DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS

QUEZON II DISTRICT ENGINEERING OFFICE


CATANAUAN, QUEZON
PHILIPPINES

Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and
Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000, K0266+300 - K0267+000

Prepared by:

HARVEY M. RAMOS
Engineer I
DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE

CATANAUAN, QUEZON FORM ABC-2015-02-00

SUMMARY OF APPROVED BUDGET FOR THE CONTRACT


Contract Duration : 150 C.D.
TOTAL MARK-UP
ITEM NO. DESCRIPTION ESTIMATED DIRECT COST VAT TOTAL INDIRECT COST TOTAL COST
% VALUE
AS SUBMITTED 233,155.62 8.00% 18,652.45 12,590.40 31,242.85 264,398.47
PART A FACILITIES FOR THE ENGINEER (GAD Related Activities)
AS EVALUATED 233,155.62 8.00% 18,652.45 12,590.40 31,242.85 264,398.47
AS SUBMITTED 573,800.32 8.00% 40,352.67 30,707.65 71,060.31 644,860.63
PART B OTHER GENERAL REQUIREMENTS (GAD Related Activities)
AS EVALUATED 573,800.32 8.00% 40,352.67 30,707.65 71,060.31 644,860.63

(Project ID)
(Project Component ID - Description)
AS SUBMITTED 2,305,418.65 20.00% 461,083.73 138,325.12 599,408.85 2,904,827.50
PART C EARTHWORKS
AS EVALUATED 2,305,418.65 20.00% 461,083.73 138,325.12 599,408.85 2,904,827.50
AS SUBMITTED 28,443.10 20.00% 5,688.62 1,706.59 7,395.21 35,838.31
PART D SUB BASE AND BASE COURSE
AS EVALUATED 28,443.10 20.00% 5,688.62 1,706.59 7,395.21 35,838.31
AS SUBMITTED 163,468.80 20.00% 32,693.76 9,808.13 42,501.89 205,970.69
PART E SURFACE COURSE
AS EVALUATED 163,468.80 20.00% 32,693.76 9,808.13 42,501.89 205,970.69
AS SUBMITTED 1,874,488.41 20.00% 374,897.68 112,469.30 487,366.99 2,361,855.40
PART F BRIDGE CONSTRUCTION
AS EVALUATED 1,874,488.41 20.00% 374,897.68 112,469.30 487,366.99 2,361,855.40
AS SUBMITTED 2,214,210.83 20.00% 442,842.17 132,852.65 575,694.82 2,789,905.64
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS EVALUATED 2,214,210.83 20.00% 442,842.17 132,852.65 575,694.82 2,789,905.64
AS SUBMITTED 6,586,029.79 1,317,205.96 395,161.79 1,712,367.74 8,298,397.53
TOTAL OF PART C TO PART G
AS EVALUATED 6,586,029.79 1,317,205.96 395,161.79 1,712,367.74 8,298,397.53
AS SUBMITTED 7,392,985.73 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64
TOTAL OF (Project ID)
AS EVALUATED 7,392,985.73 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64
AS SUBMITTED 7,392,985.73 20.00% 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64
TOTAL
AS EVALUATED 7,392,985.73 20.00% 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64

Prepared by: Checked/Reviewed by: Reviewed as to Unit Cost: Recommending Approval: Approved:

BOB JAYSON D. VELUZ VICENTE M. DAÑO MICHAEL P. ROSARIA JORGE C. PASIA CAROLINA D. PASTRANA
Engineer II Engineer III Engineer III Assistant District Engineer OIC-DISTRICT ENGINEER
Maintenance Section Chief, Maintenance Section Chief, Planning & Design Section
DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON FORM ABC-2015-02A-00

APPROVED BUDGET FOR THE CONTRACT


Contract Duration : 150 C.D.
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST

PART A FACILITIES FOR THE ENGINEER (GAD Related Activities)

AS SUBMITTED 1.00 ls 212,655.62 8% 17,012.45 11,483.40 28,495.85 241,151.47 241,151.47


A.1.1 (3) Construction of Field Office for the Engineer
AS EVALUATED 1.00 ls 212,655.62 8% 17,012.45 11,483.40 28,495.85 241,151.47 241,151.47
AS SUBMITTED 5.00 mos. 20,500.00 8% 1,640.00 1,107.00 2,747.00 23,247.00 4,649.40
A.1.4 (1) Provision of Progress Photographs
AS EVALUATED 5.00 mos. 20,500.00 8% 1,640.00 1,107.00 2,747.00 23,247.00 4,649.40
AS SUBMITTED 233,155.62 18,652.45 12,590.40 31,242.85 264,398.47
TOTAL OF PART A
AS EVALUATED 233,155.62 18,652.45 12,590.40 31,242.85 264,398.47
OTHER GENERAL REQUIREMENTS (GAD Related
PART B
Activities)
AS SUBMITTED 2.00 ea. 7,778.72 8% 622.30 420.05 1,042.35 8,821.07 4,410.53
B.5 Project Billboard/ Signboard
AS EVALUATED 2.00 ea. 7,778.72 8% 622.30 420.05 1,042.35 8,821.07 4,410.53
AS SUBMITTED 5.00 mos. 142,272.00 8% 11,381.76 7,682.69 19,064.45 161,336.45 32,267.29
B.7 Occupational Safety and Health Program
AS EVALUATED 5.00 mos. 142,272.00 8% 11,381.76 7,682.69 19,064.45 161,336.45 32,267.29
AS SUBMITTED 5.00 mos. 354,357.60 8% 28,348.61 19,135.31 47,483.92 401,841.52 80,368.30
B.8 Traffic Management
AS EVALUATED 5.00 mos. 354,357.60 8% 28,348.61 19,135.31 47,483.92 401,841.52 80,368.30
AS SUBMITTED 1.00 l.s. 69,392.00 0% - 3,469.60 3,469.60 72,861.60 72,861.60
B.9 Mobilization / Demobilization
AS EVALUATED 1.00 l.s. 69,392.00 0% - 3,469.60 3,469.60 72,861.60 72,861.60
AS SUBMITTED 573,800.32 40,352.67 30,707.65 71,060.31 644,860.63
TOTAL OF PART B
AS EVALUATED 573,800.32 40,352.67 30,707.65 71,060.31 644,860.63

(Project ID)
(Project Component ID - Description)
PART C EARTHWORKS
AS SUBMITTED 1.00 ls 152,201.00 20% 30,440.20 9,132.06 39,572.26 191,773.26 191,773.26
101 (1) Removal of Structures and Obstruction
AS EVALUATED 1.00 ls 152,201.00 20% 30,440.20 9,132.06 39,572.26 191,773.26 191,773.26
AS SUBMITTED 735.00 cu.m 171,549.00 20% 34,309.80 10,292.94 44,602.74 216,151.74 294.08
103 (1)a Structure Excavation Common Soil
AS EVALUATED 735.00 cu.m 171,549.00 20% 34,309.80 10,292.94 44,602.74 216,151.74 294.08
AS SUBMITTED 1.00 l.s. 322,960.78 20% 64,592.16 19,377.65 83,969.80 406,930.58 406,930.58
103 (5)a Shoring, cribbing and related works (Shoring)
AS EVALUATED 1.00 l.s. 322,960.78 20% 64,592.16 19,377.65 83,969.80 406,930.58 406,930.58
AS SUBMITTED 839.10 cu.m 1,566,926.95 20% 313,385.39 94,015.62 407,401.01 1,974,327.96 2,352.91
104 (2)a Embankment from borrow
AS EVALUATED 839.10 cu.m 1,566,926.95 20% 313,385.39 94,015.62 407,401.01 1,974,327.96 2,352.91
AS SUBMITTED 588.00 cu.m 91,780.92 20% 18,356.18 5,506.86 23,863.04 115,643.96 196.67
104 (7) Embankment from structure excavation
AS EVALUATED 588.00 cu.m 91,780.92 20% 18,356.18 5,506.86 23,863.04 115,643.96 196.67
Page 3 of 150
DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON FORM ABC-2015-02A-00

APPROVED BUDGET FOR THE CONTRACT


Contract Duration : 150 C.D.
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
AS SUBMITTED 2,305,418.65 461,083.73 138,325.12 599,408.85 2,904,827.50
TOTAL OF PART C
AS EVALUATED 2,305,418.65 461,083.73 138,325.12 599,408.85 2,904,827.50
PART D SUB BASE AND BASE COURSE
AS SUBMITTED 14.00 cu.m 28,443.10 20% 5,688.62 1,706.59 7,395.21 35,838.31 2,559.88
200(1) Aggregate Subbase Course
AS EVALUATED 14.00 cu.m 28,443.10 20% 5,688.62 1,706.59 7,395.21 35,838.31 2,559.88
AS SUBMITTED 28,443.10 5,688.62 1,706.59 7,395.21 35,838.31
TOTAL OF PART D
AS EVALUATED 28,443.10 5,688.62 1,706.59 7,395.21 35,838.31
PART E SURFACE COURSE

Portland Cement Concrete Pavement (Unreinforced) 0.28 m AS SUBMITTED 72.00 sq.m 163,468.80 20% 32,693.76 9,808.13 42,501.89 205,970.69 2,860.70
311(1)e1
thick 14 days AS EVALUATED 72.00 sq.m 163,468.80 20% 32,693.76 9,808.13 42,501.89 205,970.69 2,860.70
AS SUBMITTED 163,468.80 32,693.76 9,808.13 42,501.89 205,970.69
TOTAL OF PART E
AS EVALUATED 163,468.80 32,693.76 9,808.13 42,501.89 205,970.69
PART F BRIDGE CONSTRUCTION
AS SUBMITTED 531.00 m 1,874,488.41 20% 374,897.68 112,469.30 487,366.99 2,361,855.40 4,447.94
400 (6) Structural Steel Sheet Piles, Furnished
AS EVALUATED 531.00 m 1,874,488.41 20% 374,897.68 112,469.30 487,366.99 2,361,855.40 4,447.94
AS SUBMITTED 1,874,488.41 374,897.68 112,469.30 487,366.99 2,361,855.40
TOTAL OF PART E
AS EVALUATED 1,874,488.41 374,897.68 112,469.30 487,366.99 2,361,855.40

PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES

Page 4 of 150
DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON FORM ABC-2015-02A-00

APPROVED BUDGET FOR THE CONTRACT


Contract Duration : 150 C.D.
ESTIMATED DIRECT TOTAL MARK-UP TOTAL INDIRECT
ITEM NO. DESCRIPTION QUANTITY UNIT VAT TOTAL COST UNIT COST
COST % VALUE COST
AS SUBMITTED 9,949.28 kg 675,073.57 20% 135,014.71 40,504.41 175,519.13 850,592.70 85.49
404 (1)a Reinforcing Steel Grade 40
AS EVALUATED 9,949.28 kg 675,073.57 20% 135,014.71 40,504.41 175,519.13 850,592.70 85.49
AS SUBMITTED 32.40 cu.m 302,347.57 20% 60,469.51 18,140.85 78,610.37 380,957.93 11,757.96
405 (1)a2 Structural Concrete 20.68MPa A 14 days
AS EVALUATED 32.40 cu.m 302,347.57 20% 60,469.51 18,140.85 78,610.37 380,957.93 11,757.96
AS SUBMITTED 92.46 cu.m 479,345.76 20% 95,869.15 28,760.75 124,629.90 603,975.66 6,532.08
505(2)a Grouted Riprap A
AS EVALUATED 92.46 cu.m 479,345.76 20% 95,869.15 28,760.75 124,629.90 603,975.66 6,532.08
AS SUBMITTED 531.00 l.m 579,007.71 20% 115,801.54 34,740.46 150,542.00 729,549.71 1,373.92
509(1) b1 Sheet Piles Steel (Driven)
AS EVALUATED 531.00 l.m 579,007.71 20% 115,801.54 34,740.46 150,542.00 729,549.71 1,373.92
AS SUBMITTED 114.00 lm 178,436.22 20% 35,687.24 10,706.17 46,393.42 224,829.64 1,972.19
513 (1) Permanent Ground Anchor
AS EVALUATED 114.00 lm 178,436.22 20% 35,687.24 10,706.17 46,393.42 224,829.64 1,972.19
AS SUBMITTED 2,214,210.83 442,842.17 132,852.65 575,694.82 2,789,905.64
TOTAL OF PART G
AS EVALUATED 2,214,210.83 442,842.17 132,852.65 575,694.82 2,789,905.64

AS SUBMITTED 6,586,029.79 1,317,205.96 395,161.79 1,712,367.74 8,298,397.53


TOTAL OF PART C TO PART G
AS EVALUATED 6,586,029.79 1,317,205.96 395,161.79 1,712,367.74 8,298,397.53
AS SUBMITTED 7,392,985.73 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64
TOTAL OF (Project ID)
AS EVALUATED 7,392,985.73 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64
AS SUBMITTED 7,392,985.73 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64
GRAND TOTAL
AS EVALUATED 7,392,985.73 1,376,211.07 438,459.84 1,814,670.91 9,207,656.64

Submitted by: Recommending Approval by: Approved by:

MICHAEL P. ROSARIA JORGE C. PASIA CAROLINA D. PASTRANA


Chief, Planning & Design Section Assistant District Engineer OIC-District Engineer

Page 5 of 150
DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
FORM POW-2015-01A-00

ITEMIZED BREAKDOWN
DIRECT COST TOTAL UNIT COST
QUANTITY % DIRECT COST
TOTAL UNIT COST (DIRECT+INDIRECT)
ITEM NO. DESCRIPTION UNIT

AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED

PART A FACILITIES FOR THE ENGINEER (GAD Related Activities)

A.1.1 (3) Construction of Field Office for the Engineer 1.00 1.00 ls 212,655.62 212,655.62 212,655.62 212,655.62 241,151.47 241,151.47 2.88 2.88

A.1.4 (1) Provision of Progress Photographs 5.00 5.00 mos. 20,500.00 20,500.00 4,100.00 4,100.00 23,247.00 23,247.00 0.28 0.28

TOTAL OF PART A 233,155.62 233,155.62 264,398.47 264,398.47

PART B OTHER GENERAL REQUIREMENTS (GAD Related Activities)

B.5 Project Billboard/ Signboard 2.00 2.00 ea. 7,778.72 7,778.72 3,889.36 3,889.36 8,821.07 8,821.07 0.11 0.11

B.7 Occupational Safety and Health Program 5.00 5.00 mos. 142,272.00 142,272.00 28,454.40 28,454.40 161,336.45 161,336.45 1.92 1.92

B.8 Traffic Management 5.00 5.00 mos. 354,357.60 354,357.60 70,871.52 70,871.52 401,841.52 401,841.52 4.79 4.79

B.9 Mobilization / Demobilization 1.00 1.00 l.s. 69,392.00 69,392.00 69,392.00 69,392.00 72,861.60 72,861.60 0.94 0.94

TOTAL OF PART B 573,800.32 573,800.32 644,860.63 644,860.63

Project ID

(Project Component ID - Description)

PART C EARTHWORKS

101 (1) Removal of Structures and Obstruction 1.00 1.00 ls 152,201.00 152,201.00 152,201.00 152,201.00 191,773.26 191,773.26 2.06 2.06

103 (1)a Structure Excavation Common Soil 735.00 735.00 cu.m 171,549.00 171,549.00 233.40 233.40 216,151.74 216,151.74 2.32 2.32

103 (5)a Shoring, cribbing and related works (Shoring) 1.00 1.00 l.s. 322,960.78 322,960.78 322,960.78 322,960.78 406,930.58 406,930.58 4.37 4.37

104 (2)a Embankment from borrow 839.10 839.10 cu.m 1,566,926.95 1,566,926.95 1,867.39 1,867.39 1,974,327.96 1,974,327.96 21.19 21.19

104 (7) Embankment from structure excavation 588.00 588.00 cu.m 91,780.92 91,780.92 156.09 156.09 115,643.96 115,643.96 1.24 1.24

TOTAL OF PART C 2,305,418.65 2,305,418.65 477,418.66 477,418.66 2,904,827.50 2,904,827.50

PART D SUB BASE AND BASE COURSE

200(1) Aggregate Subbase Course 14.00 14.00 cu.m 28,443.10 28,443.10 2,031.65 2,031.65 35,838.31 35,838.31 0.38 0.38

TOTAL OF PART D 28,443.10 28,443.10 35,838.31 35,838.31

PART E SURFACE COURSE

311(1)e1 Portland Cement Concrete Pavement (Unreinforced) 0.28 m thick 14 days 72.00 72.00 sq.m 163,468.80 163,468.80 2,270.40 2,270.40 205,970.69 205,970.69 2.21 2.21

TOTAL OF PART E 163,468.80 163,468.80 205,970.69 205,970.69

PART F BRIDGE CONSTRUCTION

400 (6) Structural Steel Sheet Piles, Furnished 531.00 531.00 m 1,874,488.41 1,874,488.41 3,530.11 3,530.11 2,361,855.40 2,361,855.40 25.35 25.35

TOTAL OF PART E 1,874,488.41 1,874,488.41 2,361,855.40 2,361,855.40

PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES

404 (1)a Reinforcing Steel Grade 40 9,949.28 9,949.28 kg 675,073.57 675,073.57 67.85 67.85 850,592.70 850,592.70 9.13 9.13

405 (1)a2 Structural Concrete 20.68MPa A 14 days 32.40 32.40 cu.m 302,347.57 302,347.57 9,331.72 9,331.72 380,957.93 380,957.93 4.09 4.09

505(2)a Grouted Riprap A 92.46 92.46 cu.m 479,345.76 479,345.76 5,184.19 5,184.19 603,975.66 603,975.66 6.48 6.48

509(1) b1 Sheet Piles Steel (Driven) 531.00 531.00 l.m 579,007.71 579,007.71 1,090.41 1,090.41 729,549.71 729,549.71 7.83 7.83

513 (1) Permanent Ground Anchor 114.00 114.00 lm 178,436.22 178,436.22 1,565.23 1,565.23 224,829.64 224,829.64 2.41 2.41

TOTAL OF PART G 2,214,210.83 2,214,210.83 2,789,905.64 2,789,905.64

TOTAL OF PART C TO PART G 2,214,210.83 2,214,210.83 2,789,905.64 2,789,905.64

TOTAL OF (Project ID) 7,392,985.73 7,392,985.73 9,207,656.64 9,207,656.64

GRAND TOTAL 7,392,985.73 7,392,985.73 9,207,656.64 9,207,656.64 100.00 100.00

Prepared by: Checked/Reviewed by: Submitted By: Recommending Approval: Approved:


DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON
FORM POW-2015-01A-00

ITEMIZED BREAKDOWN
DIRECT COST TOTAL UNIT COST
QUANTITY % DIRECT COST
TOTAL UNIT COST (DIRECT+INDIRECT)
ITEM NO. DESCRIPTION UNIT

AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED

BOB JAYSON D. VELUZ VICENTE M. DAÑO MICHAEL P. ROSARIA JORGE C. PASIA CAROLINA D. PASTRANA

Engineer II Engineer III Engineer III Assistant District Engineer OIC- District Engineer

Maintenance Section Chief, Maintenance Section Chief, Planning and Design Section
ANNEX A
DEPARTMENT OF PUBLIC OF WORKS AND HIGHWAYS
QUEZON III DISTRICT ENGINEERING OFFICE
CATANAUAN, QUEZON FORM POW-2015-01-00
PROGRAM OF WORKS/BUDGET COST

Project : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Appropriation : ₱9,208,000.00
Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

Source of Fund For Funding

Seawall/Flood Control : 35.00 L.M.


Project ID : Bridge :
Location : Catanauan, Quezon Total Project Duration : 150 C.D.
Station Limit :
K0266+300 - K0267+000

AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
PART A FACILITIES FOR THE ENGINEER (GAD Related Activities) 3.15% 233,155.62 3.15% 233,155.62
PART B OTHER GENERAL REQUIREMENTS (GAD Related Activities) 7.76% 573,800.32 7.76% 573,800.32
Project Component ID PROJECT COMPONENT DESCRIPTION
PART C EARTHWORKS (PLS. SEE FORM POW-2015-01C-00) 31.18% 2,305,418.65 31.18% 2,305,418.65
PART D SUB BASE AND BASE COURSE (PLS. SEE FORM POW-2015-01C-00) 0.38% 28,443.10 0.38% 28,443.10
PART E SURFACE COURSE 2.21% 163,468.80 2.21% 163,468.80
PART F BRIDGE CONSTRUCTION 25.35% 1,874,488.41 25.35% 1,874,488.41
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES 29.95% 2,214,210.83 29.95% 2,214,210.83
PART H MISCELLANEOUS STRUCTURES 0.00% -

Total 42% 7,392,985.73 42% 7,392,985.73

EQUIPMENT: BREAKDOWN OF EXPENDITURES:


DESCRIPTION REQUIRED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED
1. Labor 836,640.72 836,640.72 A. Total Direct Cost 7,392,985.73 7,392,985.73
2. Materials 5,588,648.70 5,588,648.70 B. OCM and Profit 1,376,211.07 1,376,211.07
3. Rental of Equipment 967,696.31 967,696.31 C. Value Added Tax (5%) 438,459.84 438,459.84
4. Provisional Sum / Daywork D. Total Construction Cost 9,207,656.64 9,207,656.64
(PLS. SEE FORM POW-2015-01B-00) 5. OCM and Profit 1,376,211.07 1,376,211.07 E. Eng'g & Administrative Overhead, 0.00 % - -
6. Value Added Tax (5%) 438,459.84 438,459.84 F. RROW Acquisition -
7. Eng'g & Administrative Overhead - - G. Physical Reserved (Contingency)
8. RROW Acquisition - -
9. Physical Reserved (Contingency)
10.TOTAL ESTIMATED COST 9,207,656.64 9,207,656.64 H. TOTAL ESTIMATED COST 9,207,656.64 9,207,656.64
Note: 1. Prices of Materials were based on CMPD 2020 2nd Quarter and Labor based on 2020 rates in QUEZON. SAY: 9,208,000.00 9,208,000.00
2. Based on approved plans and Specification

Prepared by: Checked/Reviewed by: Submitted by: Recommending Approval: Approved:

BOB JAYSON D. VELUZ VICENTE M. DAÑO MICHAEL P. ROSARIA JORGE C. PASIA CAROLINA D. PASTRANA
Engineer II Engineer III Engineer III Assistant District Engineer OIC-District Engineer
Maintenance Section Chief, Maintenance Section Chief, Planning & Design Section
DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

Item No./Descriptio : A.1.1 (3) Construction of Field Office for the Engineer
Unit of Measuremen: LS
Quantity: : 1.00
Designation No. of Person No.of Hours Hourly Rate Amount
A. Labor

a. Construction Foreman 1 63 98.96 6,234.48


b. Skilled Labor 2 63 71.44 9,001.44
c. Unskilled Labor 6 63 55.18 20,858.04

Note: Consider (6m x 8m) Field Office as basis

Sub - Total for A 36,093.96


Name and Capacity No. of Units No.of Hours Hourly Rate Amount
B. Equipment

Sub - Total for B


C. Total (A + B) 36,093.96
D. Output
E. Direct Unit Cost (C) 36,093.96
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
a. Corr. Roofing Ga. 26 (0.55l.m) sq.m 78.00 255.00 19,890.00
b. Ord. Ridge Roll Ga. 24 (0.701mm) l.m 10.00 105.00 1,050.00
c. 1/4"thk Ordinary Plywood pc 37.00 400.00 14,800.00
d. 1/4"x12"x12" Post Trap pc 16.00 50.00 800.00
e. 1/2"dia x 6" Bolt w/ Nuts & Washer pc 32.00 48.00 1,536.00
f. Gravel,3/4 cu.m 8.00 2,567.46 20,539.68
g. Sand cu.m 5.00 2,535.46 12,677.30
h. 4" Concrete Hollow Blocks pc 170.00 15.00 2,550.00
i. Portland Cement bag 84.00 297.07 24,953.88
j. Reinforcing Steel Bar, Grade 40 kg 80.00 55.83 4,466.40
k. Ord. Flushing #24 (0.701mm) l.m 16.24 105.00 1,705.20
l. Doors And Window sq.m 20.28 690.00 13,993.20
m. Coco Lumber bd.ft 1,200.00 35.00 42,000.00
n. Common Wire Nail kg. 45.00 80.00 3,600.00
o. Electrical and Sanitary Materials 12,000.00
Sub - Total for F 176,561.66
G. Direct Unit Cost (E + F) 212,655.62
G.1 Direct Unit Cost Montly basis (G ÷ 1.00) 212,655.62
H. Overhead, Contingencies & Miscellaneous (OCM) 0.00% of G.1 -
I. Contractor's Profit (CP) 8.00% of G.1 17,012.45
J. Value Added Tax (VAT) 5.00% of (G + H + I) 10,632.78
K. Total Unit Cost (G.1 + H + I + J) 240,300.85

Prepared by:

BOB JAYSON D. VELUZ


DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000
Item No./Descriptio : A.1.4 (1) Provision of Progress Photographs
Unit of Measuremen: mos
Quantity: : 5.00
Designation No. of Person No.of Mos Hourly Rate Amount
A. Labor

Sub - Total for A -


Name and Capacity No. of Units No.of Mos Hourly Rate Amount
B. Equipment

Sub - Total for B -


C. Total (A + B) -
D. Output
E. Direct Unit Cost (C) -
Name and Specification Unit Quantity Unit Cost Amount
F. Materials

a. Printing pc. 600.00 10.00 6,000.00


b. Miscellaneous Items (Paper. Paste, Folder Etc.) l.s 1.00 1,000.00 1,000.00
c. Camera, 12MP set 1.00 13,500.00 13,500.00

-
-
-
-

Sub - Total for F 20,500.00


G. Direct Unit Cost (E + F) 20,500.00
G.1 Direct Unit Cost Montly basis (G ÷ 5.00) 4,100.00
H. Overhead, Contingencies & Miscellaneous (OCM) 0.00% of G.1 -
I. Contractor's Profit (CP) 8.00% of G.1 328.00
J. Value Added Tax (VAT) 5.00% of (G + H + I) 221.40
K. Total Unit Cost (G.1 + H + I + J) 4,649.40

Prepared by:

BOB JAYSON D. VELUZ


DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

Item No./Descriptio : B.5 Project Billboard/ Signboard


Unit of Measuremen: ea.
Quantity: : 2.00
Designation No. of No. of Hours Hourly Rate Amount
Person
A. Labor

a. Construction Foreman 1 4 98.96 395.84


b. Unskilled Labor 4 4 55.18 882.88

Sub-Total for A 1,278.72


Name and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment

-
-
-

Sub-Total for B -
C. Total (A+B) 1,278.72
D. Output per Hour = 2.00 ea.
E. Direct Unit Cost (C ÷ D) 639.36
Name and Specifications Unit Quantity Unit Cost Amount
F. Materials

a. Tarpulin (4'x8') sq.ft 32.00 25.00 800.00


b. Coco Lumber bd.ft. 42.00 35.00 1,470.00
c. 1/2"thk Marine Plywood pc 1.00 900.00 900.00
d. Common Wire Nail kg. 1.00 80.00 80.00

Sub-Total for F 3,250.00


G. Direct Unit Cost (E + F) 3,889.36
H. Overhead, Contingencies & Miscellaneous (OCM) 0.00% of G -
I. Contractor's Profit (CP) 8.00% of G.1 311.15
J. Value Added Tax (VAT) 5.00% of (G + H + I) 210.03
K. Total Unit Cost (G + H + I + J) 4,410.54

Prepared by:

