You are on page 1of 1

A B C D E F G H I J K L

KEYPLAN
POWER
A POWER OUT 18.1
20.10
20.12

20.3 32.4 20.4 20.16

B POWER IN
32.1

NO LA
20.9 12.08
20.11 20.5 17.4
20.11

P
R T NT
20.6
NORTH. 19.13.A

H.
12.7 12.5
15.03
12.4 12.1

VESDAnet 12.2 12.2

19.16
15.01

C VESDAnet B
15.02 15.05

12.4
17.01 17.02
17.8
17.6
19.11
M 12.2 12.2
14.03
1 17.7 12.3 1
D VESDAnet A 32.3 32.3 15.04

20.16
20.10

32.3
22.3

19.01
21.2 21.2
12.2 12.2
15.06

RELAY
22.2
32.2
17.5
32.2

19.15
19.17
22.1
29.04 22.5

E 3 - URGENT FAULT 32.2 22.4


12.2 12.2

28.2

F 1 - DISABLE 14.8

ITEM 1B
ITEM 1A 13.4
FLOW
N2 N1
12.2 12.2

13.9
26.01 14.01
13.10

G 2 - MINOR FAULT 28.01


13.6

19.10
13.8
28.05
14.7
12.2 12.2
14.03 13.2

H 4 - ALERT 26.02
30.3
14.5
13.01 19.13.B
14.4
20.9 32.2 20.9

I 5 - ACTION
J 7 - FIRE 2
K 8 - FIRST ALARM SECTOR 1
L 9 - FIRST ALARM SECTOR 2
2 M 10 - FIRST ALARM SECTOR 3
N 11 - FIRST ALARM SECTOR 4 RELAY TRIGGER 1 2 3 4 5 6 7 8 9 10 11 12 2

O 12 - SCANNING
P 6 - FIRE 1 FIRE 2
COMMUNICATION FIRE 1
R ETHERNET
S USB FDM-1 / RELAY CONNECTIONS SECTOR 1 ACTION
GPI RL - 3 URGENT FAULT
T MONITORED GPI RL - 7 FIRE 2 (COMMON) ALERT
U UNMONITORED GPI RL - 8 - FIRST ALARM SECTOR 1 FIRST ALARM
CHASSIS GROUND RL - 9 - FIRST ALARM SECTOR 2
3
V JUMPER FOR GROUND FAULT MONITORING RL - 10 - FIRST ALARM SECTOR 3
Q CHASSIS TERMINAL RL - 11 - FIRST ALARM SECTOR 4 3

FIRE 2

FIRE 1

SECTOR 2 ACTION

ALERT

FIRST ALARM

FROM PREVIOUS
NO

NO

FDM-1 SLC DEVICE 4


U FAULT

FIRE 1

FIRE 2
RL - 3

RL - 6

E P
C

FIRE 1
NC

NC

FDM-1
NO

NO

SECTOR 3 ACTION
RL - 12
RL - 1

F O
C

ALERT
NO

NO
RL- 11
RL- 2

G N FIRST ALARM
C

FDM-1
NO

NO
RL- 10
RL- 4

H M FIRE 2
C

FDM-1 5

FIRE 1
NO

NO

5
RL- 5

RL- 9

I L
C

SECTOR 4 ACTION
NO

NO

TO NEXT ALERT
RL- 7

RL- 8

J K FDM-1 SLC DEVICE


C

FIRST ALARM

FDM-1
DISABLE
REFERENCE DRAWINGS DWG NO.

URGENT FAULT
6

6
MINOR FAULT
MAIN
SCANNING
D
STANDBY
C
NORMALLY
THIS DRAWING AND THE DESIGN IT COVERS ARE THE PROPERTY OF AL-JAZIRAH ENGINEERING CONSULTANCY FOR SAFETY. THEY ARE MERELY LOANED

T.V S.K T.V M.R L.O ISSUED FOR REVIEW 11-05-2021 A


B ENERGIZED PROJ TEAM PROJ
REVISIONS DATE
REV
AND ON THE BORROWER'S EXPRESS AGREEMENT THAT THEY WILL NOT BE REPRODUCED, COPIED, LOANED, EXHIBITED NOR USED EXCEPT

APPROVED ENG CHK BY NO.


A CLIENT

SOYBEANS CRUSHING Co. & Derivatives


IN THE LIMITED WAY AND PRIVATE USE PERMITTED BY ANY WRITTEN CONSENT GIVEN BY THE LENDER TO THE BORROWER.

RELAY CONFIGURATIONS (Xtralis VSC Installation Program V3.09.00) (SOYA) 7

7 King Fahd Industrial Port. Yanbu.


KINGDOM OF SAUDI ARABIA

FIRE PROTECTION CONSULTANT

AL-JAZIRAH ENGINEERING
CONSULTANCY FOR SAFETY

FIRE PROTECTION CONTRACTOR

GULF INDUSTRIAL SYSTEMS CO.


To a Controlled, Safer & Secured Future

PROJECT

8
DOWNSTREAM EXPANSION - SOYA 2

DRAWING NAME
TERMINATION CARD
SOYA - 2
WIRING DIAGRAM & CONFIGURATIONS
AIR SAMPLING DETECTION SYSTEM
AIR SAMPLING DETECTOR VESDA-E, (MODEL: VES-A10-P) SCALE @ A1 PROJ. NO. DWG NO. SHEET NO. REV.

NONE J17-60098 PF18-283-FD09-DWG-012 2 OF 2 A


A B C D E F G H I J K L

You might also like