.1 - As Submitted 202.20


Equipment
Concrete Vibrator 2 1.00 57.17 114.34
B.2 Minor Tools (5% of Labor Cost) 87.87 87.87

Sub - Total for B.2 - As Evaluated 202.20


C.1 Total (A.1 + B.1) - As Submitted 1,959.50
C.2 Total (A.2 + B.2) - As Evaluated 1,959.50
D.1 Outout per hour - As Submitted 1.40
D.2 Output per hour - As Evaluated 1.40
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 1,399.65
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 1,399.65

Name and Specification Unit Quantity Unit Cost Amount

Materials
Ready Mix Concrete , 3000psi @ 14 days cu.m. 1.05 5,384.12 5,653.32
F.1 Marine Plywood, 1/2" x 4' x 8' - 4 usage pc. 1.60 750.00 300.00
Form Lumber Good - 4 usage bd.ft. 70.00 65.00 1,137.50
Hardware, CWN (assorted) kg. 0.70 80.00 56.00

Sub - Total for F.1 - As Submitted 7,146.82


Materials
Ready Mix Concrete , 3000psi @ 14 days cu.m. 1.05 5384.12 5,653.32
Marine Plywood, 1/2" x 4' x 8' - 4 usage pc. 1.60 750.00 1,200.00
F.2 Form Lumber Good - 4 usage bd.ft. 70.00 65.00 4,550.00
F.2
Hardware, CWN (assorted) kg. 0.70 80.00 14.00

Sub - Total for F.2 - As Evaluated 11,417.32


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 8,546.47
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 12,816.97
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 1,025.58
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 1,538.04
I.1 Contractor's Profit (CP) - As Submitted 8% 683.72
I.2 Contractor's Profit (CP) - As Evaluated 8% 1,025.36
J.1 Value Added Tax (VAT) - As Submitted 5% 512.79
J.2 Value Added Tax (VAT) - As Evaluated 5% 769.02
K.1 Total Unit Cost - As Submitted 10,768.56
K.2 Total Unit Cost - As Evaluated 16,149.38

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS

Item No./Description : 502(5) Metal Frames and Gratings, Type


Unit of Measurement : pair
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
A.1 Construction Foreman 1 0.50 112.02 56.01
Skilled Laborer 1 0.50 80.88 40.44
Unskilled Laborer 1 0.50 62.39 31.20
Sub - Total for A.1 - As Submitted 127.64
Labor
Construction Foreman 1 0.50 112.02 56.01
A.2 Skilled Laborer 1 0.50 80.88 40.44
Unskilled Laborer 1 0.50 62.39 31.20
Sub - Total for A.2 - As Evaluated 127.64

Name and Capacity No of Units No. of Hours Hourly Rate Amount

B.1 Equipment
Minor Tools (5% of Labor Cost) 6.38 6.38
Sub - Total for B.1 - As Submitted 6.38
Equipment
B.2 Minor Tools (5% of Labor Cost) 0 0.00 6.38 0.00
Sub - Total for B.2 - As Evaluated 0.00
C.1 Total (A.1 + B.1) - As Submitted 134.03
C.2 Total (A.2 + B.2) - As Evaluated 127.64
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 134.03
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 127.64

Name and Specification Unit Quantity Unit Cost Amount

Materials
600mm x 600mm, Steel Grate with Frame pair 1.00 20,000.00 20,000.00
F.1

Sub - Total for F.1 - As Submitted 20,000.00


Materials
600mm x 600mm, Steel Grate with Frame pair 1.00 20000.00 20,000.00
F.2 0 0 0.000 0.00 0.00

Sub - Total for F.2 - As Evaluated 20,000.00


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 20,134.03
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 20,127.65
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 2,416.08
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 2,415.32
I.1 Contractor's Profit (CP) - As Submitted 8% 1,610.72
I.2 Contractor's Profit (CP) - As Evaluated 8% 1,610.21
J.1 Value Added Tax (VAT) - As Submitted 5% 1,208.04
J.2 Value Added Tax (VAT) - As Evaluated 5% 1,207.66
K.1 Total Unit Cost - As Submitted 25,368.87
K.2 Total Unit Cost - As Evaluated 25,360.83

Prepared by:
RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 612(1) Reflectorized Thermoplastic Pavement Markings White
Unit of Measurement : sq.m.
Output per hour - As Submitted : 25.00
Output per hour - As Evaluated : 25.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Construction Foreman 1 1.00 112.02 112.02
A.1
Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 6 1.00 62.39 374.34

Sub - Total for A.1 - As Submitted 648.12


Labor
Construction Foreman 1 1 112.02 112.02
Skilled Laborer 2 1 80.88 161.76
A.2
Unskilled Laborer 6 1 62.39 374.34