BOB JAYSON D. VELUZ


DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

Item No./Descriptio : B.7 Occupational Safety and Health Program


Unit of Measuremen: mos
Quantity: : 5.00

Designation No. of Person No.of Hours Hourly Rate Amount


A. Labor

a. Safety Officer 1 800.00 66.69 53,348.00


b. First Aider 1 800 62.50 50,000.00

Sub - Total for A 103,348.00


Name and Capacity No. of Units No.of Hours Hourly Rate Amount
B. Equipment

a. Portable Mist-Based Sanitation Tent 1 800.00 9.79 7,832.00


b. Thermal Scanner (w/ rechargeable battery) 2 800.00 1.03 1,648.00
c. Power Sprayer w/ complete accessories 1 800.00 3.47 2,776.00

Sub - Total for B 12,256.00


C. Total (A + B) 115,604.00
D. Output
E. Direct Unit Cost (C) 115,604.00
Name and Specification Unit Quantity Unit Cost Amount
F. Materials

a. see detailed calculation attached 6,703.00


b. First Aid Kit, Medicine Cabinet set 1.00 10,000.00 10,000.00
c. Sanitizing Solution lit 15.00 100.00 1,500.00
d. Ethyl Alcohol lit 9.00 185.00 1,665.00
e Disinfectant Spray can 5.00 1,000.00 5,000.00
f. Liquid Hand Soap lit 4.00 200.00 800.00

Covid-19 Rapid Antibody Test each 7.00 1,000.00 1,000.00


-
-

Sub - Total for F 26,668.00


G. Direct Unit Cost (E + F) 142,272.00
G.1 Direct Unit Cost Montly basis (G ÷ 5.00) 28,454.40
H. Overhead, Contingencies & Miscellaneous (OCM) 0.00% of G.1 -
I. Contractor's Profit (CP) 8.00% of G.1 2,276.35
J. Value Added Tax (VAT) 5.00% of (G + H + I) 1,536.54
K. Total Unit Cost (G.1 + H + I + J) 32,267.29

Prepared by:

BOB JAYSON D. VELUZ


DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

Item No./Descriptio : B.8 Traffic Management


Unit of Measuremen: mos
Quantity: : 5.00
Designation No. of Person No.of Hours Hourly Rate Amount
A. Labor

a. Traffic Enforcer 1 1088 90.73 98,714.24


b. Traffic Aide 4 1088 55.18 240,143.36

Sub - Total for A 338,857.60


Name and Capacity No. of Units No.of Hours Hourly Rate Amount
B. Equipment

Sub - Total for B -


C. Total (A + B) 338,857.60
D. Output
E. Direct Unit Cost (C) 338,857.60
Name and Specification Unit Quantity Unit Cost Amount
F. Materials

a. Fab. Traffic Sign Board/Signages set 10.00 1,000.00 10,000.00


b. Miscellaneous (Caution Tape, Bollard etc.) 5,500.00

-
-
-
-
-

Sub - Total for F 15,500.00


G. Direct Unit Cost (E + F) 354,357.60
G.1 Direct Unit Cost Montly basis (G ÷ 5.00) 70,871.52
H. Overhead, Contingencies & Miscellaneous (OCM) 0.00% of G.1 -
I. Contractor's Profit (CP) 8.00% of G.1 5,669.72
J. Value Added Tax (VAT) 5.00% of (G + H + I) 3,827.06
K. Total Unit Cost (G.1 + H + I + J) 80,368.30

Prepared by:

BOB JAYSON D. VELUZ


DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

Item No./Descriptio : B.9 Mobilization / Demobilization


Unit of Measuremen: l.s.
Quantity: : 1.00
Designation No. of Person No.of Hours Hourly Rate Amount
A. Labor

Sub - Total for A -


Name and Capacity No. of Units No.of Trips Trip Rate Amount
B. Equipment
a. Low Bed Trailer 1 2.00 25,000.00 50,000.00
b. Cargo Truck (2-5mt) 1 2.00 9,696.00 19,392.00

Sub - Total for B 69,392.00


C. Total (A + B) 69,392.00
D. Output
E. Direct Unit Cost (C) 69,392.00
Name and Specification Unit Quantity Unit Cost Amount
F. Materials

-
-
-

-
-
-
-
-
-
-

Sub - Total for F -


G. Direct Unit Cost (E + F) 69,392.00
G.1 Direct Unit Cost Montly basis (G ÷ 1.00) 69,392.00
H. Overhead, Contingencies & Miscellaneous (OCM) 0.00% of G.1 -
I. Contractor's Profit (CP) 0.00% of G.1 -
J. Value Added Tax (VAT) 5.00% of (G + H + I) 3,469.60
K. Total Unit Cost (G.1 + H + I + J) 72,861.60

Prepared by:

BOB JAYSON D. VELUZ


DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

Prepared by:

BOB JAYSON D. VELUZ


DETAILED UNIT PRICE ANALYSIS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

Item No./Descriptio : 104 (2)a Embankment from borrow


Unit of Measuremen: cu.m.
Output per hour : 50.00
Designation No. of Person No. of Hours Hourly Rate Amount
A. Labor

a. Construction Foreman 1 1 98.96 98.96


b. Unskilled Labor 2 1 55.18 110.36

Sub-Total for A 209.32


Name and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment

a. Motorized Road Grader (140 hp), G710A 1 1 2,173.00 2,173.00


b. Vibratory Roller (10mt), SD100DC 1 1 1,846.00 1,846.00
c. Water Truck/Pump (1600 L) 1 0.25 2,450.00 612.50

Sub-Total for B 4,631.50


C. Total (A+B) 4,840.82
D. Output per Hour = 50.00 cu.m.
E. Direct Unit Cost (C ÷ D) 96.82
Name and Specifications Unit Quantity Unit Cost Amount
F. Materials

a. Selected Borrow cu.m 1.25 1,416.46 1,770.57


(w/ 25% Shrinkage Factor)

Sub-Total for F 1,770.57


G. Direct Unit Cost (E + F) 1,867.39
H. Overhead, Contingencies & Miscellaneous (OCM) 12.00% of G 224.09
I. Contractor's Profit (CP) 8.00% of G 149.39
J. Value Added Tax (VAT) 5.00% of (G + H + I) 112.04
K. Total Unit Cost (G + H + I + J) 2,352.91

Prepared by:Item No./Descriptio : 405 (1)a2 Structural Concrete 20.68MPa A 14 days


Unit of Measuremen: cu.m
BOB JAYSONOutput
D. VELUZ
per hour : 1.40
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT COST FOR EACH ITEM
DIRECT COST TOTAL MARK-UP ADJUSTED UNIT
ITEM NO. DESCRIPTION % QTY. UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT UNIT COST TOTAL % VALUE COST
PART A FACILITIES FOR THE ENGINEER

As Submitted - 1.00 ls 176,561.66 36,093.96 - 212,655.62 212,655.62 8% 17,012.45 11,483.40 241,151.47 241,151.47
A.1.1 (3) Construction of Field Office for the Engineer
As Evaluated - 1.00 ls 176,561.66 36,093.96 - 212,655.62 212,655.62 8% 17,012.45 11,483.40 241,151.47 241,151.47
As Submitted 0.28 5.00 mos. 20,500.00 - - 4,100.00 20,500.00 8% 1,640.00 1,107.00 23,247.00 4,649.40
A.1.4 (1) Provision of Progress Photographs
As Evaluated 0.28 5.00 mos. 20,500.00 - - 4,100.00 20,500.00 8% 1,640.00 1,107.00 23,247.00 4,649.40
As Submitted 197,061.66 36,093.96 - 233,155.62 18,652.45 12,590.40 264,398.47
TOTAL OF PART A
As Evaluated 197,061.66 36,093.96 - 233,155.62 18,652.45 12,590.40 264,398.47
PART II OTHER GENERAL REQUIREMENTS
As Submitted 0.11 2.00 ea. 6,500.00 639.36 - 3,889.36 7,778.72 8% 622.30 420.05 8,821.07 4,410.53
B.5 Project Billboard/ Signboard
As Evaluated 0.11 2.00 ea. 6,500.00 639.36 - 3,889.36 7,778.72 8% 622.30 420.05 8,821.07 4,410.53
As Submitted 1.92 5.00 mos. 26,668.00 103,348.00 - 28,454.40 142,272.00 8% 11,381.76 7,682.69 161,336.45 32,267.29
B.7 Occupational Safety and Health Program
As Evaluated 1.92 5.00 mos. 26,668.00 103,348.00 - 28,454.40 142,272.00 8% 11,381.76 7,682.69 161,336.45 32,267.29
As Submitted 4.79 5.00 mos. 15,500.00 338,857.60 - 70,871.52 354,357.60 8% 28,348.61 19,135.31 401,841.52 80,368.30
B.8 Traffic Management
As Evaluated 4.79 5.00 mos. 15,500.00 338,857.60 - 70,871.52 354,357.60 8% 28,348.61 19,135.31 401,841.52 80,368.30
As Submitted 0.94 1.00 l.s. - - 69,392.00 69,392.00 69,392.00 0% - 3,469.60 72,861.60 72,861.60
B.9 Mobilization / Demobilization
As Evaluated 0.94 1.00 l.s. - - 69,392.00 69,392.00 69,392.00 0% - 3,469.60 72,861.60 72,861.60
As Submitted 48,668.00 442,844.96 69,392.00 573,800.32 40,352.67 30,707.65 644,860.63
TOTAL OF PART B
As Evaluated 48,668.00 442,844.96 69,392.00 573,800.32 40,352.67 30,707.65 644,860.63

(Project ID)
(Project Component ID - Description)
PART C EARTHWORKS
As Submitted 2.06 1.00 ls 80,000.00 72,201.00 - 152,201.00 152,201.00 20% 30,440.20 9,132.06 191,773.26 191,773.26
101 (1) Removal of Structures and Obstruction
As Evaluated 2.06 1.00 ls 80,000.00 72,201.00 - 152,201.00 152,201.00 20% 30,440.20 9,132.06 191,773.26 191,773.26
As Submitted 2.32 735.00 cu.m - 9,720.38 161,826.79 233.40 171,549.00 20% 34,309.80 10,292.94 216,151.74 294.08
103 (1)a Structure Excavation Common Soil
As Evaluated 2.32 735.00 cu.m - 9,720.38 161,826.79 233.40 171,549.00 20% 34,309.80 10,292.94 216,151.74 294.08
As Submitted 4.37 1.00 l.s. 282,255.50 37,004.80 3,700.48 322,960.78 322,960.78 20% 64,592.16 19,377.65 406,930.58 406,930.58
103 (5)a Shoring, cribbing and related works (Shoring)
As Evaluated 4.37 1.00 l.s. 282,255.50 37,004.80 3,700.48 322,960.78 322,960.78 20% 64,592.16 19,377.65 406,930.58 406,930.58
As Submitted 21.19 839.10 cu.m 1,485,688.01 3,512.81 77,725.83 1,867.39 1,566,926.95 20% 313,385.39 94,015.62 1,974,327.96 2,352.91
104 (2)a Embankment from borrow
As Evaluated 21.19 839.10 cu.m 1,485,688.01 3,512.81 77,725.83 1,867.39 1,566,926.95 20% 313,385.39 94,015.62 1,974,327.96 2,352.91
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

FORM POW-2015-01C-00
DETAILED BREAKDOWN OF COMPONENT COST FOR EACH ITEM
DIRECT COST TOTAL MARK-UP ADJUSTED UNIT
ITEM NO. DESCRIPTION % QTY. UNIT 5% VAT TOTAL COST
MATERIAL LABOR EQUIPMENT UNIT COST TOTAL % VALUE COST
As Submitted 1.24 588.00 cu.m - 15,805.49 75,976.89 156.09 91,780.92 20% 18,356.18 5,506.86 115,643.96 196.67
104 (7) Embankment from structure excavation
As Evaluated 1.24 588.00 cu.m - 15,805.49 75,976.89 156.09 91,780.92 20% 18,356.18 5,506.86 115,643.96 196.67
As Submitted 0.38 14.00 cu.m 27,087.58 58.61 1,296.87 2,031.65 28,443.10 120% 34,131.72 3,128.74 35,838.31 2,559.88
200(1) Aggregate Subbase Course
As Evaluated 0.38 14.00 cu.m 27,087.58 58.61 1,296.87 2,031.65 28,443.10 120% 34,131.72 3,128.74 35,838.31 2,559.88
As Submitted 2.21 72.00 sq.m 147,070.80 1,310.86 15,087.14 2,270.40 163,468.80 20% 32,693.76 9,808.13 205,970.69 2,860.70
311(1)e1 Portland Cement Concrete Pavement (Unreinforced) 0.28 m thick 14 days
As Evaluated 2.21 72.00 sq.m 147,070.80 1,310.86 15,087.14 2,270.40 163,468.80 20% 32,693.76 9,808.13 205,970.69 2,860.70
As Submitted 25.35 531.00 m 1,841,374.54 3,896.03 29,217.13 3,530.11 1,874,488.41 120% 2,249,386.09 206,193.73 2,361,855.40 4,447.94
400 (6) Structural Steel Sheet Piles, Furnished
As Evaluated 25.35 531.00 m 1,841,374.54 3,896.03 29,217.13 3,530.11 1,874,488.41 120% 2,249,386.09 206,193.73 2,361,855.40 4,447.94
As Submitted 9.13 9,949.28 kg 599,956.51 37,786.79 37,330.27 67.85 675,073.57 20% 135,014.71 40,504.41 850,592.70 85.49
404 (1)a Reinforcing Steel Grade 40
As Evaluated 9.13 9,949.28 kg 599,956.51 37,786.79 37,330.27 67.85 675,073.57 20% 135,014.71 40,504.41 850,592.70 85.49
As Submitted 4.09 32.40 cu.m 261,673.90 27,534.54 13,139.12 9,331.72 302,347.57 20% 60,469.51 18,140.85 380,957.93 11,757.96
405 (1)a2 Structural Concrete 20.68MPa A 14 days
As Evaluated 4.09 32.40 cu.m 261,673.90 27,534.54 13,139.12 9,331.72 302,347.57 20% 60,469.51 18,140.85 380,957.93 11,757.96
As Submitted 6.48 92.46 cu.m 404,491.23 50,542.79 24,311.55 5,184.19 479,345.76 20% 95,869.15 28,760.75 603,975.66 6,532.08
505(2)a Grouted Riprap A
As Evaluated 6.48 92.46 cu.m 404,491.23 50,542.79 24,311.55 5,184.19 479,345.76 20% 95,869.15 28,760.75 603,975.66 6,532.08
As Submitted 7.83 531.00 l.m 94,861.49 45,595.86 438,548.70 1,090.41 579,007.71 20% 115,801.54 34,740.46 729,549.71 1,373.92
509(1) b1 Sheet Piles Steel (Driven)
As Evaluated 7.83 531.00 l.m 94,861.49 45,595.86 438,548.70 1,090.41 579,007.71 20% 115,801.54 34,740.46 729,549.71 1,373.92
As Submitted 2.41 114.00 lm 118,459.46 52,731.84 7,244.70 1,565.23 178,436.22 20% 35,687.24 10,706.17 224,829.64 1,972.19
513 (1) Permanent Ground Anchor
As Evaluated 2.41 114.00 lm 118,459.46 52,731.84 7,244.70 1,565.23 178,436.22 20% 35,687.24 10,706.17 224,829.64 1,972.19
As Submitted 5,342,919.04 357,701.80 885,405.48 6,586,029.79 3,220,137.45 490,308.37 8,298,397.53
TOTAL OF PART C
As Evaluated 5,342,919.04 357,701.80 885,405.48 6,586,029.79 3,220,137.45 490,308.37 8,298,397.53
As Submitted 5,342,919.04 357,701.80 885,405.48 6,586,029.79 3,220,137.45 490,308.37 8,298,397.53
TOTAL OF PART C TO C
As Evaluated 5,342,919.04 357,701.80 885,405.48 6,586,029.79 3,220,137.45 490,308.37 8,298,397.53
As Submitted 5,342,919.04 357,701.80 885,405.48 6,586,029.79 3,220,137.45 490,308.37 8,298,397.53
TOTAL OF (Project ID)
As Evaluated 5,342,919.04 357,701.80 885,405.48 6,586,029.79 3,220,137.45 490,308.37 8,298,397.53
As Submitted 5,588,648.70 836,640.72 954,797.48 7,392,985.73 3,279,142.57 533,606.42 9,207,656.64
GRAND TOTAL
As Evaluated 5,588,648.70 836,640.72 954,797.48 7,392,985.73 3,279,142.57 533,606.42 9,207,656.64

Prepared by: Checked/Reviewed by: Submitted by: Recommending Approval: Approved:

HARVEY M. RAMOS VICENTE M. DAÑO MICHAEL P. ROSARIA JORGE C. PASIA CAROLINA D. PASTRANA

Engineer I Engineer III Engineer III Assitant District Engineer OIC-District Engineer
Maintenance Section Chief, Maintenance Section Chief, Planning & Design Section
NAME OF PROJECT: 19DM0120 - Repair of MSR. Jct. Lopez - Catanauan, Quezon, K0241+000 - K0241+950

LOCATION: Catanauan, Quezon

STRUCTURE EXCAVATION
Volume = Width x Height x Length
Volume1 = 1.995 m x 3.50 m 45.00 = 314.21
TOTAL: 314.213 cu.m.
say: 314.21 cu.m.

ITEM 104(2)a EMBANKMENT FROM BORROW (COMMON SOIL)


Volume = Volume EXCAVATION - Volume SLOPE PROTECTION
Volume1 = 314.21 - 204.36 = 109.86
TOTAL: 109.856 cu.m.
say: 96.42 cu.m.

ITEM 506(1) STONE MASONRY


STATION
START - END LENGTH HEIGHT WIDHT A WIDTH B (.57H) VOLUME
K0241+230 - K0241+275 LS 45.00 3.50 0.6 1.995 204.36
45.00 204.36

FOR PARAPET WALL


Volume = 1/2 ( Width A + Width C) x Height x Length x No. of Units
Volume = 1/2 ( .60 + .30 ) x .60 x 1.0 x 31.00
Volume = 8.37 cu.m.
TOTAL: 212.726 cu.m.
SAY: 190.71 cu.m.

Prepared by:

BOB JAYSON D. VELUZ


Engineer II
BACK-UP COMPUTATION
(For Crib Type I)

STATION LIMITS: Height


K0 266+300 - K0 266+335 Length 35.00 m 6.00 m

TOTAL LENGTH 35.00 m


No. of Column= 19 UNITS
NO. OF BEAM = 5 UNITS
NO. OF DEADMAN = 95 UNITS
103(1)a Structure Excavation
Area = 21.00 sq.m.
Length = 35.00 m
Volume = 735.00 cu.m.
say 735.00 cu.m.
104 (2)a Embankment from borrow
Volume = 1,139.25 cu.m.
Vol. of Concrete = 32.40 cu.m.
Embankment from Structure Excavation= 588.00 cu.m.
For Reblocking 320.25 cu.m.
Volume = 839.10 cu.m.
say 839.10 cu.m.
104 (7) Embankment from structure excavation
Volume Cut = 735.00 cu.m. * 0.80 for compaction
Volume = 588.00
say 588.00 cu.m.

200(1) Aggregate Subbase Course


Volume = Length X Width X Thickness
Volume = 35.00 x 2.00 x 0.20
Volume= 14.00 cu.m.
311(1)e1 Portland Cement Concrete Pavement (Unreinforced) 0.28 m thick 14 days
Area= No of Blocks Length Width
Area= 8.00 4.50 2.00
Area= 72.00 sq.m.

405(1)a3 Structural Concrete Class A (20.68 MPa) - 28days


For Column
Area = 0.09 sq.m
Height = 6.00 m
No. of Units = 19 units
Volume = 10.26 cu.m.
For Concrete Beam
Area = 0.12 sq.m
Length = 29.30 m
No. of Units = 5 units
Volume = 17.58 cu.m.
For Concrete Deadman
Area = 0.27 sq.m
Thickness = 0.30 m
No. of Units = 57 units
Volume = 4.62 cu.m.
Total Volume = 32.46 cu.m.
say 32.40 cu.m.

404(1) Reinforcing Steel


COLUMN
ALL DIMENSION ARE OUT TO OUT OF BARS
TYPE SIZE (MM) NO. OF BARS UNIT WT TOTAL WT.
A B C D
VERT. 20 152 6 0.48 2.466 2,427.73
VERT. 16 304 6 0.48 1.578 3,107.78
Prepared by:
TIES 10 589 0.25 0.05 0.617 399.75
BOB JAYSON D. VELUZ TOTAL 5,935.26
Republic of the Philippines
Department of Public Works and Highways
Region No. IV-A, Southern Tagalog
OFFICE OF THE DISTRICT ENGINEER
Quezon 3rd Engineering District
Catanauan, Quezon (BONDOC PENINSULA)

BACK UP COMPUTATION
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide
along Catanauan - Buenavista Road, K0266+300 - K0267+000

For Reblocking

No.Of Blocks 9

101 (3)a1 - Removal of Actual Structures/Obstruction 0.15 m thick PCCP (Reinforced)

Area = Length x Width


Area = 4.50 x 2.00 x 6.00 = 54.00 sq.m.
say: 54.00 sq.m.

311(1)b - Portland Cement Concrete Pavement (Unreinforced) 0.20m thick 14 days

Area = Length x Width


Area = 4.50 x 2.00 x 9.00 = 81.00 sq.m.
say: 81.00 sq.m.

1704(1)b - Embankment From Borrow


For Reblocking
Volume = Area x Height
Area = 81.00 x 3.00 = 243.00 cu.m.

For Retaining Wall


STRUCTURE EXCAVATION
Volume = Width x Height x Length
Volume = 1.55 x 3.1 11.5 = 55.258 cu.m.
less length for reblocking

Volume = Volume EXCAVATION - Volume SLOPE PROTECTION


Volume1 = 55.2575 - 41.51 = 13.7475
TOTAL: 256.748 cu.m.
say: 256.74 cu.m.

1707(1) - Aggregate Subbase Course


Volume = Length x Width x Thickness
Volume = 40.50 x 2.00 x 0.15 12.150 cu.m.
say: 12.15 cu.m.

1711 - Stone Masonry


For Section A1
Retaining Wall
LENGTH HEIGHT WIDHT A WIDTH B VOLUME
26 3.10 0.6 1.55 86.645

Apron Slab
AREA LENGTH VOLUME
2.16 35.38 76.4208

Prepared by:BOB JAYSON D. VELUZEngineer II


For Section B1
LENGTH HEIGHT WIDHT A WIDTH B (.57H) VOLUME
26 4.50 0.6 2.25 166.725
say: 166.72 cu.m.

Apron Slab
AREA LENGTH VOLUME
1.86 40.00 74.4

TOTAL: 404.191 cu.m.


404.19 cu.m.

Prepared by:BOB JAYSON D. VELUZEngineer II


Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips,
Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 -
K0267+000

Location of the Contract : Catanauan, Quezon

BILL OF QUANTITIES

Part No. A Part Description FACILITIES FOR THE ENGINEER (GAD Related Activ

(Columns (1), (2), (3), (4) are to be filled up by the Procuring (Columns (5) and (6) are to be filled up by the
Entity) Bidders)

Pay Item Unit Price Amount


Description Unit Quantity
No. (Pesos (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos
__________________
__________________
Construction of Field
A.1.1 (3) ls 1.00 __________________
Office for the Engineer
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Provision of Progress
A.1.4 (1) mos. 5.00 __________________
Photographs
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Sub-Total for This Page __________________
__________________
In figures: Php
__________________

Submitted by:
Date:
(Name and Signature of Bidder's Representative)

Position

Name of Bidder
Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips,
Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 -
K0267+000

:
Location of the Contract : Catanauan, Quezon

BILL OF QUANTITIES

Part No. B Part Description OTHER GENERAL REQUIREMENTS


(Columns (1), (2), (3), (4) are to be filled up by the Procuring (Columns (5) and (6) are to be filled up by the
Pay Item Entity) Unit Price Bidders) Amount
Description Unit Quantity
No. (Pesos (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos
__________________
__________________
Project Billboard/
B.5 ea. 2.00 __________________
Signboard
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Occupational Safety and
B.7 mos. 5.00 __________________
Health Program
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
B.8 Traffic Management mos. 5.00 __________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Mobilization /
B.9 l.s. 1.00 __________________
Demobilization
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Sub-Total for This Page __________________
__________________
In figures: Php
__________________

Submitted by:
Date:
(Name and Signature of Bidder's Representative)

Position

Name of Bidder
Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips,
Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 -
K0267+000

:
Location of the Contract : Catanauan, Quezon

BILL OF QUANTITIES

Part No. C Part Description SEAWALL CONSTRUCTION


(Columns (1), (2), (3), (4) are to be filled up by the Procuring (Columns (5) and (6) are to be filled up by the
Pay Item Entity) Unit Price Bidders) Amount
Description Unit Quantity
No. (Pesos (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos
__________________
__________________
Removal of Structures
101 (1) ls 1.00 __________________
and Obstruction
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Structure Excavation
103 (1)a cu.m 735.00 __________________
Common Soil
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Shoring, cribbing and
103 (5)a l.s. 1.00 __________________
related works (Shoring)
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
104 (2)a Embankment from borrow cu.m 839.10 __________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Embankment from
104 (7) cu.m 588.00 __________________
structure excavation
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Sub-Total for This Page __________________
__________________
In figures: Php
__________________

Submitted by:
Date:
(Name and Signature of Bidder's Representative)

Position

Name of Bidder
Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips,
Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 -
K0267+000

:
Location of the Contract : Catanauan, Quezon

BILL OF QUANTITIES

Part No. D Part Description SUB BASE AND BASE COURSE


(Columns (1), (2), (3), (4) are to be filled up by the Procuring (Columns (5) and (6) are to be filled up by the
Entity) Bidders)
Pay Item Unit Price Amount
Description Unit Quantity
No. (Pesos (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos
__________________
__________________
Aggregate Subbase
200(1) cu.m 14.00 __________________
Course
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Sub-Total for This Page __________________
__________________
In figures: Php
__________________

Submitted by:
Date:
(Name and Signature of Bidder's Representative)

Position

Name of Bidder
Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips,
Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 -
K0267+000

:
Location of the Contract : Catanauan, Quezon

BILL OF QUANTITIES

Part No. E Part Description SURFACE COURSE


(Columns (1), (2), (3), (4) are to be filled up by the Procuring (Columns (5) and (6) are to be filled up by the
Entity) Bidders)
Pay Item Unit Price Amount
Description Unit Quantity
No. (Pesos (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos
__________________
Portland Cement __________________
Concrete Pavement
311(1)e1 sq.m 72.00 __________________
(Unreinforced) 0.28 m
thick 14 days __________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Sub-Total for This Page __________________
__________________
In figures: Php
__________________

Submitted by:
Date:
(Name and Signature of Bidder's Representative)

Position

Name of Bidder
Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips,
Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 -
K0267+000

:
Location of the Contract : Catanauan, Quezon

BILL OF QUANTITIES

Part No. F Part Description BRIDGE CONSTRUCTION


(Columns (1), (2), (3), (4) are to be filled up by the Procuring (Columns (5) and (6) are to be filled up by the
Entity) Bidders)
Pay Item Unit Price Amount
Description Unit Quantity
No. (Pesos (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos
__________________
__________________
Structural Steel Sheet
400 (6) m 531.00 __________________
Piles, Furnished
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
__________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Sub-Total for This Page __________________
__________________
In figures: Php
__________________

Submitted by:
Date:
(Name and Signature of Bidder's Representative)

Position

Name of Bidder
Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips,
Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 -
K0267+000

:
Location of the Contract : Catanauan, Quezon

BILL OF QUANTITIES

Part No. G Part Description DRAINAGE AND SLOPE PROTECTION STRUCTUR


(Columns (1), (2), (3), (4) are to be filled up by the Procuring (Columns (5) and (6) are to be filled up by the
Entity) Bidders)
Pay Item Unit Price Amount
Description Unit Quantity
No. (Pesos (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos
__________________
__________________
Reinforcing Steel Grade
404 (1)a kg 9,949.28 __________________
40
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
405 Structural Concrete
cu.m 32.40 __________________
(1)a2 20.68MPa A 14 days
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
500 Pipe Culverts 910 mm dia.
lm - __________________
(1)a3 Class II RCPC
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
505(2)a Grouted Riprap A cu.m 92.46 __________________
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
509(1)
Sheet Piles Steel (Driven) l.m 531.00 __________________
b1
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Permanent Ground
513 (1) lm 114.00 __________________
Anchor
__________________
In figures: Php In figures: Php
__________________ __________________
In words: Pesos
__________________
__________________
Sub-Total for This Page __________________
__________________
In figures: Php
__________________

Submitted by:
Date:
(Name and Signature of Bidder's Representative)
Position

Name of Bidder
Department of Public Works and Highways
Contract ID : 20DM0083
Contract Name : Repair/Rehabilitation/Improvement of Slope Protection Structure with Road
Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road,
K0266+300 - K0267+000

:
Location of the Contract : Catanauan, Quezon

SUMMARY OF BID PRICES

Part No. Part Descrption Total Amount


A FACILITIES FOR THE ENGINEER (GAD Related Activities)
B OTHER GENERAL REQUIREMENTS
C EARTHWORKS
D SUB BASE AND BASE COURSE
E SURFACE COURSE
F BRIDGE CONSTRUCTION

Total Amount

Total Amount in Words


Pesos

and centavos.

