AVIDA ATRIA TOWER 3 FIT-OUT PROJECT

Atria, Mandurriao, Iloilo City

PROGRESS REPORT
AS OF JUNE 25, 2021
1. Lamination of Powder Room Door
2. Conwood installation
3. Conwood surface preparation
4. Wall preparation. Skim coat application
5. Ceiling preparation. Skim coat application
6. On-going lamination works in reception cabinets (95% completed)
7. Plastering of uneven walls
8. Concreting of Powder room lavatory
9. Powder room wall tile works (95% completed)
10. Picture.

1
2
Prepared by Noted by:
Engr. Jeremiah V. Gilbolinga Engr. Paul Lorenz Carmelo