Sub - Total for A.2 - As Evaluated 648.12

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Cargo Truck (2-5MT) 1 1.00 1,497.02 1,497.02
B.1 Kneading Machine 1 1.00 187.50 187.50
Applicator Machine 1 1.00 93.75 93.75
Minor Tools (10% of Labor Cost) 64.81 64.81

Sub - Total for B.1 - As Submitted 1,843.08


Equipment
Cargo Truck (2-5MT) 1 1.00 1497.02 1,497.02
Kneading Machine 1 1.00 187.50 187.50
B.2 Applicator Machine 1 1.00 93.75 93.75
Minor Tools (10% of Labor Cost) 64.81 64.81

Sub - Total for B.2 - As Evaluated 1,843.08


C.1 Total (A.1 + B.1) - As Submitted 2,491.20
C.2 Total (A.2 + B.2) - As Evaluated 2,491.20
D.1 Outout per hour - As Submitted 25.00
D.2 Output per hour - As Evaluated 25.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 99.65
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 99.65

Name and Specification Unit Quantity Unit Cost Amount

Materials
Thermoplastic Paint (White) bag 0.325 1,750.00 568.75
Glass Beads bag 0.033 805.00 26.57
Primer White L 0.120 140.00 16.80
F.1
LPG, 50 kg cyl. 0.004 3,600.00 14.40
LPG, 12 kg cyl. 0.002 864.00 1.73
Calsumine kg. 0.125 3.00 0.38
Miscellaneous (5% of Material Cost) 31.43 31.43

Sub - Total for F.1 - As Submitted 660.05


Materials
Thermoplastic Paint (White) bag 0.33 1,750.00 568.75
Glass Beads bag 0.03 805.00 26.57
Primer White L 0.12 140.00 16.80
F.2 LPG, 50 kg cyl. 0.00 3,600.00 14.40
LPG, 12 kg cyl. 0.00 864.00 1.73
F.2

Calsumine kg. 0.13 3.00 0.38


Miscellaneous (5% of Material Cost) 31.43 31.43
Sub - Total for F.2 - As Evaluated 660.05
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 759.70
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 759.70
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 91.16
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 91.16
I.1 Contractor's Profit (CP) - As Submitted 8% 60.78
I.2 Contractor's Profit (CP) - As Evaluated 8% 60.78
J.1 Value Added Tax (VAT) - As Submitted 5% 45.58
J.2 Value Added Tax (VAT) - As Evaluated 5% 45.58
K.1 Total Unit Cost - As Submitted 957.22
K.2 Total Unit Cost - As Evaluated 957.22

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 612(2) Reflectorized Thermoplastic Pavement Markings Yellow
Unit of Measurement : sq.m.
Output per hour - As Submitted : 25.00
Output per hour - As Evaluated : 25.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Construction Foreman 1 1.00 112.02 112.02
A.1
Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 6 1.00 62.39 374.34

Sub - Total for A.1 - As Submitted 648.12


Labor
Construction Foreman 1 1 112.02 112.02
Skilled Laborer 2 1 80.88 161.76
A.2
Unskilled Laborer 6 1 62.39 374.34

Sub - Total for A.2 - As Evaluated 648.12

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Cargo Truck (2-5MT) 1 1.00 1,497.02 1,497.02
B.1 Kneading Machine 1 1.00 187.50 187.50
Applicator Machine 1 1.00 93.75 93.75
Minor Tools (10% of Labor Cost) 64.81 64.81

Sub - Total for B.1 - As Submitted 1,843.08


Equipment
Cargo Truck (2-5MT) 1 1.00 1497.02 1,497.02
Kneading Machine 1 1.00 187.50 187.50
B.2 Applicator Machine 1 1.00 93.75 93.75
Minor Tools (10% of Labor Cost) 64.81 64.81

Sub - Total for B.2 - As Evaluated 1,843.08


C.1 Total (A.1 + B.1) - As Submitted 2,491.20
C.2 Total (A.2 + B.2) - As Evaluated 2,491.20
D.1 Outout per hour - As Submitted 25.00
D.2 Output per hour - As Evaluated 25.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 99.65
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 99.65

Name and Specification Unit Quantity Unit Cost Amount

Materials
Thermoplastic Paint (Yellow) bag 0.325 1,950.00 633.75
Glass Beads bag 0.033 805.00 26.57
Primer Yellow L 0.120 210.00 25.20
F.1
LPG, 50 kg cyl. 0.004 3,600.00 14.40
LPG, 12 kg cyl. 0.002 864.00 1.73
Calsumine kg. 0.125 3.00 0.38
Miscellaneous (5% of Material Cost) 35.10 35.10