Name : in the capacity of :

Signed : Date :

Duly authorized to sign the Bid for and on behalf of :


-Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

FORM POW-2015-01B-00
MINIMUM TECHNICAL PERSONNEL REQUIREMENT
No. Designation Required No. of Personnel No. Designation Required No. of Personnel

1 Project Manager 1 31
2 Project Engineer 1 32
3 Materials Engineer 1 33
4 Safety Officer 1 34
5 First Aider 1 35
6 36
7 37
8 38
9 39
10 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
SUB-TOTAL 5 SUB-TOTAL
TOTAL
-Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

FORM POW-2015-01B-00
MINIMUM EQUIPMENT REQUIREMENT
Number of Number of
No. Equipment Description Capacity No. Equipment Description Capacity
Equipment Equipment
1 Dump Truck 12 yd3 2 31 Screw jack 3
2 Bulldozer 1.50m3/1.95 yd3 32 Generator Set 700 KW 1
3 Payloader 1.50m3 1 33 Vibro Hammer 272.22 HP 1
4 Backhoe 0.80 m3/1.04 yd3 1 34 Truck Mounted Crane 45T 1
5 Chainsaw 35
6 Boom Truck 2-5 mt 36
7 Water Truck/ Pump 16000L 1 37
8 Motorized Road Grader 1 38
9 Vibratory Roller 10 mt 1 39
10 Transit Mixer 5-6 yd3 4 40
11 Concrete Vibrator 2 41
12 Concrete Screeder 1 42
13 Concrete Batch Plant 1 43
14 Concrete Saw 1 44
15 Bar Cutter 1 45
16 One Bagger Mixer 4-6 ft3/min 1 46
17 Cargo Truck 2-5mt 1 47
18 Low bed Trailer 48
19 Backhoe Wheel Type (0.28 cu.m) 49
20 Bar Bender 1 50
21 Plate Compactor 5 Hp 1 51
22 Cargo Truck 9-10mt 1 52
23 Service Crane (25T-145 Hp) 1 53
24 Crane w/ Bucket 54
25 Tug Boat 21.96x6.31x2.49 55
26 Hopper Barge 550 cu.m net cap. 56
27 Welding Machine 1 57
28 Cutting Outfit 1 58
29 Crawler Crane 59
30 Ladder 2 60
SUB-TOTAL 27 SUB-TOTAL 6
TOTAL 33
ehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000
DETAILED UNIT PRICE ANALYSIS
SAFETY AND HEALTH
MAN SAFETY SAFETY WORKING RAIN DUST EYE EAR MAN UNIT
ITEM NO. DESCRIPTION DAYS AMOUNT
POWER HELMET SHOES GLOVES COAT MUSK GOGGLES MUFF DAYS COST
101 (1) Removal of Structures and Obstruction 5 0.25 2.77 7.67 - - - - 76.875 384.375 10.69 4,108.97

103 (1)a Structure Excavation Common Soil 4 0.25 2.77 7.67 - - - - 0.25 1 10.69 10.69

103 (5)a Shoring, cribbing and related works (Shoring) 7 0.25 2.77 7.67 - - - - 30 210 10.69 2,244.90
104 (2)a Embankment from borrow 3 0.25 2.77 7.67 - - - - 0.25 0.75 10.69 8.02

104 (7) Embankment from structure excavation 4 0.25 2.77 7.67 - - - - 0.25 1 10.69 10.69

200(1) Aggregate Subbase Course 3 0.25 2.77 7.67 - - - - 0.25 0.75 10.69 8.02

311(1)e1 Portland Cement Concrete Pavement (Unreinforced) 0.28 17 0.25 2.77 7.67 - - - - 0.375 6.375 10.69 68.15

404 (1)a Reinforcing Steel Grade 40 11 0.25 2.77 7.67 - - - - 0.375 4.125 10.69 44.10

405 (1)a2 Structural Concrete 20.68MPa A 14 days 19 0.25 2.77 7.67 - - - - 0.625 11.875 10.69 126.94

509(1) b1 Sheet Piles Steel (Driven) 13 0.25 2.77 7.67 - - - - 0.375 4.875 10.69 52.11

400 (6) Structural Steel Sheet Piles, Furnished 5 0.25 2.77 7.67 - - - - 0.375 1.875 10.69 20.04

TOTAL 6,702.63
SERVICE LIFE DAYS 730 365 3 730 1 60 730 say 6,703.00
PURCHASED COST (PHP) 180.55 1012 23 245 63.25 169.1 602.6
UNIT COST / MANDAYS 0.25 2.77 7.67 0.34 63.25 2.82 0.83

PREPARED BY:

BOB JAYSON D. VELUZ


Engineer II
Name of Project: Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000
Location: Catanauan, Quezon
Construction Schedule (Bar Chart/S-curve)

Construction Schedule (Bar Chart/S-curve)

240 7-Jan 4-Sep Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8
Item No. Description Days Start End

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

31

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29
PART A FACILITIES FOR THE ENGINEER (GAD Related Activities) 4/19/17
A.1.1 (3) Construction of Field Office for the Engineer
#N/A 15
0 4/4/18
4/21/17 4/18/18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

A.1.2 (6) #N/A


Operation and Maintenance of 4x2 Pick Up Type Service Vehicle for t240
0 4/5/18
4/23/17 12/1/18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

A.1.3 (1) #N/A


Provision of Field Office Staff for the Assistance to the Engineer 0240 4/1/17
4/2/17 11/26/17
4/1/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

A.1.4 (1) Provision of Progress Photographs 240


0 4/3/17
4/27/17 11/28/17
4/26/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

PART B #N/A
OTHER GENERAL REQUIREMENTS (GAD Related Activities) 0 5/1/17
B.5 Project Billboard / Signboard
#N/A 20 4/1/17
5/3/17 4/2/17 1 1

B.7 Occupational Safety and Health Program


#N/A 0240 4/1/17
5/5/17 11/26/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

B.8 Traffic Management


#N/A 240
0 4/1/17
5/5/17 11/26/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

B.9 Mobilization / Demobilization


#N/A 05 9/1/18
5/7/17 9/5/18 1 1 1 1 1

#NAME? #N/A
#NAME? 030 9/1/18
5/7/17 9/30/18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

PART CEARTHWORKS
#N/A 0 5/9/17
#NAME? #NAME?
#N/A 16
0 4/19/17
5/19/17 5/4/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

101 (1) #N/A


Removal of Structures and Obstruction 70 5/20/17
5/21/17 5/26/17 1 1 1 1 1 1 1

#NAME? #NAME? 60
0 5/22/17
5/21/17 7/20/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

405 (1)a2 #N/A


Structural Concrete 20.68MPa Class A A (14 days) 40 5/22/17
5/21/17 5/25/17 1 1 1 1

#NAME? #N/A
#NAME? 40 5/22/17
5/23/17 5/25/17 1 1 1 1

509(1) b1 Sheet Piles Steel (Driven) 50


0 5/22/17
5/21/17 7/10/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

#NAME? #NAME?
#N/A 19
0 5/22/17
5/21/17 6/9/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

#NAME? #N/A
#NAME? 09 5/22/17
5/23/17 5/30/17 1 1 1 1 1 1 1 1 1

PART D SUB BASE AND BASE COURSE


#N/A 0 5/25/17
200 (1) Aggregate Subbase Course
#N/A 19
0 5/26/17 6/13/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

PART G #N/A
DRAINAGE AND SLOPE PROTECTION STRUCTURES 0
500 (1)a3 #N/A
Pipe Culverts 910 mm dia. Class II RCPC 80 5/11/17 5/18/17 1 1 1 1 1 1 1 1

505(2)a #N/A
Grouted Riprap A 70 5/20/17 5/26/17 1 1 1 1 1 1 1

#NAME? #NAME? 160 5/20/17 10/26/17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1


Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Quezon III District Engineering Office
Catanauan, Quezon

EXECUTIVE SUMMARY
(Pre Clearance)

October 8, 2018

FOR: JUANITO R. ALAMAR


District Engineer

1. Subject Repair/Rehabilitation/Improvement of Slope Protection


Structure with Road Slips, Slope Collapse and Landslide along
Catanauan - Buenavista Road, K0266+300 - K0267+000

2. Action Recommended For approval

3. Implementing Office DPWH QUEZON III District Engineering Office

4. Reviewing Offices Planning and Design Section

5. Reason/s for Approval of Program of Works Necessary provision and scope of works provided.

6. Contractor For Bidding

7. Allocation PHP 9,208,000.00

8. Source of Fund GAA CY 2019 Regular Infra.

9. Remarks For Advertise

Prepared:

DOMINGO P. VILLARUEL
Engineer II

Submitted:

MICHAEL P. ROSARIA
Chief, Planning and Design Section
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and
Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

HAULING COST ANALYSIS


a. ASSUMPTIONS
Terrain Condition: Flat and Rolling
Road Condition: Paved/Fair
Project Site: Project Site Quezon
Bucket Efficiency Factor: 90%

CALCULATION OF CYCLE TIME FOR HAULING EQUIPMENT


C.1. ESTIMATED TRAVEL SPEED, LOADING / UNLOADING & ALLOWANCE FOR DELAY

ROAD SURFACE DUMP TRUCK TRAVEL SPEED (km/h)


TERRAIN CONDITION
CONDITION LOADED EMPTY
PAVED 35 55
FLAT
UNPAVED 30 45
PAVED 30 40
ROLLING
UNPAVED 25 35
PAVED 20 30
MOUNTAINOUS
UNPAVED 15 25
LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY (min) 10% of Cycle Time
FOR: Borrow/Fill, Subbase Aggregate, Aggregate Base Course, Crushed Aggregate Base Course,
Concrete Aggregate

Average Hauling Distance:


Location : Project Site Quezon

Source of Materials: Angono, Rizal

Angono to Lucena =====> 110 km


Lucena to DEO =====> 130 km
DEO - Project Site 18.282

258.282 km
Prepared by:

BOB JAYSON D. VELUZ


Engineer II
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and
Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

Average Hauling Distance:


= 258,282.00 m. or 258.28 km

Average Hauling Distance:

D= 258,282.00 m.

C.3. COMPUTATION OF CYCLE TIME


FOR: Borrow/Fill, Subbase Aggregate, Aggregate Base Course, Crushed Aggregate Base Course,
Concrete Aggregate

Average Hauling Distance 258,282.00 m.


Loading Time 3.00 min
Loaded Travel Time:
First 200 m. @ 30 kph = 0.40 min.
Succeeding 257882 m. @ 40 kph = 386.82 min.
Next 200 m. @ 30 kph = 0.40 min.
Unload and Maneuver = 2.00 min.
Return Empty
First 200 m. @ 40 kph = 0.30 min.
Succeeding 257882 m. @ 50 kph = 309.46 min.
Next 200 m. @ 40 kph = 0.30 min.
Cycle Time = 702.68 min.
Allowance for Delay = 70.27 min.
Total Cycle Time, T = 772.95 min.

T= 772.95 min.

Prepared by:

BOB JAYSON D. VELUZ


Engineer II
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and
Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

Hauling Outputs : (Borrow/Fill, Subbase Aggregate, Aggregate Base Course, Crushed Aggregate Base
Course, Concrete Aggregate)
Dump Truck Capacity = 10.00 cu.m.
No. of trips per hr 60.00 min/hr trips/hr
= = 0.08
per Dump Truck 772.95 min/trip Dump Truck

No. of trips per day = 480.00 min/day = 0.60 trips/day


per Dump Truck 772.95 min/trip Dump Truck
Estimated Number of = 10.00 cu.m. = 17.00 Dump Truck
Dump Trucks 0.60 trips/day/DT
Estimated Number of 10.00 cu.m. say
= = 77.00
Dump Trucks 0.08
0.13 trips/hr/DT*77
Hauled Volume in cu.m./hour = = 59.77 cu.m./hr.
DT* 10.00 cu.m.
2.00 trips/day/DT*5
Hauled Volume in cu.m./day = = 102.00 cu.m./day
DT* 10.00 cu.m.

Computation of Hauling Cost per cubic meter per hour


FOR: Borrow/Fill, Subbase Aggregate, Aggregate Base Course, Crushed Aggregate Base Course,
Concrete Aggregate
Dump Truck rental cost per hour = ₱1,420.00
Dump Truck rental cost per day = ₱11,360.00
₱11,360.00 per day
Cost per cu.m. = x 17 DT = ₱1,893.33
102.00 cu.m./day
₱1,893.33 per cu.m.
Delivery Cost per cu.m. per km = = ₱7.33 per cu.m./km
258.28 km.
say = ₱7.30 per cu.m./km

HAULING COST = ₱7.30 per cu.m./km

Prepared by:

BOB JAYSON D. VELUZ


Engineer II
oad Slips, Slope Collapse and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000
###
###
### Upgrading (Asphalt to Concrete) with 280 mm slab along Catanauan-Buenavista Road, K0278 + 600 - K0279 + 100
###
###
###

HAULING COST ANALYSIS


F

UNIT COST per HAULING COST TOTAL UNIT


DESCRIPTION UNIT BASIC PRICE SOURCE OF HAULING cu.m./ km. COST
(Pesos) MATERIALS DISTANCE (km.)
(Pesos) (Pesos) (Pesos)
###

Angono,
p 1 Gravel (G1) cu.m. ₱715.00
Rizal
258.28 ₱7.30 ₱ 1,885.46 ₱ 2,600.46

p Angono,
2 Gravel (G3/4) cu.m. ₱682.00 258.28 ₱7.30 ₱ 1,885.46 ₱ 2,567.46
Rizal

3 Natural Gravel cu.m. ₱630.00 Angono, 258.28 ₱7.30 ₱ 1,885.46 ₱ 2,515.46


Rizal

4 Fine Aggregate (Sand) cu.m. ₱650.00 Angono, 258.28 ₱7.30 ₱ 1,885.46 ₱ 2,535.46
Rizal

5 Boulders cu.m. ₱750.00 Angono, 258.28 ₱7.30 ₱ 1,885.46 ₱ 2,635.46


Rizal

Common Borrow: ₱308.00 Cement: ₱ 250.00


Gravel (G1): ₱2,600.46 Sand: ₱ 2,535.46
Gravel (G3/4): ₱2,567.46
40% of Binder (Common Borrow) = 0.4 (P308.00)= ₱123.20
60% of Gravel (G1)= 0.6 (P2,533.7) = ₱1,560.28
Subbase Course = ₱1,683.48

Computation for Crushed Agg. Surface Couse:


35% of Binder (Common Borrow) = 0.35 (P308.00)= ₱107.80
65% of Gravel (G3/4)= 0.65 (P2,570.73) = ₱1,668.85
Crused Agg. Surface Course = ₱1,776.65

Prepared by:

BOB JAYSON D. VELUZ


Engineer II
LABOR & EQUIPMENT RATE
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse and Landslide along
Catanauan - Buenavista Road, K0266+300 - K0267+000

EQUIPMENT RATE PER HOUR RATE PER DAY


Air Compressor 965.00 / hour 7,720.00 / day
Asphalt Distributor, 10 ft. wide (5 ton) 936.00 / hour 7,488.00 / day
Asphalt Paver (80Hp) NF220BIIVDM 1,833.00 / hour 14,664.00 / day
Asphalt Batch Plant (60-80 TPH) 4,286.63 / hour 34,293.04 / day
Applicator Machine 93.75 / hour 750.00 / day
Backhoe (0.80 cu.m) 1,537.00 / hour 12,296.00 / day
Backhoe w/ Breaker (0.80 cu.m) 1,998.10 / hour 15,984.80 / day
Backhoe Wheel Type (0.28 cu.m) 922.00 / hour 7,376.00 / day
Bar Bender 351.50 / hour 2,812.00 / day
Bar Cutter, Single Phase 219.75 / hour 1,758.00 / day
Batching Plant (30 cu.m) 1,759.50 / hour 14,076.00 / day
Bentonite Bin Set 280.00 / hour 2,240.00 / day
Bentonite Mixer 173.00 / hour 1,384.00 / day
Boom Truck (2-5 mt) 1,017.90 / hour 8,143.20 / day
Bulldozer, D6H SERIES II PSDS/DD 3,379.00 / hour 27,032.00 / day
Cargo Truck (9-10mt) 1,212.00 / hour 9,696.00 / day
Cargo Truck (2-5mt) 783.00 / hour 6,264.00 / day
Chain Saw 75.36 / hour 602.88 / day
Compressor w/ Jack Hammer 1,300.82 / hour 10,406.56 / day
Concrete Batch Plant (30 cu.m) 1,759.50 / hour 14,076.00 / day
Concrete Saw, Blade 14"dia (7.5 Hp) 32.63 / hour 261.04 / day
Concrete Screeder (5.5 Hp) 545.00 / hour 4,360.00 / day
Concrete Vibrator 91.25 / hour 730.00 / day
Crawler Crane (25 T) 1,384.00 / hour 11,072.00 / day
Crawler Crane (45 T) 1,772.00 / hour 14,176.00 / day
Cutting Outfit 45.45 / hour 363.60 / day
Dumptruck (12 yd³) 1,420.00 / hour 11,360.00 / day
Drilling Rig 12,637.00 / hour 101,096.00 / day
Drop Hammer w/ accessories (20T) 100.00 / hour 800.00 / day
Elastomeric Bearing Pad 6800.00/pc 6800.00/pc
Generator Set (301-350 KW) 758.77 / hour 6,070.16 / day
Hopper Barge (550 cu.m net cap.) 1,133.00 / hour 9,064.00 / day
Jackhammer 150.00 / hour 1,200.00 / day
Kneading Machine 187.50 / hour 1,500.00 / day
Lighting System/Tower Lights 543.00 / hour 4,344.00 / day
Motorized Road Grader (140 hp), G710A 2,173.00 / hour 17,384.00 / day
One Bagger Mixer 172.00 / hour 1,376.00 / day
Payloader (1.50 cu.m) 1,733.00 / hour 13,864.00 / day
Plate Compactor (5 Hp) 123.00 / hour 984.00 / day
Pneumatic Tire Roller (10 m.t) 561.00 / hour 4,488.00 / day
Power Broom (2 m wide) 130.54 / hour 1,044.32 / day
Service Crane (25 T, 145 Hp) 1,384.00 / hour 11,072.00 / day
Service Truck 783.00 / hour 6,264.00 / day
Service Vehicle 312.50 / hour 2,500.00 / day
Streesing (Jack) Machine 10,000.00 / hour 80,000.00 / day
SPT & Desanding Machine 559.00 / hour 4,472.00 / day
Tandem Steel Roller (10.1 m.t), CC421 1,652.00 / hour 13,216.00 / day
Traffic Safety Devices 62.50 / hour 500.00 / day
Transit Mixer (5 cu.m) 1,318.00 / hour 10,544.00 / day
Tremie Pipe set 320.00 / hour 2,560.00 / day
Truck Mounted Crane (35T) 1,861.00 / hour 14,888.00 / day
Truck Mounted Crane (45T) 2,606.00 / hour 20,848.00 / day
Tug boat (21.96x6.31x2.49) 1,884.00 / hour 15,072.00 / day
Vibratory Roller (10mt), SD100DC 1,846.00 / hour 14,768.00 / day
Vibro Hammer (Hydraulic Operated) 2,123.00 / hour 16,984.00 / day
Water Pump, 100 mm suction 266.25 / hour 2,130.00 / day
Water Truck/Pump (1600 L) 2,450.00 / hour 19,600.00 / day
Wood/Steel Ladder 100.00 / hour 800.00 / day
Welding Machine 371.00 / hour 2,968.00 / day
Source: Detailed Unit Price Analysis (DUPA) from Central Office 2015

LABOR RATE PER HOUR RATE PER DAY


Project Engineer 152.71 / hour 1,221.68 / day
Batching Plant Engineer 152.71 / hour 1,221.68 / day
Mechanical Engineer 152.71 / hour 1,221.68 / day
Electrical Engineer 152.71 / hour 1,221.68 / day
Construction Foreman 98.96 / hour 791.68 / day
Traffic Enforcer 90.73 / hour 725.84 / day
Traffic Aide 55.18 / hour 441.44 / day
Driver 71.44 / hour 571.52 / day
Safety Officer 66.69 / hour 533.48 / day
First Aider 62.50 / hour 500.00 / day
Leadman 90.73 / hour 725.84 / day
Skilled Labor 71.44 / hour 571.52 / day
Semi Skilled Labor 65.95 / hour 527.60 / day
Unskilled Laboratory Technician 48.59 / hour 388.72 / day
Unskilled Labor 55.18 / hour 441.44 / day
Source: Standard Labor Rates for DPWH-Regional/Destrict Engineering Offices

MARK UP
ESTIMATED DIRECT COST TOTAL
OCM PROFIT
Up to P5M 15% 10% 25%
Above P5M up to P50M 12% 8% 20%
Above P50M up to P150M 10% 8% 18%
Above P150M 8% 8% 16%

Govern! 12% 8% 20%

TAXES PERCENTAGE TOTAL


Value Added Tax (VAT) 5% 5%
Source: D.O. 197 series of 2016

Prepared by:

BOB JAYSON D. VELUZ


Engineer I
Malicboy Jct. N
K0158+(-)958 fr. Lucena

QUEZON III MAP W


NW NE

E
UnisanJct. SW SE
K0198+590 fr. Atimonan
MALICBOY K0188+848 fr. Lucena

TO PAGBILAO
GUITONG

SIPA
M OA
NN
Pototanin Jct.
S SITE
K0214+235 fr. Gumaca
O AT
I

Buenavista Jct.
T

HINGUIN
K0203+490 fr. Lucena
UMC
A A K0216+(-)962 fr. Pitogo K0249+181 fr. Lopez
PADRE BURGOS
G

Jct. K0279+100 fr. Catanauan


O
T

MARAO

KINAGUNAN
SUMMIT K0250+(-)800 fr.
AGDANGAN PANAON AMONTAY
Buenavista
KALILAYAN
CAIGDAL RIZAL POTOTANIN
GANGAHIN
POCTOL
UNISAN DELA PAZ
PITOGO

Z
PACATIN PINAGBAYANAN SAN VICENTE MAGALLANES

P
OE
MACALELON
OL
BAGONG SILANG
BATABAT
T
TAGUIN LILUKIN Abuyon Jct.
OLONGTAO
MALAYA
SAN PABLO SUHA CATULIN
K0294+023 fr. Gumaca
BUENAVISTA
SAN IGNACIO
SAN JOSE STA. MARIA MILAGROSA
RIZAL SAN DIEGO K0267+506 fr. Buenavista
MALIGAYA
GEN. LUNA ILA. DOONGAN
BUKAL
SAN VICENTE
CANCULAJAO SAN ROQUE
SAN ISIDRO PIDAC NAVITAS ANUSAN
SAN ISIDRO
DAHICAN CAWAYANIN SAN JOSE ANYAO
BACONG MAGUITING
BOLO
TAYABAS BAY
TAGBAKAN ILA.
M.SABANG SIL. CATANAUAN CAMANDISON BURGOS San Narciso Jct.
CAMANDISON
PACABIT CALWIT
LAKDAYAN
SABIT
K0301+562 fr. Gumaca
M.SABANG KAN. MADULAO SAN NARCISO
SAN ANTONIO PALA
MAGSAYSAY CAMBUGA BUENAVISTA K0401+804 fr. Sn Andres
ANDRES BONIFACIO
RIZAL
SAN JUAN
MULANAY BINAY
BIGO PUNTA
Lopez- Catanauan Jct. BOTANIOG
AMOGUIS WHITE CLIFF
SAN ISIDRO
K0258+612 fr. Gumaca BUENAVISTA
F.NANADIEGO VILLA REYES PUGSO POINT

K0255+199 fr. Lopez CANUYEP PAKIING


ILA.YUNI VIGO CENTRAL
MATATAJA
ILA. TAYUMAN

IBA. TAYUMAN TALA

CAWAYANIN I

SAN FRANCISCO
Catanauan- Buenavista INABUAN
ALIBIHABAN

Jct. SILONGIN
CAMFLORA

K0261+450 fr. Gumaca


CASAY SAN ANDRES
K0250+(-)482 fr.
Catanauan DON JUAN VERCELOS

BUTANGUIAD FISH PORT

PUGON

D.E.O. NASALAAN

PAGSANGAHAN
PANSOY

MANGERO

TALISAY

SIBUYAN SEA
San Francisco Pob.
K0311+850 fr. Mulanay Jct.
K0312+(-)100 fr. San
Francisco

DESTINATION LRP'S CHAINAGE LENGTH


Lucena to Project Site 130.000

TOTAL 130.000

Prepared by:

BOB JAYSON D. VELUZ


Engineer II
COSTING OF MATERIALS
Repair/Rehabilitation/Improvement of Slope Protection Structure with Road Slips, Slope Collapse
and Landslide along Catanauan - Buenavista Road, K0266+300 - K0267+000