Sub - Total for F.1 - As Submitted 737.12


Materials
Thermoplastic Paint (Yellow) bag 0.33 1,950.00 633.75
Glass Beads bag 0.03 805.00 26.57
Primer Yellow L 0.12 210.00 25.20
F.2 LPG, 50 kg cyl. 0.00 3,600.00 14.40
LPG, 12 kg cyl. 0.00 864.00 1.73
F.2

Calsumine kg. 0.13 3.00 0.38


Miscellaneous (5% of Material Cost) 35.10 35.10
Sub - Total for F.2 - As Evaluated 737.12
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 836.77
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 836.77
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 100.41
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 100.41
I.1 Contractor's Profit (CP) - As Submitted 8% 66.94
I.2 Contractor's Profit (CP) - As Evaluated 8% 66.94
J.1 Value Added Tax (VAT) - As Submitted 5% 50.21
J.2 Value Added Tax (VAT) - As Evaluated 5% 50.21
K.1 Total Unit Cost - As Submitted 1,054.33
K.2 Total Unit Cost - As Evaluated 1,054.33

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 624(9)a1 Single Arm Solar LED Roadway Lighting, 8m-Pole, 60W-80W
Unit of Measurement : ea.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Installation/Fixing of Pole & Solar LED Light
A.1 Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 2 1.00 62.39 124.78

Sub - Total for A.1 - As Submitted 398.56


Labor
Construction Foreman 1 1 112.02 112.02
Skilled Laborer 2 1 80.88 161.76
A.2
Unskilled Laborer 2 1 62.39 124.78

Sub - Total for A.2 - As Evaluated 398.56

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Installation/Fixing of Pole & Solar LED Light
B.1
Telescopic Manlift, 15m max working ht. 1 0.40 824.75 329.90
Boom Truck, 10 mt 1 0.60 2,784.92 1,670.95
Minor Tools (10% of Labor Cost) 39.86 39.86
Sub - Total for B.1 - As Submitted 2,040.71
Equipment
B.2
Sub - Total for B.2 - As Evaluated #REF!
C.1 Total (A.1 + B.1) - As Submitted 2,439.27
C.2 Total (A.2 + B.2) - As Evaluated #REF!
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,439.27
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated #REF!

Name and Specification Unit Quantity Unit Cost Amount

Materials
Solar Powered LED Roadway Lighting (60 Watts) set 1.000 67,500.00 67,500.00
*GSIL - 36 Watts Smart LED Solar Streetlight IP65 Lumens
* 60 W / 8500 Lumens
*Power of Solar Panel - 49W
*Rechargeable Li-ion Battery/ 407 WH
*3 Types Aluminum Aloy
*1,327 x 381 x 95mm

F.1
8m Mounting Height Pole with 1.5m Single Mast Arm set 1.00 40,500.00 40,500.00
*Round Steel Tapered Post:Bot-200mmØ, Top-100mmØ, 8000mm
Height
*Thickness: 4.0mm
*Base Plate: 20mmx 400mmx 400mm
*Stiffener Plate: 16mm x 200mm x 100mm x 20mm, Hot Dip
Galvanized
*Anchor Bolt 19mm x 508mm OAL Bend 50mm Triple Nuts and
Double Flat Washers

Sub - Total for F.1 - As Submitted 108,000.00


Materials
#REF! #REF! #REF! #REF! #REF!
F.2
0 0 0.00 0.00 0.00
Sub - Total for F.2 - As Evaluated #REF!
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 110,439.27
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated #REF!
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 13,252.71
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% #REF!
I.1 Contractor's Profit (CP) - As Submitted 8% 8,835.14
I.2 Contractor's Profit (CP) - As Evaluated 8% #REF!
J.1 Value Added Tax (VAT) - As Submitted 5% 6,626.36
J.2 Value Added Tax (VAT) - As Evaluated 5% #REF!
K.1 Total Unit Cost - As Submitted 139,153.48
K.2 Total Unit Cost - As Evaluated #REF!