DISTANCE

Lucena to DEO =====> 130.000km


DEO - Project Site 18.282km

148.282km
ADJUSTED UNIT
MATERIALS UNIT COST HAULING RATE
COST
Portland Cement 260.00/bag 0.25/bag/km 297.07/bag
1/2"dia x 6" Bolt w/ Nuts & Washer 48.00/pc - 48.00/pc
1/2"thk Marine Plywood 900.00/pc - 900.00/pc
1/2"thk Ordinary Plywood 700.00/pc - 700.00/pc
1/4"thk Ordinary Plywood 400.00/pc - 400.00/pc
1/4"x12"x12" Post Trap 50.00/pc - 50.00/pc
5/8"dia x 9" Bolt w/ Nuts & Washer 28.00/pc - 28.00/pc
5/8"dia x 1" Bolt w/ Nuts & Washer 21.00/pc - 21.00/pc
4" Concrete Hollow Blocks 15.00/pc - 15.00/pc
6" Concrete Hollow Blocks 18.00/pc - 18.00/pc
10mm Square Bar 60.00/kg 60.00/kg
12x12mm Sealant 40.00/l.m - 40.00/l.m
12.70 dia. S.R. Strunds 62.75/kg 62.75/kg
75mmØ GI Pipe 433.33/pc - 433.33/pc
Sign Face, 3mm thk. Aluminum Sheet 3800.00/pc 3800.00/pc
Aggregate Base Course 1300.00/cu.m 7.30/cu.m/km 2382.46/cu.m
Aggregate Sub-Base Course 600.00/cu.m 7.30/cu.m/km 1682.46/cu.m
Aggregate Surface Course (Crushed) 1400.00/cu.m 7.30/cu.m/km 2482.46/cu.m
Aggregates, sand 1000.00/cu.m 7.30/cu.m/km 2082.46/cu.m
Aggregates, 3/8 1635.00/cu.m 7.30/cu.m/km 2717.46/cu.m
Anchorage Block with accesories 300.00/pc 300.00/pc
Asphalt Cement Penetration Grade 60-70 74851.00 /M.T. - 74851.00 /M.T.
Asphalt Sealant 44.00/lit - 44.00/lit
Bituminous Concrete Surface Course 6500.00 /M.T. 6500.00 /M.T.
Boulders 1000.00/cu.m 2635.46/cu.m
Calsumine 25.00/kg - 25.00/kg
Coco Lumber 35.00/bd.ft - 35.00/bd.ft
Coco Fiber Roll (CGR 200) 480.00/l.m - 480.00/l.m
Common Wire Nail 80.00/kg - 80.00/kg
Concrete Saw Diamond Blade (14") 8000.00/pc - 8000.00/pc
Corr. Roofing Ga. 26 (0.55l.m) 255.00/sq.m 255.00/sq.m
Curring Compound 55.00/lit - 55.00/lit
Doors and Window 690.00/sq.m - 690.00/sq.m
Ducts 80.00/l.m 80.00/l.m
Elastomeric Bearing Pad 6800.00/pc 6800.00/pc
Emulsified Asphalt SS-1 74851.00 /M.T. - 74851.00 /M.T.
Formworks/Plywood 500.00/sq.m 500.00/sq.m
Ord. Flushing #24 (0.701mm) 105.00/l.m - 105.00/l.m
Ord. Ridge Roll Ga. 24 (0.701mm) 105.00/l.m - 105.00/l.m
Filter Cloth 190.00/sq.m - 190.00/sq.m
Fuel Diesel 45.00/lit 45.00/lit
Gabions Wire Mesh (1m x 1m x 2m) 2550.00/pc 2550.00/pc
Glass Beads 905.00/bag - 905.00/bag
Good Lumber 60.00/bd.ft - 60.00/bd.ft
G.I. Flat Bar 1 1/2" x 1/8" 55.00/kg 55.00/kg
G.I. Bolts w/ Nuts & Washer, 5mmØ 12.00/pc 12.00/kg
G.I. Bolts w/ Nuts & Washer, 2mmØ 10.00/pc 10.00/kg
G.I. Pipe 50mmǾ 1500.00/l.m - 1500.00/l.m
G.I. Pipe 150mmǾ 1500.00/l.m - 1500.00/l.m
Gravel,3/4 1050.00/cu.m 2567.46/cu.m
Gravel,G1 1000.00/cu.m 2600.46/cu.m
Gravel Fill, G1 1000.00/cu.m 2600.46/cu.m
Grease/Tar 112.00/lit - 112.00/lit
LPG (12 kg.) 780.00 /cyl - 780.00 /cyl
LPG (50 kg.) 3250.00 /cyl - 3250.00 /cyl
Lubricant 290.00/lit 290.00/lit
Metal Beam Guardrail 1490.00/l.m 1490.00/l.m
Mineral Filler 240.00/bag 240.00/bag
Metal Guardrail End Piece 1650.00/pc 1650.00/pc
Natural Gravel 515.00/cu.m 7.30/cu.m/km 1597.46/cu.m
Break Fluid 160.00/lit 160.00/lit
Oxy/Acetylene 2500.00/set 2500.00/set
Paint Roller 85.00/pc 85.00/pc
Paver Blocks 1500.00/sq.m 1500.00/sq.m
PEJ Filler 12mm 1600.00/sq.m 1600.00/sq.m
Pipe Sleeve, 1" dia. 34.33/pc - 34.33/pc
Pipe Sleeve, 1 1/2" dia. 57.67/pc - 57.67/pc
Pipe Sleeve, 2" dia. 90.00/pc - 90.00/pc
Plate 2.00/pc 2.00/pc
Primer White 208.00/lit - 208.00/lit
Primer Yellow 225.00/lit - 225.00/lit
Reinforcing Steel Bar, Grade 40 41.00/kg 0.10/kg/km 55.83/kg
Reinforcing Steel Bar, Grade 60 43.00/kg 0.10/kg/km 57.83/kg
RC Pipe (610mm) 1800.00/pc 8.00/pc/km 2986.26/pc
RC Pipe (910mm) 4000.00/pc 8.00/pc/km 5186.26/pc
RC Pipe (1220mm) 4700.00/pc 8.00/pc/km 5886.26/pc
Ready Mix Concrete (3000psi) 14days 6100.00/cu.m 6100.00/cu.m
Ready Mix Concrete (4000psi) 14days 6700.00/cu.m 6700.00/cu.m
Ready Mix Concrete (5000psi) 28days 7000.00/cu.m 7000.00/cu.m
Reflectorized Traffic Paint 460.00/lit - 460.00/lit
Roofing Nail 90.00/kg - 90.00/kg
Rope, 1" dia. - 5 uses 20.00/l.m 20.00/l.m
Packing Tape 75.00/roll 75.00/roll
Sand 1000.00/cu.m 2535.46/cu.m
Sand Bedding 1000.00/cu.m 2535.46/cu.m
Selected Borrow 334.00/cu.m 7.30/cu.m/km 1416.46/cu.m
4x2 (3.0L) Pick Up Type Service Vehicle 1,500,000.00 1,500,000.00
Steel Block 250.00/pc 250.00/pc
Steel Casing 37,564.00 37,564.00
Steel Casing 1.20 dia. (10mm thick) 14,205.00 14,205.00
Steel Casing 1.50 dia. (10mm thick) 17,756.00 17,756.00
Steel Forms (150 mm) 89.00/l.m - 89.00/l.m
Steel Forms (230 mm) 120.00/l.m - 120.00/l.m
Steel Forms (280 mm) 180.00/l.m - 180.00/l.m
Steel Sheet Pile 56.00/kg 0.10/kg/km 70.83/cu.m
Tarpulin (4'x8') 25.00/sq.ft 25.00/sq.ft
Thermoplastic Paint (White) 1575.00/bag - 1575.00/bag
Thermoplastic Paint (Yellow) 1800.00/bag - 1800.00/bag
Tie Wire 80.00/kg - 80.00/kg
Weep Holes (3" PVC) 160.00/l.m - 160.00/l.m
Welding Rod 106.00/kg 106.00/kg
Vetiver Grass System 110.00/sq.m - 110.00/sq.m

Removal Electrical Post Materials


Steel Pole 30 Standard 13037.14/pc 13037.14/pc
Machine Bolt 5/8'x8" 39.11/pc 39.11/pc
Oval eye bolt, 5/8"x8" 97.50/pc 97.50/pc
Washer, 2-1/4"x2-1/4"x3/16" hole 18.75/pc 18.75/pc
Washer, 4"x4"x1/2", 13/16" hole 146.79/pc 146.79/pc
Locknut, 5/8" 13.39/pc 13.39/pc
Spool insulator,1-3/4" dia. Groove 24.64/pc 24.64/pc
Clevis secondary swinging w/o spool 94.29/pc 94.29/pc
Clamp guy, 3 bolts, 6" long, Heavy Duty 214.29/pc 214.29/pc
Ground wire iron 5/16 24.61/pc 24.61/pc
Jumper #4AWG al.alloy stranded (M.) 15.82/pc 15.82/pc
Guy wire,S-M, 7-stranded(M.) 34.27/pc 34.27/pc
Guy hook, J 39.64/pc 39.64/pc
Anchor Rod treaded single eye, 5/8 x 7 361.07/pc 361.07/pc
Anchor Block, 6" x 3"'-0 964.29/pc 964.29/pc

Prepared by:

BOB JAYSON D. VELUZ


Engineer II
PART A
✘ A.1.1 (1)
A.1.1 (2)
A.1.1 (3)
A.1.1 (4)
A.1.1 (5)
A.1.1 (6)
A.1.1 (7)
A.1.1 (8)
A.1.1 (9)
A.1.1 (10)
A.1.1 (11)
A.1.1 (12)
A.1.1 (13)
A.1.1 (14)
A.1.1 (15)
A.1.1. (16)
A.1.1. (17)
A.1.1 (18)
A.1.2 (1)
A.1.2 (2)
A.1.2 (3)
A.1.2 (4)
A.1.2 (5)
A.1.2 (6)
A.1.2 (7)
A.1.2 (8)
A.1.2 (9)
A.1.3 (1)
A.1.3 (2)
A.1.3 (3)
A.1.3 (4)
A.1.4 (1)
A.1.5 (1)
A.1.5 (2)

PART B
B.1
B.2
B.3
B.4 (1)
B.4 (2)
B.4 (3)
B.4 (4)
B.4 (5)
B.5 (6)
B.5 (7)
B.5 (8)
B.5 (9)
B.5 (10)
B.5
B.6
B.7
B.8
B.9
B.10
B.11
B.12
B.13
B.14
B.15 (1)
B.15 (2)
B.16
B.17
B.18 (1)
B.18 (2)
B.19

PART C
100 (1)
100 (2)
100 (3)a1
100 (3)a2
100 (3)a3
100 (3)a4
100 (4)
101 (1)
101 (2)
101 (3)a1
101 (3)a2
101 (3)a3
101 (3) a4
101 (3)a5
101 (3)a6
101 (3)a7
101 (3)a8
101 (3)b1
101 (3) b2
101 (3)b3
101 (3)b4
101 (3)b5
101 (3)b6
101 (3)b7
101 (3)b8
101 (3)c1
101 (3)c2
101 (3)d
101 (4)a1
101 (4)a2
101 (4)a3
101 (4)a4
101 (4)a5
101 (4)a6
101 (4)b
101 (4)c
101 (5)a1
101 (5)a2
101 (5)a3
101 (5)a4
101 (5)a5
101 (5)a6
101 (5)a7
101 (5)b1
101 (5)b2
101 (5)b3
101 (5)b4
101 (5) b5
105 (5) c1
101 (5)c2
101 (5) c3
101 (5)c4
101 (5) c5
101 (5) c6
101 (5)c7
101 (6)
101 (7)a
101 (7)b
101 (7)c
101 (8)
101 (9)
101 (10)
102 (1)
102 (2)
102 (3)a
102 (3)b
102 (4)
103 (1)a
103 (1)b
103 (1)c
103 (2)a
103 (2)b
103 (2)c
103 (3)
103 (4)

103 (5)b
103 (6)a
103 (6) b
103 (6) c
104 (7)
104 (1)b
104 (1)c
104 (2)a
104 (2)b
104 (2)c
104 (2)d
104 (2) e
104 (3)a
104 (3)b
104 (4)
104 (5)
104 (6)
105 (1)a
105 (1)b
105 (1)c
105 (1)d
105 (1)e
105 (1)f
106 (1)
107 (1)
107 (2)
107 (3)
107 (4)

PART D
200(1)
201(1)
202 (1)
203 (1)a
203 (1) b
204 (1)a
204 (1) b
205 (1)a
205 (1)b
205 (1)
207 (1)a
207 (1)b
208 (1)
209 (1)
PART E
300 (1)
300 (2)
301 (1)a
301 (1)b
301 (1)c
301 (1)d
301 (1)e
301 (2)a
301 (2)b
301 (2)c
301 (2)d
302 (1)a
302 (1)b
302 (1)c
302 (1)d
302 (2)
303 (1)a
303 (1)b
303 (1)c
303 (2)a
303 (2)b
303 (2)c
303 (2)d
303 (2)e
303 (3)a
303 (3)b
303 (3)c
303 (3)d
303 (4)
304 (1)
304 (2)
304 (3)a
304 (3)b
304 (3)c
304 (3)d
304 (4)a
304 (4)b
304 (4)c
304 (4)d
304 (4)e
304 (5)
305 (2)
305 (3)a
305 (3)b
305 (3)c
305 (3)d
305 (4)
306 (1)
306 (2)
308 (1)
309 (1)
310(1)a1
310(1)a2
310(1)a3
310(2)
310(3)
310(4)a1
310(4)a2
310(4)a3
310(5)
310(6)a1
310(6)a2
310(6)a3
311(1)a
311(1)b
311(1)c1
311(1)c2
311(1)c3
311(1)d1
311(1)d2
311(1)d3
311(1)e1
311(1)e2
311(1)e3
311(1)f1
311(1)f2
311(1)f3
311(1)g1
311(1)g2
311(1)g3
311(1)h1
311(1)h2
311(1)h3
311(2)a
311(2)b
311(2)c1
311(2)c2
311(2)c3
311(2)d1
311(2)d2
311(2)d3
311(2)e1
311(2)e2
311(2)e3
311(2)f1
311(2)f2
311(2)f3
311(2)g1
311(2)g2
311(2)g3
311(2)h1
311(2)h2
311(2)h3
311(3)a1
311(3)a2
311(3)a3
311(3)b1
311(3)b2
311(3)b3
311(3)c1
311(3)c2
311(3)c3
311(3)d1
311(3)b2
311(3)d3
311(3)e1
311(3)e2
311(3)e3
311(3)f1
311(3)f2
311(3)f3
311(4)a1
311(4)a2
311(4)a3
311(4)a4
311(4)a5
311(4)b1
311(4)b2
311(4)b3
311(4)b4
311(4)b5
311(5)a1
311(5)a2
311(5)a3
311(5)a4
311(5)a5
311(5)b1
311(5)b2
311(5)b3
311(5)b4
311(5)b5
313(1)
PART F
400 (1)
400 (2)
400 (3)a
400 (3)b
400 (3)c
400 (3)d
400 (4)a1
400 (4)a2
400 (5)a1
400 (5)a2
400 (6)
400 (7)
400 (8)
400 (9)
400 (10)
400 (11)
400 (12)
400 (13)
400 (14)
400 (15)
400 (16)
400 (17)a1
400 (17)a2
400 (17)a3
400 (17)a4
400 (17)a5
400 (17)a6
400 (17)a7
400 (17)a8
400 (17)a9
400 (17)a10
400 (17)a11
400 (17)a12
400 (17)a13
400 (17)a14
400 (17)a15
400 (17)a16
400 (17)a17
400 (17)a18
400 (17)a19
400 (17)a20
400 (17)a21
400 (17)a22
400 (17)a23
400 (18)a1
400 (18)a2
400 (19)a1
400 (19)a2
400 (20)
400 (21)
400 (22)
400 (23)a1
400 (23)a2
400 (23)a3
400 (23)a4
400 (23)a5
400 (23)a6
400 (23)a7
400 (23)a8
400 (23)a9
400 (23)a10
400 (23)a11
400 (23)a12
400 (23)a13
400 (23)a14
400 (23)a15
400 (23)a16
400 (23)a17
400 (23)a18
400 (23)a19
400 (23)a20
400 (23)a21
400 (23)a22
400 (23)a23
400 (24)a1
400 (24)a2
400 (24)a3
400 (24)b1
400 (24)b2
400 (24)b3
400 (24)c1
400 (24)c2
400 (24)c3
400 (24)d1
400 (24)d2
400 (24)d3
400 (24)e1
400 (24)e2
400 (24)e3
400 (24)f1
400 (24)f2
400 (24)f3
400 (24)g1
400 (24)g2
400 (24)g3
400 (24)h1
400 (24)h2
400 (24)h3
400 (24)i1
400 (24)i2
400 (24)j1
400 (24)j2
400 (24)k1
400 (24)k2
400 (24)l1
400 (24)l2
400 (24)m1
400 (24)m2
400 (24)n1
400 (24)n2
400 (24)o1
400 (24)o2
400 (24)p1
400 (24)p2
400 (24)q1
400 (24)q2
400 (24)r1
400 (24)r2
400 (24)s1
400 (24)s2
400 (24)t1
400 (24)t2
400 (24)u1
400 (24)u2
400 (24)v1
400 (24)v2
400 (24)w1
400 (24)w2
400 (25)
400 (26)
400 (27)a
400 (27)b
400 (28)
400 (29)a1
400 (29)a2
400 (29)a3
400 (30)a1
400 (30)a2
400 (30)
401 (1)a
401 (1)b
401 (2)a
401 (2)b
401 (2)c
401 (3)
401 (4)
402 (2)
402 (2)
403 (1)
403 (2)
403 (3)
403 (4)
403 (5)
403 (6)
404 (1)a
404 (1)b
404A (1)a
404A (1)b
405 (1)a1
405 (1)a2
405 (1)a3
405 (1)b1
405 (1)b2
405 (1)b3
405 (2)a
405 (2)b
405 (2)a
405 (3)b
405 (3)a1
405 (4)a2
405 (4)a3
405 (4)b1
405 (4)b2
405 (4)b3
405 (5)
405 (6)
406 (1)a1
406 (1)a2
406 (1)a3
406 (1)b1
406 (1)b2
406 (1)b3
406 (1)b4
406 (1)b5
406 (1)c1
406 (1)c2
406 (1)c3
406 (1)c4
406 (1)c5
406 (1)c6
406 (1)c7
406 (1)d1
406 (1)d2
406 (1)d3
406 (1)d4
406 (1)d5
406 (1)d6
406 (1)d7
406 (1)d8
406 (1)d9
406 (1)e1
406 (1)e2
406 (1)e3
406 (1)e4
406 (1)e5
406 (1)e6
406 (1)e7
406 (1)e8
406 (1)f1
406 (1)f2
406 (1)f3
406 (1)f4
406 (1)f5
406 (1)f6
406 (1)f7
406 (1)f8
406 (1)f9
406 (1)f10
406 (1)f11
406 (1)f12
406 (1)g1
406 (1)g2
406 (1)g3
406 (1)g4
406 (1)g5
406 (1)g6
406 (1)g7
406 (1)g8
406 (1)g9
406 (1)g10
406 (1)g11
406 (1)g12
406 (1)h1
406 (1)h2
406 (1)h3
406 (1)h4
406 (1)h5
406 (1)h6
406 (1)h7
406 (1)h8
406 (1)h9
406 (1)h10
406 (1)h11
406 (1)h12
406 (1)h13
406 (1)a
406 (1)b
406 (1)a
406 (1)b
407 (1)
407 (2)
407 (3)
407 (4)
407 (5)
407 (6)
407 (7)
407 (8)
408 (1)
409 (1)
410 (1)
410 (2)
411 (1)
411(2)
412 (1)
413 (1)a
413 (1)b
414 (1)
415 (10)
416 (1)a
416 (1)b
416 (1)c
416 (2)
416A (1)
417 (1)a
417 (1)b
417 (1)c
418 (1)

500 (1)a1
500 (1)a2
500 (1)a3
500 (1)a4
500 (1)a5
500 (1)a6
500 (1)b1
500 (1)b2
500 (1)b3
500 (1)b4
500 (1)b5
500 (1)b6
500 (2)
501 (1)
501 (2)
501 (3)
502 (1)a1
502(1)a2
502(1)a3
502(1)a4
502(1)a5
502(1)a6
502(1)b1
502(1)b2
502(1)b3
502(1)b4
502(1)b5
502(1)b6
502(2)a1
502(2)a2
502(2)a3
502(2)a4
502(2)a5
502(2)a6
503(3)a1
503(3)a2
503(3)a3
503(3)a4
503(3)a5
503(3)a6
502 (4)a1
502 (4)a2
502 (4)a3
502 (4)a4
502 (4)a5
502 (4)a6
502 (5)
502 (6)
502 (7)
502 (8)
503 (1)
503 (2)
504 (1)a1
504 (1)a2
504 (1)a3
504 (1)a4
504 (1)a5
504 (1)a6
504 (2)a1
504 (2)a2
504 (2)a3
504 (2)a4
504 (2)a5
504 (2)a6
504 (3)a1
504 (3)a2
504 (3)a3
504 (3)a4
504 (3)a5
504 (3)a6
504 (4)
505(1)a
505(1)b
505(1)c
505(1)d
505(2)a
505(2)b
505(2)c
505(2)d
505(3)
1711
1713(1)
508 (1)
509(1)
509(2)a
509(2)b
509(3)a
509(3)b
509(3)c
510 (1)
103 (5)a
511 (1)
511 (2)
511 (3)
512(1)a
512(1)b
512(1)c
512(1)d
512(1)e
512(2)
512(3)
513 (1)
514 (1)
514 (2)
515 (1)
515 (2)
515 (3)
516 (1)
516 (2)
513(1)
517 (1)b
520 (1)
522 (1)
522 (1)
522 (1)
522 (2)

PART H
602 (1)a
602 (1)b
602 (2)a
602 (2)b
602 (2)c
602 (3)a
602 (3)b
602 (4)a
602 (4)b1
602 (4)b2
602 (4)b3
602 (5)
602 (6)
603 (1)
603 (2)
603 (3)a1
603 (3)a2
603 (4)a
603 (4)b
603 (4)c
603 (5)
604 (1)
604 (2)
604 (3)
604 (4)
604 (5)
605 (1)a1
605 (1)a2
605 (1)a3
605 (1)b1
605 (1)b2
605 (1)b3
605 (1)c1
605 (1)c2
605 (1)c3
605 (1)d1
605 (1)d2
605 (1)d3
605 (1)e1
605 (1)e2
605 (1)f1
605 (1)f2
605 (1)g1
605 (1)g2
605 (1)g3
605 (1)g4
605 (1)h1
605 (1)h2
605 (1)h3
605 (1)h4
605 (1)i1
605 (1)i2
605 (1)i3
605 (1)j1
605 (1)j2
605 (1)j3
605 (1)j4
605 (1)k1
605 (1)k2
605 (1)k3
605 (1)k4
605 (1)l1
605 (1)l2
605 (1)l3
605 (1)l4
605 (1)m1
605 (1)m2
605 (1)m3
605 (1)n1
605 (1)n2
605 (1)n3
605 (1)o1
605 (1)o2
605 (1)o3
605 (1)p1
605 (1)p2
605 (1)p3
605 (1)p4
605 (1)q1
605 (1)q2
605 (1)q3
605 (1)q4
605 (1)r1
605 (1)r2
605 (1)s1
605 (1)s2
605 (1)s3
605 (1)s4
605 (1)t1
605 (1)t2
605 (1)t3
605 (1)t4
605 (1)t5
605 (1)t6
605 (1)u1
605 (1)u2
605 (1)u3
605 (1)u4
605 (1)u5
605 (1)u6
605 (1)v1
605 (1)v2
605 (1)v3
605 (1)v4
605 (1)w1
605 (1)w2
605 (1)w3
605 (1)w4
605 (1)x1
605 (1)x2
605 (1)y1
605 (1)y2
605 (1)y3
605 (1)y4
605 (1)z1
605 (1)z2
605 (1)z3
605 (1)z4
605 (1)aa1
605 (1)aa2
605 (1)aa3
605 (1)ab1
605 (1)ab2
605 (1)ab3
605 (1)ac1
605 (1)ac2
605 (1)ac3
605 (1)ac4
605 (1)ad1
605 (1)ad2
605 (1)ad3
605 (1)ad4
605 (1)ae1
605 (1)ae2
605 (1)ae3
605 (1)af1
605 (1)af2
605 (1)af3
605 (1)af4
605 (1)af5
605 (1)af6
605 (1)af7
605 (1)ag1
605 (1)ag2
605 (1)ag3
605 (1)ah1
605 (1)ah2
605 (1)ah3
605 (1)ah4
605 (1)ai1
605 (1)ai2
605 (1)ai3
605 (1)aj1
605 (1)aj2
605 (1)ak1
605 (1)al1
605 (1)al2
605 (1)al3
605 (1)am1
605 (1)am2
605 (1)an1
605 (1)ao1
605 (1)ao2
605 (1)ao3
605 (1)ap1
605 (1)ap2
605 (1)ap3
605 (1)aq1
605 (1)ar1
605 (1)ar2
605 (1)ar3
605 (1)as1
605 (1)as2
605 (1)as3
605 (1)at1
605 (1)at2
605 (1)at3
605 (1)au1
605 (1)au2
605 (1)au3
605 (1)av1
605 (1)av2
605 (1)av3
605 (1)aw1
605 (1)aw2
605 (1)aw3
605 (1)ax1
605 (1)ax2
605 (1)ax3
605 (1)ay1
605 (1)ay2
605 (1)ay3
605 (1)az1
605 (1)az2
605 (1)az3
605 (1)ba1
605 (1)ba2
605 (1)ba3
605 (1)bb1
605 (1)bb2
605 (1)bb3
605 (1)bb4
605 (1)bb5
605 (1)bb6
605 (1)bb7
605(2)a1
605(2)a2
605(2)a3
605(2)a4
605(2)b1
605(2)b2
605(2)b3
605(2)b4
605(2)c1
605(2)d1
605(2)d2
605(2)d3
605(2)d4
605(2)d5
605(2)d6
605(2)d7
605(2)e1
605(2)e2
605(2)e3
605(2)e4
605(2)e5
605(2)e6
605(2)e7
605(2)f1
605(2)f2
605(2)f3
605(2)f4
605(2)f5
605(2)f6
605(2)f7
605(2)g1
605(2)g2
605(2)g3
605(2)g4
605(2)g5
605(2)h1
605(2)h2
605(2)h3
605(2)h4
605(2)h5
605(2)h6
605(2)i1
605(2)i2
605(2)i3
605(2)i4
605(2)i5
605(2)j1
605(2)j2
605(2)j3
605(2)j4
605(2)j5
605(2)j6
605(2)j7
605(2)j8
605 (2) j9
605 (2)j10
605 (2)j11
605 (2)k1
605 (2)k2
605 (2)k3
605 (2)k4
605 (2)k5
605 (2)k6
605 (2)k7
605 (2)k8
605 (2)k9
605 (2)k10
605 (2)k11
605 (2)l1
605 (2)l2
605 (2)l3
605 (2)l4
605 (2)l5
605 (2)l6
605 (2)l7
605 (2)l8
605 (2)l9
605 (2)l10
605 (2)l11
605 (2)m1
605 (2)m2
605 (2)m3
605 (2)n1
605 (2)n2
605 (2)n3
605 (2)n4
605 (2)o1
605 (2)o2
605 (2)o3
605 (2)o4
605 (2)p1
605 (2)p2
605 (2)p3
605 (2)p4
605 (2)q1
605 (2)q2
605 (2)q3
605 (2)q4
605 (2)r1
605 (2)r2
605 (2)r3
605 (2)r4
605 (2)s1
605 (2)s2
605 (2)s3
605 (2)s4
605 (2)s5
605 (2)t1
605 (2)t2
605 (2)u1
605 (2)u2
605 (2)v1
605 (2)v2
605 (2)w1
605 (2)w2
605 (2)x1
605 (2)x2
605 (2)y1
605 (2)y2
605 (2)z1
605 (2)z2
605 (2)aa1
605 (2)aa2
605 (2)aa3
605 (2)ab1
605 (2)ab2
605 (2)ab3
605 (2)ac1
605 (2)ac2
605 (2)ac3
605 (2)ac4
605 (2)ae1
605 (2)af1
605 (2)ag1
605 (2)ag2
605 (2)ag3
605 (2)ag4
605 (2)ag5
605 (2)ah1
605 (2)ai1
605 (2)ai2
605 (2)ai3
605 (2)aj1
605 (2)aj2
605 (2)aj3
605 (2)ak1
605 (2)ak2
605 (2)ak3
605 (2)al1
605 (2)al2
605 (2)al3
605 (3)a1
605 (3)a2
605 (3)a3
605 (3)b1
605 (3)b2
605 (3)c1
605 (3)c2
605 (3)c3
605 (3)c4
605 (3)d1
605 (3)d2
605 (3)e1
605 (3)e2
605 (3)e3
605 (3)f1
605 (3)f2
605 (3)f3
605 (3)f4
605 (3)g1
605 (3)g2
605 (3)g3
605 (3)g4
605 (3)h1
605 (3)h2
605 (3)h3
605 (3)h4
605 (3)h5
605 (3)h6
605 (3)i1
605 (3)i2
605 (3)i3
605 (3)i4
605 (3)j1
605 (3)j2
605 (3)j3
605 (3)j4
605 (3)j5
605 (3)j6
605 (3)j7
605 (3)j8
605 (3)k1
605 (3)k2
605 (4)a1
605 (4)a2
605 (4)a3
605 (4)b1
605 (4)b2
605 (4)b3
605 (4)b4
605 (4)b5
605 (4)c1
605 (4)c2
605 (4)c3
605 (4)d1
605 (4)d2
605 (4)d3
605 (4)d4
605 (4)e1
605 (4)e2
605 (4)e3
605 (4)e4
605 (4)e5
605 (4)e6
605 (4)e7
605 (4)e8
605 (4)f1
605 (4)f2
605 (4)f3
605 (4)f4
605 (4)g1
605 (4)g2
605 (4)g3
605 (4)h1
605 (4)h2
605 (4)h3
605 (4)h4
605 (4)h5
605 (4)h6
605 (4)h7
605 (4)i1
605 (4)j1
605 (4)j2
605 (4)k1
605 (4)k2
605 (4)l1
605 (4)l2
605 (5)a1
605 (5)a2
605 (5)a3
605 (5)a4
605 (5)a5
605 (5)b1
605 (5)b2
605 (5)b3
605 (5)b4
605 (5)b5
605 (5)b6
605 (5)b7
605 (5)b8
605 (5)b9
605 (5)b10
605 (5)b11
605 (5)b12
605 (5)b13
605 (5)b14
605 (5)B15
605 (5)B16
605 (5)a
605 (5)b1
605 (5)c1
605 (5)c2
605 (5)c3
605 (5)d1
605 (5)d2
606 (1)a1
606 (1)a2
606 (1)b1
606 (1)b2
607 (1)a
607 (1)b
607 (2)a
607 (2)b
607 (3)a
607 (3)b
608 (1)
608 (2)
609 (1)
609 (2)
610 (1)
611 (1)
611 (2)
612 (1)
612 (2)
612 (3)
613 (1)
613 (2)
614 (1)a1
614 (1)a2
614 (1)a3
614 (2)
618 (1)
620 (1)a1
620 (1)a2
622 (1)a
622 (1)b
622 (1)c
622 (2)a
622 (2)b
622 (2)c
622 (2)d
622 (2)e
622 (3)a
622 (3)b
633 (1)
623 (2)a
623 (2)b
623 (2)c
623 (2)d
623 (2)e
623 (3)a
623 (3)b
623 (4)a
623 (4)b
623 (4)c
623 (4)d
623 (4)e
623 (4)f
623 (4)g
623 (4)h
623 (5)
623 (6)
623 (7)
623 (8)a1
623 (8)a2
623 (8)a3
623 (9)a1
623 (9)a2
623 (10)a1
623 (10)a2
623 (10)a3
623 (10)b1
623 (10)b2
623 (10)b3
623 (10)b4
623 (10)b5
623 (10)c1
623 (10)c2
623 (10)c3
623 (10)d1
623 (10)d2
623 (10)d3
623 (10)d4
623 (10)d5
623 (11)
623 (12)
623 (13)a1
623 (13)a2
623 (14)a1
623 (14)a2
623 (15)a1
623 (15)a2
623 (15)a3
623 (15)a4
623 (15)a5
623 (15)a6
623 (15)a7
623 (15)a8
623 (16)a
623 (16)b
623 (16)c
623 (16)d
623 (17)a1
623 (17)a2
623 (17)a3
623 (17)a4
623 (17)a5
623 (18)
623 (19)
623 (20)
623 (21)
623 (22)
623 (23)
623 (24)
623 (25)
623 (26)
623 (27)
623 (28)
623 (29)
623 (30)a1
623 (30)a2
623 (30)a3
623 (30)a4
623 (30)a5
623 (30)b1
623 (30)b2
623 (30)b3
623 (30)b4
623 (30)b5
623 (31)
623 (32)
623 (33)
623 (34)
623 (35)
623 (36)
623 (37)
624 (1)
625 (1)a1
625 (1)a2
625 (1)a3
625 (1)a4
625 (1)b1
625 (1)b2
625 (1)b3
625 (1)b4
625 (1)c1
625 (1)c2
625 (2)a1
625 (2)a2
625 (2)a3
625 (2)a4
625 (3)a1
625 (3)a2
625 (4)a
625 (4)b
625 (4)c
625 (4)d
625 (4)e
625 (5)a1
625 (5)a2
625 (5)a3
625 (5)a4
625 (5)a5
625 (5)a6
625 (6)a1
625 (6)a2
625 (6)a3
625 (6)a4
625 (6)a5
625 (6)a6
625 (6)a7
625 (6)a8
625 (6)a9
625 (7)a1
625 (7)a2
625 (8 )a1
625 (8)a2
625 (9)a1
625 (9)a2
625 (10)
625 (11)a1
625 (11)a2
625 (11)a3
625 (11)a4
625 (11)a5
625 (11)a6
626 (1)a1
626 (1)a2
626 (1)a3
626 (1)a4
626 (1)a5
626 (1)a6
626 (1)a7
626 (1)a8
626 (1)a9
626 (2)a1
626 (2)a2
626 (2)a3
626 (2)a4
626 (2)a5
626 (2)a6
626 (2)a7
626 (3)a1
626 (3)a2
626 (3)a3
626 (3)a4
626 (3)a5
626 (3)a6
626 (4)a1
626 (4)a2
626 (4)a3
626 (4)a4
626 (4)a5
626 (4)a6
626 (4)a7
626 (4)a8
626 (4)a9
626 (4)a10
626 (4)a11
626 (5)a1
626 (5)a2
626 (5)a3
626 (6)a1
626 (6)a2
626 (7)a1
626 (7)a2
626 (7)a3
626 (7)a4