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 624(1)a2 Single Arm Roadway Lighting - 9m-Pole - LED - 100W-125W
Unit of Measurement : ea.
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Installation/Fixing of Pole & Solar LED Light
A.1
Construction Foreman 1 1.00 112.02 112.02
Skilled Laborer 2 1.00 80.88 161.76
Unskilled Laborer 2 1.00 62.39 124.78
Sub - Total for A.1 - As Submitted 398.56
Labor
Construction Foreman
Skilled Laborer 1 1 112.02 112.02
A.2
Unskilled Laborer 2 1 80.88 161.76
Sub - Total for A.1 - As Submitted 2 1 62.39 124.78
Sub - Total for A.2 - As Evaluated 398.56

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Installation/Fixing of Pole & Solar LED Light
B.1
Telescopic Manlift, 15m max working ht. 1 0.40 824.75 329.90
Boom Truck, 10 mt 1 0.60 2,784.92 1,670.95
Minor Tools (10% of Labor Cost) 39.86 39.86
Sub - Total for B.1 - As Submitted 2,040.71
Equipment
Installation/Fixing of Pole & Solar LED Light
B.2 Telescopic Manlift, 15m max working ht. 1 0.4 824.75 329.90
Boom Truck, 10 mt 1 0.6 2784.92 1,670.95
Sub - Total for B.2 - As Evaluated 2,040.71
C.1 Total (A.1 + B.1) - As Submitted 2,439.27
C.2 Total (A.2 + B.2) - As Evaluated 2,439.27
D.1 Outout per hour - As Submitted 1.00
D.2 Output per hour - As Evaluated 1.00
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 2,439.27
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 2,439.27

Name and Specification Unit Quantity Unit Cost Amount

Materials
Solar Powered LED Roadway Lighting (120 Watts) set 1.000 73,880.00 73,880.00
*Solar Panel:36V 150W Monocrystalline Silicon Solar Panel
*Battery: lithium-ion Grade A LiFePO4 35aH/24v Battery model
32650 at 2900 cycles
*LED Chips: Industrial Grade Philips High Lumen Chips
*Charge Controller: Microcomputer intelligent control for circuit
protection
*Power Output: 120 Watts
*Luminous Flux: 21,600 Lumens
F.1
*Charging Time: 6-7 Hours
*Ligthing Time: 10-12 hrs/day Sustain 8-12 days Rainy Days
9m Mounting Height Pole with 1.5m Single Mast Arm set 1.00 44,460.00 44,460.00
*Round Steel Tapered Post:Bot-200mmØ, Top-100mmØ,
9000mm Height
*Thickness: 4.0mm
*Base Plate: 20mmx 400mmx 400mm
*Stiffener Plate: 16mm x 200mm x 100mm x 20mm,
Hot Dip Galvanized
*Anchor Bolt 19mm x 508mm OAL Bend 50mm Triple Nuts and
Double Flat Washers
Sub - Total for F.1 - As Submitted 118,340.00
Materials
Solar Powered LED Roadway Lighting (120 Watts) set 1.00 73,880.00 73,880.00
*Solar Panel:36V 150W Monocrystalline Silicon Solar Panel 0 0.00 0.00 0.00
*Battery: lithium-ion Grade A LiFePO4 35aH/24v Battery model 0 0.00 0.00 0.00
32650 at 2900 cycles 0 0.00 0.00 0.00
*LED Chips: Industrial Grade Philips High Lumen Chips 0 0.00 0.00 0.00
*Charge Controller: Microcomputer intelligent control for circuit 0 0.00 0.00 0.00
protection 0 0.00 0.00 0.00
*Power Output: 120 Watts 0 0.00 0.00 0.00
*Luminous Flux: 21,600 Lumens 0 0.00 0.00 0.00
*Charging Time: 6-7 Hours 0 0.00 0.00 0.00
F.2
*Ligthing Time: 10-12 hrs/day Sustain 8-12 days Rainy Days 0 0.00 0.00 0.00
9m Mounting Height Pole with 1.5m Single Mast Arm set 1.00 44,460.00 44,460.00
*Round Steel Tapered Post:Bot-200mmØ, Top-100mmØ, 0 0.00 0.00 0.00
9000mm Height 0 0.00 0.00 0.00
*Thickness: 4.0mm 0 0.00 0.00 0.00
*Base Plate: 20mmx 400mmx 400mm 0 0.00 0.00 0.00
*Stiffener Plate: 16mm x 200mm x 100mm x 20mm, 0 0.00 0.00 0.00
Hot Dip Galvanized 0 0.00 0.00 0.00
*Anchor Bolt 19mm x 508mm OAL Bend 50mm Triple Nuts and 0 0.00 0.00 0.00
Double Flat Washers
Sub - Total for F.2 - As Evaluated 118,340.00
G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 120,779.27
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 120,779.27
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 14,493.51
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 14,493.51
I.1 Contractor's Profit (CP) - As Submitted 8% 9,662.34
I.2 Contractor's Profit (CP) - As Evaluated 8% 9,662.34
J.1 Value Added Tax (VAT) - As Submitted 5% 7,246.76
J.2 Value Added Tax (VAT) - As Evaluated 5% 7,246.76
K.1 Total Unit Cost - As Submitted 152,181.88
K.2 Total Unit Cost - As Evaluated 152,181.88

Prepared by:

RAMIL A. BALISNOMO
Engineer II
Road Widening - Primary Roads - Manila North Rd - K0312+000 - K0312+348

DETAILED UNIT PRICE ANALYSIS


FORM-POW-2015-01D-00
Item No./Description : 706(1) Concrete, Clay, Plastic and Fiber Pipe
Unit of Measurement : l.m.
Output per hour - As Submitted : 6.75
Output per hour - As Evaluated : 6.75

No. of
Designation No. of Hours Hourly Rate Amount
Person
Labor
Construction Foreman 1 1.00 112.02 112.02
A.1
Skilled Laborer 4 1.00 80.88 323.52
Unskilled Laborer 8 1.00 62.39 499.12

Sub - Total for A.1 - As Submitted 934.66


Labor
Construction Foreman 1 1 112.02 112.02
Skilled Laborer 4 1 80.88 323.52
A.2
Unskilled Laborer 8 1 62.39 499.12

Sub - Total for A.2 - As Evaluated 934.66

Name and Capacity No of Units No. of Hours Hourly Rate Amount

Equipment
Generator Set 1 0.46 872.87 401.52
Boom Truck 1 0.09 2,784.92 250.64
Portable Air Compressor 1 0.22 148.88 32.75
B.1
Electrofusion 1 0.24 219.75 52.74
Plate Compactor 1 0.16 123.00 19.68
Backhoe (0.80 cu.m.) 1 0.16 2,536.41 405.83
Minor Tools (10% of Labor Cost) 93.47 93.47

Sub - Total for B.1 - As Submitted 1,256.63


Equipment
Generator Set 1 0.46 872.87 401.52
Boom Truck 1 0.09 2784.92 250.64
Portable Air Compressor 1 0.22 148.88 32.75
Electrofusion 1 0.24 219.75 52.74
B.2
Plate Compactor 1 0.16 123.00 19.68
Backhoe (0.80 cu.m.) 1 0.16 2536.41 405.83
Minor Tools (10% of Labor Cost) 93.47 93.47

Sub - Total for B.2 - As Evaluated 1,256.63


C.1 Total (A.1 + B.1) - As Submitted 2,191.29
C.2 Total (A.2 + B.2) - As Evaluated 2,191.29
D.1 Outout per hour - As Submitted 6.75
D.2 Output per hour - As Evaluated 6.75
E.1 Direct Unit Cost (C.1 / D.1) - As Submitted 324.64
E.2 Direct Unit Cost (C.2 / D.2) - As Evaluated 324.64

Name and Specification Unit Quantity Unit Cost Amount

Materials
Structured Wall Pipe - High Density Polyethylene Pipe (1400mm Ø) l.m. 1.000 25,946.67 25,946.67
F.1
Freight and Handling Cost l.m. 1.000 805.00 805.00
Electrofusion Wire l.m. 4.396 140.00 615.44
Sand Bedding/ Selected Sandy Soil cu.m. 0.150 680.00 102.00
Sub - Total for F.1 - As Submitted 27,469.11
Materials
Structured Wall Pipe - High Density Polyethylene Pipe (1400mm Ø) l.m. 1.00 25,946.67 25946.67
Freight and Handling Cost l.m. 1.00 805.00 805.00
F.2 Electrofusion Wire l.m. 4.40 140.00 615.44
F.2
Sand Bedding/ Selected Sandy Soil cu.m. 0.15 680.00 102.00

Sub - Total for F.2 - As Evaluated 27,469.11


G.1 Direct Unit Cost (E.1+ F.1) - As Submitted 27,793.75
G.2 Direct Unit Cost (E.2+ F.2) - As Evaluated 27,793.75
H.1 Overhead, Contingencies & Miscellaneous (OCM) - As Submitted 12% 3,335.25
H.2 Overhead, Contingencies & Miscellaneous (OCM) - As Evaluated 12% 3,335.25
I.1 Contractor's Profit (CP) - As Submitted 8% 2,223.50
I.2 Contractor's Profit (CP) - As Evaluated 8% 2,223.50
J.1 Value Added Tax (VAT) - As Submitted 5% 1,667.62
J.2 Value Added Tax (VAT) - As Evaluated 5% 1,667.62
K.1 Total Unit Cost - As Submitted 35,020.12
K.2 Total Unit Cost - As Evaluated 35,020.12

Prepared by:

RAMIL A. BALISNOMO
Engineer II