700 (1)
701 (1)
702 (1)
703 (1)
703A (1)
704 (1)
706 (1)
707 (1)
708 (1)
709 (1)
710 (1)
711 (1)
712 (1)
713 (1)
714 (1)
715 (1)a
715 (1)b
715 (1)c
715 (1)d
715 (1)e
715 (2)
715 (3)
716 (1)
719 (1)
726 (1)
727 (1)
729 (1)
733 (1)
734 (1)
735 (1)
739 (1)
741 (1)
741 (2)

807(1)
807(9)
509(1) b1
FACILITIES FOR THE ENGINEER
Construction of Combined Field Office, Laboratory and Living Quarters Building for the Engineer
Construction of Combined Field Office and Laboratory Building for the Engineer
Construction of Field Office for the Engineer
Construction of Field Laboratory for the Engineer
Construction of Living Quarters for the Engineer
Provision of Combined Field Office , Laboratory and Living Quarters Building for the Engineer (Rental Bas
Provision of Combined Field Office and Laboratory Building for the Engineer (Rental Basis)
Provision of Field Office for the Engineer (Rental Basis)
Provision of Laboratory for the Engineer (Rental Basis)
Provision of Living Quarters for the Engineer (Rental basis)
Provision of Furnitures/Fixtures, Equipment & Appliance for the Field Office for the Engineer
Provision of Furnitures/Fixtures, Equipment & Appliance for Laboratory Building for the Engineer
Provision of Furnitures/Fixtures & Appliance for the Living Quarters for the Engineer
Provision of Laboratory Testing Equipment, Apparatus and Publication for the Engineer
Operation & Maintenance of Temporary Field Office, Laboratory and Living Quarters Building for the En
Operation & Maintenance of Field Office for the Engineer
Operation & Maintenance of Laboratory Building for the Engineer
Operation & Maintenance of Living Quarters for the Engineer
Provision of 4x4 Pick Up Type Service Vehicle for the Engineer
Provision of 4x4 Pick Up Type Service Vehicle for the Engineer on Bare Rental Basis
Provision of 4x4 Pick Up Type Service Vehicle for the Engineer
Provision of 4x4 Pick Up Type Service Vehicle for the Engineer on Bare Rental Basis
Operation and Maintenance of 4x4 Pick Up Type ervice Vehicles for the Engineer
Operation and Maintenance of 4x2 Pick Up type Service Vehicles for the Engineer
Provision of 4x4 Van Type Service Vehicle (12-Seater)
Provision of 4x4 Van Type Service Vehicle on Rental Basis ( 12 Seater)
Operation and Maintenance of 4x4 Van Type Service Vehicles (12-seater)
Provision of Field Office Staff for the Assistance to the Engineer
Provision of Survey Equipment for the Assistance to the Engineer
Provision of Survey Personnel for the Assistance to the Engineer
Provision of Laboratory Personnel for the Assistance to the Engineer
Provision of Progress Photographs
Provision of Communication Facility for the Engineer
Operation and Maintenance of Communication Facility for the Engineer

OTHER GENERAL REQUIREMENTS


Offices, Shops, Stores and Workments Accommodation for Contractor
Medical Room and First Aid Facilities
Permits and Clearances
Construction survey and staking
Slope, reference, and clearing and grubbling stakes
Centerline reestablishment
Culvert survey and staking
Bridge survey and staking
Retaining wall survey and staking
Grade finishing stakes
Permanent monuments and markers
Miscellaneous survey and staking
Miscellaneous survey and staking
Project Billboard/ Signboard
Installation of ODA Recognition Plate
Occupational Safety and Health Program
Traffic Management
Mobilization / Demobilization
DayWorks
Provisional Sum
Removal and Relocation of Utilities
Additional Geotechnical Investigation
Environmental Management and Monitoring
Detour /Access Road
Detour /Access Road
Recognition Plate/Project Marker
Temporary Diversion of Waterway
Craneway
Craneway
Geotechnical Exploration

EARTH WORKS
Clearing and Grubbing
Clearing and Grubbing
Individual Removal of Trees 150 - 300 mm dia. Small
Individual Removal of Trees 301 - 500 mm. dia Small
Individual Removal of Trees 501 - 750 mm.dia Small
Individual Removal of Trees 751 - 900 mm.dia Small
Individual Removal of Trees above 900mm dia. Large
Removal of Structures and Obstruction
Removal of Actual Structures/Obstruction
Removal of Actual Structures/Obstruction 0.15 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.20 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.23 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.25 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.28 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.30 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.33 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.35 m thick PCCP (Reinforced)
Removal of Actual Structures/Obstruction 0.15 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.20 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.23 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.25 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.28 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.30 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.33 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.35 m thick PCCP (Unreinforced)
Removal of Actual Structures/Obstruction 0.05 m thick ACP
Removal of Actual Structures/Obstruction 0.10 m thick ACP
Removal of Actual Structures/Obstruction 0.10 m thick Sidewalk
Removal of Actual Structures/Obstruction 610 mm dia. RCPC
Removal of Actual Structures/Obstruction 760 mm dia. RCPC
Removal of Actual Structures/Obstruction 910 mm dia. RCPC
Removal of Actual Structures/Obstruction 1070 mm dia. RCPC
Removal of Actual Structures/Obstruction 1220 mm dia. RCPC
Removal of Actual Structures/Obstruction 1520 mm dia. RCPC
Removal of Actual Structures/Obstruction Curb
Removal of Actual Structures/Obstruction Curb and Gutter
Removal of Pipes Other than Pipe Culverts 50 mm dia. PVC
Removal of Pipes Other than Pipe Culverts 75 mm dia. PVC
Removal of Pipes Other than Pipe Culverts 100 mm dia. PVC
Removal of Pipes Other than Pipe Culverts 150 mm dai. PVC
Removal of Pipes Other than Pipe Culverts 200 mm dai. PVC
Removal of Pipes Other than Pipe Culverts 250 mm dai. PVC
Removal of Pipes Other than Pipe Culverts 300 mm dai. PVC
Removal of Pipes Other than Pipe Culverts 150 mm dai. Concrete
Removal of Pipes Other than Pipe Culverts 200 mm dai. Concrete
Removal of Pipes Other than Pipe Culverts 250 mm dai. Concrete
Removal of Pipes Other than Pipe Culverts 300 mm dai. Concrete
Removal of Pipes Other than Pipe Culverts 350 mm dai. Concrete
Removal of Pipe Other than Pipe Culverts 50 mm dia. High Density Polyethylene HDPE
Removal of Pipe Other than Pipe Culverts 75 mm dia. High Density Polyethylene HDPE
Removal of Pipe Other than Pipe Culverts 100 mm dia. High Density Polyethylene HDPE
Removal of Pipe Other than Pipe Culverts 150 mm dia. High Density Polyethylene HDPE
Removal of Pipe Other than Pipe Culverts 200 mm dia. High Density Polyethylene HDPE
Removal of Pipe Other than Pipe Culverts 250 mm dia. High Density Polyethylene HDPE
Removal of Pipe Other than Pipe Culverts 300 mm dia. High Density Polyethylene HDPE
Removal of Structures and Obstruction Concrete
Removal of Structures and Obstruction Steel
Removal of Structures and Obstruction Steel H-Piles
Removal of Structures and Obstruction RSB
Removal of Existing Guardrails
Removal of Existing Guardrails Post
Removal of Existing Guardrails Post
Unsuitble Excavation
Surplus Common Excavation
Surplus Rock Excavation Soft
Surplus Rock Excavation Hard
Surplus Unclassified Excavation
Structure Excavation Common Soil
Structure Excavation Soft Rock
Structure Excavation Hard Rock
Bridge Excavation Common Soil
Bridge Excavation Soft Rock
Bridge Excavation Hard Rock
Foundation Fill
Excavation ordered below Plan Elevation

Shoring, cribbing and related works Cribbing/Cofferddamming


Pipe culverts and drain excavation Common Soil
Pipe culverts and drain excavation Soft Rock
Pipe culverts and drain excavation Hard Rock
Embankment from structure excavation
Embankment from roadway excavation Soft Rock
Embankment from roadway excavation Hard Rock
Embankment from borrow
Embankment from borrow Soft Rock
Embankment from borrow Hard Rock
Embankment from borrow Granular Coarse Material
Embankment from borrow Granular Fine Material
Selected Borrow for topping Case 1
Selected Borrow for topping Case 2
Eart Berm
Boulder Fill
Preload, relocated, and compacted Common Borrow
Subgrade Preparation Common Material
Subgrade Preparation Existing Pavement
Subgrade Preparation Unsuitable Material
Subgrade Preparation Hard Rock Material
Subgrade Preparation Soft Rock Material
Subgrade Preparation Unclassified Material
Compaction Equipment and Density Control Strip Common Material
Overhaul
Overhaul
Overhaul of Barrow Case 1
Overhaul of Barrow Case 1

SUBBASE AND BASE COURSE


Aggregate Subbase Course
Aggregate Base Course
Crushed Aggregate Base Course
Lime Stabilized Road Mix Base Course New Soil Aggregate
Lime Stabilized Road Mix Base Course Salvaged Soil Aggregate
Portland Cement Stabilized Road Mix Base Course New Soil Aggregate
Portland Cement Stabilized Road Mix Base Course Salvaged Soil Aggregate
Asphalt Stabilized Road Mix Base Course New Soil Aggregate
Asphalt Stabilized Road Mix Base Course Salvaged Soil Aggregate
Polymer-Based Chemical Soil Additive
Portland Cement Treated Plant Mix Course New Soil Aggregate
Portland Cement treated Plant Mix Course Salvage Soil Aggregate
Aggregate Stockpile
Asphalt Treated Plant Mix Base Course
SURFACE COURSE
Gravel Surface Course
Crushed Aggregate Surface Course
Bituminous Prime Coat - MC- Cut-back Asphalt Grade 30
Bituminous Prime Coat - MC- Cut-back Asphalt Grade 70
Bituminous Prime Coat - MC- Cut-back Asphalt Grade 250
Bituminous Prime Coat - MC- Cut-back Asphalt Grade 800
Bituminous Prime Coat - MC- Cut-back Asphalt Grade 3000
Bituminous Prime Coat - RC- Cut-back Asphalt Grade 70
Bituminous Prime Coat - RC- Cut-back Asphalt Grade 250
Bituminous Prime Coat - RC- Cut-back Asphalt Grade 800
Bituminous Prime Coat - RC- Cut-back Asphalt Grade 3000
Bituminous Tack Coat - RC - Cut-back Asphalt Grade 70
Bituminous Tack Coat - RC - Cut-back Asphalt Grade 250
Bituminous Tack Coat - RC - Cut-back Asphalt Grade 800
Bituminous Tack Coat - RC - Cut-back Asphalt Grade 3000
Emulsified Asphalt
Cover Aggregate Type 2
Cover Aggregate Type 3A
Cover Aggregate Type 3B
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 30
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 70
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 250
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 800
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 3000
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 70
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 250
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 800
Bituminous Seal Coat - MC-Cut-back Asphalt Grade 3000
Asphalt Cement Pen. Gr.
Aggregate Grading
Asphalt Cement Pen. Grade
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 70
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 250
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 800
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 3000
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 30
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 70
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 250
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 800
Bituminous Surface Treatment - RC-Cut-back Asphalt Grade 3000
Emulsified Asphalt
Asphalt Cement
Bituminous Penetration Macadam Pavement - RC Cut- back Asphalt Grade 70
Bituminous Penetration Macadam Pavement - RC Cut- back Asphalt Grade 250
Bituminous Penetration Macadam Pavement - RC Cut- back Asphalt Grade 800
Bituminous Penetration Macadam Pavement - RC Cut- back Asphalt Grade 3000
Emulsified Asphalt
Aggregate for Bituminous Road Mix Surface Course
Bituminous Material for Bituminous Road Mix Surface Course
Bituminous Plant-Mix Surface Course, Cold-Laid
Bituminous Plant-Mix (Stockpile Maintenance Mixture)
Bituminous Concrete Surface Wearing Course, Hot-Laid 30 mm (Grading D)
Bituminous Concrete Surface Wearing Course, Hot-Laid 40 mm
Bituminous Concrete Surface Wearing Course, Hot-Laid 50 mm
Bituminous Concrete Surface BinderCourse, Hot-Laid 50 mm (Grading B)
Aspahaltic Concrete with Lahar as Fine Aggregate Replacements
Bituminous Concrete Surface Wearing Course, Stone Mastic 30 mm
Bituminous Concrete Surface Wearing Course, Stone Mastic 40 mm
Bituminous Concrete Surface Wearing Course, Stone Mastic 50 mm
Bituminous Concrete Surface Wearing Course, Stone Mastic 50 mm
Bituminous Concrete Surface Wearing Cousrse,PMB 30 mm
Bituminous Concrete Surface Wearing Cousrse,PMB 40 mm
Bituminous Concrete Surface Wearing Cousrse,PMB 50 mm
Portland Cement Concrete Pavement (Unreinforced) 0.15 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.23 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.23 m thick 7 days
Portland Cement Concrete Pavement (Unreinforced) 0.23 m thick 3 days
Portland Cement Concrete Pavement (Unreinforced) 0.25 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.25 m thick 7 days
Portland Cement Concrete Pavement (Unreinforced) 0.25 m thick 3 days
Portland Cement Concrete Pavement (Unreinforced) 0.28 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.28 m thick 7 days
Portland Cement Concrete Pavement (Unreinforced) 0.28 m thick 3 days
Portland Cement Concrete Pavement (Unreinforced) 0.30 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.30 m thick 7 days
Portland Cement Concrete Pavement (Unreinforced) 0.30 m thick 3 days
Portland Cement Concrete Pavement (Unreinforced) 0.33 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.33 m thick 7 days
Portland Cement Concrete Pavement (Unreinforced) 0.33 m thick 3 days
Portland Cement Concrete Pavement (Unreinforced) 0.35 m thick 14 days
Portland Cement Concrete Pavement (Unreinforced) 0.35 m thick 7 days
Portland Cement Concrete Pavement (Unreinforced) 0.35 m thick 3 days
Portland Cement Concrete Pavement (Reinforced) 0.15 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.20 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.23 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.23 m thick 7 days
Portland Cement Concrete Pavement (Reinforced) 0.23 m thick 3 days
Portland Cement Concrete Pavement (Reinforced) 0.25 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.25 m thick 7 days
Portland Cement Concrete Pavement (Reinforced) 0.25 m thick 3 days
Portland Cement Concrete Pavement (Reinforced) 0.28 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.28 m thick 7 days
Portland Cement Concrete Pavement (Reinforced) 0.28 m thick 3 days
Portland Cement Concrete Pavement (Reinforced) 0.30 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.30 m thick 7 days
Portland Cement Concrete Pavement (Reinforced) 0.30 m thick 3 days
Portland Cement Concrete Pavement (Reinforced) 0.33 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.33 m thick 7 days
Portland Cement Concrete Pavement (Reinforced) 0.33 m thick 3 days
Portland Cement Concrete Pavement (Reinforced) 0.35 m thick 14 days
Portland Cement Concrete Pavement (Reinforced) 0.35 m thick 7 days
Portland Cement Concrete Pavement (Reinforced) 0.35 m thick 3 days
Portland Cement Concrete Pavement (Reinforced 0.23 m thick 14 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.23 m thick 7 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.23 m thick 3 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.25 m thick 14 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.25 m thick 7 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.25 m thick 3 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.28 m thick 14 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.28 m thick 7 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.28 m thick 3 days
Portland Cement Concrete Pavement (Reinforced ith Wire Mesh) 0.30 m thick 14 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.30 m thick 7 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.30 m thick 3 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.33 m thick 14 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.33 m thick 7 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.33 m thick 3 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.35 m thick 14 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.35 m thick 7 days
Portland Cement Concrete Pavement (Reinforced with Wire Mesh) 0.35 m thick 3 days
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.15
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.20
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.23
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.25
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.28
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.15
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.20
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.23
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.25
Portland Cement Concrete Pavement with Coralline Material as Coarse Aggregates (Unreinforced) 0.28
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.15 mthick 1
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.20 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.23 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.25 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.28 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.15 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.20 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.23 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.25 m thick
Portland Cement Concrete Pavement with Dolomites as Aggregates (Unreinforced) 0.28 m thick
Rock Asphalt
BRIDGE CONSTRUCTION
Untreated Timber Piles, furnished
Treated Timber Piles, preservatives, furnished
Steel H-Piles, furnished 305mmx305mm 79 kg/m 79 kg/m
Steel H-Piles, furnished 305mmx305mm 94 kg/m 94 kg/m
Steel H-Piles, furnished 305mmx305mm 110 kg/m 110 kg/m
Steel H-Piles, furnished 305mmx305mm 125 kg/m 125 kg/m
Precast Concrete Piles, furnished 400x400 mm
Precast Concrete Piles, furnished 450x450 mm
Precast, Prestresssed Concrete Pile, furnished 400x400 mm
Precast, Prestresssed Concrete Pile, furnished 450x450 mm
Structural Steel Sheet Piles, Furnished
Precast Concrete Sheet Piles, furnished
Untreated Timber Piles, driven
Treated Timber Piles,driven
Steel H-Piles, driven
Steel Pipes Piles
Structural Steel Sheet Piles, driven
Precast Concrete Sheet Piles, driven
Precast Concrete Piles, driven
Precast, Prestresssed Concrete Pile, driven
Test Piles, furnished and driven
Concrete Piles cast in Drilled Holes 0.8
Concrete Piles cast in Drilled Holes 0.9
Concrete Piles cast in Drilled Holes 1
Concrete Piles cast in Drilled Holes 1.1
Concrete Piles cast in Drilled Holes 1.2
Concrete Piles cast in Drilled Holes 1.3
Concrete Piles cast in Drilled Holes 1.4
Concrete Piles cast in Drilled Holes 1.5
Concrete Piles cast in Drilled Holes 1.6
Concrete Piles cast in Drilled Holes 1.7
Concrete Piles cast in Drilled Holes 1.8
Concrete Piles cast in Drilled Holes 1.9
Concrete Piles cast in Drilled Holes 2
Concrete Piles cast in Drilled Holes 2.1
Concrete Piles cast in Drilled Holes 2.2
Concrete Piles cast in Drilled Holes 2.3
Concrete Piles cast in Drilled Holes 2.4
Concrete Piles cast in Drilled Holes 2.5
Concrete Piles cast in Drilled Holes 2.6
Concrete Piles cast in Drilled Holes 2.7
Concrete Piles cast in Drilled Holes 2.8
Concrete Piles cast in Drilled Holes 2.9
Concrete Piles cast in Drilled Holes 3
Concrete Piles cast in Steel Shells 400mm dia
Concrete Piles cast in Steel Shells 500mm dia.
Concrete Piles Cast inSteel Pipes 400mm dia.
Concrete Piles Cast inSteel Pipes 500mm dia.
Pile Shoes
Splices
Load Test
Bored Piles 0.8
Bored Piles 0.9
Bored Piles 1
Bored Piles 1.1
Bored Piles 1.2
Bored Piles 1.3
Bored Piles 1.4
Bored Piles 1.5
Bored Piles 1.6
Bored Piles 1.7
Bored Piles 1.8
Bored Piles 1.9
Bored Piles 2
Bored Piles 2.1
Bored Piles 2.2
Bored Piles 2.3
Bored Piles 2.4
Bored Piles 2.5
Bored Piles 2.6
Bored Piles 2.7
Bored Piles 2.8
Bored Piles 2.9
Bored Piles 3
Permanent Casing 0.8 10mm thick
Permanent Casing 0.8 12mm thick
Permanent Casing 0.8 16mm thick
Permanent Casing 0.9 10mm thick
Permanent Casing 0.9 12mm thick
Permanent Casing 0.9 16mm thick
Permanent Casing 1 10mm thick
Permanent Casing 1 12mm thick
Permanent Casing 1 16mm thick
Permanent Casing 1.1 10mm thick
Permanent Casing 1.1 12mm thick
Permanent Casing 1.1 16mm thick
Permanent Casing 1.2 10mm thick
Permanent Casing 1.2 12mm thick
Permanent Casing 1.2 16mm thick
Permanent Casing 1.3 10mm thick
Permanent Casing 1.3 12mm thick
Permanent Casing 1.3 16mm thick
Permanent Casing 1.4 10mm thick
Permanent Casing 1.4 12mm thick
Permanent Casing 1.4 16mm thick
Permanent Casing 1.5 10mm thick
Permanent Casing 1.5 12mm thick
Permanent Casing 1.5 16mm thick
Permanent Casing 1.6 12mm thick
Permanent Casing 1.6 16mm thick
Permanent Casing 1.7 12mm thick
Permanent Casing 1.7 16mm thick
Permanent Casing 1.8 12mm thick
Permanent Casing 1.8 16mm thick
Permanent Casing 1.9 12mm thick
Permanent Casing 1.9 16mm thick
Permanent Casing 2 12mm thick
Permanent Casing 2 16mm thick
Permanent Casing 2.1 12mm thick
Permanent Casing 2.1 16mm thick
Permanent Casing 2.2 12mm thick
Permanent Casing 2.2 16mm thick
Permanent Casing 2.3 12mm thick
Permanent Casing 2.3 16mm thick
Permanent Casing 2.4 12mm thick
Permanent Casing 2.4 16mm thick
Permanent Casing 2.5 16mm thick
Permanent Casing 2.5 20mm thick
Permanent Casing 2.6 16mm thick
Permanent Casing 2.6 20mm thick
Permanent Casing 2.7 16mm thick
Permanent Casing 2.7 20mm thick
Permanent Casing 2.8 16mm thick
Permanent Casing 2.8 20mm thick
Permanent Casing 2.9 16mm thick
Permanent Casing 2.9 20mm thick
Permanent Casing 3 16mm thick
Permanent Casing 3 20mm thick
Permanent Casing
Splices of R.C. Pile with Expoxy
Pile Intergrity Testing Crosshole-Sonic
Pile Intergrity Testing Low Strain
High Strain Dynamic Testing (P.D.A)
Sand Compaction Pile 0.6
Sand Compaction Pile 0.7
Sand Compaction Pile 0.8
Gravel Compaction Pile 0.6
Gravel Compaction Pile 0.7
Gravel Compaction Pile 0.8
Metal Railing Steel
Metal Railing Aluminum
Concrete Railing Standard
Concrete Railing Balluste
Concrete Railing Parapet
Wooden Railing
Stone and Bricks Railing
Timber Structure
Timber Structure
Structural Steel, furnished
Structural Steel, fabricated
Structural Steel, eracted
Structural Steel, furnished, and fabricated
Structural Steel, furnised, fabricated, and eracted
Structural Steel, painting works
Reinforcing Steel Grade 40
Reinforcing Steel Grade 60
Epoxy-Coated Reinforcing Steel Bars Grade 40
Epoxy-Coated Reinforcing Steel Bars Grade 60
Structural Concrete 20.68MPa A 7 days
Structural Concrete 20.68MPa A 14 days
Structural Concrete 20.68MPa A 28 days
Structural Concrete 27.58 Mpa A 7 days
Structural Concrete 27.58 Mpa A 14 days
Structural Concrete 27.58 Mpa A 28 days
Structural Concrete 20.68MPa A
Structural Concrete 27.58 Mpa B
Structural Concrete 20.68 MPa C
Structural Concrete 27.58 Mpa C
Structural Concrete 34.47 Mpa P 7 days
Structural Concrete 34.47 Mpa P 14 days
Structural Concrete 34 .47 Mpa P 28 days
Structural Concrete 41.37 Mpa P 7 days
Structural Concrete 41.37 Mpa P 14 days
Structural Concrete 41.37 Mpa P 28 days
Seal Concrete
Structural Concrete, painting works
Prestressed Structural Concrete Members 9.00 m. Type I I-Girders
Prestressed Structural Concrete Members 10.00 m. Type I I-Girders
Prestressed Structural Concrete Members 11.00 m. Type I I-Girders
Prestressed Structural Concrete Members 11.00 m. Type II I-Girders
Prestressed Structural Concrete Members 12.00 m. Type II I-Girders
Prestressed Structural Concrete Members 13.00 m. Type II I-Girders
Prestressed Structural Concrete Members 14.00 m. Type II I-Girders
Prestressed Structural Concrete Members 15.00 m. Type II I-Girders
Prestressed Structural Concrete Members 15.00 m. Type III I-Girders
Prestressed Structural Concrete Members 16.00 m. Type III I-Girders
Prestressed Structural Concrete Members 17.00 m. Type III I-Girders
Prestressed Structural Concrete Members 18.00 m. Type III I-Girders
Prestressed Structural Concrete Members 19.00 m. Type III I-Girders
Prestressed Structural Concrete Members 20.00 m. Type III I-Girders
Prestressed Structural Concrete Members 21.00 m. Type III I-Girders
Prestressed Structural Concrete Members 19.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 20.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 21.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 22.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 23.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 24.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 25.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 26.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 27.00 m. Type IV I-Girders
Prestressed Structural Concrete Members 23.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 24.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 25.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 26.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 27.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 28.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 29.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 30.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 23.00 m. Type IV-A I-Girders
Prestressed Structural Concrete Members 24.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 25.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 26.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 27.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 28.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 29.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 30.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 31.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 32.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 33.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 34.00 m. Type IV-B I-Girders
Prestressed Structural Concrete Members 26.00 m. Type V I-Girders
Prestressed Structural Concrete Members 27.00 m. Type V I-Girders
Prestressed Structural Concrete Members 28.00 m. Type V I-Girders
Prestressed Structural Concrete Members 29.00 m. Type V I-Girders
Prestressed Structural Concrete Members 30.00 m. Type V I-Girders
Prestressed Structural Concrete Members 31.00 m. Type V I-Girders
Prestressed Structural Concrete Members 32.00 m. Type V I-Girders
Prestressed Structural Concrete Members 33.00 m. Type V I-Girders
Prestressed Structural Concrete Members 34.00 m. Type V I-Girders
Prestressed Structural Concrete Members 35.00 m. Type V I-Girders
Prestressed Structural Concrete Members 36.00 m. Type V I-Girders
Prestressed Structural Concrete Members 37.00 m. Type V I-Girders
Prestressed Structural Concrete Members 33.00 m. Type V I-Girders
Prestressed Structural Concrete Members 34.00 m. Type V I-Girders
Prestressed Structural Concrete Members 45.00 m. Type V I-Girders
Prestressed Structural Concrete Members 46.00 m. Type V I-Girders
Prestressed Structural Concrete Members 47.00 m. Type V I-Girders
Prestressed Structural Concrete Members 48.00 m. Type V I-Girders
Prestressed Structural Concrete Members 49.00 m. Type V I-Girders
Prestressed Structural Concrete Members 40.00 m. Type V I-Girders
Prestressed Structural Concrete Members 41.00 m. Type V I-Girders
Prestressed Structural Concrete Members 42.00 m. Type V I-Girders
Prestressed Structural Concrete Members 43.00 m. Type V I-Girders
Prestressed Structural Concrete Members 44.00 m. Type V I-Girders
Prestressed Structural Concrete Members 45.00 m. Type V I-Girders
Prestressed Structural Concrete Members Type V I-Girders
Prestressed Structural Concrete Members Type V I-Girders
Prestressed Structural Concrete Members Type V I-Girders
Prestressed Structural Concrete Members Type V I-Girders
Concrete (Refer to Item 405) A
Concrete Post/Baluster Railings (Refer to Item 401)
Parapet Walls
Piling
Structure Excavation
Sidewalk Concrete
Reinforcing Steel Bars (Refer to Item 404) Grade 40
Lean Concrete Class B (16.5 Mpa)
Steel Bridges
Welded Structural Steel
Timber
Treated Timber
Paint
Paint
Elastomeric Bearing
Preformed Sponge Rubber Joint Expansion
Preformed Cork Joint Expansion
Forms and Falsework
Elastomeric, Hot-Applied Expansion Sealant (With Single-Sized Aggregates)
Carbon Fiber Sheet 1 Layer
Carbon Fiber Sheet 2 Layers
Carbon Fiber Sheet 3 Layers
Glass Fiber
Carbon Fiber Plate
Bearing Devices Steel Bearing
Bearing Devices Rubble Bearing
Bearing Devices High Dumping Rubble Bearing
Asphaltic flug Joints (APJ) for Bridges

Pipe Culverts 610 mm dia. Class II RCPC


Pipe Culverts 760 mm dia. Class II RCPC
Pipe Culverts 910 mm dia. Class II RCPC
Pipe Culverts 1070 mm dia. Class II RCPC
Pipe Culverts 1220 mm dia. Class II RCPC
Pipe Culverts 1520 mm dia. Class II RCPC
Pipe Culverts 610 mm dia. Classs IV RCPC
Pipe Culverts 760 mm dia. Classs IV RCPC
Pipe Culverts 910 mm dia. Classs IV RCPC
Pipe Culverts 1070 mm dia. Classs IV RCPC
Pipe Culverts 1220 mm dia. Classs IV RCPC
Pipe Culverts 1520 mm dia. Classs IV RCPC
Storm Drain
Underdrain 150 mm dia.
Blind drain
Granular backfill filter material for underdrains
Manholes 610 mm dia. Concrete
Manholes 760 mm dia. Concrete
Manholes 910 mm dia. Concrete
Manholes 1070 mm dia. Concrete
Manholes 1220 mm dia. Concrete
Manholes 1520 mm dia. Concrete
Manholes 610 mm dia. CHB
Manholes 760 mm dia. CHB
Manholes 901 mm dia. CHB
Manholes 1070 mm dia. CHB
Manholes 1220 mm dia. CHB
Manholes 1520 mm dia. CHB
Inlets, Type 610 mm dia.
Inlets, Type 760 mm dia.
Inlets, Type 910 mm dia.
Inlets, Type 1070 mm dia.
Inlets, Type 1220 mm dia.
Inlets, Type 1520 mm dia.
Catch Basins 610 mm dia.
Catch Basins 760 mm dia.
Catch Basins 910 mm dia.
Catch Basins 1070 mm dia.
Catch Basins 1220 mm dia.
Catch Basins 1520 mm dia.
Concrete covers 610 mm dia.
Concrete covers 760 mm dia.
Concrete covers 910 mm dia.
Concrete covers 1070 mm dia.
Concrete covers 1220 mm dia.
Concrete covers 1520 mm dia.
Metal Frames and gratings, type
Metal frames and covers
Adjusting manholes
Adjusting catch basin
Metal frames and grating
Metal frames and grating
Removing, cleaning, stockpiling salvaged culvert pipe 610 mm dia.
Removing, cleaning, stockpiling salvaged culvert pipe 760 mm dia.
Removing, cleaning, stockpiling salvaged culvert pipe 910 mm dia.
Removing, cleaning, stockpiling salvaged culvert pipe 1070 mm dia.
Removing, cleaning, stockpiling salvaged culvert pipe 1220 mm dia.
Removing, cleaning, stockpiling salvaged culvert pipe 1520 mm dia.
Removing, cleaning, and relaying salvaged culvert pipe 610 mm dia.
Removing, cleaning, and relaying salvaged culvert pipe 760 mm dia.
Removing, cleaning, and relaying salvaged culvert pipe 910 mm dia.
Removing, cleaning, and relaying salvaged culvert pipe 1070 mm dia.
Removing, cleaning, and relaying salvaged culvert pipe 1220 mm dia.
Removing, cleaning, and relaying salvaged culvert pipe 1520 mm dia.
Cleaning Culvert pipe in place 610 mm dia., half silted
Cleaning Culvert pipe in place 760 mm dia., half silted
Cleaning Culvert pipe in place 910 mm dia., half silted
Cleaning Culvert pipe in place 1070 mm dia., half silted
Cleaning Culvert pipe in place 1220 mm dia., half silted
Cleaning Culvert pipe in place 1520 mm dia., half silted
Reconditioning drainage structures
Riprap A
Riprap B
Riprap C
Riprap D
Grouted Riprap A
Grouted Riprap B
Grouted Riprap C
Grouted Riprap D
Filter layer of granular material
Stone Masonry
Rubble Concrete
Hand-Laid Rock Embankment
Sheet Piles Timber Furnished and Driven
Sheet Piles Steel Slope Protection
Sheet Piles Steel Cofferdamming
Sheet Piles Concrete Furnished
Sheet Piles Concrete Driven
Sheet Piles Concrete Furnished and Driven
Bed Course Granular Material Concrete
Shoring, cribbing and related works (Shoring)
Gabions
Mattresses
Filter Cloth
Erosion Control Mat Type 1
Erosion Control Mat Type 2
Erosion Control Mat Type 3
Erosion Control Mat Type 4
Erosion Control Mat Type 5
Roving
Cellular Confinement Systems
Permanent Ground Anchor
Shortcrete with reinforcing steel
Shortcrete with reinforcing fibers
Mechanically-Stabilized Earth (MSE) Retaining Walls
Select Granular Backfill
Structural Backfill
Wet Stone Masonry
Wet Stone Masonry
Permanent Ground Anchor
Drain Pipe PVC
Hydroseeding
Rockfall Netting
Rockfall Barrier
Active Protection System
Passive/Rockfall Barrier

MISCELLANEOUS STRUCTURE
Right-of-Way Monuments Timber
Right-of-Way Monuments Concrete
Maintenance Marker post Cast-in-place
Maintenance Marker post Precast
Maintenance Marker post Timber
Kilometer posts Cast-in-place
Kilometer posts Precast
Guide Posts 1000±50 high, 100mm±5 wide, 50mm±5 thick,
Guide Posts 1000±50 high, 100mm±5 wide, 50mm±5 thick,
Guide Posts 1000±50 high, 100mm±5 wide, 50mm±5 thick,
Guide Posts 1000±50 high, 100mm±5 wide, 50mm±5 thick,
Precast Guide posts Rectangular
Cast-in-place Guide post Precast
Guardrail (Wire rope or Wire Cable)
Cable Guardrail (Chain Link Fabric)
Metal Guardrail (Metal Beam) Including Post W-Bean
Metal Guardrail (Metal Beam) Including Post Thrie-Bean
Metal Beam End Piece Fish Tail
Metal Beam End Piece Bull Nose
Metal Beam End Piece Eccentric Loader Breakway Cable
Guardrail (Timber)
Fencing Barbed wire
Fencing Chain Link Fence Fabric
Fencing Post
Fencing Gates
Concrete Fence including Post
Warning Signs 600 mm W1-1A Horizontal Alignment Sharp Turn L or R
Warning Signs 750 mm W1-1B Horizontal Alignment Sharp Turn L or R
Warning Signs 900 mm W1-1C Horizontal Alignment Sharp Turn L or R
Warning Signs 600 mm W1-2A Horizontal Alignment Reverse Turn L or R
Warning Signs 750 mm W1-2B Horizontal Alignment Reverse Turn L or R
Warning Signs 900 mm W1-2C Horizontal Alignment Reverse Turn L or R
Warning Signs 600 mm W1-3A Horizontal Alignment Curve L or R
Warning Signs 750 mm W1-3B Horizontal Alignment Curve L or R
Warning Signs 900 mm W1-3C Horizontal Alignment Curve L or R
Warning Signs 600 mm W1-4A Horizontal Alignment Reverse Curve L or R
Warning Signs 750 mm W1-4B Horizontal Alignment Reverse Curve L or R
Warning Signs 900 mm W1-4C Horizontal Alignment Reverse Curve L or R
Warning Signs 600 mm W1-5A Horizontal Alignment Winding Road L or R
Warning Signs 750 mm W1-5B Horizontal Alignment Winding Road L or R
Warning Signs 600 mm W1-6A Horizontal Alignment Hairpin Bend L or R
Warning Signs 750 mm W1-6B Horizontal Alignment Hairpin Bend L or R
Warning Signs 450 mm W2-1A Intersection and Junction Sign Cross
Warning Signs 600 mm W2-1B Intersection and Junction Sign Cross
Warning Signs 750 mm W2-1C Intersection and Junction Sign Cross
Warning Signs 900 mm W2-1D Intersection and Junction Sign Cross
Warning Signs 450 mm W2-2A Intersection and Junction Signs
Warning Signs 600 mm W2-2B Intersection and Junction Signs
Warning Signs 750 mm W2-2C Intersection and Junction Signs
Warning Signs 900 mm W2-2D Intersection and Junction Signs
Warning Signs 600 mm W2-3A Itersection and Junction Signs Skewed
Warning Signs 750 mm W2-3B Itersection and Junction Signs Skewed
Warning Signs 900 mm W2-3C Itersection and Junction Signs Skewed
Warning Signs 450 mm W2-4A Itersection and Junction Signs T-
Warning Signs 600 mm W2-4B Itersection and Junction Signs T-
Warning Signs 750 mm W2-4C Itersection and Junction Signs T-
Warning Signs 900 mm W2-4D Itersection and Junction Signs T-
Warning Signs 450 mm W2-5A Itersection and Junction Signs Y-
Warning Signs 600 mm W2-5B Itersection and Junction Signs Y-
Warning Signs 750 mm W2-5C Itersection and Junction Signs Y-
Warning Signs 900 mm W2-5D Itersection and Junction Signs Y-
Warning Signs 450 mm W2-6A Itersection and Junction Signs Side
Warning Signs 600 mm W2-6B Itersection and Junction Signs Side
Warning Signs 750 mm W2-6C Itersection and Junction Signs Side
Warning Signs 900 mm W2-6D Itersection and Junction Signs Side
Warning Signs 450 mm W2-7A Itersection and Junction Signs
Warning Signs 600 mm W2-7B Itersection and Junction Signs
Warning Signs 750 mm W2-7C Itersection and Junction Signs
Warning Signs 600 mm W2-8B Itersection and Junction Signs Priority
Warning Signs 750 mm W2-8C Itersection and Junction Signs Priority
Warning Signs 900 mm W2-8D Itersection and Junction Signs Priority
Warning Signs 600 mm W2-9B Itersection and Junction Signs Priority
Warning Signs 750 mm W2-9C Itersection and Junction Signs Priority
Warning Signs 900 mm W2-9D Itersection and Junction Signs Priority
Warning Signs 450 mm W2-10A Itersection and Junction Signs Priority
Warning Signs 600 mm W2-10B Itersection and Junction Signs Priority
Warning Signs 750 mm W2-10C Itersection and Junction Signs Priority
Warning Signs 900 mm W2-10D Itersection and Junction Signs Priority
Warning Signs 600 mm W3-1A Advance Warning of Traffic Control Device
Warning Signs 750 mm W3-1B Advance Warning of Traffic Control Device
Warning Signs 900 mm W3-1C Advance Warning of Traffic Control Device
Warning Signs 1200 mm W3-1D Advance Warning of Traffic Control Device
Warning Signs 450 mm W3-2A Advance Warning of Traffic Control Device
Warning Signs 600 mm W3-2B Advance Warning of Traffic Control Device
Warning Signs 750 mm W3-2C Advance Warning of Traffic Control Device
Warning Signs 450 mm W3-3A Advance Warning of Traffic Control Device S
Warning Signs 600 mm W3-3B Advance Warning of Traffic Control Device S
Warning Signs 750 mm W3-3C Advance Warning of Traffic Control Device S
Warning Signs 450 mm W4-A1 Road Width Sign Narrow Bridge
Warning Signs 600 mm W4-1B Road Width Sign Narrow Bridge
Warning Signs 750 mm W4-1C Road Width Sign Narrow Bridge
Warning Signs 450 x 700 mm W4-1PA Road Width Sign Narrow Bridge
Warning Signs 600 x 900 mm W4-1PB Road Width Sign Narrow Bridge
Warning Signs 750 x 1200 mm W4-1PC Road Width Sign Narrow Bridge
Warning Signs 450 mm W4-2A Road Width Sign Road Narrows
Warning Signs 600 mm W4-2B Road Width Sign Road Narrows
Warning Signs 750 mm W4-2C Road Width Sign Road Narrows
Warning Signs 450 x 700 mm W4-2PA Road Width Sign Road Narrows
Warning Signs 600 x 900 mm W4-2PB Road Width Sign Road Narrows
Warning Signs 750 x 1200 mm W4-2PC Road Width Sign Road Narrows
Warning Signs 450 mm W2-3A Road Width Sign Divided Road
Warning Signs 600 mm W4-3B Road Width Sign Divided Road
Warning Signs 750 mm W4-3C Road Width Sign Divided Road
Warning Signs 900 mm W4-3D Road Width Sign Divided Road
Warning Signs 450 mm W4-4A Road Width Sign Divided Road
Warning Signs 600 mm W4-4B Road Width Sign Divided Road
Warning Signs 750 mm W4-4C Road Width Sign Divided Road
Warning Signs 900 mm W4-4D Road Width Sign Divided Road
Warning Signs 600 mm W5-1B Road Width Sign Divided Road
Warning Signs 750 mm W5-1C Road Obstacle Signs Opening Bridge
Warning Signs 450 mm W5-2A Road Obstacle Signs Uneven Road
Warning Signs 600 mm W5-2B Road Obstacle Signs Uneven Road
Warning Signs 750 mm W5-2C Road Obstacle Signs Uneven Road
Warning Signs 900 mm W5-2D Road Obstacle Signs Uneven Road
Warning Signs 450 mm W5-3A Road Obstacle Signs Hump
Warning Signs 600 mm W5-3B Road Obstacle Signs Hump
Warning Signs 750 mm W5-3C Road Obstacle Signs Hump
Warning Signs 900 mm W5-3D Road Obstacle Signs Hump
Warning Signs 600 mm W5-4B Road Obstacle Signs Steep Descent
Warning Signs 750 mm W5-4C Road Obstacle Signs Steep Descent
Warning Signs 900 mm W5-4D Road Obstacle Signs Steep Descent
Warning Signs 450 mm W5-5A Road Obstacle Signs Steep Climb
Warning Signs 600 mm W5-5B Road Obstacle Signs Steep Climb
Warning Signs 750 mm W5-5C Road Obstacle Signs Steep Climb
Warning Signs 450 mm W5-6A Road Obstacle Signs Spill Way
Warning Signs 600 mm W5-6B Road Obstacle Signs Spill Way
Warning Signs 750 mm W5-6C Road Obstacle Signs Spill Way
Warning Signs 900 mm W5-6D Road Obstacle Signs Spill Way
Warning Signs 450 mm W5-7A Road Obstacle Signs Flood
Warning Signs 600 mm W5-7B Road Obstacle Signs Flood
Warning Signs 750 mm W5-7C Road Obstacle Signs Flood
Warning Signs 900 mm W5-7D Road Obstacle Signs Flood
Warning Signs 600 mm W5-8B Road Obstacle Signs Falling Rock L or R
Warning Signs 750 mm W5-8C Road Obstacle Signs Falling Rock L or R
Warning Signs 900 mm W5-8D Road Obstacle Signs Falling Rock L or R
Warning Signs 450 mm W5-9A Road Obstacle Signs Falling Rock L or R
Warning Signs 600 mm W5-9B Road Obstacle Signs Slippery Road
Warning Signs 750 mm W5-9C Road Obstacle Signs Slippery Road
Warning Signs 900 mm W5-9D Road Obstacle Signs Slippery Road
Warning Signs 450mm X 700 mm W5-9PA Road Obstacle Signs Slippery Road
Warning Signs 600mm X 900 mm W5-9PB Road Obstacle Signs Slippery Road
Warning Signs 750mm X 1200 mm W5-9PC Road Obstacle Signs Slippery Road
Warning Signs 600 mm W5-10B Road Obstacle Signs Animal Crossing
Warning Signs 750 mm W5-10C Road Obstacle Signs Animal Crossing
Warning Signs 900 mm W5-10D Road Obstacle Signs Animal Crossing
Warning Signs 450 mm W5-11A Road Obstacle Signs Aircraft
Warning Signs 600 mm W5-11B Road Obstacle Signs Aircraft
Warning Signs 750 mm W5-11C Road Obstacle Signs Aircraft
Warning Signs 900 mm W5-11D Road Obstacle Signs Aircraft
Warning Signs 600 X 600 mm W6-1B Pedestrian and School Signs Pedestrian
Warning Signs 750mm X 750 mm W6-1C Pedestrian and School Signs Pedestrian
Warning Signs 450mm X 750 mm W6-1P Pedestrian and School Signs Pedestrian
Warning Signs 600mm X 600 mm W6-2B Pedestrian and School Signs Children
Warning Signs 750mm X 750 mm W6-2C Pedestrian and School Signs Children
Warning Signs 300mm X 450 mm W6-3 Pedestrian and School Signs Cross Only At
Warning Signs 450mm X 450 mm W6-4A Pedestrian and School Signs Wheel Chair
Warning Signs 600mm X 600 mm W6-4B Pedestrian and School Signs Wheel Chair
Warning Signs 750mm X 750 mm W6-4C Pedestrian and School Signs Wheel Chair
Warning Signs 400mm X 900 mm W6-5A Pedestrian and School Sign Bike Lane Ahead
Warning Signs 600mm X 900 mm W6-5B Pedestrian and School Sign Bike Lane Ahead
Warning Signs Railroad Cross Position W7-1 Railway Level Crossing Signs Rairoad Crossing
Warning Signs 600 mm W7-2B Railway level Crossing Signs Railway Crossing
Warning Signs 750 mm W7-2C Railway level Crossing Signs Railway Crossing
Warning Signs 900 mm W7-2D Railway level Crossing Signs Railway Crossing
Warning Signs 600 mm W7-3B Railway level Crossing Signs Railway Crossing
Warning Signs 750 mm W7-3C Railway level Crossing Signs Railway Crossing
Warning Signs 900 mm W7-3D Railway level Crossing Signs Railway Crossing
Warning Signs 700mm X 900 mm W7-4 Railway level Crossing Signs Alternative
Warning Signs 600mm X 400 mm W8-1A Supplementary Signs Advisory Speed
Warning Signs 750mm X 500 mm W8-1B Supplementary Signs Advisory Speed
Warning Signs 900mm X 600 mm W8-1C Supplementary Signs Advisory Speed
Warning Signs 600mm X 400 mm W8-2A Supplementary Signs On Side Road
Warning Signs 750mm X 500 mm W8-2B Supplementary Signs On Side Road
Warning Signs 900mm X 600 mm W8-2C Supplementary Signs On Side Road
Warning Signs 600mm X 200 mm W8-3A Supplementary Signs Distance … m
Warning Signs 750mm X 250 mm W8-3B Supplementary Signs Distance … m
Warning Signs 900mm X 300 mm W8-3C Supplementary Signs Distance … m
Warning Signs 600mm X 200 mm W8-4A Supplementary Signs Distance … km
Warning Signs 750mm X 250 mm W8-4B Supplementary Signs Distance … km
Warning Signs 900mm X 300 mm W8-4C Supplementary Signs Distance … km
Warning Signs 600mm X 400 mm W8-5A Supplementary Signs When Wet
Warning Signs 750mm X 500 mm W8-5B Supplementary Signs When Wet
Warning Signs 900mm X 600 mm W8-5C Supplementary Signs When Wet
Warning Signs 600mm X 200 mm W8-6A Supplementary Signs Blind
Warning Signs 750mm X 250 mm W8-6B Supplementary Signs Blind
Warning Signs 900mm X 300 mm W8-6C Supplementary Signs Blind
Warning Signs 600mm X 200 mm W8-7A Supplementary Signs Aged
Warning Signs 750mm X 250 mm W8-7B Supplementary Signs Aged
Warning Signs 900mm X 300 mm W8-7C Supplementary Signs Aged
Warning Signs 600mm X 400 mm W8-8A Supplementary Signs Playground
Warning Signs 750mm X 500 mm W8-8B Supplementary Signs Playground
Warning Signs 900mm X 600 mm W8-8C Supplementary Signs Playground
Warning Signs 600mm X 200 mm W8-9A Supplementary Signs School
Warning Signs 750mm X 250 mm w8-9B Supplementary Signs School
Warning Signs 900mm X 300 mm W8-9C Supplementary Signs School
Warning Signs 600mm X 200 mm W8-10A Supplementary Signs Disabled
Warning Signs 750mm X 250 mm W8-10B Supplementary Signs Disabled
Warning Signs 900mm X 300 mm W8-10C Supplementary Signs Disabled
Warning Signs 1500mm X 600 mm W9-1A Other Warning Signs Vertical Clearance;
Warning Signs 1950mm X 600 mm W9-1B Other Warning Signs Vertical Clearance;
Warning Signs 1060mm X 600 mm W9-2A Others Warning Signs Slow Down Accident
Warning Signs 1060mm X 600 mm W9-2B Others Warning Signs Bumagal Madalas Ang
Warning Signs 1060mm X 600 mm W9-3 Other Warning Signs Slow Down Merging
Warning Signs 950mm X 600 mm W9-4 Others Warning Signs Lane Ends - Merge Left
Warning Signs 1060mm X 600 mm W9-5 Other Warning Signs Slow Down
Regulatory Signs 450 x 450 mm R1-1A Priority Signs Stop
Regulatory Signs 600 x 600 mm R1-1B Priority Signs Stop
Regulatory Signs 750 x 750 mm R1-AC Priority Signs Stop
Regulatory Signs 900 x 900 mm R1-1D Priority Signs Stop
Regulatory Signs 600 mm R1-2A Priority Signs Give Way
Regulatory Signs 750 mm R1-2B Priority Signs Give Way
Regulatory Signs 900 mm R1-2C Priority Signs Give Way
Regulatory Signs 640 x 900 mm R1-2P Priority Signs Give Way
Regulatory Signs 500 x 750 mm R1-3 Priority Signs Left Turner M
Regulatory Signs 450 mm R2-1A Direction Signs No TURNS; Disc Type
Regulatory Signs 450 mm R2-2A Direction Signs ONE WAY; Disc Type
Regulatory Signs 450 mm R2-3A Direction Signs KEEP RIGHT; Disc Type
Regulatory Signs 450 mm R2-4A Direction Signs LANE SPLIT; Disc Type
Regulatory Signs 450 mm R2-5A Direction Sign ALL TRAFFIC; Disc Type
Regulatory Signs 450 mm R2-6A Direction Signs MERGING TRAFFIC;
Regulatory Signs 450 mm R2-7A Direction Signs TWO WAY; Disc Type
Regulatory Signs 600 mm R2-1B Direction Signs NO TURN; Disc Type
Regulatory Signs 600 mm R2-2B Direction Signs ONE WAY; Disc Type
Regulatory Signs 600 mm R2-3B Direction Signs KEEP RIGHT; Disc Type
Regulatory Signs 600 mm R2-4B Direction Signs LANE SPLIT; Disc Type
Regulatory Signs 600 mm R2-5B Direction Signs ALL TRAFFIC; Disc Type
Regulatory Signs 600 mm R2-6B Direction Signs MERGING TRAFFIC;
Regulatory Signs 600 mm R2-7B Direction Signs TWO WAY; Disc Type
Regulatory Signs 750 mm R2-1C Direction Signs NO TURNS; Disc Type
Regulatory Signs 750 mm R2-2C Direction Signs ONE WAY; Disc Type
Regulatory Signs 750 mm R2-3C Direction Signs KEEP RIGHT; Disc Type
Regulatory Signs 750 mm R2-4C Direction Signs LANE SPLIT; Disc Type
Regulatory Signs 750 mm R2-5C Direction Signs ALL TRAFFIC; Disc Type
Regulatory Signs 750 mm R2-6C Direction Signs MERGING TRAFFIC;
Regulatory Signs 750 mm R2-7C Direction Signs TWO WAY; Disc Type
Regulatory Signs Disc Size 400 mm R2-1PA Direction Signs NO TURN; PLATE Type;
Regulatory Signs Disc Size 400 mm R2-2PA Direction Signs ONE WAY; Plate Type; 450
Regulatory Signs Disc Size 400 mm R2-3PA Direction Signs KEEP RIGHT; Plate
Regulatory Signs Disc Size 400 mm R2-5PA Direction Signs ALL TRAFFIC; Plate Type;
Regulatory Signs Disc Size 400 mm R2-6PA Direction Signs MERGING TRAFFIC;
Regulatory Signs 450 x 750 mm R2-7PA Other Direction Signs TWO WAY
Regulatory Signs 900 x 700 mm R2-7S Other Direction Signs SALUBONG NA TRAPIKO
Regulatory Signs 450 X 750 mm R2-8A ( R ) Other Diretion Signs RIGHT LANE MUST
Regulatory Signs 450 X 750 mm R2-8A ( L ) Other Directional Sign LEFT LANE MUST
Regulatory Signs 600 X 1000 mm R2-8B ( R ) Other Directional Signs RIGHT LANE MUST
Regulatory Signs 600 X 1000 mm R2-8B ( L ) Other Directional Signs LEFT LANE MUST
Regulatory Signs 600 mm R3-1A Prohibitive or Restrictive Signs No
Regulatory Signs 750 mm R3-1B Prohibitive or Restrictive Signs No
Regulatory Signs 400 x 600 mm R3-1PA Prohibitive or Restrictive Signs No
Regulatory Signs 600 x 900 mm R3-1PB Prohibitive or Restrictive Signs No
Regulatory Signs 800 x 1200 mm R3-1PC Prohibitive or Restrictive Signs No
Regulatory Signs 450 mm R3-2A Prohibitive or Restrictive Signs No Empty For Cars
Regulatory Signs 450 mm R3-3A Prohibitive or Restrictive Signs No
Regulatory Signs 450 mm R3-4A Prohibitive or Restrictive Signs No
Regulatory Signs 450 mm R3-5A Prohibitive or Restrictive Signs No
Regulatory Signs 450 mm R3-6A Prohibitive or Restrictive Signs No Empty For Tricycles
Regulatory Signs 4500 mm R3-7A Prohibitive or Restrictive Signs No Empty For Buses
Regulatory Signs 450 mm R3-8A Prohibitive or Restrictive Signs No Empty For Trucks
Regulatory Signs 450 mm R3-9A Prohibitive or Restrictive Signs No Empty For Truck with Trailer
Regulatory Signs 450 mm R3-10A Prohibitive or Restrictive Signs No Empty For Pedestrians
Regulatory Signs 450 mm R3-11A Prohibitive or Restrictive Signs No Empty For Animal Drawn Vehicle
Regulatory Signs 450 mm R3-12A Prohibitive or Restrictive Signs No Empty For Pushcarts
Regulatory Signs 600 mm R3-2B Prohibitive or Restrictive Signs No Empty For Cars
Regulatory Signs 600 mm R3-3B Prohibitive or Restrictive Signs No Empty For Jeepney
Regulatory Signs 600 mm R3-4B Prohibitive or Restrictive Signs No Empty For Bicycles
Regulatory Signs 600 mm R3-5B Prohibitive or Restrictive Signs No Empty For Motorcyles
Regulatory Signs 600 mm R3-6B Prohibitive or Restrictive Signs No Empty For Tricyles
Regulatory Signs 600 mm R3-7B Prohibitive or Restrictive Signs No Empty For Buses
Regulatory Signs 600 mm R3-8B Prohibitive or Restrictive Signs No Empty For Trucks
Regulatory Signs 600 mm R3-9B Prohibitive or Restrictive Signs No Empty For Trucks with Trailer
Regulatory Signs 600 mm R3-10B Prohibitive or Restrictive Signs No Empty For Pedestrians
Regulatory Signs 600 mm R3-11B Prohibitive or Restrictive Signs No Empty For Animal Drawn Vehicles
Regulatory Signs 600 mm R3-12B Prohibitive or Restrictive Signs No Empty For Pushcarts
Regulatory Signs 750 mm R3-2C Prohibitive or Restrictive Signs No Empty For Cars
Regulatory Signs 750 mm R3-2C Prohibitive or Restrictive Signs No Empty For Jeepneys
Regulatory Signs 750 mm R3-4C Prohibitive or Restrictive Signs No Empty For Bicyles
Regulatory Signs 750 mm R3-5C Prohibitive or Restrictive Signs No Empty For Motorcyles
Regulatory Signs 750 mm R3-6C Prohibitive or Restrictive Signs No Empty For Trycles
Regulatory Signs 750 mm R3-7C Prohibitive or Restrictive Signs No Empty ForBuses
Regulatory Signs 750 mm R3-8C Prohibitive or Restrictive Signs No Empty For Trucks
Regulatory Signs 750 mm R3-9C Prohibitive or Restrictive Signs No Empty For Trailer
Regulatory Signs 750 mm R3-10C Prohibitive or Restrictive Signs No Empty For Pedestrians
Regulatory Signs 750 mm R3-11C Prohibitive or Restrictive Signs No Empty For Vehicles
Regulatory Signs 750 mm R3-12C Prohibitive or Restrictive Signs No Empty For Pushcarts
Regulatory Signs 450 x 600 mm R3-10P1 Prohibitive or Restrictive Signs Use Overpass
Regulatory Signs 450 x 600 mm R3-10P2 Prohibitive or Restrictive Signs Use Pedxing
Regulatory Signs 300 x 350 mm R3-10P3 Prohibitive or Restrictive Signs Bawal tumawid gamitin ang O
Regulatory Signs 600 mm R3-13A Prohibitive or Restrictive Signs Turning Prohibition; No Right Turn
Regulatory Signs 900 mm R3-13B Prohibitive or Restrictive Signs Turning Prohibition; No Right Turn
Regulatory Signs 450 x 750 mm R3-13 PA Prohibitive or Restrictive Signs Turning Prohibition; No Right
Regulatory Signs 600 x 1000 mm R3-13 PB Prohibitive or Restrictive Signs Turning Prohibition; No Right
Regulatory Signs 600 mm R3-14A Prohibitive or Restrictive Signs Turning Prohibition; No Right Turn
Regulatory Signs 900 mm R3-14B Prohibitive or Restrictive Signs Turning Prohibition; No Right Turn
Regulatory Signs 450 x 750 mm R3-14 PA Prohibitive or Restrictive Signs Turning Prohibition; No LEFT T
Regulatory Signs 600 x 1000 mm R3-14 PB Prohibitive or Restrictive Signs Turning Prohibition; No LEFT
Regulatory Signs 600 mm R3-15A Prohibitive or Restrictive Signs Turning Prohibition; No U Turn
Regulatory Signs 900 mm R3-15B Prohibitive or Restrictive Signs Turning Prohibition; No U Turn
Regulatory Signs 450 x 750 mm R3-15 PA Prohibitive or Restrictive Signs Turning Prohibition; No U Tur
Regulatory Signs 600 x 1000 mm R3-15 PB Prohibitive or Restrictive Signs Turning Prohibition; No U Tu
Regulatory Signs 600 mm R3-16A Prohibitive or Restrictive Signs Prohibition of Overtaking
Regulatory Signs 900 mm R3-16B Prohibitive or Restrictive Signs Prohibition of Overtaking
Regulatory Signs 600 x 900 mm R3-16 PA Prohibitive or Restrictive Signs Prohibition of Overtaking; Ba
Regulatory Signs 750x 1000 mm R3-16 PB Prohibitive or Restrictive Signs Prohibition of Overtaking; B
Regulatory Signs 450 mm R4-1A Speed Signs Speed Restriction (Maximum)
Regulatory Signs 600 mm R4-1B Speed Signs Speed Restriction (Maximum)
Regulatory Signs 900 mm R4-1C Speed Signs Speed Restriction (Maximum)
Regulatory Signs 450 x 450 mm R4-2A Speed Signs Speed Restriction (Maximum)
Regulatory Signs 600 x 600 mm R4-2B Speed Signs Speed Derestriction Signs
Regulatory Signs 450 x 750 mm R4-2PA Speed Signs Speed Derestriction Signs
Regulatory Signs 600 x 1000 mm R4-2PB Speed Signs Speed Derestriction Signs
Regulatory Signs 800 x 1334 mm R4-2PC Speed Signs Speed Derestriction Signs
Regulatory Signs 900 mm R4-3A Speed Signs Speed Derestriction Signs
Regulatory Signs 450 mm R5-15A Parking Signs No Parking (Disc)
Regulatory Signs 600 mm R5-15B Parking Signs No Parking (Disc)
Regulatory Signs 450 x 750 mm R5-1PA Parking Signs No Parking (Pilipino Worded) (Plate)
Regulatory Signs 600 x 1000 mm R5-1PC Parking Signs No Parking (Pilipino Worded) (Plate)
Regulatory Signs 450 x 750 mm R5-2PA Parking Signs No Parking - Loading Only (Plate)
Regulatory Signs 600 x 1000 mm R5-2PB Parking Signs No Parking - Loading Only (Plate)
Regulatory Signs 450 x 750 mm R5-3PA Parking Signs No Parking - Anytime (Plate)
Regulatory Signs 600 x 1000 mm R5-3PB Parking Signs No Parking - Anytime (Plate)
Regulatory Signs 450 x 750 mm R5-3CA Parking Signs No Parking - TOW Away (Plate)
Regulatory Signs 600 x 1000 mm R5-3CB Parking Signs No Parking - TOW Away (Plate)
Regulatory Signs 450 x 750 mm R5-4 Parking Signs Restricted Parking; Meter Parking
Regulatory Signs 450 x 750 mm R5-4A Parking Signs Restricted Parking; 2 Hour Parking
Regulatory Signs 450 x 750 mm R5-4B Parking Signs Loading Signs; Loading Zone
Regulatory Signs 450 x 7500 mm R5-4C Parking Signs Loading Signs; Loading and Unloading Zone
Regulatory Signs 450 x 750 mm R5-5 Parking Signs No Waiting Signs
Regulatory Signs 450 x 750 mm R5-5A Parking Signs No Waiting Signs
Regulatory Signs 450 x 750 mm R5-5B Parking Signs No Waiting Signs
Regulatory Signs 450 x 750 mm R5-6 Parking Signs No Loading and Unloading Signs
Regulatory Signs 450 x 750 mm R5-6A Parking Signs No Loading and Unloading Signs
Regulatory Signs 450 x 750 mm R5-7 Parking Signs No Loading/Unloading Within Red-Painted Curb
Regulatory Signs 450 x 750 mm R5-8 Parking Signs No Stopping Anytime
Regulatory Signs 400 x 900 mm R5-9A Parking Signs No Parking or Stopping Signs; Bus Stop
Regulatory Signs 400 x 900 mm R5-9B Parking Signs No Parking or Stopping Sign; PUJ Stop
Regulatory Signs 400 x 900 mm R5-9C Parking Signs No Parking or Stopping Sign; PUJ Stop
Regulatory Signs 400 x 600 mm R5-10 Parking Sign Do not Block Intersection
Regulatory Signs 450 x 600 mm R5-11 Parking Signs Right Turners Cross at Broken White Lines
Regulatory Signs 600 mm R6-1 Miscellaneous Signs Prohibition on Use of Audible Warning Device
Regulatory Signs 600 mm R6-1 Miscellaneous Signs Load and Dimension Restriction Signs
Regulatory Signs 600 mm R6-2 Miscellaneous Signs Load and Dimension Restriction Signs
Regulatory Signs 600 mm R6-3 Miscellaneous Signs Load and Dimension Restriction Signs
Regulatory Signs 600 mm R6-4 Miscellaneous Signs Load and Dimension Restriction Signs
Regulatory Signs 450 x 675 mm R6-7 Miscellaneous Signs Use Seat Belt Sign
Regulatory Signs 450 mm R6-8A Miscellaneous Signs Pedestrian Crossing
Regulatory Signs 600 mm R6-8B Miscellaneous Signs Pedestrian Crossing
Regulatory Signs 750 mm R6-8C Miscellaneous Signs Pedestrian Crossing
Regulatory Signs 450 mm R6-9A Miscellaneous Signs School Children Crossing
Regulatory Signs 600 mm R6-9B Miscellaneous Signs School Children Crossing
Regulatory Signs 750 mm R6-9C Miscellaneous Signs School Children Crossing
Regulatory Signs 450 mm R6-10A Miscellaneous Signs Bike Lane Signs
Regulatory Signs 600 mm R6-10B Miscellaneous Signs Bike Lane Signs
Regulatory Signs 750 mm R6-10C Miscellaneous Signs Bike Lane Signs
Regulatory Signs 450 mm R6-11A Miscellaneous Signs Wheel Chair Crossing Signs
Regulatory Signs 600 mm R6-11B Miscellaneous Signs Wheel Chair Crossing Signs
Regulatory Signs 750 mm R6-11C Miscellaneous Signs Wheel Chair Crossing Signs
Guide or Information Signs G1-1 Advance Direction Signs Stack Signs
Guide or Information Signs G1-2 Advance Direction Signs Stack Signs
Guide or Information Signs G1-3 Advance Direction Signs Stack Signs
Guide or Information Signs G1-4 Advance Direction Signs daigrammatic Direction Signs
Guide or Information Signs G1-5 Advance Direction Signs daigrammatic Direction Signs
Guide or Information Signs G2-1 Itersection Direction Signs
Guide or Information Signs G2-2 Itersection Direction Signs
Guide or Information Signs G2-3 Itersection Direction Signs
Guide or Information Signs G2-4 Itersection Direction Signs
Guide or Information Signs G3-1 Reassurance Direction Signs
Guide or Information Signs G3-2 Reassurance Direction Signs
Guide or Information Signs G4-1 Finger Board Direction Sign
Guide or Information Signs G4-2 Finger Board Direction Sign
Guide or Information Signs G4-3 Finger Board Direction Sign
Guide or Information Signs G5-1 Street Name Signs
Guide or Information Signs G5-2A Street Name Signs
Guide or Information Signs G5-2B Street Name Signs
Guide or Information Signs G5-3 Street Name Signs
Guide or Information Signs G6-1 Town Name and Geographical Feature Signs Town Name
Guide or Information Signs G6-2 Town Name and Geographical Feature Signs Town Name
Guide or Information Signs G6-3 Town Name and Geographical Feature Signs Town Name
Guide or Information Signs G6-4 Town Name and Geographical Feature Signs Local Government Boun
Guide or Information Signs G7-1 Service Signs Service Center 2km
Guide or Information Signs G7-2 Service Signs Weighbrige Station
Guide or Information Signs G7-3 Service Signs Parking and Restrooms
Guide or Information Signs G7-3A Service Signs Gasoline Station and Restaurant or Cafes
Guide or Information Signs G7-4 Service Signs Rest Area and Truck Parking Turn Left 300m
Guide or Information Signs G7-5 Service Signs Shopping Center
Guide or Information Signs G8-1 Tourist Information and Tourist Destination Signs
Guide or Information Signs G8-2 Tourist Information and Tourist Destination Signs
Guide or Information Signs G8-3 Tourist Information and Tourist Destination Signs
Guide or Information Signs G8-4 Tourist Information and Tourist Destination Signs
Guide or Information Signs G9-1 Route Markers Route Number
Guide or Information Signs G9-2 Route Markers
Guide or Information Signs G9-3 Route Markers
Guide or Information Signs G9-4 Route Markers
Guide or Information Signs G9-5 Route Markers
Guide or Information Signs G9-6 Route Markers
Guide or Information Signs G9-7 Route Markers End
Guide or Information Signs G9-8 Route Markers
Guide or Information Signs 600mm x 750 mm G10-1A Asian Highway Route Markers
Guide or Information Signs 900 mm G10-1B Expressway Approach Signs
Signs on Expressways GE1-1 Expressway Approach Signs
Signs on Expressways GE1-2 Expressway Approach Signs
Signs on Expressways G31-3 Expressway Information Signs Prohibited on Expressway
Signs on Expressways GE2-1A Expressway Information Signs Prohibited on Expressway
Signs on Expressways GE2-1B Expressway Information Signs Prohibited on Expressway
Signs on Expressways GE2-1C Expressway Information Signs Toll Charge (Advance Information)
Signs on Expressways GE2-2 Expressway Information Signs Lane Direction Signs
Signs on Expressways GE2-3 Advance Exit Signs Advanve Exit with Distance
Signs on Expressways GE3-1 Advance Exit Signs Advance Exit with Distance plus RIGHT LANE
Signs on Expressways GE3-2 Advance Exit Sign Supplementary Advance (NEXT EXIT)
Signs on Expressways GE3-3 Expressway Exit Direction Signs Exit Signs with Destination
Signs on Expressways GE4-1 Expressway Exit Direction Signs NEXT EXIT …..KM
Signs on Expressways GE4-2 Expressway Exit Direction Signs EXIT
Signs on Expressways GE4-3 Expressway Exit Direction Signs Numbered exit
Signs on Expressways GE4-3A Expressway Service Signs Rest Area Right Lane 2km
Signs on Expressways 2800mm x 1500 mm GE5-1 Expressway Service Signs Rest Area Right Lane 2km
Signs on Expressways 2800mm x 1500 mm GE5-1A Expressway Service Signs Rest Area 2km
Signs on Expressways 2500mm x 1100 mm GE5-2 Expressway Service Signs Rest Area
Signs on Expressways 1500mm x 1800 mm GE5-3 Expressway Service Signs Service Center 2km
Signs on Expressways 2800mm x 1500 mm GE5-4 Expressway Service Signs Truck Parking 2km
Signs on Expressways 2240mm x 1800 mm GE5-5 Expressway Service Signs Restaurant Next Exit
Signs on Expressways 3240mm x 1800 mm GE5-6 Expressway Service Signs Truck Parking Exit
Signs on Expressways 2800mm x 1800 mm GE5-7 End of Expressway END EXPRWAY 1 km
Signs on Expressways 2300mm x 1500 mm GE6-1 End of Expressway END EXPRWAY 2 km
Signs on Expressways 1200mm x 600 mm GE6-1A End of Expressway START EXPRWAY
Signs on Expressways 900mm x 450 mm GE6-2 End of Expressway END EXPRWAY
Signs on Expressways 900mm x 450 mm GE6-3 Toll Signs Toll Plaza Ahead
Signs on Expressways 2600mm x 1600 mm GE7-1 Toll Sign Stop At Toll Gates
Signs on Expressways 1600mm x 1900 mm GE7-2 Toll Signs Pay Toll Ahead
Signs on Expressways 2400mm x 1200 mm GE7-3 Expressway Traffic Instruction and Regulatory Signs
Signs on Expressways 2300mm x 1470 mm GE8-1 Expressway Traffic Instruction and Regulatory Signs R
Signs on Expressways 1600mm x 1700 mm GE8-2 Expressway Traffic Instruction and Regulatory Signs R
Signs on Expressways 2700mm x 1700 mm GE8-3 Expressway Traffic Instruction and Regulatory Signs L
Signs on Expressways 2700mm x 1400 mm GE8-4 Expressway Traffic Instruction and Regulatory Signs L
Signs on Expressways 1750mm x 1500 mm GE8-5 Expressway Traffic Instruction and Regulatory Signs S
Signs on Expressways 2400mm x 2950 mm GE8-6 Expressway Traffic Instruction and Regulatory Signs
Signs on Expressways 2000mm x 1100 mm GE8-7 Expressway Traffic Instruction and Regulatory Signs
Signs on Expressways 2600mm x 2000 mm S1-4E Expressway Traffic Instruction and Regulatory Signs Sp
Signs on Expressways 900 Disc R4-1C (XXX) Expressway Traffic Instruction and Regulatory Signs Speed L
Signs on Expressways 1200 Disc R4-1D (XXX) Expressway Traffic Instruction and Regulatory Signs Min
Signs on Expressways 900 Disc R4-3A (XX) Expressway Traffic Instruction and Regulatory Signs Minimu
Signs on Expressways 1200 Disc R4-3B (XX) Expressway Traffic Instruction and Regulatory Signs Speed D
Signs on Expressways 900 Disc R4-2C Expressway Traffic Instruction and Regulatory Signs Speed De-rest
Signs on Expressways 1200 Disc R4-2D Supplementary Signs USE OVERPASS
Traffic Instruction Signs 600mm x 300 mm S1-1 Supplementary Signs USE PEDESTRIAN CROSSING
Traffic Instruction Signs 600mm x 450 mm S1-2 Supplementary Signs TRUCK USE LOW GEAR
Traffic Instruction Signs 800mm X 600 mm S1-3A Supplementary Signs TRUCK USE LOW GEAR
Traffic Instruction Signs 1000mm X 750 mm S1-3B Supplementary Signs CHECK BREAKES
Traffic Instruction Signs 620mm X 420 mm S1-4 Movement Instruction Signs REDUCE SPEED
Traffic Instruction Signs 1500mm X 750 mm S2-1 Movement Instruction Signs STOP HERE ON RED SIG
Traffic Instruction Signs 450mm X 750 mm S2-2 Movement Instruction Signs TURN LEFT WITH CARE
Traffic Instruction Signs 400mm X 600 mm S2-3L Movement Instruction Signs TURN RIGHT ANYTIME
Traffic Instruction Signs 750mm X 500 mm S2-3R Movement Instruction Signs DETOUR FOR HIGH VEHICL
Traffic Instruction Signs 1300mm X 350 mm S2-4A Movement Instruction Signs DETOUR FOR HEAVY VEH
Traffic Instruction Signs 1400mm X 350 mm S2-4A(L)® Movement Instruction Signs GIVEWAY TO PEDE
Traffic Instruction Signs 900mm X 600 mm S2-5 Movement Instruction Signs NO RIGHT TURN ON RED
Traffic Instruction Signs 500mm X 800 mm S2-6 Movement Instruction Signs SLOW VEHICLES USE RIG
Traffic Instruction Signs 950mm X 1100 mm S2-7 Movement Instruction Signs MABAGAL NA SASAK
Traffic Instruction Signs S2-7A Movement Instruction Signs TRAK AT BUS MAMALAGI SA KANAN
Traffic Instruction Signs S2-7B Movement Instruction Signs NO THROUGH ROAD
Traffic Instruction Signs 600mm X 400 mm S2-8A Movement Instruction Signs NO THROUGH ROAD
Traffic Instruction Signs 900mm X 600 mm S2-8B Movement Instruction Signs ROAD CLOSED
Traffic Instruction Signs 900mm X 550 mm S2-9 Movement Instruction Signs FORM ONE (TWO) LANE
Traffic Instruction Signs 600mm X 800 mm s2-10 Movement Instruction Signs ALT ROUTE for TRUCKS
Traffic Instruction Signs 2100mm X 350 mm s2-11 One-Way Hazard Marker
Hazard Markers 1600mm X 400 mm HM 2 Obstruction Marker
Hazard Markers 1800mm X 400 mm HM 3 Two-Way Hazard Markers
Hazard Markers 2000mm X 400 mm HM 4A Two-Way Hazard Markers
Hazard Markers 1200mm X 400 mm HM 4B Two-Way Hazard Markers
Hazard Markers 400mm X 1000 mm HM 5 Width Marker (L or R)
Hazard Markers 225mm X 450 mm HM 6A Width Marker (L or R)
Hazard Markers 450mm X 900 mm HM 6B
Pavement markings Premixed Reflectorized White
Pavement markings Premixed Reflectorized Yelow
Pavement markings Reflectorized Thermoplastic White
Pavement markings Reflectorized Thermoplastic Yellow
Reflectorized Pavement Studs Flush Type Mono-Directional
Reflectorized Pavement Studs Flush Type Bi-Directional
Reflectorized Pavement Studs Flush Type Mono-Directional
Reflectorized Pavement Studs Flush Type Bi-Directional
Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type
Internally Illuminated (Solar) Pavement Levelled Marker/Stud Flush Type
Furnishing and Placing Topsoil
Placing Topsoil
Sprigging
Sprigging
Sodding
Trees Furnishing and Transplanting
Trees Furnishing
Reflectorized Thermoplastic Pavement Markings (White)
Reflectorized Thermoplastic Pavement Markings (Yellow)
Removal of Existing Reflectorized Thermoplastic Pavement Markings
Concrete Joint Sealant (Hot-Poured Elastic Type)
Concrete Joint Sealant (Cold-Applied Type)
Waterstop
Waterstop
Waterstop
Waterstop
Reflectorized Thermoplastic Rumble Strips
Chevron Signs 450x600mm
Chevron Signs 600x800mm
Coco-net CN 400
Coco-net CN 700
Coco-net CN 900
Coco-logs/Fascine CN 100
Coco-logs/Fascine CN 200
Coco-logs/Fascine CN 300
Coco-logs/Fascine CN 400
Coco-logs/Fascine CN 500
Vegetation Grass-Cover
Vegetation Vetiver Grass System
Local Controller Footing TSC1
Footing TSC2 Type A (w/pedestal)
Footing TSC3 Type A (w/o pedestal)
Footing TSC4 Type B
Footing TSC5 Type C
Footing TSC5 Type D
Handhole TSC6 Type B
Handhole TSC7 Type A
Trenching - Double Barrel 100mm dia. TSC8 P.E Pipe Concrete Pavement
Trenching - Single Barrel 100mm dia. TSC9 P.E Pipe Concrete Pavement
Trenching - Double Barrel 100mm dia. TSC10 P.E Pipe Concrete Pavement
Trenching - Single Barrel 100mm dia. TSC11 P.E Pipe Concrete Pavement
Trenching - Double Barrel 100mm dia. TSC12 P.E Pipe Concrete Sidewalk
Trenching - Single Barrel 100mm dia. TSC13 P.E Pipe Concrete Sidewalk
Trenching - Double Barrel 100mm dia. TSC14 P.E Pipe Concrete Surface
Trenching - Single Barrel 100mm dia. TSC15 P.E Pipe Concrete Surface
Concrete Bollard TSC16
Protection Cage for Local Controller TSC17
Traffic Signal Flasher Controller TSE1
Local Controller Microprocessor Type TSE2 8 Signal Group
Local Controller Microprocessor Type TSE3 16 Signal Group
Local Controller Microprocessor Type TSE4 32 Signal Group
Detector Card/Board TSE5 8 Channel
Detector Card/Board TSE6 16 Channel
Traffic Signal Head, LED-Type 200mm 1 Aspect TSE7
Traffic Signal Head, LED-Type 200mm 1 Aspect TSE8
Traffic Signal Head, LED-Type 200mm 1 Aspect TSE9
Traffic Signal Head, LED-Type 200mm 2 Aspect TSE10
Traffic Signal Head, LED-Type 200mm 3 Aspect TSE11
Traffic Signal Head, LED-Type 200mm 4 Aspect TSE12
Traffic Signal Head, LED-Type 200mm 5 Aspect TSE13
Traffic Signal Head, LED-Type 200mm 6 Aspect TSE14
Traffic Signal Head, LED-Type 300mm 1 Aspect TSE15 Amber Lens
Traffic Signal Head, LED-Type 300mm 1 Aspect TSE16 Red Lens
Traffic Signal Head, LED-Type 300mm 1 Aspect TSE17 Green Lens
Traffic Signal Head, LED-Type 300mm 2 Aspect TSE18
Traffic Signal Head, LED-Type 300mm 3 Aspect TSE19
Traffic Signal Head, LED-Type 300mm 4 Aspect TSE20
Traffic Signal Head, LED-Type 300mm 5 Aspect TSE21
Traffic Signal Head, LED-Type 300mm 6 Aspect TSE22
Pedestrian Signal Head, LED-type 300mm 2 Aspect TSE23
Pedestrian Pushbutton Assembly TSE24
Mounting Bracket 200mm TSE25
Mounting Bracket 300mm TSE26
Arrow Mask 200mm TSE27
Arrow Mask 300mm TSE28
Target Board Polycarbonate or Powder-coated 200mm 3 Aspect TSE29 Aluminum Substrate for Traffic S
Target Board Polycarbonate or Powder-coated 200mm 4 Aspect TSE30 Aluminum Substrate for Traffic S
Target Board Polycarbonate or Powder-coated 200mm 5 Aspect TSE31 Aluminum Substrate for Traffic S
Target Board Polycarbonate or Powder-coated 200mm 6 Aspect TSE32 Aluminum Substrate for Traffic
Target Board Polycarbonate or Powder-coated 300mm 3 Aspect TSE33 Aluminum Substrate for Traffic S
Target Board Polycarbonate or Powder-coated 300mm 4 Aspect TSE34 Aluminum Substrate for Traffic S
Target Board Polycarbonate or Powder-coated 300mm 5 Aspect TSE35 Aluminum Substrate for Traffic S
Target Board Polycarbonate or Powder-coated 300mm 6 Aspect TSE36 Aluminum Substrate for Traffic S
Supply & Install Traffic Signal Pole TSE37 Type A Mast Arm 4m outreach
Supply & Install Traffic Signal Pole TSE38 Type B
Supply & Install Traffic Signal Pole TSE39 Type C
Supply & Install Traffic Signal Pole TSE40 Type D
Traffic Signal Control Cable 4 Core TSE41
Traffic Signal Control Cable 8 Core TSE42
Traffic Signal Control Cable 12 Core TSE43
Traffic Signal Control Cable 19 Core TSE44
Traffic Signal Control Cable 29 Core TSE45
Loop Dectector Cable TSE46
Loop Feed Cable TSE47
Loop Sealant TSE48
Splicing Kit TSE49
Grounding Cable TSE50
Electricity/Power Supply Cable TSE51
Main Circuit Breaker TSE52
Mounting Strap TSE53
Mounting Buckle TSE54
Terminal Board (20P) TSE55
Terminal Lugs TSE56
Grounding Rod & Connector TSE57
Install Traffic Signal Head, LED-type 200mm 2 Aspect TSI1
Install Traffic Signal Head, LED-type 200mm 3 Aspect TSI2
Install Traffic Signal Head, LED-type 200mm 4 Aspect TSI3
Install Traffic Signal Head, LED-type 200mm 5 Aspect TSI4
Install Traffic Signal Head, LED-type 200mm 6 Aspect TSI5
Install Traffic Signal Head, LED-type 300mm 2 Aspect TSI6
Install Traffic Signal Head, LED-type 300mm 3 Aspect TSI7
Install Traffic Signal Head, LED-type 300mm 4 Aspect TSI8
Install Traffic Signal Head, LED-type 300mm 5 Aspect TSI9
Install Traffic Signal Head, LED-type 300mm 6 Aspect TSI10
Install Pedestrian Signal Head, LED -type
Install Pedestrian Pushbutton Assembly
Installation of Local Controller inc. Testing & Commision
Loop Detector Installation
Complete Installation Local Wiring & Connection to Local Controller
Supply & Install Meter Base, Service Entrance & Main Circuit Breaker
Costumization of Local Controller
Single Arm Post, with Street Light (LED 40W)
200mm X 100mm X Zinc anneal plate with Delineators 3mm thick plate with Button type glass reflector
200mm X 100mm X G.I plate with glass Delineators 3mm thick plate with Button type reflector of prima
200mm X 100mm X Delineators 200mm X 100mm X 3mm thick plate with Button type Zinc anneal plate
200mm X 100mm X Delineators 3mm thick plate with G.I plate with retroflective Sheeting 3'' dia. (
Delineators 4'' X 4'' Aluminum Panel Type - Retroflective Sheeting
Delineators 4'' X 4'' GI Panel Type - Retroflective Sheeting
Delineators 10'' X 10'' Aluminum Panel Type - Retroflective Sheeting
Delineators 10'' X 10'' GI Panel Type - Retroflective Sheeting
Delineators 2'' X 4'' Aluminum Panel Type - Retroflective Sheeting
Delineators 2'' X 4'' GI Panel Type - Retroflective Sheeting
Linear Delineation System (LDS) 34''X 4'' Aluminum Rib Type
Linear Delineation System (LDS) 34''X 4'' GI Rib Type
Linear Delineation System (LDS) 34''X 6'' Aluminum Rib Type
Linear Delineation System (LDS) 34''X 6'' GI Rib Type
Tubular Markers 1000mm (40'') X 75mm (3'') dia. Surface Mounted Collapsible Bollards
Tubular Markers 1000mm (40'') X 75mm (3'') dia. In-ground Mouted Collapsible Bollards
Road Safety Barrier System Semi-rigid Box-Beam Steel
Road Safety Barrier System Rigid Concrete Safety Shape (F-Shape/Jersey/Type)
Road Safety Barrier System Rigid Concrete Single Slope
Road Safety Barrier System Plastic Jersey Type - Waterfilled
Road Safety Barrier System Steel Guard Fence
Impact Attenuator/Crash Cushion Stationary Gating - Waterfilled
Impact Attenuator/Crash Cushion Stationary Gating - Sand Filled Barrels
Impact Attenuator/Crash Cushion Stationary Non-gating - Independent collapsible bays
Impact Attenuator/Crash Cushion Stationary Non-gating-High Molecular Weight/High Density Poly
Impact Attenuator/Crash Cushion Stationary Non-gating - Shock Absorbing Cable Mechanism
Impact Attenuator/Crash Cushion Stationary Truck-Mounted-attenuator (TMA)
Traffic Control Devices mm (3') dia. Plastic, Rubber, Synthetic Rubber Temporary Bollard - Surface
Traffic Control Devices 1000 mm (40'') x 75 mm (3'') dia Plastic, Rubber, Synthetic Rubber Temporary Bol
Traffic Control Devices 28'' high Plastic, Rubber, Synthetic Rubber Traffic Cone Reflective Striped
Traffic Control Devices 36'' high Plastic, Rubber, Synthetic Rubber Traffic Cone
Traffic Control Devices 1500 x 450 mm T5-4 Temporary Hazard Marker
Traffic Control Devices 600 x 600 mm T5-5 Temporary Hazard Marker
Traffic Control Devices (2.5m - 4 m) x (150 mm - 200 mm) Timber Barrier Boards
Traffic Control Devices (2.5m - 4 m) x (150 mm - 200 mm) Plastic Barrier Boards
Traffic Control Devices Lightweight Plastic Units Containment Fences
Traffic Control Devices 100mm wide Tapes Containment Fences
Traffic Control Devices 1 m high Mesh Fencing Containment Fences
Traffic Control Devices Expanded Polystrene (EPS) Foam Antiglare Screen
Traffic Control Devices Double Reverse Corrugate (DRC)Galvanized Steel Fabric Antiglare Screen
Traffic Control Devices High Impact Polymer Antiglare Screen
Traffic Control Devices Flashing Lamps
Traffic Control Devices Concrete Temporary Curb
Traffic Control Devices Interlocking Blocks Temporary Curb
Traffic Control Devices HMW/HDPE Plastic Temporary Curb
Traffic Control Devices Rotating Light Vehicles Mounted Equipment
Traffic Control Devices Flashing Arrow Board Vehicles Mounted Equipment
Traffic Control Devices Variable Message Signs
Traffic Control Devices Portable Traffic Signal
Advance Warning Signs 1800 x 600 mm T1 - 1 Roadwork Ahead
Advance Warning Signs 1801 x 600 mm T1 - 2 Bridgework Ahead
Advance Warning Signs 1200 x 600 mm T1 - 3 Road Machinery Ahead
Advance Warning Signs 900 x 600 mm T1 - 4 Grader Ahead
Advance Warning Signs 900 x 600 mm T1 - 5 Workmen Ahead
Advance Warning Signs 1800 x 600 mm T1 - 24 Road Next km
Advance Warning Signs 1800 x 600 mm T1 - 25 Roadwork On Side Road
Advance Warning Signs 600 x 600 mm T1 - 28 Next 2 km
Advance Warning Signs 1800 x 600 mm T1 - 16 End Roadwork
Regulatory Control Signs 450 mm diameter T7-2 Stop Hand Held Sign
Regulatory Control Signs 450 mm diameter T7 - 1 Slow Hand Held Sign
Regulatory Control Signs 900 x 600 mm T - 18 Prepare To Stop
Regulatory Control Signs 600 x 800 mm (size B) R4 - 1 (T) Speed Restriction
Regulatory Control Signs 600 x 400mm (size B) R4 - 3 (T) Road Work
Regulatory Control Signs 600 x 1000 mm (size B) R4 - 2P End Speed Restriction
Regulatory Control Signs 600 x 800 mm (size B) R4 - 2 (T) De - Restriction
Detour Signs 1200 x 600 mm T1 - 6 Detour Ahead
Detour Signs 1200 x 300 mm T5 - 1 ( R ) Detour (Right)
Detour Signs 1200 x 300 mm T5 - 1 ( L ) Detour (Left)
Detour Signs 450 x 450 mm T5 - 6A Detour Marker
Detour Signs 900 x 600 mm G9 - 40 - 2 Local Traffic Only
Detour Signs 1200 x 600 mm T2 - 23 End Detour
Road Condition and Hazard Signs 900 x 600 mm T3 - 1 Wet Tar
Road Condition and Hazard Signs 900 x 600 mm T3 -3 Slippery
Road Condition and Hazard Signs 900 x 600 mm T3 - 6 Soft Edges
Road Condition and Hazard Signs 900 x 600 mm T3 - 7 Rough Surface
Road Condition and Hazard Signs 900 x 600 mm T3 - 9 Loose Stones
Road Condition and Hazard Signs 900 x 600 mm T3 - 13 Gravel Road
Road Condition and Hazard Signs 900 x 600 mm T3 - 14 Loose Surface
Road Condition and Hazard Signs 1500 x 900 mm T3 - 12 No Lines Do Not Overtake Unless Safe
Road Condition and Hazard Signs 1200 x 900 mm T1 - 10 Traffic Hazard Ahead
Road Condition and Hazard Signs 900 x 600 mm T4 - 25 Trucks Entering
Road Condition and Hazard Signs 1800 x 900 mm T2 - 5 Power Line Works in Progress
Lane and Road Closure Signs 1800 x 300 mm T2 - 4 Road Closed
Lane and Road Closure Signs 1200 x 900 mm T2 - 6 - 1 Lane Status
Lane and Road Closure Signs 1800 x 900 mm T2 - 6 - 2 Lane Status
Blasting Signs 1200 x 600 mm T4 - 2 Blasting Area Switch Off Radio Transmitters
Blasting Signs 1200 x 450 mm T4 - 3 End Blasting Area
Pedestrian Control Signs 900 x 600 mm T8 - 1 Pedestrians Watch Your Step
Pedestrian Control Signs 1200 x 300 mm T8 -2 ( R ) Pedestrians (Right)
Pedestrian Control Signs 1200 x 300 mm T8 - 2 ( L ) Pedestrians (Left)
Pedestrian Control Signs 900 x 600 mm T8 - 3 Use Other Path

Portland Cement and Mansonry Cement


Construction Lime (Hydrated)
Bituminous Materials
Aggregates
Mineral Filler
Masonry Units
Concrete, Clay, Plastic and Fiber Pipe
Metal Pipe
Chemical Admixtures for Concrete
Paints
Reinforcing Steel and Wire Rope
Fence and Guarddrail
Structural Metal
Treated and Untreated Timber
Water
Geotextile
Separation Geotextile
Drainage Geotextile
Paving Fabric
Hydraulic Filter
Silt Fence
Remaining Sediment
Drilling Slurry
Epoxy-Resin-Bonding Systems for Concrete
Coal Tar Surface Tretment
Non-Shrink Grout
Protective Coating for Concrete
Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
Stone Mastic Asphalt with cellulose fiber Surface Course, Hot-Laid 0.05 m thick
Porous Asphalt Pavement with Polymer Modified Bitumen 0.05 m Thick
Aluminum Cladding
Concrete Paving Blocks
Articulated Concrete Blocks

Site Development
Paver Blocks
Sheet Piles Steel (Driven)
0 ls
0 ls
1 ls Required QTY
0 ls
0 ls
0 mos.
0 mos.
0 mos.
0 mos.
0 mos.
0 ls
0 ls
0 ls
0 ls
0 ls
0 mos.
0 mos.
0 mos.
0 ea.
0 mos.
0 ea.
0 mos.
0 mos.
0 mos.
0 ea.
0 mos.
0 mos.
0 mos.
0 ls
0 mos.
0 mos.
5 mos.
0 ea.
0 ea.
0
Required QTY
0 l.s.
0 l.s.
0
0 Km
0 Km
0 Km
0 ea.
0 l.s.
0 l.s.
0 Km
0 ea.
0 Hour
0 l.s.
2 ea. Required QTY
0 l.s.
5 mos. Required QTY
5 mos. Required QTY
1 l.s. Required QTY
0 PS
0 PS
0 l.s.
0 l.s.
0 mos.
0 l.s.
0 l.m.
0 ea.
0 l.s.
0
0
0
0
0
Required QTY
0 Ha.
0 ea.
0 ea.
0 ea.
0 ea.
0 cu.m
0 ea.
1 ls Required QTY
0 ea.
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 lm.
0 cu.m
0 kg.
0 kg.
0 kg.
0 lm.
0 ea.
0 ea.
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
735 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 ls
0 ls
0 cu.m
0 cu.m
0 cu.m
588 cu.m
0 cu.m
0 cu.m
839.1 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 cu.m
0 Km
0 cu.m
0 Km
0
0
Required QTY
14 cu.m Required QTY
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0 cu.m.
0
Required QTY
0 cu.m.
0 cu.m.
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 tonne
0 sq.m.
0 sq.m.
0 sq.m.
0 cu.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
72 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0
Required QTY
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
531 m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0 ea.
0 ea.
0 ea.
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0 ea.
0 ea.
0 ea.
0 ea.
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0m
0 span
0m
0 kg
0 kg
0 kg
0 kg
0 kg
0 sq.m
9949.28 kg
0 kg
0 kg
0 kg
0 cu.m
32.4 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 sq.m
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ls
0 ls
0 cu.m
0 cu.m
0 cu.m
0 ea.
0 cu.m
0 lm
0 cu.m
0 cu.m
0 kg.
0 cu.m
0 ls
0 ls
0 cu.m
0 cu.m
0 sq.m
0 sq.m
0 ea.
0 cu.m
0 cu.m
0 ls
0 cu.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 ea.
0 ea.
0 ea.
0 ea.
0
0
0
0
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 cu.m
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 pair
0 pair
0 ea.
0 ea.
0 set
0 kg.
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 ea.
0 cu.m
0 cu.m
0 cu.m
0 cu.m
92.463 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 lm
0 cu.m
0 cu.m
0 cu.m
0 cu.m
0 cu.m
1 l.s.
0 cu.m
0 cu.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
114 lm
0 sq.m
0 sq.m
0 sq.m
0 cu.m
0 cu.m
0 lm
0 cu.m
0 lm
0 lm
0 sq.m
0 sq.m
0 lm
0 sq.m
0
0
0

0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 lm
0 lm
0 lm
0 ea.
0 ea.
0 ea.
0 lm
0 lm
0 lm
0 sq.m
0 ea.
0 ea.
0 sq.m
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 cu.m
0 cu.m
0 sq.m
0 sq.m
0 sq.m
0 ea.
0 ea.
0 sq.m
0 sq.m
0 sq.m
0 kg.
0 kg.
0m
0m
0m
0 ls
0 sq.m
0 ea.
0 ea.
0 sq.m
0 sq.m
0 sq.m
0 lm
0 lm
0 lm
0 lm
0 lm
0 sq.m
0 sq.m
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 lm
0 unit
0 unit
0 unit
0 unit
0 unit
0 unit
0 unit
0 unit
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 pc.
0 pc.
0 pc.
0 pc.
0 pc.
0 pc.
0 pc.
0 pc.
0 pc.
0 pc.
0 unit
0 unit
0 unit
0 unit
0 m.
0 m.
0 m.
0 m.
0 m.
0 m.
0 m.
0 pail
0 pc.
0 roll
0 box
0 pc.
0 pc.
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 set
0 unit
0 slot
0 site
0 site
0 unit
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 m.
0 m.
0 ea.
0 ea.
0 ea.
0 ea.
0 lm
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0 ea.
0
0 bag
0 bag
0 MT
0 cu.m
0 ea
0 ea.
0 lm.
0 lm.
0 lit.
0 lit.
0 kg.
0 sq.m
0 kg.
0 bd.ft
0 lit.
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 lm.
0 cu.m
0 lit.
0 lm.
0 sq.m
0 kg.
0 lit.
0 lit.
0 sq.m
0 sq.m
0 sq.m
0 sq.m
0 ls
sq.m
sq.m
0 l.s
0 sq.m.
531 l.m
TIME AND MOTION ANALYSIS
Average Speed of Dump Truck (Kilometer per hour)
Haul dist. Good Poor Haul dist. Good Poor
Km. Maintained Maintained Km. Maintained Maintained
Road Road Road Road
0.3 18 13 11 46 30.5
0.4 19 14 12 47 31
0.5 20 15 13 48 31.5
0.6 21 16 14 49 32
0.7 22 17 15 50 32.5
0.8 23 18 16 51 33
0.9 24 19 17 52 33.5
1 25 20 18 53 34
2 27 21 19 54 34.5
3 30 22 20 55 35
4 32 23 21 55 35
5 35 25 22 55 35
6 37 26 23 same speed same speed
7 39 27 24 to all to all
8 41 28 24 succeeding succeeding
9 43 29 26 haul distance haul distance
10 45 30 27
NOTE: Free haul distance is limited to 200 meters.

SPEED OF DUMPTRUCK IN KPH:


MANPOWER AND EQUIPMENT PRODUCTIVITY OUTPUT, CHQTE - pp10

BELOW 7% GRADE 7% - 12% GRADE ABOVE 20% GRADE

DIRT ROAD PAVED DIRT ROAD PAVED PAVED

LOADED TRIP 15 25 10 15 5

W/o LOAD 20 30 15 20 10

DUMPTRUCK TRANSIT MIXER


Loading Time 5.00 minutes Loading Time of Aggregates and Cem 10.00 minutes
Unloading Time 1.00 minutes Watering: 2.00 minutes
Slacktime 6.00 minutes Slack Time: 6.00 minutes
Manuevering 10.00 minutes Unloading Time: 5.00 minutes
22.00 minutes Cleaning & Washing Time: 5.00 minutes
28.00 minutes
Derive for Materials Unit Cost:

TIME AND MOTION STUDY


Dump Trucks
Average Distance of Overhaul 135.80 Kms.
Speed Empty 30.00 Km. per Hour
Speed Loaded 25.00 Km. per hour
Time of Travel Empty 271.60 minutes
Time of Travel Loaded 325.92 minutes
Manuevering, Loading,Spot
and Unloading Time 22.00 minutes
Total Time 619.52 minutes
No of Trips per DT/day 0.70
Capacity of DT 10.00 cu.m.
Volume hauled per DT/day 7.00 cu.m
HAULING COST ANALYSIS
For Embankment, Sub base, Base Course, Surface Course, Sand , Gravel Etc.

Source of Materials: Catanauan D.E.O. Terrain Condition: Rolling to Mountainous


Hauling Distance 136.00 Road Condition: Paved/Unpaved

Sariaya to DEO: 136.00

Project Site: Catanauan, Que.

COMPUTATION:
Hauling Requirements:
Dumptrucks Capacity: 10 cu.m
Loading Requirements:
1 - Payloader Capacity: 1.5 cu.m
Loading Output: 240 cu.m/day
Required No. of DT:
= 240 cu.m / 7.00 cu.m per day / DT = 34.29 Dumptrucks

Hauling Cost per cu.m Dumptruck Rental Cost x No. of Dumptruck / 240 cu.m
= 10,896.00 x 34.29 / 240
= 1556.77 per cu.m
Hauling Cost per cu.m - km 1556.77 / 136.00 Km
Hauling Cost per cu.m - km ₱11.45 * for Sand, Gravel, and Boulderssay Php 8.00 per km

Hauling Cost per kg. - km = ₱0.10 * for Reinforcing Steel Bars


Adopt from DPWH DEO
Hauling Cost per bag. - km ₱0.25 * for Cement
FLYWHEEL HORSEPOWER
DESCRIPTION MODEL CAPACITY RENTAL RATE
1 Earthmoving Equipment
1.1 Bulldozer D6H SERIES II PSDS/DD 1.50m3/1.95 yd3 165 ₱ 3,379.00
1.2 Bulldozer w/ Ripper D6H SERIES II PSDS/DD 165 ₱ 3,885.85
1.3 Payloader LX80-2C 1.50m3 110 ₱ 1,733.00
1.4 Motorized Road Grader G710A 140 ₱ 2,173.00
1.5 Road Grader w/ Scarifier G710A 140 ₱ 2,824.90
2 Compaction Equipment
2.1 Pneumatic Tire Roller 9-WHL, 9.00X20, 4PR 10 mt 107 ₱ 561.00
2.2 Vibratory Roller SD100DC 10 mt 125 ₱ 1,846.00
2.3 Tandem Steel Roller CC421 10.10 mt 123.4 ₱ 1,652.00
2.4 Plate Compactor 400-500 Gasoline Engine 5 ₱ 123.00
3 Lifting Equipment
3.1 Crawler Crane All Models 36-40 mt 190 ₱ 1,902.00
3.2 Truck Mounted Crane All Models 31-35 mt 238 ₱ 1,861.00
3.3 Truck Mounted Crane All Models 41-45 mt 246 ₱ 2,606.00
4 Excavating Equipment
4.1 Backhoe SE 130 LC-2 0.80 m3/1.04 yd3 99 ₱ 1,537.00
3 3
4.2 Backhoe w/ Breaker SE 130 LC-2 0.80 m /1.04 yd 99 ₱ 1,998.10
3 3
4.3 Backhoe, Wheel Mounted PW60N-1 0.28m /0.37 yd 50 ₱ 922.00
5 Foundation
5.1 Vibro Hammer DPD600T Hydraulic Pile Driver 60 ton 201 ₱ 2,123.00
6 Asphalting Equipment
6.1 Asphalt Distributor ROSCO/5 ton 3000 USG 100 ₱ 936.00
6.2 Asphalt Paver NF220BIIVDM 80 ₱ 1,833.00
7 Concreting Equipment
7.1 Concrete Screeder Wacker Truss Screed 5.5 ₱ 545.00
7.2 Concrete Paver COMMANDER III, FOUR-TRACK ₱ 6,765.00
7.3 One Bagger Mixer 4-6 ft3/min ₱ 172.00
3
7.4 Transit Mixer All Models 5-6 yd 175 ₱ 1,318.00
8 Hauling Equipment
8.1 Dump Truck All Models 12 yd3 290 ₱ 1,420.00
8.2 Cargo/Service Truck All Models 2-5 mt 160 ₱ 783.00
8.3 Boom Truck All Models 2-5 mt 160 ₱ 1,017.90
8.4 Cargo/ Service Truck All Models 9-10 mt 270 ₱ 1,212.00
8.5 Water Truck/ Pump All Models 16000L 360 ₱ 2,450.00
9 Air Equipment
9.1 Air Compressor All Models 356-450 cfm 130 ₱ 965.00
9.2 Air Compressor All Models 161-185 cfm 69 ₱ 502.00
9.3 Air Compressor All Models 15-35 cfm 20 ₱ 205.00
9.4 Diamond Drill CP-8 ₱ 201.25
9.5 Jackhammer ₱ 150.00
9.6 Pneumatic Drilling Machine ₱ 170.00
10 Pumping Equipment
10.1 Water Pump, 100 mm suction 2,667 50 16 ₱ 266.25
12 Shop Equipment
12.1 Welding Machine Gas/Diesel Driven 300 48 ₱ 371.00
13 Special Support Equipment
13.1 Chainsaw HUSQVARNA 2100 CD with 5 Amperes Gasoline Drive Unit ₱ 75.36
14 Miscellaneous Equipment
14.1 Concrete Vibrator Flexible Shaft Type 2" Head Ø with 5 Amperes Gasoline Drive Unit ₱ 91.25
14.2 Concrete Saw 14'' Blade Ø with 4 3/4 7.5 ₱ 32.63
14.3 Bar Cutter 25 mm Maximum Rebar Ø ( Grade 40 ) , Single phase ₱ 219.75
14.4 Bar Bender 25 mm Maximum Rebar Ø, Three Phase ₱ 351.50
15 Plants
15.1 Asphalt Concrete Plant Complete with : Cold Feed System, bins, Feeder and collecting conveyors. Drying and ₱ 4,286.63
Burner System, Feed conveyors drum and fully modulating burner. Fuel feed system
Screening-Weightning-Mixing System, hot elevator, vibrating Screen,hot bins, weighing
Scale and twinshaft pugmill mixer.Dust collection and filler feeding system,bag filter
and exhaust fan.Thermal Hot oil System, delivery Pump and heater and Computerized
Plant Control System.
15.2 Concrete Batch Plant Complete with: cement silo and screw conveyor system.Water and Supply System. ₱ 759.50
Aggregate storage bins with vibrators and conveyors system.Weigh hopper with elect-
ronic loadcell for aggregates, cement,water and admixture.Central twinshaft mixer.
Hydraulic System and Computerized Plant Control System.
18 Others
18.1 Power Broom, Towed Type With engine 2 m wide 6-30 km/h Sweeping Capacity ₱ 130.54
18.2 Hydroseeding Machine ₱ 952.00
18.3 Applicator Machine ₱ 93.75
18.4 Kneading Machine ₱ 187.50
18.5 Drop Hammer ₱ 200.00
18.6 Cutting Outfit ₱ 45.45
18.7 Steel Wheel w/ Nylon Rope ₱ 300.00
18.8 Improvised Bamboo w/ Bucket ₱ 200.00
18.9 Asphalt Kettle/Drum ₱ 10.00